Nestrans Draft Nestrans Strategic Investment Programme - 2017/18 Appendix 2

Total Page:16

File Type:pdf, Size:1020Kb

Nestrans Draft Nestrans Strategic Investment Programme - 2017/18 Appendix 2 Nestrans Draft Nestrans Strategic Investment Programme - 2017/18 Appendix 2 RTS Project Project Details 2016/17 2017/18 2017/18 delayed proposals draft draw down budget IC1 Rail Kintore Railway Station Design of Car Park, Further works associated with Station Fund Bid and £527,000 £488,000 £1,015,000 Legal Costs associated with the Compulsory Purchase Order THEME TOTAL £527,000 £488,000 £1,015,000 IC2a Strategic Road Capacity Improvements Strategic network monitoring Phase The Third phased deployment of an Internet Protocol closed-circuit £150,000 £150,000 3 television (IPCCTV) equipment at traffic signals, along strategic transport corridors. This phase would aim to further capture nodes along A956 Wellington Road and King Street and the A944 corridor. AWPR Signage in Aberdeenshire Development of Signage Strategy and Preliminary Design of Strategic £30,000 £30,000 Signage THEME TOTAL £30,000 £150,000 £180,000 IC2b Strategic Road Safety Improvements A947 Road Safety Improvements Delivery of Action Plan and Development of Business Cases for £80,000 £80,000 individual schemes along the corridor A92 / A90 Lower Northwater Bridge Reflective Road Studs £1,680 £1,680 A93 Peterculter to Braemar Reflective Road Studs £21,112 £21,112 A944 / B993 to A97 Reflective Road Studs £28,630 A97 / A944 to Formartine Reflective Road Studs £48,426 A93 Neth Knox Embankment Reconstruction (Gabions) £100,000 B9119 Queen’s Cross pedestrian Two pedestrian crossings at the Queens Cross Roundabout (Queens £25,000 £25,000 crossing upgrades Road and Carden Place) have been the location of child pedestrian injury accidents. It is proposed to provide additional and updated infrastructure at these locations to highlight the crossings to drivers, reducing red light running, and make a safer environment for pedestrians. Improvements are likely to include carden place being upgraded to a puffin and incorporating a refuge island on Queens road crossing with an additional signal pole. THEME TOTAL £0 £304,848 £304,848 IC2d Strategic Road Prioritised Maintenance A947 Mill of Kingoodie Bends Phase Resurfacing £100,050 £100,050 2 A947 Lower Woodton to Birkenshills Resurfacing £125,020 £125,020 A93 Bridge of Canny to Sluie Surface Dressing £73,858 £73,858 THEME TOTAL £0 £298,928 £298,928 IC3 Bus improvements A93 Crathes Mini Interchange Hub Contribution towards the creation of a Mini Interchange Hub which £70,000 £70,000 would include for a designated car park, improved bus stop facilities and pedestrian crossing facilities Ellon Park & Ride Additional external waiting facilities and upgrade to turning circle to £470,000 £470,000 accommodate 15m vehicles Aberdeen City and Shire Joint Bus In accordance with Council's Bus Information Strategy documents - £20,000 £20,000 Stop Information Initiatives. replace and/or provide bus timetable display cases at bus stops within Aberdeen City and Shire Oldmeldrum Interchange Hub Contribution towards the development of a Mini Interchange Hub at £250,000 £250,000 Oldmeldrum to compliment the existing commercial services operated THEME TOTAL £540,000 £270,000 £810,000 IC6 Walking and Cycling A96 Inverurie - Kintore Cycleway Contribution to the Construction a Shared Used Footway / Cycleway £54,000 £54,000 Connecting Kintore Railway Station to Thainstone Business Centre Feasibility and Design of Future Feasibility and Design of Future Cycleway / Footway Schemes £15,000 £15,000 Cycleway Schemes associated with the 5 ITT Towns being developed by Aberdeenshire which include for Peterhead, Ellon, Huntly, Portlethen & Inverurie Long Distance Paths Development of Long Distance paths as per Active Travel Action Plan £15,000 £50,000 £65,000 River Don Paths - Farburn Formalising and widening of existing narrow dust paths and the £40,000 £40,000 replacement of existing bridge across the Farburn to improve a section of the River Don path behind the Burnside Drive Flats in Dyce. River Don Paths - Mugiemoss Link Formalising and widening of current track to provide an active travel link £28,250 £28,250 between the River Don Path and the NCN 1 at A947/Mugiemoss Road in Dyce. River Don Paths - Seaton Park Creation of a new Ped - Cycle Entrance opposite Lord Hay's Grove to £11,000 £0 £11,000 Entrance provide a active link between the Seaton Park paths and through to the Beach Esplanade River Don Paths - Arjo Wiggins Construction of a ped cycle link path through Arjo Wiggins site following £40,000 £40,000 desire line. Linking Stoneywood and existing River Don path. RTS Project Project Details 2016/17 2017/18 2017/18 delayed proposals draft draw down budget A90 Trunk Road Cycle Route - Construction of a shared use cycle route connecting the existing £100,000 £100,000 Parkway Extension facilities on the Parkway (A90) at Balgownie Road to the Third Don Cycle Facilities at Gordons Brae. Anderson Drive Phase 1 Continuation of design and development of a shared use cycle route £15,000 £15,000 between Deeside way and Riverside Cycle Route along the western side of Anderson Drive (A90). Junction Alterations (LiB) Detailed design of options for alterations to Broomhill Road - Anderson £25,000 £25,000 Drive and Westburn/Lang Stracht - Anderson Drive with a focus on improvements for Active travel. Junction Alterations (LiB) Phase 2 Feasibility of options to improve active travel at the junctions on the A90 £25,000 £25,000 Anderson Drive with Great Western Rd, Cromwell Rd, Queens Rd, Provost Fraser Dr and Rosehill Dr/Provost Rust Dr. Riverside Cycleway BoD to RGU Design and development of a shared use cycle path along the north £20,000 bank of the River Dee linking the existing cycle facilities at the Bridge of Dee with RGU Garthdee campus. Craigshaw Cycle Route Development of design options for a cycle route on Craigshaw Road to £15,000 create a designated cycle link between the Shell path and Wellington Road. Project will include detailed design of preferred option. Wellheads Drive Cycle Route Completion of design and construction of an extension to the Welheads £10,000 £10,000 Cycle route to Farburn Terrace. Middlefield & Northfield Active Travel Contribution to Active Travel improvements in Middlefield and £150,500 £150,500 Project Northfield. Works will include improvement to active travel infrastructure to link up residential, education and commercial buildings in this area including links to existing and planned strategic cycle links . Nestrans funding will specifically be utilised to improve ped-cyclists crossings on Manor Avenue and Provost Rust Drive and ped /cycle directional signage. THEME TOTAL £255,000 £358,750 £613,750 CR1 Carbon Reduction and Air Quality Hydrogen Fuel Cell Vans This project will test prototype range extended vehicles including vans £53,000 £53,000 and large trucks to prove their viability and their role in delivering EU and national energy and climate change targets. Hydrogen Fuel Cell Electric Vehicles (FCEVs) are important to green transport solutions as they have a larger range than electric battery vehicles. The proposed budget allows for the purchase of 2 vehicles, with European and ACC funding allowing 10 prototype vans to be purchased, increasing the demand for the initial refuelling infrastructure within Aberdeen City. The vans will be trialled by Aberdeen City Council, Co-Wheels, NHS Grampian and selected private sector companies with large fleets of vans to widen the participation and hydrogen awareness opportunities for both the private and public sector. Aberdeen City Hydro Energy Storage Further contribution to the construction of this project. £186,474 £186,474 (ACHES) THEME TOTAL £53,000 £186,474 £239,474 Various Fraserburgh/Peterhead to Aberdeen STAG Part 2 study £50,000 £50,000 Strategic Transport Study VMS Phase 3 - possible sites being: The third phase of Variable Message Sign (VMS) deployment to capture £165,000 £165,000 A90 Ellon Road sbd, just south of location where decision points arise in relation to the AWPR. This would roundabout at B&Q, A947 see an additional three signs deployed to capture decision points for Newmachar to Dyce Road, sbd, prior routing onto the AWPR once opened. It will also allow advertising of to AWPR junctions and A93 ebd, Park and Ride locations where appropriate. prior to AWPR junction THEME TOTAL £0 £215,000 £215,000 TOTAL £1,405,000 £2,272,000 £3,677,000 SUMMARY Rail £527,000 £488,000 £1,015,000 Strategic road capacity improvements £30,000 £150,000 £180,000 Strategic road safety improvements £0 £304,848 £304,848 Strategic road maintenance £0 £298,928 £298,928 Bus improvements £540,000 £270,000 £810,000 Walking and Cycling £255,000 £358,750 £613,750 Carbon Reduction and Air Quality £53,000 £186,474 £239,474 Various £0 £215,000 £215,000 TOTAL £1,405,000 £2,272,000 £3,677,000.
Recommended publications
  • A Short History of the Highlands Hill and Monykebbock Tramway
    A Short History of the Highlands Hill and Monykebbock Tramway By A. White-Settler Introduction to the Second Edition On hearing ‘Highlands’ in connection with Scotland, images of the hills and mountains towards the middle and the west of the country usually come to mind. In this case however, ‘Highlands’ is the local name given to a small area of rolling countryside to the north of Dyce in Aberdeenshire, close to the village of Newmachar. The Highlands Hill and Monykebbock Tramway (to give it its full name) was a short narrow gauge line originally built to serve a pair of crofts in that area by taking feed out to the fields, quarrying stone for boundary walls and collecting ‘Swailend Earth’, used as fertile topsoil for local growers. In later years, it was used by a local college to provide courses for light railway operations, and to support forestry courses, and became home for the Garioch Industrial Narrow Gauge Railway Society (G.I.N.G.R.S.). In conversation (and often in writing), most people would call it “The Highlands Tramway” or simply “The Tramway”. What follows is a very short history of an obscure line, built up from snippets of conversation in various pubs and small businesses around the area. It is thought that the line fell out of use in the late 1960s; an increasingly small number of people have distant memories of the tramway, and I have been unable to find any reference to it in any library or local newspaper archives. Although the local farmer kindly granted me access to his land, it would appear that all but a few traces of the tramway have been obliterated, and so whilst I have made my best efforts to make this history as comprehensive as possible, unfortunately the accuracy of any information that follows cannot always be assured.
    [Show full text]
  • A947 Route Improvement Strategy
    A947 ROUTE IMPROVEMENT STRATEGY CONSULTATION REPORT People reached via Social Media about 14000 the consultation Circulation of 9800 newspapers (Turriff/Ellon/ Inverurie Advertiser) which carried an advert promoting the consultation exercise @# Freepost Travel Surveys inserted into the 750 Banffshire Journal Paper Surveys distributed at Community Facilities and GP 4500 Surgeries on the A947 500 People spoken to during a 681 two day consultation Respondents to the stand at the Turriff Show detailed A947 Travel Survey (Online & Paper) “ 297 Respondents to a Freepost Freepost Travel Surveys completed Travel Survey provided as via the Banffshire Journal Inserts ” part of a Roadside Interview Surveys on the A947 155 7 Businesses A947 in located on the A947 participated in a detailed Numbers telephone interview. Table of Contents 1. Approach to Consultation ................................................................................................................................................ 1 2. Summary of Findings........................................................................................................................................................ 3 Appendix A: RSI Survey – Questionnaire and Results ............................................................................................................. 17 Appendix B: Online Survey – Questionnaire & Results ............................................................................................................ 18 Appendix C: Newspaper Survey – Questionnaire
    [Show full text]
  • Statement of Sustainable Economic Growth 2017/18
    Sustainable Economic Growth Statement 2017/18 – 2018/19 Introduction Section 32(1)(a) of the Public Services Reform (Scotland) Act 2010 provides that as soon as reasonably practicable after the end of each financial year each listed public body must publish a statement of the steps it has taken during the financial year to promote and increase sustainable growth through the exercise of its functions. Nestrans is a listed body within the Act. This statement is intended to fulfil the requirement of the Act in relation to Sustainable Economic Growth. This statement should be read in conjunction with the statement on Efficiency, Effectiveness and Economy and the financial information provided on the Nestrans website that are also required by the Act. Government purpose and performance framework The purpose of the Scottish Government is to focus government and public services on creating a more successful country, with opportunities for all of Scotland to flourish, through increasing sustainable economic growth. The approach to delivering this Purpose is set out in the Scotland’s Economic Strategy published in March 2015 which combines work to boost economic growth and increase competitiveness with a drive to tackle inequality. The updated Strategy has four priorities, namely: • Investing in people and infrastructure in a sustainable way; • Fostering a culture of innovation and research and development; • Promoting inclusive growth and creating opportunity through a fair and inclusive jobs market and regional cohesion; and, • Promoting Scotland on the international stage to boost our trade and investment, influence and networks. Progress towards the Purpose is being measured through a range of Purpose Targets and National Indicators in the National Performance Framework that was updated in March 2016.
    [Show full text]
  • The Aberdeenshire (Electoral Arrangements) Order 1998
    Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format. STATUTORY INSTRUMENTS 1998 No. 3239 (S. 198) LOCAL GOVERNMENT, SCOTLAND The Aberdeenshire (Electoral Arrangements) Order 1998 Made - - - - 21st December 1998 Coming into force - - 1st January 1999 Whereas under section 17(1) of the Local Government (Scotland) Act 1973(1), as read with Schedule 5 to that Act(2), the Local Government Boundary Commission for Scotland on 16th October 1998 submitted to the Secretary of State a report on a review together with its proposals for the future electoral arrangements for the area of Aberdeenshire Council; Now, therefore, in exercise of the powers conferred on him by sections 17(2) and 233(3) of, and Schedule 5 to, the said Act and of all other powers enabling him in that behalf, the Secretary of State hereby makes the following Order: Citation and commencement 1. This Order may be cited as the Aberdeenshire (Electoral Arrangements) Order 1998 and shall come into force on 1st January 1999. Interpretation 2. In the Schedule to this Order– (a) a reference to– (i) an electoral ward is a reference to that electoral ward as constituted in this Order; and (ii) a road, footpath, railway line, river, burn or canal shall, where the context so admits, be construed as a reference to the centre line of the feature concerned; and (b) the following abbreviations are used:– “EW” for electoral ward; “NG Ref” for National Grid Reference as published on Ordnance Survey Maps. Electoral arrangements 3.
    [Show full text]
  • Buchan Views, Fyvie Turriff, Aberdeeenshire, Ab53 8Qr
    BUCHAN VIEWS, FYVIE TURRIFF, ABERDEEENSHIRE, AB53 8QR Architect designed 4 bedroom farmhouse set in landscaped grounds Modern farm buildings extending to 557sqm (6,000 sq. ft.) or thereby Land extending to 33.50 Ha (82.77 acres) or thereby Fyvie 1 mile Oldmeldrum 8 miles Aberdeen 27 miles BUCHAN VIEWS FYVIE, TURRIFF, AB53 8QR A MODERN DETACHED FAMILY HOME IN APPROXIMATELY 85 ACRES WITH FANTASTIC VIEWS ACROSS ABERDEENSHIRE FOR SALE AS WHOLE WITH VACANT POSSESSION: OFFERS OVER £475,000 ABERDEEN & NORTHERN (ESTATES) LIMITED www.anmgroup.co.uk/estates Viewing By appointment with the sellers – Mrs Rankin Tel: 01651 891654 / 07787 706827 Directions From Aberdeen, take the A947 road north towards Fyvie. Approximately 9 miles past Oldmeldrum turn left where signed ‘Mill of Crichie’, ‘Cross of Jackston’ and ‘Cloverly Woodland Burial Ground’. Continue on this road in a westerly direction for exactly 1 mile and turn left at the track marked with an Aberdeen & Northern Estates Sale Board, beside the property known as ‘Brackenrigg’ and as per the at- tached OS extract plan. Please be aware that a Sat Nav device will not take you directly to Buchan Views but will direct you to properties close by. Situation Buchan Views is conveniently located close to the historic village of Fyvie and only a short distance to the north of the popular Aberdeenshire town of Oldmeldrum. The property was used until recently as a golf course and remnants of the course can still be found on the site. The original fairways, greens and rough ground have been seeded with a commercial grass mix and are thought likely to provide good quality grazing.
    [Show full text]
  • Nestrans Annual Report 2017-19 and Business Plan 2019-20
    Annual Report 2017-2019 & Business Plan 2019/2020 2 Contents Page Foreword by the Chair of Nestrans 4 Executive Summary 6 1. Nestrans Organisation 10 2. Regional Transport Strategy 12 3. Representing North East Interests 19 4. Project Delivery 26 5. Results 37 6. Planning for the Future 40 7. Funding 49 Appendices Appendix 1: The Nestrans Board and Executive 51 Appendix 2: Public Services Reform Information 55 3 Cllr Peter Argyle Chair of Nestrans Foreword s the Chair of Nestrans, I am delighted to introduce the combined Annual Report for 2017/18 to 2018/19. I am pleased to reflect on transport related achievements by Nestrans and many other public and private partners and organisations in the past two years, which have all assisted with Adelivery of the Regional Transport Strategy aims. Most significant has been the completion of the long awaited Aberdeen Western Peripheral Route and Balmedie to Tipperty dualling. The northern sections were opened in summer 2018, followed by a significant section of new road between Stonehaven and Craibstone and the A956 between Cleanhill and Charleston in December 2018 prior to completion of the final section and opening of the entire route in February 2019. Substantial progress has also been made with construction of phase 1 of the Aberdeen to Inverness rail improvement between Aberdeen and Dyce, Aberdeen International Airport terminal improvements, the new Aberdeen South Harbour at Nigg and Peterhead Port improvements. Transport Scotland is progressing the design and development for dualling the section of the A96 between Aberdeen and east of Huntly, the preferred option has been identified for the grade separated junction on the A90 at Laurencekirk and the construction contract has been awarded for the A90/A96 Haudagain junction improvement.
    [Show full text]
  • A Landscape Fashioned by Geology Jon Merritt and Graham Leslie
    Northeast Scotland: A landscape fashioned by geology The area described in this book extends northeast from the Cairngorms, and is bounded by the Moray Northeast Scotland Firth and the North Sea. It encompasses the heather-clad mountains that provide the backdrop to the A Landscape Fashioned by Geology beautiful landscape of Royal Deeside and a swath of more remote, rolling hills and glens to the north that include many of the famous whisky distilleries of the region. Jon Merritt and Graham Leslie “This volume on NE Scotland is an excellent addition to this valuable series, and admirably promotes the great variety of geology and landscape in an area that lies outside the traditional Scottish tourist destinations. Events that shaped this area cover hundreds of millions of years from the creation of the Caledonian Mountains to the deposition of the Old Red Sandstone, and the geologically recent NORTHEAST SCOTLAND: A LANDSCAPE FASHIONED BY GEOLOGY modifications of landscape in the Ice Ages. The influence of geology on landscape is clearly described and beautifully illustrated. There are many geological gems in this region, so be inspired, and go out and explore the ancient heritage of Buchan!” Professor Nigel Trewin, Aberdeen University About the Authors Jon Merritt has worked on various aspects of the superficial deposits and glacial landforms of Scotland for over thirty years particularly in the Highlands and Islands. He is an enthusiastic devotee of the Quaternary, the last two million years or so of the geological record, when glacial and periglacial processes fashioned so much of the landscape we see today.
    [Show full text]
  • (Public Pack)Agenda Document for North East Of
    Public Document Pack Councillor Sandra Macdonald, Chair; Councillor Peter Argyle and Dr Margaret Bochel, Vice Chairs; Councillor David Aitchison, Councillor Philip Bell, Councillor George Carr, Councillor John Cox, Councillor Michael Hutchison and Councillor Avril MacKenzie; and Colin Allanach, Gerry Donald and Ian Ross. Aberdeen City Council Substitute Members:- Councillors David Cameron, Ross Grant, Ryan Houghton and Ian Yuill Aberdeenshire Council Substitute Members:- Councillors Martin Ford, Ian Mollison, Gillian Owen and one vacancy. Please note that a substitute member may only participate in the meeting when a substantive member is absent. Should you require further information regarding the agenda, please contact Rab Dickson 01224 346680 North East of Scotland Transport Partnership Meeting of the Board This Meeting will be held virtually utilising Teams. A recording of the meeting will be available from the Nestrans website as soon as is practical Wednesday, 10 February 2021 at 2.00 pm AGENDA 1 Housekeeping 1.1 Declarations of Interest 1.2 Minute of Board Meeting, 9 December 2020 (Pages 3 - 8) 2 Presentation: Clive Robinson, Transport Projects Programme Manager, Department for Infrastructure Northern Ireland 3 Budget Matters 3.1 2020/21 Budget Matters (Pages 9 - 20) 3.2 Implications of Transport (Scotland) Act 2019 (Pages 21 - 22) 3.3 2021/22 Budget Proposals (Pages 23 - 34) 4 Strategy 4.1 Director's Report (Pages 35 - 48) 4.2 Regional Transport Strategy 2040 (Pages 49 - 204) 5 Projects 5.1 Bus Partnership Fund (Pages 205 - 218)
    [Show full text]
  • (Public Pack)Agenda Document for North East of Scotland
    Public Document Pack To: Councillor Peter Argyle, Chair; Dr Margaret Bochel and Councillor Sandra Macdonald, Vice Chairs; Mr Eddie Anderson, Councillor David Aitchison, Councillor Philip Bell, Councillor John Cox, Mr Gerry Donald, Mr George Mair, Councillor Alex Nicoll, Eric Owens, Councillor Colin Pike and Councillor Jennifer Stewart. Aberdeen City Council Substitute Members:- Councillors Ross Grant, Brett Hunt, Michael Hutchison and Ian Yuill. Aberdeenshire Council Substitute Members:- Councillors George Carr, Martin Ford, Ian Mollison and Gillian Owen Please note that a substitute member may only participate in the meeting when a substantive member is absent. Should you require further information regarding the Agenda, please contact Derick Murray 01224 625524 NORTH EAST OF SCOTLAND TRANSPORT PARTNERSHIP Meeting of Board (Committee Room 2 - Woodhill House, Aberdeen) WEDNESDAY, 14 FEBRUARY 2018 at 2.00 pm. AGENDA 1 Minutes 1a Minute of Board Meeting, 13 December 2017 (Pages 3 - 10) 1b Minute of the Appointments Sub Committee Shortlisting Meeting of 19 December 2017 (Pages 11 - 12) 1c Minute of the Appointments Sub Committee Interview Meeting of 9 January 2018 (Pages 13 - 14) 2 Mr Humza Yousaf, Minister for Transport & the Islands 3 Strategy 3a Director's Report (Pages 15 - 30) 3b Risk Register (Pages 31 - 44) 4 Projects 4a Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: Next Steps (Pages 45 - 50) 4b A96 and A947 Strategic Roads Update (Pages 51 - 54) 5 Action Plans 5a Bus Action Plan: Bus Quality Partnership Agreement
    [Show full text]
  • ANNEX E the A96 Dualling East of Huntly To
    ANNEX E The A96 Dualling East of Huntly to Aberdeen Improvement Strategy Option Q Appraisal Report – October 2018 Transport Scotland A96 Dualling East of Huntly to Aberdeen Improvement Strategy Option Q Appraisal Report A96PEA-AMAR-GEN-NLA-RP-ZZ-000010 P01 | October 2018 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. AmeyArup Joint Venture Office 7 Thainstone Business Centre Inverurie AB51 5TB United Kingdom Transport Scotland A96 Dualling East of Huntly to Aberdeen Improvement Strategy Option Q Appraisal Report Executive Summary i 1 Introduction 1 1.1 Background 1 1.2 DMRB Stage 1 Assessment 1 1.3 Improvement Strategy Option Q Background 2 1.4 Purpose of this Report 2 2 Characteristics of the Area 3 2.1 Population Distribution 3 2.2 Travel to Work 4 2.3 Public Transport Provision 5 2.4 Bus Park-and-Ride facilities 6 2.5 Active Travel 7 2.6 Development Plans 7 3 Characteristics of the A96, A920 and A947 9 3.1 Road Characteristics 9 3.2 Traffic Volumes 9 3.3 Automatic Number Plate Recognition Data 12 3.4 Accident Data 14 3.5 Other Baseline Data 15 4 Improvement Strategy Option Q Corridor Proposals 16 4.1 Corridor Areas and Corridor Options 16 4.2 Corridor Options Q01 and Q02 18 5 Assessment of Corridor Options Q01 and Q02 20 5.1 Methodology 20 5.2 Engineering Assessment of Q01 & Q02 21 5.3 Environmental Assessment of Q01 & Q02 22 5.4 Traffic Assessment of Q01 & Q02 24
    [Show full text]
  • GR079 Land South East of Hillbrae Way, Newmachar
    19. Other information Please provide any other information that you would like us to consider in support of your proposed development (please include details of any up-to-date supporting studies that have been undertaken and attach copies e.g. Transport Appraisal, Flood Risk Assessment, Drainage Impact Assessment, Peat/Soil Survey, Habitat/Biodiversity Assessment etc.) Please see attached masterplan and appended Supporting Planning Statement Please tick to confirm your agreement to the following statement: √ By completing this form I agree that Aberdeenshire Council can use the information provided in this form for the purposes of identifying possible land for allocation in the next Local Development Plan. I also agree that the information provided, other than contact details and information that is deemed commercially sensitive (questions 1 to 3), can be made available to the public. 10 Newmachar South East Newmachar, Aberdeenshire Development Bid Kirkwood Homes Limited March 2018 Contents 1.0 Introduction and Vision ....................................................................................................... 3 2.0 Site Characteristics and Background .................................................................................. 4 3.0 Planning Context ................................................................................................................ 5 4.0 Site Analysis and Appraisal ................................................................................................ 8 5.0 Community Engagement ................................................................................................
    [Show full text]
  • (Public Pack)Agenda Document for North East of Scotland Transport
    Public Document Pack To: Councillor Peter Argyle, Chair; Dr Margaret Bochel and Councillor Sandra Macdonald, Vice Chairs; Mr Eddie Anderson, Councillor David Aitchison, Councillor Philip Bell, Councillor John Cox, Mr Gerry Donald, Mr George Mair, Mr Ian Ross, Councillor Alex Nicoll, Stephen Archer, Councillor Colin Pike and Councillor Jennifer Stewart. Aberdeen City Council Substitute Members:- Councillors Ross Grant, Brett Hunt, Michael Hutchison and Ian Yuill. Aberdeenshire Council Substitute Members:- Councillors George Carr, Martin Ford, Ian Mollison and Gillian Owen Please note that a substitute member may only participate in the meeting when a substantive member is absent. Should you require further information regarding the Agenda, please contact Derick Murray 01224 346680 NORTH EAST OF SCOTLAND TRANSPORT PARTNERSHIP Meeting of Board (Committee Room 2 Woodhill House, Aberdeen) WEDNESDAY, 20 JUNE 2018 at 2.00 pm. AGENDA 1 Minute of Board Meeting, 18 April 2018 (Pages 3 - 10) 2 Appointment of Professional Adviser (Verbal Report) 3 Strategy 3a Director's Report (Pages 11 - 28) 3b Annual Performance Indicators (Pages 29 - 34) 3c Strategic Transport Appraisal – Interim Objectives (Pages 35 - 64) 3d Annual Monitoring Report (Pages 65 - 128) 3e General Data Protection Regulations (Pages 129 - 140) 4 Projects - Not Taken Up 5 Action Plans 5a HTAP Annual Report (Pages 141 - 154) 6 General 6a Progress Report (Pages 155 - 198) 6b Consultations (Pages 199 - 206) 6c Other Publications (Pages 207 - 212) 7 Budget Matters 7a 2018/19 Budget Matters
    [Show full text]