Rail Accident Report

Total Page:16

File Type:pdf, Size:1020Kb

Rail Accident Report Rail Accident Report Derailment at Grayrigg 23 February 2007 Report 20/2008 October 2008 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2008 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.raib.gov.uk DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Derailment at Grayrigg, 23 February 2007 Contents Preface 5 General terms used in the report 5 Summary of the report into the derailment at Grayrigg on 23 February 2007 6 The Accident 15 The Investigation 25 The Infrastructure: Evidence and Analysis 29 Degradation of Lambrigg 2B points 30 Inspection and maintenance 56 Other accidents and incidents involving S&C stretcher bars 79 Network Rail’s management arrangements 82 Safety Regulation 109 The cause of the derailment 123 The Derailed Train: Evidence, Analysis and Conclusions 131 Rescue and First Aid: Evidence, Analysis and Conclusions 153 Action reported as already taken or in progress 163 Recommendations 169 Appendices 187 Appendix A - Glossary of abbreviations and acronyms 188 Appendix B - Glossary of terms 189 Appendix C - Key standards current at the time 205 Appendix D - An overview of points operation and terms 208 Appendix E - Bolted Joints 213 Appendix F - On-train recording of infrastructure features 215 Appendix G - Definition of cant and cant deficiency 220 Appendix H - Access restrictions at Lambrigg 221 Appendix I - Signalling maintenance standards 224 Appendix J - Compliance & Assurance 226 Appendix K - Overview of the relationship between Network Rail’s engineering and maintenance organisations 228 Appendix L - Actions taken by Network Rail in response to the Potters Bar investigations 231 Rail Accident Investigation Branch Report 20/2008 www.raib.gov.uk October 2008 Appendix M - The Role of the Safety Regulator 241 Appendix N - Actions taken in response to recommendations from the Potters Bar derailment that were directed at HMRI 243 Appendix O - Network Rail SIN 97, 99 and 101 results 247 Appendix P - Urgent Safety Advice issued by RAIB 250 Appendix Q - Summary of egress routes 254 Rail Accident Investigation Branch Report 20/2008 www.raib.gov.uk October 2008 Preface Preface 1 The purpose of a Rail Accident Investigation Branch (RAIB) investigation is to determine the cause of an accident or incident, with the aim of preventing future accidents and incidents, and of improving railway safety. 2 The RAIB does not consider or determine blame or liability, or carry out prosecutions. General terms used in the report 3 This report is about the derailment of an express passenger train which occurred on 23 February 2007 near Grayrigg in Cumbria, on the West Coast Main Line (WCML). The general orientation of the WCML is on a north-south axis. However, at the location where the derailment occurred, trains running from London to Glasgow are travelling in an easterly direction. For the purposes of consistency, the terms ‘north’ and ‘south’ are used in this report when referring to infrastructure or events on the Glasgow and London side of the derailment respectively. 4 The geographical location on the WCML in the area of Grayrigg is established by the distance from a ‘zero’ datum at Lancaster station, measured in miles and chains. 5 At various places in this report, reference is made to the ‘right’ or ‘left’ side of the train or track. In all cases, this refers to the perspective of a person facing north in the direction the train was travelling, from London to Glasgow. 6 The location of the derailment was at Lambrigg emergency crossover, in the vicinity of the village of Grayrigg. In this report the derailment is referred to as being at Grayrigg, the nearest location of note, but the crossover and points are referred to as Lambrigg. 7 Throughout the report the term Switches and Crossings (S&C) is used to describe all means of intersection of railway lines, including diamonds, slips, and other more complex layouts. The term ‘points’ is used when specific reference is made to points or the points at Lambrigg. 8 Appendix A to this report contains explanations of acronyms and abbreviations and Appendix B explains technical definitions that are shown in italics the first time that they appear in the report. Rail Accident Investigation Branch Report 20/2008 www.raib.gov.uk October 2008 Summary of the report Summary of the report into the derailment at Grayrigg on 23 February 2007 Key facts about the accident 9 On 23 February 2007 at 20:12 hrs, an express passenger train derailed at facing points, known as Lambrigg 2B points, located near Grayrigg in Cumbria (Figure 1). The train, reporting number 1S83, was the 17:15 hrs service from London Euston to Glasgow, operated by West Coast Trains Ltd, part of Virgin Rail Group (referred to as ‘Virgin Trains’ in the remainder of this report), and was travelling at 95 mph (153 km/h). All nine vehicles of the Class 390 Pendolino unit derailed (Figure 2). Eight of the vehicles subsequently fell down an embankment and five turned onto their sides. Location of accident © Crown Copyright. All rights reserved. Department for Transport 10002027 2008 Figure 1: Extract from Ordnance Survey map showing location of accident 2 7 8 9 a points 1 Figure 2: Aerial view of derailed train Rail Accident Investigation Branch Report 20/2008 www.raib.gov.uk October 2008 10 The train was carrying four crew and at least 105 passengers at the time of the accident. 11 One passenger was fatally injured; 28 passengers, the train driver and one other crew member received serious injuries and 58 passengers received minor injuries. The remaining 18 passengers and two crew members were not physically injured in the derailment. 12 The railway line through the area remained closed until 12 March 2007. Initially this was for the rescue of the injured, then solely for accident investigation, then (in parallel) for Summary of the report accident investigation, vehicle recovery and repairs to the infrastructure, and finally to complete the repairs to the infrastructure. Summary of the derailment and its causes 13 The train derailed as it passed over 2B points which were in an unsafe state. A combination of failures of stretcher bars and their joint to the switch rails allowed the left- hand switch rail to move, under its natural flexure, towards the left-handstock rail. The left-hand wheels of either the first or secondbogie on the leading vehicle (it is not clear which) passed the wrong side of the left-hand switch rail and were forced into the reducing width between the switch rails. The wheels then derailed by climbing over the rails. All the other vehicles of the train derailed as a consequence. Figures 3 and 4 show the key details of the points. 14 This situation arose at 2B points because of a combination of three factors. These were: • the failure of the bolted joint connecting the third permanent way stretcher bar to the right-hand switch rail; • incorrect set up of the points with excessive residual switch opening; and • the omission of the scheduled weekly inspection on 18 February 2008. All three were necessary for the accident to occur. 15 The bolts holding the third permanent way stretcher bar to the right-hand switch rail became loose, and subsequently completely undone. As a result of this, and the excessive residual switch opening, the left-hand switch rail was struck by the inner faces of passing train wheels, giving rise to large cyclic forces. As a consequence, rapid deterioration of the condition of the remaining stretcher bars and their fasteners occurred. This led to the left-hand switch rail becoming totally unrestrained. 16 This deterioration took place over a period of at least eleven days prior to the accident. An inspection, scheduled for 18 February, which should have detected the degradation, was omitted. 17 There were a number of shortcomings in Network Rail’s safety management arrangements which were underlying factors in this accident. Rail Accident Investigation Branch 7 Report 20/2008 www.raib.gov.uk October 2008 Summary of the report Third permanent way stretcher bar Minimum free wheel clearance position Swan neck insulated joint Bracket Supplementary Fastener drive Second permanent way stretcher bar Left-hand Right-hand stock stock rail rail Left-hand Right-hand switch switch rail rail Drive rod First permanent way stretcher bar Points machine Switch toes Lock stretcher bar Detector Switch rail rods extension pieces Figure 3: Layout of points showing switch and stock rails and stretcher bars Rail Accident Investigation Branch 8 Report 20/2008 www.raib.gov.uk October 2008 Swan neck insulation joint Summary of the report Track Gauge Wheelset back-to-back Flange back clearance Wheel flange thickness Residual switch opening Free
Recommended publications
  • 570 Bus Time Schedule & Line Route
    570 bus time schedule & line map 570 Ravenstonedale - Kendal View In Website Mode The 570 bus line (Ravenstonedale - Kendal) has 2 routes. For regular weekdays, their operation hours are: (1) Kendal: 10:25 AM (2) Ravenstonedale: 2:55 PM Use the Moovit App to ƒnd the closest 570 bus station near you and ƒnd out when is the next 570 bus arriving. Direction: Kendal 570 bus Time Schedule 20 stops Kendal Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday Not Operational Classic Coaches Bus Depot, Ravenstonedale Tuesday Not Operational The Black Swan, Ravenstonedale Wednesday Not Operational Market Square, Shap Thursday 10:25 AM Main Street, Shap Civil Parish Friday Not Operational Woodville Terrace, Shap Green Croft, Shap Civil Parish Saturday Not Operational The Greyhound Hotel, Shap Brookƒeld B&B, Shap Brookƒeld, Shap Civil Parish 570 bus Info Direction: Kendal Turn For Shap Wells Hotel, Scout Green Stops: 20 Trip Duration: 90 min The Square, Orton Line Summary: Classic Coaches Bus Depot, Front Street, Orton Civil Parish Ravenstonedale, The Black Swan, Ravenstonedale, Market Square, Shap, Woodville Terrace, Shap, The Service Station, Old Tebay Greyhound Hotel, Shap, Brookƒeld B&B, Shap, Turn Orton Road, Tebay Civil Parish For Shap Wells Hotel, Scout Green, The Square, Orton, Service Station, Old Tebay, Mount Pleasant, Mount Pleasant, Tebay Tebay, Cross Keys, Tebay, Barnaby Rudge, Tebay, Primary School, Grayrigg, Crescent Green, Mintsfeet, Cross Keys, Tebay Morrisons, Mint Bridge, Lakeland Laundry, Mintsfeet, Victoria Apartments,
    [Show full text]
  • Cumbrian Railway Ancestors B Surnames Surname First Names
    Cumbrian Railway Ancestors B surnames Year Age Surname First names Employment Location Company Date Notes entered entered Source service service Babbs John Porter Barrow Goods FUR 08/08/1895 Entered service on 20/- pw 1895 26 FR Staff Register Babbs John Parcels Porter Barrow Central FUR 25/06/1900 From Barrow Goods on 22/- pw 1895 26 FR Staff Register Babbs John Labourer Buccleuch Jct to Goods Dep FUR 16/09/1907 Entered service 1907 38 Furness PW staff register p 6 Babbs John P.Way Askam FUR 00/03/1908 AMB Listed as available mobilisation for Babbs John P Way Labourer Askam FUR 06/08/1914 RAIL 214/81 entrenchmen works Babe William Signalman Carlisle MID 14/11/1876 New appointment. Still in post in 1898 RAIL 491/1024 Babe William Signalman Carlisle MID 00/00/1902 Died RAIL 491/1026 Backhouse James Porter Barrow ? FUR 00/00/1851 Age 32 b.Whitehall Census Backhouse Luke Clerk Askam FUR 10/10/1881 Entered service on 5/6 pw 1881 15 FR Staff Register Transferred from Askam Iron Works on Backhouse Luke Office Boy Dalton FUR 15/05/1882 1881 15 FR Staff Register 7/6 pw Backhouse Luke Clerk Foxfield FUR 20/02/1883 Transferred from Dalton on 10/- pw 1881 15 FR Staff Register Backhouse Luke Clerk Ulverston FUR 29/10/1883 Transferred from Foxfield on 12/6 pw 1880 15 FR Staff Register Backhouse Luke Clerk Ulverston FUR 08/05/1886 Resigned 1880 15 FR Staff Register Backhouse R Underman Lake Side LMS 05/05/1928 In service with LMS on May 5 1928 Furness PW staff register p 26,25 Bacon A.
    [Show full text]
  • Annual Report 2011 Section 2: Reported Status of RAIB's
    Annual Report 2011 Section 2: Reported Status of RAIB’s Recommendations 2011 This page is left intentionally blank This report is published in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2012 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.raib.gov.uk DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. This page is left intentionally blank Annual Report 2011 Section 2: Reported Status of RAIB’s Recommendations 2011 Contents Index of investigation reports in this report Page 7 Introduction Page 9 The Recommendation Progress Report Page 10 List of all Investigation reports showing recommendation status as at 31 Page 11 December 2011 Recommendations made in 2011 to end implementer Page 18 Recommendations that were the subject
    [Show full text]
  • Rail Accident Report
    Rail Accident Report Fatal collision between a Super Voyager train and a car on the line at Copmanthorpe 25 September 2006 Report 33/2007 September 2007 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2007 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.raib.gov.uk DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Fatal collision between a Super Voyager train and a car at Copmanthorpe, 25 September 2006 Contents Introduction 5 Summary of the report 6 Key facts about the accident 6 Immediate cause, contributory factors, underlying causes 7 Severity of consequences 7 Recommendations 7 The Accident 8 Summary of the accident 8 The parties involved 8 Location 9 External circumstances 9 Train
    [Show full text]
  • How Understanding a Railway's Historic Evolution Can Guide Future
    College of Engineering, School of Civil Engineering University of Birmingham Managing Technical and Operational Change: How understanding a railway’s historic evolution can guide future development: A London Underground case study. by Piers Connor Submitted as his PhD Thesis DATE: 15th February 2017 University of Birmingham Research Archive e-theses repository This unpublished thesis/dissertation is copyright of the author and/or third parties. The intellectual property rights of the author or third parties in respect of this work are as defined by The Copyright Designs and Patents Act 1988 or as modified by any successor legislation. Any use made of information contained in this thesis/dissertation must be in accordance with that legislation and must be properly acknowledged. Further distribution or reproduction in any format is prohibited without the permission of the copyright holder. Managing Technical & Operational Development PhD Thesis Abstract The argument for this thesis is that patterns of past engineering and operational development can be used to support the creation of a good, robust strategy for future development and that, in order to achieve this, a corporate understanding of the history of the engineering, operational and organisational changes in the business is essential for any evolving railway undertaking. It has been the objective of the author of this study to determine whether it is essential that the history and development of a railway undertaking be known and understood by its management and staff in order for the railway to function in an efficient manner and for it to be able to develop robust and appropriate improvement strategies in a cost-effective manner.
    [Show full text]
  • Milepost 27 I I October 2006
    MILEPOST 27 I I OCTOBER 2006 VIRGIN GLASGOW-EUSTON RECORD - See Page 227 Milepost 27½ - 159 - October 2006 MILEPOST 27½ - October 2006 The Journal of The Railway Performance Society Honorary President: Peter Semmens MA CChem FRSC MBCS MCIT Commitee: CHAIRMAN Nigel Smedley 40 Ferrers Way, Darley Abbey, Derby DE22 2BA. e-mail: [email protected] tel: 01332 541267 SECRETARY Frank Collins 10 Collett Way, Frome, Somerset, BA11 2XR e-mail: [email protected] Tel: 01373 466408 TREASURER Peter Smith 28 Downsview Ave, Storrington, West Sussex RH20 4PS (and Membership) e-mail: [email protected] 01903 742684. EDITOR David Ashley 92 Lawrence Drive, Ickenham, Uxbridge, Middx, UB10 8RW e-mail: [email protected], Tel 01895 675178 Meetings Officer Martin Barrett 112 Langley Drive, Norton, Malton, N Yorks YO17 9AB [email protected] tel 01653 694937 s Fastest Times Editor David Sage 93 Salisbury Road, Burton, Christchurch, Dorset BH23 7JR e-mail: [email protected] tel; 01202 249717 Distance Chart Editor John Bull 37 Heathfield Road, Basingstoke, Hants RG22 4PA email;[email protected] Milepost 27½ - 160 - October 2006 Archivist & Librarian Lee Allsopp 2 Gainsborough, North Lake, Bracknell RG12 7WL e-mail: [email protected] tel; 01344 648644 Technical Officer David Hobbs 11 Lynton Terrace, Acton, London W3 9DX Tel 020 8993 3788 [email protected] Publicity Officer Jeremy Hartill, 7 Curlow Close, Beverley, N Humberside HU17 7QN. Phone 01482 870507 e-mail: [email protected] Non-committee officials:- Topical points Martin Robertson 23 Brownside Rd, Cambuslang, Glasgow, G72 0NL e-mail: [email protected] Directors of RPS Rail Performance Consultants Ltd.:- Frank Collins (chairman), Martin Barrett (secretary), Nigel Smedley.
    [Show full text]
  • Recovery Working Group Report Following the Ufton Nervet Rail
    Recovery Working Group Report Following Title of Report: Item 15 the Ufton Nervet Rail Crash Report to be Executive considered by: Forward Plan Ref: EX1058 CP1 – Providing strong community leadership CP5 – Ensuring that the street environment is clean, well maintained and safe CP7 – Promoting safer communities Corporate Plan Priority: CP9 – Enhancing the sustainability of the West Berkshire community and preserving the local environment through improving environmental resource management D2 – Building capacity through partnership and innovation D3 – Customer focus The proposals contained in this report will help to achieve the above Corporate Plan priorities by: Providing strong community leadership in an emergency. Purpose of Report: To brief the Executive regarding the work led by the Council following the train crash in Ufton Nervet on 6 th November 2004. Recommended Action: (1) To note the actions of the Recovery Working Group. (2) To endorse the recommendations. Reason for decision to be taken: To determine the Council’s response to the recommendations of the Recovery Working Group, which was set up to oversee and manage the local response to the Ufton Nervet rail crash. List of other options considered: Not applicable Key background documentation: None Portfolio Member: Councillor Geoff Findlay Tel. No.: (01635) 871992 E-mail Address: [email protected] Contact Officer Details Name: Margaret Goldie Job Title: Corporate Director (Community Care and Housing) Tel. No.: 01635 519730 E-mail Address: [email protected] West Berkshire Council Executive 15 September 2005 Implications Policy: The recommendations contained within the report include some proposed changes to the Council’s Emergency Planning procedures. Personnel: Some recommendations will require further training for staff.
    [Show full text]
  • Cumbrian Railway Ancestors C Surnames Surname First Names
    Cumbrian Railway Ancestors C surnames Year Age Surname First names Employment Location Company Date Notes entered entered Source service service WW1 service, 4th Kings Own (Royal Caddy M. Engineer's Dept FR FUR 1914-18 0 FR Roll of Honour Lancaster) Regt., Private. Died Caddy Matthew, Sergeant Labourer Ulverston FUR 23/12/1916 Died serving in 4th King's Own, aged 21 Railwaymen of Cumbria Rem Caddy T. Clerk Grange FUR 26/05/1892 Entered service on 5/6 pw 1892 14 FR Staff Register Caddy T. Clerk Grange FUR 04/05/1894 Left without notice 1892 14 FR Staff Register Caddy W Underman Grange LMS 05/05/1928 In service with LMS on May 5 1928 Furness PW staff register p 18 Caddy W Ganger Levens LMS 05/05/1928 In service with LMS on May 5 1928 Furness PW staff register p 21 Caddy W. P Way Dept. Ulverston FUR 00/04/1906 AMB Listed as available mobilisation for Caddy William P Way Labourer Leven FUR 06/08/1914 RAIL 214/81 entrenchmen works Caddy William Platelayer Grange FUR 00/03/1922 AMB Caddy William Permanent Way Grange FUR 26/07/1922 Presentation of Ambulance Award WDSO Kerr PR1/031-8 Caddy William Permanent Way Grange FUR 08/09/1923 Presentation of Ambulance Award WDSO Kerr PR1/031-12 Moved from Wilnecote. Resigned Cadwallader J. Signalman Newbiggin MID 14/11/1876 RAIL 491/1024 17/03/1877 Caffey John Checker Barrow Goods FUR 09/12/1872 Entered service on 22/6 1872 42 FR Staff Index 1845-1873 Caffey John Checker Barrow Goods FUR 08/03/1873 Resigned 1872 42 FR Staff Register Cain A.
    [Show full text]
  • Cumbria 3-2021.Xlsx
    Lens of Sutton Association ‐ Cumbria Railways ‐ Transport Library List 2021 Neg Description 66291 41221 Ivatt 2MT waiting at Coniston Station, Furness Railway, circa 1950 (AW Croughton) 66420 LMS 70 Stanier 3P 2‐6‐2T waiting at Low Gill Station, Little Noth‐Western side, 1948 (AW Croughton) 66522 Keswick Station, Cockermouth, Keswick & Penrith Railway, circa 1950 (AW Croughton) 66744 FR 105 Pettigrew 0‐6‐2T and FR 4 Pettigrew 0‐6‐0 outside Lakeside Station, Furness Railway, circa 1920 68610 Millom Station, Furness Railway, with Barrow bound DMU circa 1967 90459 42457 Stanier 4MT on eastbound passenger service entering Arnside Station, 13/8/1953 90522 42134 Faiburn 4MT in Windermere branch platform at Oxenholme Station, circa 1965 AY165 45572 Jubilee class on northbound passenger service at Penrith Station, circa late 1950s AY171 45506 Patriot class on northbound passenger service at Penrith Station, circa late 1950s CFO429 LMS 11627 ex Furness Railway 0‐6‐2T inside Moor Row engine shed, 10/7/1935 (CF Oldham) CFO447 LMS 12497 ex Furness Railway 0‐6‐0 outside Workington engine shed, 12/7/1935 (CF Oldham) CFO448 LMS 8603 ex LNWR 'Cauliflower' class 0‐6‐0 outside Workington engine shed, 12/7/1935 (CF Oldham) CFO449 LMS 4007 ex MR 4F class 0‐6‐0 outside Workington engine shed, 12/7/1935 (CF Oldham) CFO1276 LMS 8369 ex LNWR 'Cauliflower' class 0‐6‐0 on eastbound passenger service at Keswick Station, on the Cockermouth, Keswick and Penrith Railway, 7/6/1939 (CF Oldham) CFO1277 LMS 8610 ex LNWR 'Cauliflower' class 0‐6‐0 on eastbound passenger service near Threlkeld, on the Cockermouth, Keswick and Penrith Railway, 6/1939 (CF Oldham) CFO1278 LMS 8551 ex LNWR 'Cauliflower' class 0‐6‐0 on passenger service near Embleton, on the Cockermouth, Keswick and Penrith Railway, 6/1939 (CF Oldham) JNF261‐7 66478 ex NBR class J35 leaving Carlisle Station with 3‐25 pm service to Silloth, 15/7/1956 (JN Faulkner) JNF261‐8 42376 Fowler 4MT awaiting departure from Coniston Station with the 12‐00 to Barrow, 18/7/1956.
    [Show full text]
  • Rail Accident Report
    Rail Accident Report Buffer stop collision at Chester station 20 November 2013 Report 26/2014 November 2014 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2014 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.raib.gov.uk DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Buffer stop collision at Chester station 20 November 2013 Contents Summary 5 Introduction 6 Preface 6 Key definitions 6 The accident 7 Summary of the accident 7 Context 8 The investigation 12 Sources of evidence 12 Key facts and analysis 13 Sequence of events 13 Background information 16 Identification of the immediate cause 21 Identification of causal factors 22 Factors affecting the severity of consequences 35 Previous
    [Show full text]
  • Papcastle Local History Group 2009
    PAPCASTLE HISTORY Eric Apperley Papcastle Local History Group 2009 1 First Published in Great Britain in 2009 ISBN 978-0-9551845-3-6 by Little Bird Publications High Moor House, Hill Street, Cockermouth Cumbria CA13 OAU Copyright © 2009 by Eric Apperley The right of Eric Apperley to be identified as the author of this work has been asserted by him in accordance with Section 77 of the Copyright, Designs and Patents Act 2000. All right reserved to Papcastle Local History Group Printed in Great Britain by PrintExpress Sneckyeat Road, Hensingham, Whitehaven, Cumbria 2 FOREWORD In spring 2007, Jack Sedgwick, a veterinary surgeon, who had spent his life since the late 1920’s in the village, gave a talk in the village hall. He presented an interesting insight into his early days and identified just five others who had lived all their lives in the village, from about the same time. This talk stimulated discussion into the fact that the history of the village had never been recorded. So from it a Papcastle Local History Group was formed with the intention of recovering as much as possible and with the expectation of publishing at least a small volume. By the autumn of 2008, it was clear that a major decision was needed - whether to publish what had been discovered so far or to hold off for some distant date when many more months, or possibly years of painstaking research might have been done. That would require regular trips to the Records Offices and not inconsiderable expense. This book is therefore a first edition, and one day may be superseded by a superior fresh and much extended edition.
    [Show full text]
  • Life-Time Monitoring of in Service Switches and Crossings Through
    Life-time monitoring of in service switches and crossings through field experimentation ANDREW TOM CORNISH Future Railway Research Centre Department of Mechanical Engineering Imperial College London Supervisors Professor Roderick Smith Professor John Dear Submitted for the degree of Doctor of Philosophy to Imperial College London May 2014 DECLARATION I can confirm that the work completed in this thesis report is my original work, and whilst gaining information from some relevant sources that are referenced, the words, format and processes have been generated by me. Andrew Tom Cornish The copyright of this thesis rests with the author and is made available under a Creative Commons Attribution Non-Commercial No Derivatives licence. Researchers are free to copy, distribute or transmit the thesis on the condition that they attribute it, that they do not use it for commercial purposes and that they do not alter, transform or build upon it. For any reuse or redistribution, researchers must make clear to others the licence terms of this work. - II - ABSTRACT In financial year 2011/2012, Switches and crossings (S&C) cost the UK rail infrastructure owner, operator and maintainer, Network Rail, over £220m in maintenance and £189m in renewals. This represented 24% of the total track maintenance budget, whilst accounting for only 5% of the network mileage. The large costs are due to the complex S&C design that allows network flexibility whilst supporting a vehicle traversing from the switch rail to the stock rail and through the crossing. The motivation for undertaking this research was to understand how S&C reacts to dynamic loading imposed by the vehicles, and to gain a better knowledge of the deterioration of the asset.
    [Show full text]