Catálogo 2018
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Lantania to Carry out the Renovation Work of Metrovalencia Line 1
Press release Lantania to carry out the renovation work of Metrovalencia Line 1 The contract awarded to the company in a joint venture with COMSA amounts to 18 million euros In Madrid, June 3rd, 2021 Ferrocarrils de la Generalitat Valenciana (FGV) has awarded the contract to the UTE (Temporary Joint Venture) formed by Lantania and COMSA to complete the renovation work of Line 1 of Metrovalencia. The budget for this contract amounts to 18 million euros, including taxes, and the time period for the completion of the work is 30 months. The work will be carried out on the section between the Valencia Sud and Villanueva de Castellón stations on Line 1 of the Valencia metro. It will mainly consist of the replacement of the existing turnouts and the activation and modification of interlockings and centralised traffic control systems (CTC) due to changes in track configurations at some stations. Several branches will also have their tracks replaced, the most significant being the section between Paiporta- Torrent (3,600 m) and Espioca- Almaguer (1,880 m). In addition, the level crossings will be renovated, both for vehicles and pedestrians, which will involve refurbishing the track in the affected area. A Strail type level crossing which is made from a mixture of recycled and new rubber will also be installed. The main work that will be undertaken is the replacement of 45 turnouts, the supply and installation of 14,374 prestressed monoblock concrete sleepers and the supply and placement of 24,932 m3 of ballast. The renovation work will affect the stations of Paiporta, Picanya, Torrent, Alcasser, Picassent (San Ramón), Benifaió, Alginet, Carlet, Alcudia, Massalaves, Alberic and Villanueva de Castellón. -
Texto Tomado De La Revista Vía Libre Mayo-Junio 2020
operadores El ferrocarril ante la crisis sanitaria La crisis sanitaria provocada por la pan- del Congreso el 27 de abril, se pusieron en marcha las primeras medidas, basadas en directrices del Ministe- demia del coronavirus ha afectado desde rio de Sanidad. Así, se adaptaron y revisaron los protocolos el punto de vista sanitario, social y eco- de actuación existentes en relación con el transpor- nómico a todo el mundo, sin exclusión te de viajeros, y a principios de marzo se implantó un procedimiento específico de actuación frente a posi- de sectores o segmentos de actividad. En bles casos en el ámbito ferroviario. Ya el 12 de marzo, Renfe abrió la posibilidad de devolución o el cambio el ferrocarril, que une a su condición de de billetes sin sobrecoste. El estado de alarma, de quince días de dura- estratégico social y económicamente, la ción inicial, en el ámbito del transporte supuso la he- de ser el del modo de transporte masivo rramienta para hacer frente a la crisis sanitaria, redu- ciendo la movilidad de los viajeros y garantizando el por excelencia, la pandemia y las medi- abastecimiento. El Real Decreto reducía los servicios, estable- das tomadas para atajarla, han puesto a cía la obligación de realizar una limpieza diaria de los vehículos de transporte, la inclusión de mensajes en prueba, como ninguna otra circunstancia, los sistemas de venta de billetes desaconsejando el a administraciones, reguladores, gestores viaje, y la necesidad de adoptar la máxima separación posible entre los pasajeros. de infraestructura, operadores e industria. Además, daba a los operadores un plazo de cinco días para cumplir con la oferta establecida de forma homogénea entre los distintos servicios, y facultaba a las autoridades competentes delegadas Ya antes de la declaración del estado de alarma, el 14 para adoptar medidas adicionales de limitación en de marzo, según detalló el ministro de Transportes, el transporte colectivo, necesarias para preservar la Movilidad y Agenda Urbana, José Luis Ábalos, en su salud pública. -
Pais Vasco 2018
The País Vasco Maribel’s Guide to the Spanish Basque Country © Maribel’s Guides for the Sophisticated Traveler ™ August 2018 [email protected] Maribel’s Guides © Page !1 INDEX Planning Your Trip - Page 3 Navarra-Navarre - Page 77 Must Sees in the País Vasco - Page 6 • Dining in Navarra • Wine Touring in Navarra Lodging in the País Vasco - Page 7 The Urdaibai Biosphere Reserve - Page 84 Festivals in the País Vasco - Page 9 • Staying in the Urdaibai Visiting a Txakoli Vineyard - Page 12 • Festivals in the Urdaibai Basque Cider Country - Page 15 Gernika-Lomo - Page 93 San Sebastián-Donostia - Page 17 • Dining in Gernika • Exploring Donostia on your own • Excursions from Gernika • City Tours • The Eastern Coastal Drive • San Sebastián’s Beaches • Inland from Lekeitio • Cooking Schools and Classes • Your Western Coastal Excursion • Donostia’s Markets Bilbao - Page 108 • Sociedad Gastronómica • Sightseeing • Performing Arts • Pintxos Hopping • Doing The “Txikiteo” or “Poteo” • Dining In Bilbao • Dining in San Sebastián • Dining Outside Of Bilbao • Dining on Mondays in Donostia • Shopping Lodging in San Sebastián - Page 51 • Staying in Bilbao • On La Concha Beach • Staying outside Bilbao • Near La Concha Beach Excursions from Bilbao - Page 132 • In the Parte Vieja • A pretty drive inland to Elorrio & Axpe-Atxondo • In the heart of Donostia • Dining in the countryside • Near Zurriola Beach • To the beach • Near Ondarreta Beach • The Switzerland of the País Vasco • Renting an apartment in San Sebastián Vitoria-Gasteiz - Page 135 Coastal -
Boletín De Sumarios
BOLETÍN DE SUMARIOS Esta nueva entrega del Boletín de Sumarios recoge 202 nuevos números, correspondientes a 55 títulos distintos, recibidos en la Biblioteca durante enero, febrero y marzo de 2013. Ordenados alfabéticamente, los títulos van seguidos de los números recibidos que, mediante enlaces, permiten acceder a los sumarios correspondientes. Si desea consultar alguna de estas revistas, puede hacerlo en la Sala de Lectura de la Biblioteca de Cultura. La mayoría de ellas se encuentra también en la Biblioteca Nacional. Si usted se encuentra fuera de Madrid, puede dirigirse a la Red de Bibliotecas de su Comunidad. Confiamos en que la información que ofrecen estos boletines sea de utilidad y rogamos remitan cualquier sugerencia sobre este servicio al buzón [email protected] Secretaría General Técnica Subdirección General de Documentación y Publicaciones Academia Núm. 196 (2013) ADE Teatro Núms. 141, 143 (2012) Album Núm. 111 (2012) Arte y Parte Núms. 97, 98, 99, 100, 101 (2012); Núm. 102 (2013) AV Núms. 151, 152 (2011); Núms. 153-154, 155, 156 (2012) AV Proyectos Núms. 47, 48 (2011); Núms. 49, 50, 51, 52 (2012) BBF: Bulletin Des Bibliothèques de France Núm. 6 (2012) BJC: Boletín de Jurisprudencia Constitucional Núms. 371-372, 374 (2012) Boletín de la Institución Libre de Enseñanza Núms. 85-86, 87-88 (2012) Boletín del Museo del Prado Núm. 47 (2011) Claves de Razón Práctica Núms. 220, 221, 222, 223, 224, 225 (2012) Clij Núms. 245, 246, 247, 248, 249, 250 (2012) Cuadernos Hispanoamericanos Núms. 749, 750 (2012); 751, 752 (2013) Cultural Trends Vol. 21 núm 4 (2012) Delibros Núm. -
Estudio De Los Tranvías De España En La Actualidad
ESTUDIO DE LOS TRANVÍAS DE ESPAÑA EN LA ACTUALIDAD PROYECTO FINAL DE CARRERA: Estudio de los tranvías de España en la actualidad Carmen Castañer Castillo DIRECTOR Luis Lezaún ESPECIALIDAD Mecánica CONVOCATORIA Junio 2010 ESTUDIO DE LOS TRANVÍAS DE ESPAÑA EN LA ACTUALIDAD ÍNDICE 1. Introducción ..................................................................................................................... 1 2. Historia del tranvía........................................................................................................... 2 2.1 Historia del tranvía de Zaragoza.............................................................................. 5 2.1.1 Antiguas líneas del tranvía............................................................................... 5 2.1.2 Las Primeras Máquinas................................................................................. 12 3. Funcionamiento del tranvía............................................................................................ 15 3.1. Clasificación .......................................................................................................... 17 4. Tranvías de España en la actualidad .............................................................................. 18 4.1. Tranvías Comunidad Valenciana........................................................................... 19 4.1.1. Valencia ......................................................................................................... 19 4.1.2. Alicante......................................................................................................... -
Athens Metro Athens Metro
ATHENSATHENS METROMETRO Past,Past, PresentPresent && FutureFuture Dr. G. Leoutsakos ATTIKO METRO S.A. 46th ECCE Meeting Athens, 19 October 2007 ATHENS METRO LINES HELLENIC MINISTRY FORFOR THETHE ENVIRONMENT,ENVIRONMENT, PHYSICALPHYSICAL PLANNINGPLANNING ANDAND PUBLICPUBLIC WORKSWORKS METRO NETWORK PHASES Line 1 (26 km, 23 stations, 1 depot, 220 train cars) Base Project (17.5 km, 20 stations, 1 depot, 168 train cars) [2000] First phase extensions (8.7 km, 4 stations, 1 depot, 126 train cars) [2004] + airport link 20.9 km, 4 stations (shared with Suburban Rail) [2004] + 4.3 km, 3 stations [2007] Extensions under construction (8.5 km, 10 stations, 2 depots, 102 train cars) [2008-2010] Extensions under tender (8.2 km, 7 stations) [2013] New line 4 (21 km, 20 stations, 1 depot, 180 train cars) [2020] LINE 1 – ISAP 9 26 km long 9 24 stations 9 3.1 km of underground line 9 In operation since 1869 9 450,000 passengers/day LENGTH BASE PROJECT STATIONS (km) Line 2 Sepolia – Dafni 9.2 12 BASE PROJECT Monastirakiι – Ethniki Line 3 8.4 8 Amyna TOTAL 17.6 20 HELLENIC MINISTRY FORFOR THETHE ENVIRONMENT,ENVIRONMENT, PHYSICALPHYSICAL PLANNINGPLANNING ANDAND PUBLICPUBLIC WORKSWORKS LENGTH PROJECTS IN OPERATION STATIONS (km.) PROJECTS IN Line 2 Ag. Antonios – Ag. Dimitrios 30.4 27 Line 3 Egaleo – Doukissis Plakentias OPERATION Doukissis Plakentias – Αirport Line 3 (Suburban Line in common 20.7 4 use with the Metro) TOTAL 51.1 31 HELLENIC MINISTRY FORFOR THETHE ENVIRONMENT,ENVIRONMENT, PHYSICALPHYSICAL PLANNINGPLANNING ANDAND PUBLICPUBLIC WORKSWORKS -
Informe Encuesta Satisfacción Metrovalencia
Client logo [delete the right line and the grey box if not required] ESTUDIO SATISFACCIÓN DE CLIENTES ESTUDIO SATISFACCIÓN DE CLIENTES Informe de resultados. Noviembre2016 2017 Estudio nº: 14941 Persona de contacto en GfK Emer Ad-Hoc Research: Carlos Minguez [email protected] ER- 0484/1/00 A50/000021 Mª Ángeles Rodríguez [email protected] © GfK 20122017 | TitleEstudio of presentation de Satisfacción | DD. de Month Clientes| 2012 Noviembre 2017 1 Client logo [delete the right line and the grey box if not required] 1. Introducción © GfK 20122017 | TitleEstudio of presentation de Satisfacción | DD. de Month Clientes| 2012 Noviembre 2017 2 Client logo [delete the right line and the grey box if Objetivos principales del estudio not required] El estudio de satisfacción de los usuarios de Metrovalencia tiene dos objetivos principales: 1. Análisis de la satisfacción de los usuarios de Metrovalencia. Este objetivo engloba los siguientes indicadores: Medición de la calidad del servicio ofrecido por Metrovalencia en sus líneas: ISC 2017 Análisis a nivel de factores y atributos: jerarquización de la importancia de los atributos en la formación de la satisfacción global y nivel de satisfacción en cada atributo El análisis de satisfacción de los usuarios se realiza en términos evolutivos. El análisis de satisfacción se desarrolla en la parte II del informe © GfK 20122017 | TitleEstudio of presentation de Satisfacción | DD. de Month Clientes| 2012 Noviembre 2017 3 Client logo [delete the right line and the grey box if Objetivos principales -
Donostia 2016
Maribel’s Guide to San Sebastián © January 2016 SAN SEBASTIÁN-DONOSTIA (GIPÚZKOA) INDEX Web Resources and Travel Planning - Page 2 Donostia’s Markets - Page 13 Getting to San Sebastián - Page 2 Performing Arts - Page 14 San Sebastián-Donostia - Page 3 Cooking Schools and Classes - Page 15 Sightseeing - Page 4 Thalassotherapy - Page 16 • Kursaal Performing Arts Center Beaches - Page 17 • Zurriola Bridge Maribel’s San Sebastián Dining Guide - Page 18 Alderi-Elder Park • • Pintxos in the Parte Vieja - Page 19 Peine del Viento, “Comb of the Wind” • • Pintxos in the Gros Quarter - Page 26 Mount Igueldo • • Pintxos in El Centro - Page 29 Palacio de Miramar • • Creative and Contemporary Cuisine - Page 30 Mont Urgell • • Dining with Panoramic Views - Page 33 Naval Museum • • Dining on Mondays - Page 34 Aquarium • • Moderately Priced Fine Dining - Page 36 Island of Santa Clara • • Casual Dining at the Pier - Page 36 Constitution Square • • Dining in El Antiguo - Page 37 Basílica de Santa María del Coro • • Gastronomic Splurges outside the city - Page 38 • Catedral del Buen Pastor Craft Cocktails - Page 39 • Iglesia de San Vicente • Cristo de la Mota My Shopping Guide - Page 40 • Victoria Eugenia Theatre Lodging in San Sebastian-Donostia Surfboards and Bike Rentals - Page 9 • On or near La Concha Beach - Page 42 Museo Chillida-Leku - Page 10 • In The Old Quarter, the Parte Vieja - Page 45 City Tours - Page 11 • In The Gros Quarter, near Zurriola Beach - Page 45 Private Pintxos Tours - Page 12 • Staying in “El Antiguo” - Page 46 Maribel’s Guides for the Sophisticated Traveler ™ Page !1 Maribel’s Guide to San Sebastián © January 2016 WEB RESOURCES AND TRAVEL PLANNING INFORMATION ON THE WEB • Euskadi Tourism - tourism.euskadi.eus • Basque Country Tourism - www.basquecountry-tourism.com • San Sebastian Tourism - www.sansebastianturismo.com • International Jazz Festival - www.heinekenjazzaldia.com • San Sebastian Film Festival - www.sansebastianfestival.com TRAVEL PLANNING SERVICES Exclusive Travel Planning Services by Iberian Traveler & Maribel's Guides. -
Maribel's Guide to San Sebastián-Donostia © The
Maribel’s Guides For The Sophisticated Traveler ™ 3rd Edition May 2015 MARIBEL’S GUIDE TO SAN SEBASTIÁN-DONOSTIA © THE BASQUE COUNTRY – PAÍS VASCO INDEX Getting to San Sebastián - Page 2 Maribel’s San Sebastián Dining Guide San Sebastián-Donostia - Page 3 Donostia’s Michelin Stars - Page 21 Tourist Information - Page 4 Pintxos in the Parte Vieja (old city) - Page 22 Sightseeing in Donostia - Page 5 Pintxos in the Gros Quarter - Page 28 City Tours - Page 12 Creative and Contemporary Cuisine - Page 32 Dining with Panoramic Views - Page 35 Private Pintxos Tours - Page 13 Moderately Priced Fine Dining - Page 36 Cooking Schools-Classes - Page 13 Dining on Mondays - Page 37 Visit To A Cider House - Page 14 Casual Dining at the Pier - Page 39 Performing Arts - Page 15 Gastronomic Splurges outside of the city - Page 40 Donostia’s Markets - Page 16 Lodging in San Sebastian-Donostia - Page 41 Thalassotherapy - Page 17 Staying in El Antiguo - Page 45 Craft Cocktails - Page 18 Dining in El Antiguo - Page 46 Maribel’s Shopping Guide - Page 19 Maribel’s Guide to San Sebastián-Donostia © 1 Maribel’s Guides For The Sophisticated Traveler ™ 3rd Edition May 2015 WEB RESOURCES INFORMATION ON THE WEB • Euskadi Tourism - tourism.euskadi.eus • Basque Country Tourism - www.basquecountry-tourism.com • San Sebastian Tourism - www.sansebastianturismo.com • International Jazz Festival - www.heinekenjazzaldia.com • San Sebastian Film Festival - www.sansebastianfestival.com TRAVEL PLANNING SERVICES Exclusive Travel Planning Services by Iberian Traveler & Maribel's Guides. Contact Maribel to arrange a custom itinerary for your trip to Spain, Portugal, Paris or southwest France. Travel planning services are fee based, depending on the length of your trip. -
Memoria De Actividades Fundacionales 2020
Memoria de actividades 2020 Índice LA FUNDACIÓN Introducción ............................................................................................................................................ 9 Órganos de la Fundación ................................................................................................................. 10 Fines de la Fundación ........................................................................................................................ 12 Actividades a desarrollar para el cumplimiento de sus fines ......................................... 13 Datos económicos ............................................................................................................................... 14 Relaciones Institucionales ............................................................................................................... 17 Plan Estratégico .................................................................................................................................... 21 MEMORIA DE ACTIVIDADES Museo del Ferrocarril de Madrid .................................................................................................. 29 Museo del Ferrocarril de Cataluña .............................................................................................. 61 Acción Cultural y Comunicación .................................................................................................. 73 Vías Verdes ............................................................................................................................................. -
Member States
EUR million Member States Belgium 1 755,0 Gas storage, transport and transmission throughout Belgium Fluxys 120,0 Construction of two combined cycle gas-fired units in Lelystadt-Flevoland (Netherlands), combined cycle gas-fired unit in Amercoeur-Hainaut and blast furnace residue gas-fired unit at Arcelor plant in Ghent Electrabel SA 25,0 (Belgium) Construction and operation of first phase of Belgium's second large offshore wind farm Special purpose entity/fund 300,0 Financing of small and medium-scale renewable energy projects Dexia Banque Belgique 150,0 Construction and rehabilitation of regional wastewater treatment facilities in Flemish region Aquafin NV 100,0 Construction and modernisation of sewerage networks in Flemish region, comprising East and West Aquafin NV 200,0 Flanders, Antwerp, Flemish Brabant and Limburg Compagnie Upgrading of drinking water supply networks in Greater Liège Intercommunale Liégeoise 120,0 des Eaux Urban regeneration comprising demolition, upgrading and repair of social housing and associated social Société Wallonne du 250,0 and urban infrastructure in Walloon region Logement Vlaamse Maatschappij voor Modernisation, refurbishment and reconstruction of 7 500 rented social housing units 200,0 Sociaal Wonen NV RDI in fields of cancer diagnosis and therapy on various sites Ion Beam Applications S.A. 50,0 R&D in field of hardware and software for virtual simulation, prototyping and testing technologies in LMS International NV 15,0 Leuven (Belgium), Brasov (Romania) and Lyon (France) Financing of small and medium-scale projects carried out by SMEs ING Bank N.V. 75,0 Fortis Banque SA 150,0 Bulgaria 173,5 Rehabilitation of three major junctions in Sofia's road network Sofia Municipality 43,5 Financing of small and medium-scale projects carried out by SMEs Erste Group Bank AG 5,0 Eurobank EFG Bulgaria AD 50,0 Piraeus Bank Bulgaria AD 40,0 Bulgarian Development 25,0 Bank AD Alpha Bank AE 10,0 Czech Republic 1 860,5 Upgrading and extension of electricity distribution network across large part of Czech Republic ČEZ Distribuce, a.s. -
Urban Guidance: Detailed Coverage for Supported Transit Systems
Urban Guidance: Detailed coverage for supported transit systems Andorra .................................................................................................................................................. 3 Argentina ............................................................................................................................................... 4 Australia ................................................................................................................................................. 5 Austria .................................................................................................................................................... 7 Belgium .................................................................................................................................................. 8 Brazil ...................................................................................................................................................... 9 Canada ................................................................................................................................................ 10 Chile ..................................................................................................................................................... 11 Colombia .............................................................................................................................................. 12 Croatia .................................................................................................................................................