Newstletter June 2016
Total Page:16
File Type:pdf, Size:1020Kb
OA D E R IDG N R KE AC BR BR AU N D S D TR A A EE O D T R O A E D R A O E O L R R G E A I G D D N I R U N N N E T E K T C O A P N R E B S E D A C N I D B G A T E R O Gateway A D D A UPGRADE O R E E G D U Project Newsletter N NORTH June 2016 Major construction is underway on the Gateway Upgrade North project Work has begun on the upgrade to the Gateway Motorway between About the project: Nudgee and Bracken Ridge. The contractor appointed to design and ` the Gateway Upgrade North construct the project, Lend Lease Engineering project is jointly funded by the Pty Ltd, has started activities to upgrade bridges at Sandgate Road and Bicentennial Australian and Queensland Road, and construct a new interchange Governments at Nudgee. Works are also underway to upgrade the Deagon Deviation, with the new ` involves upgrading the southbound alignment being built. Gateway Motorway to six Savings delivered through the tender process have also seen key improvements lanes between Nudgee and added to the project. Road pavement and Bracken Ridge safety improvements between Bracken Ridge and Bald Hills will now be included as part of ` will widen the Deagon the project. This work will see new guardrail, roadside safety features, variable message Deviation to provide two lanes and speed limit signs, and upgraded lighting in each direction between to enhance motorists’ safety. Depot Road and Bracken The $1.143 billion project is jointly funded by Ridge Road the Australian Government ($914.18 million) and Queensland Government ($228.54 ` includes the construction million) on a 80:20 split. The upgrade is being delivered by the Department of Transport and of a new, off-road shared Main Roads, which has engaged Transurban pedestrian and cycle path Queensland to assist in managing the delivery of the major works package. between Nudgee and Bracken Ridge ` will enhance safety, ease Visitor Information Centre now open congestion and improve The community has been invited to learn more about the Gateway Upgrade North, with freight movements on the the opening of the project’s Visitor Information Centre in Deagon. national network The centre offers an informative walk through the project benefits and a look back at the Gateway’s history. There are videos of the Gateway Bridge construction from the ` install Intelligent Transport 1980s, information panels about construction, environment, sustainability and health Systems such as variable and safety on site, a fly-through of the upgrade’s design and a direct link to the project hotline. message signs, CCTV cameras Community members can drop in from Monday to Friday, between 9am and 5pm at the and variable speed signs. Deagon Depot, 7 Depot Road, Deagon. Sandgate Station BCC Gateway Upgrade North project revised design Transfer Centre Nudgee Extended on and off-ramps at Boar Rd Legend Bicentennial Road interchange New bridges over Nundah Creek Main alignment – 3 lanes minimum d in each direction St Rd Off-ramp e Deagon Boondall Station Wetlands On-ramp Ridg New Nudgee Road n Modifications to local road bridge over Gateway Nudgee acke Brisbane Realignment of motorway to Motorway Road pavement and safety improvements Br Golf Course Redcliffe New northbound Deagon Access to Deagon Deviation via Entertainment ease curves and improve safety Bridge structure Deviation connection separate upgraded Braun Street/Depot Centre B k ic e e e Childs Rd from Gateway Motorway Rd intersection n r New shared cycle/pedestrian pathway t C e n Nudgee Waterhole h Realignment of Deagon Deagon Wetlands n a d Reserve Access to shared cycle/pedestrian pathway i New northbound bridge over a Deviatio Connect to existing Deagon n motorway to ease curves l u n Pedestrian overpass bikeway bridge Racecourse Sandgate Road/Shorncliffe R N Extended on and and improve safety rail line, including new d Pedestrian underpass off-ramps at Nudgee Nudgee shared pathway Road interchange Rest area along shared pathway Brau Connect to existing bikeways Service n St Centre Fauna underpass New signalised intersection Nudgee Airport Depot Road widened to North at Bracken Ridge Road/ Line Station Fauna overpass (rope ladders) four lanes between Braun Boondall ncliffe Rail Barfoot Street to replace Station Stanwor Shor existing roundabout Street and the Gateway Boondall Australian Motorway ramps Station Catholic University Connect to existing New northbound access Closure of Sandgate Road th River Pine bikeways to Deagon Deviation and northbound on-ramp Rd ay Redcliffe via overpass from rw to St the Gateway Motorway o t M et New signalised intersection ay Road pavement rehabilitation, rr w eek at Sandgate Road/Holroyd Connect to existing te guardrail improvements, Ba Cr a e Street for improved access to Nudgee Jim Soorley Bikeway G upgraded emergency access, re Rd T North Boondall train station Sa e Rd e nd upgraded lighting, new road t g Road ga a signage and ITS technology b te Ridg b Incorporation of already a Rd Rd Br n C uc Depo completed works from Gateway e ampa acke High Additional Lane Project k Br Wy e wa e r y C For a closer look at the Gateway Upgrade North project visit www.gatewayupgradenorth.com.au s l l i H d l Bruce Highway a B Deagon Deviation Sandgate Road bridges A car park is also being built at the Boondall train station that will help Energex works to offset the temporary loss of commuter parking at North Boondall. Site establishment is underway ahead of construction for the new Major works have started to upgrade the southbound bridge at Once the project is completed, the affected car parks at North Boondall To enable the widening of the motorway, Energex is replacing existing What’s next alignment of the southbound Deagon Deviation. Sandgate Road. These works will be completed in several stages. Stage will be reinstated, providing a long-term increase in the overall number high voltage towers next to the motorway between Nudgee Road and one involves widening the existing two-lane southbound bridge to three Over the coming months, the project team will carry Once the new southbound lanes are completed in late 2016, work of car parks available. Nundah Creek. lanes. Piling activities have started to install new bridge foundations. out a range of important works, including: will start on building the northbound carriageway of the Deagon Over the coming months, the project team will install new bridge deck The project team will provide early notification to train commuters prior New 30-metre power poles were installed earlier this year to replace Deviation. units to widen the footprint of the bridge. to any car parking changes. the existing towers and Energex has begun to transfer power to these ` site establishment at several points along the new poles. The existing towers are being removed to allow for the Once work on the southbound bridge is complete, traffic in both motorway Bicentennial Road interchange construction of the additional lanes in this section of the motorway. directions will be temporarily diverted onto the upgraded southbound The Bicentennial Road interchange is being upgraded, with major bridge to allow for the demolition of the existing northbound bridge and works underway to widen the four bridges at this location. This work will be completed in June 2016, weather and construction ` piling to create foundations for new and upgraded construction of a new bridge in its place. The southbound bridge will be conditions permitting. Works will be completed at night, and motorists bridge structures wide enough to accommodate this temporary traffic arrangement and a Piling works have begun for the two northbound bridges and bridge are encouraged to be patient and expect traffic delays and short-term speed of 80km/h will be maintained during peak hours. works will continue throughout 2016. Two lanes of traffic in each road closures. direction will be maintained in peak hours during these works. ` initial construction of the expanded motorway This diversion is expected to occur in late 2016 and be in place for between the existing north and southbound lanes approximately 12 months. Two lanes of traffic in each direction will be Noise barriers maintained in peak hours during these works. Nudgee Road interchange The project team has carried out noise monitoring to develop a noise Preparatory works have begun to construct the new Nudgee Road ` rehabilitation of the Gateway Motorway between model, which predicts future noise levels and the need for new Impacts to North Boondall train station car park interchange, to the north of the existing interchange. Earthworks are or upgraded noise barriers. The noise model has identified those Bracken Ridge and the Wyampa Road overpass, Preliminary works at the North Boondall train station are complete being undertaken on both sides of the motorway to create the new locations, between Nudgee and the Deagon Deviation, where new or near the Bruce Highway, including pavement and and the new permanent car park on Peacock Street is now open to upgraded noise barriers are required and these will be constructed as Nudgee Road alignment and on and off-ramps for the interchange. safety improvements. commuters. part of the project. Works to build the bridge structure over the motorway will commence Construction of the new northbound bridge over Sandgate Road and The location of noise barriers is determined in line with the road traffic in late 2016 and will continue throughout 2017. The relocation of These works are critical to improve safety outcomes the Shorncliffe rail line requires significant works in the vicinity of noise criteria set by the department.