Metro Project Tender Predesigns, General and Detailed Final Designs (GFD, DFD) for Extension to for two (2) single track TBM , one (1) station and one (1) forestation, Thessaloniki, Project Tender Predesigns, General Final Designs (GFD) and Detailed Final Designs (DFD) for two (2) single track TBM tunnels, one (1) station and one (1) forestation of the project: “Design, Construction and Commissioning of Thessaloniki Metro Extension to Kalamaria", Greece Construction Cost Total cost: approx. € 312 m. Project Schedule Design: 2012 – on going Construction: 2013 – on going Project Description Two (2) single track TBM tunnels Total length: ~ 7km Cross section: 30.20m2 Effect. cross section: 22.10m2 1 Pumping shaft for each Mikra Station Indicative model for stability check Length: ~ 320m, Width: 16.60m - 21.10m, Depth: 18.70m - 21.90m 4 final levels: Foundation level / Platform level / Concourse & EM level /Roof level Two (2) tunnels for TBM start up: Length: ~36m (each) Cross section: 2x 44.8m2 Effective cross section: 2x37.2m2 Mikra Forestation Tunnel Length: ~ 358m, Width: 10.40m-16.40m, Depth: 11.50m-21.00m 2 final levels: Foundation level /Roof level Terminal shaft: Length:8.00m, Width: 9.60m, Depth: 9.60m CttiConstruction MthdMethod Two (2) single track TBM tunnels: Mechanical excavation with Model for the excavation and temporary support of the TBM start up tunnels’ EPB - TBM (Earth Pressure Balance – Tunnel Boring Machine) Mikra Station: Construction with Cut & Cover method reinforced concrete piles rows / Prestressed anchors/ Struts Two (2) tunnels excavated with conventional means for TBM start up Mikra Forestation: Construction with Cut & Cover method Reinforced concrete piles rows / Prestressed anchors Final Lining • Concrete C40/50 for TBM tunnels’ segments, Reinforcement B500c • Concrete C30/37 for station’s & forestation’s permanent structures • Reinforcement B500c Geology Neogene, quaternary deposits and recent superficial man made deposits, Overburden: 5 -25m Our Services • Geotechnical – structural evaluation • Geotechnical and structural predesigns • Geotechnical and structural General Final Designs (GFD) Typical ring with various flexible elements • Geotechnical and structural Detailed Final Designs (DFD) Client AKTOR S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Jaipur, India Metro tunnels Tender Predesigns & Detailed Designs of two (2) TBM Metro Tunnels on East-West Corridor of Jaipur Metro Project (Stage 1B) at Jaipur, Rajasthan, India.

Project Tender Predesigns & Detailed Design of two (2) TBM Tunnels between Chandpole and Badi Chouper of the Jaipur Metro project on East-West Corridor of Jaipur Metro (Stage 1B) at Jaipur, Rajasthan, India. Construction Cost Total cost: ~50,000,000 US $ Project Schedule Design - Construction: 2013 ~ 2016 Project Description Two (2) single track TBM tunnels Total length: ~ 2.8km Cross section: 35m2 Effect. cross section: 26m2

Construction Method Chandpole Gate Surface settlements due to TBMs Two (2) single track TBM tunnels: excavation Mechanical excavation with EPB - TBM (Earth Pressure Balance – Tunnel Boring Machine) Final Lining • Concrete M50 for TBM tunnels’ segments • Reinforcement Fe500D Geology Sand, Silty Sand & Silty Sand with Gravels ObdOverburden for TBM: 6~12m. Our Services • Preliminary Design Submissions Starting up frame • Geotechnical Interpretation Report for the whole project • Definitive Tunnel Segment Design • Definitive Design of Sump Pit & Tunnel Drainage, design of temporary works including reaction frame • Definitive Design of connection details with launching & retrieval shaft, Star ting-up frame desig in &TBMb& TBM brea kthk through h me thdlthodology • Assessment and protection of Existing Building and Utilities • Ground settlement contours within the influence zone of the tunnelling and stations’ works • Instrumentation systems for monitoring settlements of the ground and adjacent structures • Calculation of TBM required support pressure • Risk Assessment of buildings, structures and utilities due to tunnelling works Temporary tunnel support frame for • The desiggpns were provided in common with INDUS CONSULTRANTS Pvt. Ltd. India cross-passage construction Client CEC INT’L CORP INDIA PVT. LTD.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Stations Tender Predesigns & Detailed Designs of two (2) UG Metro Stations, Two (2) C&Cs and Two (2) Shafts on East-West Corridor of Jaipur Metro Project (Stage 1B) at JiJaipur, RjRajast han, IdiIndia Project Tender Predesigns & Detailed Design of two (2) Underground Metro Stations, Choti Chouper and Badi Chouper, by Top Down Method, two (2) C&Cs and two (2) shafts for the Jaipur Metro project on East-West Corridor of Jaipur Metro (Stage 1B) at Jaipur, Rajasthan, India. Construction Cost Total cost: ~50,000,000 US $ Project Schedule Design - Construction: 2013 ~ 2016 Project Description

7Choti Chouper underground station Length: ~ 233m, Width:22.65m ~ 63.05m, Depth: ~20.00m Five (5) final levels: Foundation level / Platform level / Concourse level / TV shaft level/Roof level Badi Chouper Station Lengg,th: ~ 233m, Width:27.95m ~ 68.35m, Depth: ~20.00m Five (5) final levels: Foundation level / Platform level / Concourse level / TV shaft level / Roof level C&Cs Length: ~ 269m, Width:12.6m, Depth:~18.00m Length: ~ 110m, Width: 12.6 ~23.6m, Depth:~18.00m Shafts Choti Chouper UG Station 3D model Length: ~ 25.6m, Width: 24.6m, Depth:~18.00m Length: ~ 25.6m, Width: 24.6m, Depth:~12.00m CttiConstruction MthdMethod • Choti & Badi Chouper Stations: Construction by Top Down method with Diaphragm Walls • C&C and shafts with cut & cover method (piles and struts) Final Lining Concrete M35 for the structures, Reinforcement Fe500D Geology Sand, Silty Sand & Silty Sand with Gravels Our Services • Preliminary Design Submissions

• Geotechnical Interpretation Report for the whole project Badi Chouper • Definitive Design of Cut and Covers, Shafts, design of temporary works UG Station 3D model • Ground settlement contours within the influence zone of the stations’ works • Design of Secondary Structures i.e. track plinth and track concrete, emergency walkway • Structural Design of the Stations with 3D analysis model • Structural design of entry & exit structures, tunnel ventilation shafts, supply & exhaust vent shafts and C&C • Formworks (plan views and cross sections) and reinforcement reinforcement drawings for the stations, the entrances, the C&C and the shafts • Details for waterproofing of various structural elements • The designs were provided in common with INDUS CONSULTRANTS Pvt. Ltd. India Client CEC INT’L CORP INDIA PVT. LTD.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Stations Detailed Design of one (1) UG Metro Station and of one (1) ancillary building for Contract No-CC 23 of Delhi MRTS Project of Phase-III, Delhi Metro Corporation N. Delhi, India Project Detailed Structural Design of one (1) Underground Metro Station and of one (1) Ancillary Building for Contract No-CC 23: Design and Construction of Tunnel between Hauz Khas Station and Kalkaji Station by Shield TBM, Tunnel near Chirag Delhi & Kalkaji Stations and Underground Ramp beyond Kalkaji Station by Cut & Cover Method, Underground Metro Stations at Panchsheel Park, Chirag Delhi, G.K.Enclave-1,Nehru Place & Kalkaji by Cut & Cover Method on Janakpuri West-Botanical Garden Corridor of Delhi MRTS Project of Phase-III, Delhi Metro Corporation, India Construction Cost Total cost: approx. 25 m. € Project Schedule Design - Construction: 2013 ~ 2015 Project Description Greater Kailash Enclave – 1 underground station Length: ~ 267m, Width:23.20m ~ 30m, Depth: 15.70 ~17.80m Four (4) final levels: Foundation level / Platform level / Concourse level / Roof level One ancillary building Plan view dimensions: 27m x 23m Height: ~13m Construction Method

• Station: Construction by Top Down method with Diaphragm Walls Greater Kailash Enclave – 1 Station 3D model • Cross passages: Conventional tunnelling method (NATM) • Ancillary Building – Entrances of station: Cut & Cover method Final Lining Concrete M40 for the station’s permanent structures, Reinforcement Fe500D Concrete M35 for ancillary building, Reinforcement Fe500D Geology Stiff silt & very stiff silt

Our Services Greater Kailash Enclave – 1 Station entrance 3D model • Structural Design of the Station with 3D analysis models for the permanent situation and for each discrete part of the station according to the construction sequence • Assessment of ground settlements within influence zone of station work • Definitive Design of Cross passages, Sump Pit & Tunnel Drainage • Structural design of entry & exit structures, tunnel ventilation shafts, supply & exhaust vent shafts and ancillary building at the area of the station • Formworks (plan views and cross sections) and reinforcement drawings for the station, the entrances and the ancillary building and details for waterproofing of various structural elements • The d esig ins were provid ed i n common wi th INDUS CONSULTRANTS Pvt. LdLtd. In dia Client Ancillary Building 3D model FEMC-PRATIBHA JV

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Delhi Metro Tunnels (TBM & NATM Tunnels) “Pre-bid & Detailed Design Engineering Services for Tunnel Portion by TBM & NATM” for Contract No-CC 23 of Delhi MRTS Project of Phase-III, Delhi Metro Corporation IdiIndia Project “Prebid and detailed design engineering services for Tunnel Portion by TBM & NATM” for Contract No-CC 23: Design and Construction of Tunnel between Hauz Khas Station and Kalkaji Station by Shield TBM, Tunnel near Chirag Delhi & Kalkaji Stations and Underground Ramp beyond Kalkaji Station by Cut & Cover Method, Underground Metro Stations at Panchsheel Park, Chirag Delhi, G.K.Enclave-1,Nehru Place & Kalkaji by Cut & Cover Methdhod on Janakkpuri West-Botanical Garden Corridor of DelhiMRTSProject of Phase-III, Delhi Metro Corporation, India Typical view of Earth Pressure Balance Shield Construction Cost Total cost : approx. 185 m. € Project Schedule Design: 2012 - 2013 Construction: 2013 - Project Description Prebid and detailed designengineering for DMRC package CC-23 for FEMC – PRATIIBHA JV 8.2 km Metro tunnels out of which: • 8km TBM tunnels, excav. cross section: 35m2 & effective cross section: 26 m2 • 0.2km NATM tunnels, excav. cross section: 90m2 & effective cross section: 60m2 Excavation Method • Mechanical excavation with four (4) EPB and Mixed Shield- TBMs • NATM – Conventional excavation Typical view of Cutter Head Geology Delhi Silt & Quartzite Our Services • Evaluation of the geological - geotechnical investigation campaign • TBM type selection • Calculations of TBM support pressure • Calculations of surface settlements • Initial inspection of existing critical structures above the tunnel’s centreline • Designs for the tunnel’s segments including segment lining details • Designs for the excavation & temporary support of NATM Tunnels and cross passages • Designs for the final lining of NATM Tunnels & cross passages • Special consultancy services for the monitoring instrumentation • The designs were provided in common with INDUS CONSULTRANTS Pvt. Ltd., India Final lining

Reinforced concrete C40/50 (M50), 500D, for TBM tunnels Typical view of the FE-model with 15m Reinforced concrete C30/37 (M35), 500D, for NATM tunnels overburden and the segmental lining Client FEMC - PRATIBHA JV, INDIA

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Delhi Metro Tunnels “Pre-bid Engineering Services for TBM Metro Tunnels” for the project No-CC 34 of Delhi MRTS Project of Phase-III, Delhi Metro Corpp,oration, India

Project Prebid engineering consultancy services for the TBM tunnels of the project: Design and Construction of Tunnels from Ch. 785.912 near Janakpuri West underground station to Palam Underground Metro station (excluding) (Ch. (+)4591.630) by Shield TBM, Janakpuri West, Dabri Mor and Dashrath Puri underground metro Stations by Cut & Cover Method and works in connection with interchange facilities between existing eldlevated Metro station and proposed unddderground metro station at Janakpuri West on Janakpuri West– Kalindi Kunj Corridor under Delhi MRTS Project of Phase-III / Contract Nο: CC-34 (UG-5), Delhi Metro Corporation, India Calculated surface settlements for overburden 15m, Construction Cost support pressure 1.5bar & Ko=1.0 Total cost: approx. 145 m. € Project Schedule Design: 2012 Construction: 2013 – Project Description Prebid engineering for DMRC package CC-34 / Delhi Metro Phase III, for JV CEC-CICI for 8.5 km ΤΒΜ Metro tunnels with excav. cross section 35m2 and effective cross section: 26m2 Excavation Method Mechanical excavation with EPB - TBM (Earth Pressure Balance - Tunnel Boring Machine) Geology Typical soil profile of Delhi Silt formation Delhi Silt Our Services • Evaluation of the geological - geotechnical investigation campaign • TBM type selection • Calculations of TBM support pressure • Calculations of surface settlements • Initial inspection of existing critical structures above the tunnel’ s centreline • Designs for the tunnel’s segments including segment lining details • Designs for the excavation & temporary support of NATM Tunnels and cross passages • Design for the final lining of NATM cross passages • Special consultancy services for the monitoring instrumentation • The designs were provided in common with INDUS CONSULTRANTS Pvt. Ltd. India Final lining Reinforced concrete C40/50 (M50), 500D Client JV CEC-CICI, INDIA Geological map of Delhi with CC34 alignment indication

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Tunnels Doha Metro Golden Line Underground Tunnels Tender Predesigns Doha, Qatar

Project Doha Metro Golden Line underground tunnels & cross passages Project Budget Total Cost: approx. € 0,5 m. Project Schedule Tender Design: 2012 Construction: 2013 - 2018 Project Description 14 twin bore tunnels and 1 single bore tunnel (TBM) in urban environment Total length: approx. 40km Cross section: 39.6m2 Typical view of the FE-model and the segmental lining Effective cross section: 19.4m2 65 Pedestrian Cross Passages (NATM) in urban environment Total length: approx. 600m Cross section: 15.7m2 - 22m2 Effective cross section: ~8.0m2 Excavation Method • TBM tunnels: Mechanical excavation with EPB - TBM ( Earth Pressure Balance - Tunnel Boring Machine) • Cross passages: Conventional tunnelling method (NATM) Final Lining • Concrete C40/50 for segments (30cm thickness) • Concrete C30/37 for cross passages Geology Earth Pressure Balance - Tunnel Boring Machine (EPB - TBM) • Weathered limestone, limestone, shale, chalky limestone and interlayers of siltstone • Karst and sink holes/cavities • 2 aquifers (unconfined & confined), high water aggressiveness • Overburden: 15m - 30m Our Services • Geotechnical & structural tender predesigns and drawings • The designs were elaborated in common with EDR GmbH, Munich Construction Details • Special grouting techniques for water isolation • Concrete mix for 120 years durability • DblDoublewaterproofing gasket wihith hdhydrophili hilicseal Client

YAPI MERKEZI – STFA - AKTOR JOINT VENTURE Cross passage excavation geometry at pumping shaft

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Stations Doha Metro Golden Line Underground Stations Tender Predesigns, Doha, Qatar Project Tender ppgredesigns for 14 UG Stations, 4 Switchboxes & 2 Emerggyency Exits for the Golden Line of Doha Metro Project Budget Total cost: approx. € 1.5 b. Project Schedule Tender Design: 2012 Construction: 2013 – 2018 Project Description • 14 UG Stations((gincluding ventilation shafts): 13 UG stations each with: Length: ~177m / Width: ~27m / Depth: ~25m to ~ 45m / 4 final levels: Foundation level / Platform level / Concourse level / Roof level 1 UG station with: Length: ~355m / Width: ~48m / Depth: ~45m Station Structural Analysis Model 6 final levels: Foundation level / Platform level / Transfer level / Intermediate level / Concourse level / Roof level 15 Pedestrian/Ventilation Tunnels: Total length: 650m / Cross section: 73-121m2 / Effective cross section: 38-60m2 • 4 Switchboxes: Length: ~120m & ~190m / Width: ~25m & ~45m / Depth: ~20m & ~28m / 2 final levels: Foundation level /Roof level • 2 Emergency exits shafts: Length: 12m / Width: ~6m / Depth: ~28m Construction Method • Excavation & reinstatement (Cut & Cover) for stations, switchboxes & shafts • Open excavation retaining structures: reinforced concrete diaphragm walls, prestressed anchors, struts for stations, switchboxes & shafts • Stations pedestrian/ventilation tunnels: excavated with conventional

means (“barrel vault” method) Underground tunnel construction with conventional • Stations/switchbox bridge structures: secant concrete piles with d: means Φ100/Φ120 and l: 15m ~ 19m, prestressed anchors, precast beams, diaphragm walls with l: 16km, d: ~12m to 46m and w: 0.80m/1.00m, multi levels of anchors Final Lining Reinforced concrete C30/37 Geology Weathered limestone, limestone, shale, chalky limestone and interlayers of siltstone, 2 aquifers (unconfined & confined), high water aggressiveness Our Services • Geotechnical & structural tender predesigns and drawings • The designs were elaborated in common with EDR GmbH, Munich Construction Details Excavation & temporary support typical cross section with the applilica tion o f diaph hragm wa lls an d prestdtressed anchors • Durability requirements for 120 years • Special dewatering systems • Appropriate traffic deviations Client YAPI MERKEZI – STFA - AKTOR JOINT VENTURE

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Stations Doha Metro Major (“FLAGSHIP”) UG Stations Tender Predesigns, Doha, Qatar Project Mshaireb UG Metro Station & Education City UG Metro Station in Doha city Construction Budget Total Cost: approx. € 1 Β. Project Schedule Tender Design: 2012 Construction: 2013 – 2018 Project Description Mshaireb UG Station ((jmajor interchange station in the centre of Doha City) Length: 177m (Main Station) Width: ~33m (Main Station) Depth: ~38m 6 final levels: Foundation level/2 Platform levels /Intermediate level/Concourse level/Roof level Passenger tunnel of ~275m long Education City UG Station (dual operation Station) Length: ~177m (Main Station) Width: ~65m Depth: ~23m Mshaireb Station Analysis Model 4 final levels: Foundation level/Platform level/ Concourse level/Roof level 2 switchboxes of 25m span and 81m and 155m long Passenger tunnel 145m long Construction Method • Excavation & Reinstatement (Cut & Cover) • Open excavation retaining structures: reinforced concrete diaphragm walls, prestressed anchors, struts, precast beams • Mshaireb Station: Pedestrian tunnel excavated with conventional means / Temporary steel bridge / Bridge Final Lining Reinforced concrete C30/37 Geology Weathered limestone, limestone, shale, chalky limestone and interlayers of siltstone, 2 aquifers (unconfined & confined) High water aggressiveness Education City Station Analysis Model Our Services • Geotechnical & structural tender predesigns and drawings • The designs were elaborated in common with the EDR Gmbh, Munich Construction Details • 120 years durability • Special dewatering systems • Diaphragm walls l: 1,5m d: ~14m to 28m and w: 0.64/0.80 • Multi levels of anchors • Appropriate traffic deviations Client YAPI MERKEZI – STFA - AKTOR JOINT VENTURE

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Station Athens Attiko Metro Elliniko Station Athens, Greece Project Metro Station Bit and Metro Building Athens Attiko Metro, Extension of line 2 to Elliniko Construction Cost Total cost: approx. € 21 m. Project Schedule Design: 2006-2007 Construction: 2006-2009 Project Description Main Station(including ventilation and detonation shafts) Length 123m Width: 17m – 28m Depth: 25m –28m 5 final levels: Foundation level / Platform level/ Ticket Issue level / EM level /Roof level Station’s East Entrance Length: 15m Width: 9m Depth: 26,5m Station’s Access Tunnel Length: 3,5m Cross section: 44m2 - 55m2 Effective cross section: 25 m2 Construction Method Main Station and East Entrance: • Excavation & Reinstatement (Cut & Cover) • Retaining structures of open excavation: reinforced concrete shaftpiles, prestressed anchors, gunite, structural tissue Station’s Access Tunnel Top Down Excavation - NATM Excavation Final Lining Reinforced concrete C30/37, Β500c Geology • Debris, clastic deposits, neogene deposits (siltstones, conglomerates, marlys limestones) • Access tunnel overburden height: 10m Our Services • Geotechnical evaluation • Detailed geotechnical and structural design Client J/V AKTOR SA – SIEMENS AG – VINCI CONSTRUCTION GRANDS PROJECTS Station’s construction works

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Station Athens Attiko Metro Argiroupoli Station Athens, Greece Project Metro Station Bit and Metro Building

Athens Attiko Metro, Extension of line 2 to Elliniko Building Station Analysis Model Construction Cost Total cost: approx. € 21 m.

Project Schedule Design: 2006-2007 CttiConstruction: 2006-2009

Project Description Main Station(including ventilation and detonation shafts) Length 123m Width: 19m – 28m Depth: 21m –24.5m 5 final levels: Foundation level / Platform level/ Station construction works Ticket Issue level / EM level /Roof level Station’s East Entrance Length: 43m Width: 4m-8m Depth: 2,0m-14m Station’s Access Tunnel Length: 52m Cross section: 44m2 - 55m2 Effective cross section: 25 m2

Construction Method Main Station and East Entrance: • Excavation & Reinstatement (Cut & Cover) • Retaining structures of open excavation: reinforced concrete shaftpiles, prestressed anchors, gunite, structural tissue.

Station’s Access Tunnel Top Down Excavation - NATM Excavation

Final Lining Reinforced concrete C30/37, Β500c

Geology • Debris, Athenian schists • Access tunnel overburden height: 6m-7m • Existence of common utility network

Our Services • GthilGeotechnical evaltiluation • Detailed geotechnical and structural design

Client J/V AKTOR S.A. – SIEMENS AG – VINCI CONSTRUCTION GRANDS PROJECTS

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Project Athens Attiko Metro Sourmena Shaft Athens, Greece

Project Athens Attiko Metro, Extension of line 2 to Elliniko Shaft for the launch of TBM machine

Construction Cost Total cost: approx. € 5 m.

Project Schedule Design: 2006 Construction: 2006

Project Description Retaining structures of open excavation Length 74.50m Width: 16m – 18m Depth: 25,4m Final lin ing consiiisting of the fllfollow ing lllevels: • Foundation slate level • Two in between slates with openings • Top slate level

Construction Method • Excavation & Reinstatement (Cut & Cover) • Retaining structures of open excavation: reinforced concrete shaftpiles, prestressed anchors, gunite, structural tissue. • Final lining at the NW section of the shaft, dimensioning 20m x 14,35m, consisting of reinforced concrete C30/37 Shaft construction works and B500c • Reinstatement of the rest, after the completion of the TBM assembly and real works

Geology •Debris, • Clas tic ditdeposits • Existence of common utility network inside the excavation • Existence of middle pedestal at he exiting bridge at 7m distance of the WE side of the shaft

Our Services • Geotechnical evaluation • Detailed geotechnical and structural design

Client J/V AKTOR S.A. – SIEMENS AG – VINCI CONSTRUCTION GRANDS PROJECTS ΤΒΜ assembly

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Project Athens Attiko Metro Elliniko Shaft Athens, Greece

Project Railway tunnel ventilation shaft and TBM relocation shaft Athens Attiko Metro, Extension of line 2 to Elliniko

Construction Cost Total cost: approx. € 2,2 m.

Project Schdlhedule Design: 2006-2007 Shaft analysis model Construction: 2007-2009

Project Description Retaining structures of open excavation with rectangular cross section Length 22m Width: 16m Depth: 25,5m

Final lining consisting of the following levels: • Foundation slate level • Two in between slates with openings • Top slate level

Construction Method • Eti&Rittt(Ct&C)Excavation & Reinstatement (Cut & Cover) • Retaining structures of open excavation: reinforced concrete shaftpiles, prestressed anchors, gunite, structural tissue.

Final lining: Reinforced concrete C30/37 and B500c

Geology •Debris, • Athenian schist

Our Services • Geotechnical evaluation • Detailed geotechnical and structural design

Client J/V AKTOR S.A. - SIEMENS AG – VINCI CONSTRUCTION GRANDS PROJECTS

Shaft construction works

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Tunnel Athens Attiko Metro Extension of line 2 Athens, Greece

Project Metro Tunnel

Construction Cost Total cost: approx. € 84,5 m.

Project Schdlhedule ΤΒΜ assembly Design: 2006-2007 Construction: 2007-2009

Project Description Urban Tunnel Length: 4.593m Cross Section: double track with diameter 9,48m

Excavation Method Mechanical excavation with EPB - TBM ( Earth Pressure Balance - Tunnel Boring Machine)

Final Lining Pre-cast segments concrete C40/50 and Β500c

Geology • DbiDebris, cltilastic ditdeposits, neogene deposit s ( s iltst ones, conglomerates, sandstones, marlys limestones, alpine deposits (marly limestones, athenian schists) • Underground water table • Overburden height: 10m – 18m

Our Services • Geotechnical evaluation • Detailed design of the final lining • Detailed design for the EPB –TBM advance

Client J/V AKTOR S.A. – SIEMENS AG – VINCI CONSTRUCTION GRANDS PROJECTS

ΤΒΜ’s digging out at Elliniko station

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Project Athens Attiko Metro Extension of Line 3 Athens, Greece

Project • Metro tunnel • Construction shafts

Construction Cost Total cost: approx. € 43,12 m.

Project Schedule Design: 2002-2005 Construction: 2002-2006

Project Description - Railway tunnel in urban environment Prof. Daniel shaft Total length: 1890m Cross section: 67m2 - Five construction shafts Depth: 25-30m Cross section: 80-300m2

Method of tunnel excavation NATM – Mechanical excavation

Final Lining Reinforced concrete C20/25

Geology Schists, alluvial deposits, man-made deposits Railway tunnel, fully excavated Ground water Max. overburden: 18m

Our Services • Detailed geotechnical & structural design •Supervision during construction • Design jointly elaborated by OMIKRON KAPPA CONSULTING & EDR GmbH, Munich

Construction Details • Special drainage measures • Special grouting techniques Railway tunnel during the a΄ excavation Client phase J/V AKTOR S.A. – IMPREGILO S.p.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro station Athens Attiko Metro Eleonas station building Athens, Greece

Project Metro station building

Construction Cost Total cost: approx. € 6 m.

Project Schedule Planning and design: 2004 Construction: 2003-2005

Analysis model of the building Project Description Width: 30m Length: 40m Depth: 34m

Our Services • Detailed geotechnical, structural & architectural design • Supervision during construction • Design jointly elaborated by OMIKRON KAPPA CONSULTING & EDR GmbH, Munich Construction works Client J/V AKTOR S.A. – IMPREGILO S.p.A.

Architectural design of the station building

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro station Athens Attiko Metro Eleonas station Athens, Greece

Project Metro Station Building Pit

Construction Cost Total cost: approx. € 12,7 m.

Project Schedule Design: 2003 Construction: 2003-2004

Project Description Archeological findings during construction Pile anchored wall retaining structure Width: 30m Length: 40m Depth: 34m

Construction Method • Pile anchored wall retaining structure • Top down construction

Geology Alluvial deposits, man-made deposits Ground water Archaeological findings

Building pit SE view during construction Our Services • Detailed geotechnical & structural designs • Supervision during construction • Design jointly elaborated by OMIKRON KAPPA CONSULTING & EDR GmbH, Munich

Client J/V AKTOR S.A. – IMPREGILO S.p.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Metro Station Athens Attiko Metro Agios Antonios station Athens, Greece

Project Metro station building pit Retaining structures of the west blast shaft

Construction Cost Total cost: approx. € 10 m.

Project Schedule Design: 2002 -2004 Construction: 2002-2004

Project Description • Pile anchored wall retaining structure Station building pit Max. width: 75m Max. length: 150m Max. depth: 19,3m West blast shaft Length: 26m Max. width: 14,1m Max. depth: 14,5m

Construction Method • Pile anchored wall retaining structure •Top down construction

Geology Station building pit view during construction Alluvial deposits, man-made deposits Ground water Archaeological findings

Our Services • Detailed geotechnical & structural design • Design jointly elaborated by OMIKRON KAPPA CONSULTING & EDR GmbH, Munich

Construction Details • Construction of secant piles in the regions of the building pits over the tunnel portals and near the existing buildings • Pile walls anchoring with one to six rows of prestressed anchors Station during operation • Construction of Berlin walls in the perimeter of the building pit due to safety reasons

Client C. I. KALOGRITSAS S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Railway Project Consulting services, technical review and checking of designs and Panagopoula Railway Tunnel associated detailed designs Athens - Patras High Speed Railway Line, Section Rododafni – Psathopirgos Greece

Project • Consulting services, technical review and checking of the designs of the project: “Construction of the New Double High Speed Railway Line at the section Rododafni – Psathopirgos from CH. 91+500 until CH. 113+000 and Panagopoula Railway Tunnel design”. • Panagopoula railway tunnel detailed designs. Construction Cost Total cost: approx. € 293 m. Project Schedule Design – Construction: 2013 – 2016 West adit’s E&S class ΣΠ2 Project Description Consulting services, technical review and checking for the following structures: • Four (4) Roadway Bridges • Thirty (30) Railway Bridges • Fifty (50) Retaining Walls • Panagopoula twin bore railway tunnel including entrance and exit structures with total length ~8.500m Panagopoula railway tunnel detailed designs: • Panagopoula railway tunnel West adit Length: 68m, Cross section: 44m2, Overburden: 35m Bridge’s pilewall detail • Panagopoula railway tunnel West adit portal (Length : 18m , Piles Ø 1.20) • West cavern and cross gallery of Panagopoula railway tunnel Length: 52m, Cross section: 77m2, Overburden: 62m • Intermediate cavern and cross gallery of Panagopoula railway tunnel Length: 55m, Cross section: 77m2, Overburden: 202m

Geology Quaternary deposits of clayey scree from the marls weathering encountered in the area and pliocene and pleistocene sediments characterized by marls (stiff clays) and conglomerates alternations, limestones, chertstones Adit’s plan view Our Services • Consulting services, review and checking of the designs of the project in order to identify adequacy and incompleteness of the available desgns relevant to the projects’ feasibility and constructability • Detailed design of Panagopoula railway tunnel West adit and portal • Detailed designs of the intermediate and west caverns and cross galleries of Panagopoula railway tunnel Clients • AKTOR S.A. – J&P AVAX S.A. – INTRAKAT S.A. Joint Venture Adit’s portal pilewall • AKTOR S.A. – J&P AVAX S.A. Construction Joint Venture

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Railway Project Railway Tunnel SS5 of the New Double High Speed Railway Line Lianokladi - Domokos

Project Railway Tunnel SS5

Construction Cost Total cost: approx. € 5,5 m. Entrance portal view Project Schedule Design: 2010 Construction: 2008-2010

Project Description Excavation of the rest part of SS5 Tunnel Total length: 370m Unemined length 32m Excavation cross section: 160m2

Excavation Method NATM – Use of mechanical means Excavation and primary support Typical cross section Final Lining Reinforced concrete C30/37

Geology Basalts, schist-cherts

Our Services • Special detailed geotechnical design for the unexcavated section of the tunnel • Detailed structural design for the total length of the tunnel • Detailed design and rehabilitation of the entrance portal

Portal skew edge Construction Details • Use of forepoles and spiles • Excavation in two phases

Client AKTOR S.A.

Static simulation model

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Railway Project Twin Bore Railway Tunnel SS6 of the New Double High Speed Railway Line Lianokladi - Domokos Central Greece

Project Twin Bore Railway Tunnel SS6

Project Schedule Design: 2010 CtCostructi on: 2009 -

Project Description • Design of unmined part of tunnel, based on collected Exit portals view data from the already excavated part and on back analysis • Preliminary design check for the adequacy of final lining

Total tunnel length: 2 x 6400m Unmined length: 2 x 1800m Maximum overburden: 375m Excavation cross section: 120m2

Excavation Method NATM – Use of mechanical means and drilling & blasting

Final Lining Excavation and primary support Cross section Reinforced concrete C30/37

Geology Basalts, pillow lavas, dolerites, diabase, peridotites, schist-cherts

Our Services • Geotechnical design for the excavation and primary support of the unmined part of the tunnel • Check for the adequacy of final lining

Construction Details • Use of forepoles and spiles • Excavation in two phases

Client AKTOR S.A.

Finite elements model

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Platanos & Trapeza Railway Tunnels and associated Hydraulic Drainage Tunnel Athens - Patras High Speed Railway Line, Section Kiato - Egio Central Greece Project • Platanos railway tunnel • Trapeza railway tunnel • Water drainage tunnel Construction Cost Total cost : approx. € 100 m. Project Schedule Design: 2007 -2009 Construction: 2007 - Trapeza tunnel entrance portal Project Description –Section of Platanos Railway Tunnel Tunnel’s length: 500m Excavation cross section : 140m2 -Section of Trapeza Railway Tunnel Tunnel ‘s length: 2.715m Excavation cross section: 140m2 -Water Drainage Tunnel Tunnel ‘s length: 200m Cross section: 7m2 Method of tunnel excavation NATM – Use of mechanical means

TBM (Tunnel Boring Machine) for Trapeza tunnel pipe jacking Top heading Excavation geometry

Final Lining Reinforced concrete C30/37 and precast reinforced concrete segments Geology Marls, conglomerates, marine deposits Maximum overburden of Platanos tunnel: 90m Maximum overburden of Trapeza tunnel: 90m Maximum overburden of water drainage Tunnel: 30m Our Services Detailed geotechnical & structural design Construction Details • Use of forepoles and spiles Tunnel’s face – Grey Marl • Excavation in two phases • Pipe jacking technique Client AΚΤOR S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Railway Project Railway Embankments Design for the New Double High Speed Railway Line Liakokladi - Domokos Central Greece

Project Designs of reinforced embankments for the project: “Design of infrastructure Works from CH 25+000 until CH 52+000 of the New Double High Speed Railway Line at the section Lianokladi – Domokos”

Project Schedule Design: 2007 - 2009 Construction: 2008 - 2011

Project Description Total length of excavation works: 4000m Embankments : soil or rock fill material reinforced with geogrids Modulation geometry: one or double sided Reinforced slopes with gradient 2:3 DkDeck width: 13.0m–13.5 m Maximum height: 20m

Geology Recent disposals, scree, serpentinized peridodites, limestone’s flysh formations, weathered mantle, schistosed serpentinites, ophicalcites (encountered as highly weathered or as rocky formations)

Our Services • Detailed design • Construction drawings

Construction Details • Construction of drainage – foundation improvement layer and application of separation geotextile • Construction of embankments with soil fill materials • Foundation of the embankments with reinforced geogrids • Installation of 3-D protection geogrid for slope protection

Client Embankment typical cross sections Construction J/V AKTOR S.A. - TERNA S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Railway Project – Subbase and Trackbed Reinforcement Earthworks at North Portal of Kallidromo Railway Tunnel of the New Double High Speedld Railway Line Tithorea - Lianokla di Fthiotida Providence, Komnina Region

Project Subbbase and trackbed reinforcement of the new double track high

Γ S_GR_K / Σ

Γ Γ / / Σ speed railway line Tithorea-Lianokladi at section 14+300 – 19+000 Σ

ΑΞΟΝΑΣ

ΞΟΝΑΣ ΔΙΠΛΗΣ ΟΣ

Α

Ρ CiConstruction Cost Σ Total Cost: approx. 1,2 m. € ΑΡΙΣΤΕ ΑΞΟΝΑ ΔΕΞΙΟΣ

Project Schedule Design: 2009 - 2010 Construction: 2011 -

Project Description Determination of the subbase requirements of the new double track high speed railway line Tithorea-Lianokladi at section 14+300 – Subbase reinforcement with geogrids typical 19+000 cross section

Geomorphology – Geology • Clayey-marl formations, with scattered intercalations of sandy- marl • The presence of the sand layers in combination with the inclination of the layers acts as a water bank, creating confined water masses of hihigh h capacitity and hdhydros ttitatic pressure • During slope excavation, intense water flow was monitored from the sand layers of the “champagne” effect type and creation of mudflow

Our Services • Investigation of the in-situ geotechnical conditions of the subbase • Qualitative classification of the subbase according to UIC719R 2008 • Selection of the required subbase reinforcement according to UIC719R 2008 • Appropriate reinforcement of the subbase with geogrids and soil replacement in sections of the project where the minimum requirements of the UIC719R 2008 are not met.

Client Construction Joint Venture AKTOR S.A. – TERNA S.A. – J&P AVAX S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr σκυρόδεμα C20/25 διαστάσεων

1.40m(πλάτος)x1.20m(ύψος) .

Θ

.

.

Πά σσαλοι διάτμησης από Χ

Θ Special Geotechnical Applications – οπλισμένο σκυρόδεμα C20/25 .

διαστάσεων O100/2.00m, L=12.00m Χ

3 : 1

K-ê 4 ΟΡΙΟ ΑΠΑΛΛΟΤΡΙΩΣΗΣ :

3

Τμή 0 μα 4 . 31 Πα 1 σσ 30 άλω 29 L=6 ν Δ 2 1.2 ιάτ 8 0m μησ K-ð 2 4 η 7 : ς 26 3 2.0 25 0 24

% 23 3 4 2 : 2 1 21 2 Αρμός 2εκ. 0 Landslide Rehabilitation 19 1 1 8 : 1 17 16

% 15

4 0

1

0

1 : 4 4 . :

2

1

DSR6 13 3

1 4 2 :

2

1 3 3 : 11 . 1 3 10

0 %

9 μού 0 % Πόδας αναβαθ . 4

0

4 5

0 Αρμός 2εκ. 8 .

2 7 6 2.0 Στέψη αναβαθμού 5 0 0 % 1 0 4 . :

2 4 1 3 2

0

0

1 . 1 : Πόδας αναβαθμού % 7 0 1 4 4 .

1 0

0

.

5

% Στέψη αναβαθμού 4

0

0

. 1

0

:

2

0

.

1

2

%

4 Πόδας αναβαθμού

0

0

0 4%

. Earthworks at North Portal of 5

. 4%

5

6

Στέψη αναβαθμού

0

0

.

1 :

2

0 1

0

.

2

Πόδας αναβαθμού

0

0

. Αποστραγγιστική τάφρος

5 1 σύμ φωνα με υδραυλική μελέτη

4% : 0 1

5

.

6

Στέψη αναβαθμού 0

0

3 .

: 2 %

1

1 4

:

% 1 4

0

0

. 2 Πόδας αναβαθμού

0

0

.

% 1 5 : % 4 1 4

0

0 1 . :

2 1

3

: %

1 4 Στέψη αναβαθμού

0

%

0

.

4 Kallidromo Railway Tunnel 5 1 1 :1 : 1 % 4 1 0 βαθμού : 1 Πόδας ανα

0 : 1

.

6 1

2

0

.

2 2 Στέψη αναβαθμού

4% 1 : 1 % 4 1 3 : : 1 2 DSR6 1 Fthiotida Providence, Komnina Region BH2 :1 Πόδας αναβαθμού

1 :

% 1

4

3

:

1 4

6

. % Σχεδιασμός μόνιμων πρανών

5

4

2 σύμφ ωνα με εγκεκριμένες γεωτεχνικές μελέτες Εγκάρσια κανάλια εκροής σύμφωνα με υδραυλική μελέτη

1

:

1 Στέψη αναβαθμού

ΙΧΝΟΣ ΟΡΙΟΥ ΑΣΤΟΧΙΑΣ ΕΠΙ

3

1 : ΥΦΙΣΤΑΜΕΝΟΥ ΑΝΑΓΛΥΦΟΥ :

1

X.Θ. 15+714 - X.Θ. 15+820 1 Πόδας αναβαθμού

Project (07/2009)

% 4

Εγκάρσια κανάλια εκ ροής σύμ φωνα με υδραυλική μελέτη

5

4

3

.

2

1 .

4 5

4

3

: Landslide rehabilitation and slope protection in 3 areas of the project 1

0

1

.

7

2 from Ch. 15+365 up to Ch. 15+665 BH1

Αποστραγγιστική τάφρος σύμφωνα με υδραυλική μελέτη

ΑΞΟΝΑΣ ΔΙΠΛ from Ch. 15+710 up to Ch. 15+835 ΗΣ ΣΙΔ. ΓΡΑΜΜΗΣ from Ch. 16+651 up to Ch. 16+804 Excavation layout for the partial removal of landslided masses Construction Cost Total Cost: approx. 4 m. €

Π Σ ΕΡΙΟΧΗ ΕΦΑΡΜΟΓΗΣ Η ΤΥΠΙΚΗΣ Τ ΔΙΑΤΟΜΗΣ 787 Ε ΠΕΡΙΟΧΗ ΕΦΑΡΜΟΓΗΣ Λ 5 ΠΕ 3 ΡΙΟΧ Ε Η ΕΦ 0 ΤΥΠΙΚΗΣ ΔΙΑΤΟΜΗΣ ΑΡΜΟΓΗΣ 3 8 786 : 0

Μ . 1 Τ + ΥΠΙΚΗΣ ΔΙΑΤΟΜΗΣ 784 0

5 Σ Σχεδιασμ ός μόνιμων πρανών 7 1

Ο ΙΧΝΟΣ ΟΡΙΟΥ ΑΣΤΟΧΙΑΣ ΕΠΙ 7

0 . σύμφωνα με εγκεκριμένες

+ Λ γεωτεχνικές μελέτες ΥΦΙΣΤΑΜΕΝΟΥ ΑΝΑΓΛΥΦΟΥ 0 Σ . Θ

5 Ε . X.Θ. 15+714 - X.Θ. 15+820

Η 0

5

1

Τ

Χ 0 (07/2009) Τ 2

. .

7

Ε

0

Θ

+

. Κεφαλόδεσμος από οπ λισμένο Λ 1

5

7

Χ σκυρόδεμα C20/25 διαστάσεων Ε 1

+ Project Schedule

Μ 1.40m(πλάτος)x1.20m(ύψος) .

5

1

Θ

Η

.

.

Πάσσαλοι διάτμησης από Χ Χ

Θ

Ρ οπλισμένο σκυρόδεμα C20/25 .

διαστάσεων O100/2.00m, L=12.00m Α ΟΡΙΟ ΜΟΝΙΜΗΣ ΕΚΣΚΑΦΗΣ Χ

3 : 1

ΕΠΙΧΩΜΑ ΧΩ ΡΙ Σ ΟΠΛΙΣΗ K-ê ΟΡΙΟ ΑΠΑΛΛΟΤΡΙΩΣΗΣ

Τ μήμ α Π 31 ασσ Design: 2009 - 2010 30 άλ ω 29 L=6 ν Δ 2 1.2 ιάτ 8 0m μησ K-ð 27 ης 26 25 2 4 3 : 23 1 22 21 2 Αρμός 2εκ. 0 19 18 17 16 15 14 DSR6 13 Construction: 2011 - 12 11 10 9 % 4 Αρμός 2εκ. 8 7 6 5 Ã 4 3 2 1

% 4

ΕΠΙΧΩΜΑ ΧΩΡΙΣ ΟΠΛΙΣΗ

3 0 : 5 . 1 2

0 5 . Project Description 2

ΕΠΙΧΩΜΑ ΜΕ ΟΠΛΙΣΗ ΓΕΩΠΛΕΓΜΑΤΩΝ

Απ οστρα γγ ισ τικ ή τάφρος σύμφωνα με υδραυλική μελέτη % 4 B 3 3

: :

1 1

3

:

Όριο επιχώματος 1 σταθεροποίησης - αποκατάστασης Works for the stabilization of the landslide phenomena and the final 2

6

.

0

2

6

9

.

4

1

3

: Αποστραγγιστική τάφρος 1 rehabilitation of the area, taking into account the in-situ conditions and σύμφωνα με υδραυλική μελέτη

0

0

.

4 0 3

0 :

. 2

4 Á DSR6 BH2 DSR6

3

:

1

Σχεδιασμός μόνιμων πρανών

3 : σύμφωνα με εγκεκριμένες 1

3 minimizing any destabilization risks. : γεωτεχνικές μελέτες Εγ κάρ σια κανά λια εκ ροής 1 σύμφωνα με υδραυλική μελέτη

3

:

1

Όριο επιχώματος ΙΧΝΟΣ ΟΡΙΟΥ ΑΣΤΟΧΙΑΣ ΕΠ Ι σταθεροποίησης -

3 ΥΦΙΣΤΑΜΕΝΟΥ ΑΝΑΓΛΥΦΟΥ αποκατάστασης : X.Θ. 15+714 - X.Θ. 15+820 1 Total affected area ~ 28,000m2 (07/2009)

0

5

.

7

0

4

5

.

7

4 Εγκάρσια κανάλια εκροής σύμφωνα με υδραυλική μελέτη

4

2

.

5

4 ΕΠΙΧΩΜΑ ΜΕ ΟΠΛΙΣΗ ΓΕΩΠΛΕΓΜΑΤΩΝ

Geology BH1 Αποστραγγιστική τάφρος σύμφωνα με υδραυλική μελέτη

1

3

.

3 1 ΑΞΟΝΑΣ Δ • Clayey-marl formations, with scattered intercalations of sandy-marl ΙΠΛΗΣ ΣΙΔ. ΓΡΑΜΜΗΣ

3

: • The presence of the sand layers in combination with the inclination of 1 the layers acts as a water bank, creating confined water masses of Surface final layout and rehabilitation high capacity and hydrostatic pressure • During slope excavation, intense water flow was monitored from the sand layers of the “champpgagne” effect type and creation of mudflow Our Services

DSR6

ΛΕΠΤ. "Α" 4% 4%

• Geotechnical investigation program and geotechnical interpretation of 4%

4%

4%

ΛΕΠΤ. "B"

4%

Í.Ó.ÃÑÁÌÌÇ the landsliding mechanism 4% • Drainage works design 4% 4% • Design of the best possible slope layout and removal of the landslide materials • Stabilization and rehabilitation embankments • Landslide retaining pilewalls Slope failure rehabilitation typical cross section • Long-term anticorrosion slope protection • Execution of back analysis and determination of the potential sliding surfaces Design Details • Excavation layout for partial removal of landslide material on 1:3 slopes • Geometrical and reinforcement calculation of the necessary pilewall systems for the protection of the excavations and strengthening of the subbase • Application of reinforced embankment for stabilization and rehabilitation of the area with 1:3 slope • Application of 3D geocomposite and adequate hydraulic protection of the slopes Client Terrain slide failure signs Construction Joint Venture AKTOR S.A. – TERNA S.A. – J&P AVAX S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr Railway Excavation Works Railway Cut Design High Speed Railway Line, PATHE Axis, Kakia Skala Section Central Greece

Project Excavation of permanent slopes for the high speed railway line

Construction Cost Total cost: approx. € 0,9 m.

Project Schedule Design: 2002 Construction: 2002-2003

Project Description Length: 100m Max. height: 40m

Modulation geometry: Slopes view during construction 4 slopes with gradient 3:1 and intermediate benches with 4m width

Construction Method Mechanical excavation due to the vicinity with the existing railway line

Geology • Brecciated limestones, in a seismically active area • Steep morphology with loose limestone blocks, probably unstable

Our Services • Detailed geotechnical design • Construction drawings

Construction Details • Elaboration of a special excavation method in Typical cross section distinct phases with application of rockbolts in the ground of each excavation phase • Design of rockfall barriers • Protection wall and special barriers installed to prevent rockfalls and to absorb kinetic energy, for the protection of the existing Railway Line • Design of prestressed anchors for the support of the permanent slopes

Client ALTE S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr