Nestrans Draft Nestrans Strategic Investment Programme - 2017/18 Appendix 2
Nestrans Draft Nestrans Strategic Investment Programme - 2017/18 Appendix 2 RTS Project Project Details 2016/17 2017/18 2017/18 delayed proposals draft draw down budget IC1 Rail Kintore Railway Station Design of Car Park, Further works associated with Station Fund Bid and £527,000 £488,000 £1,015,000 Legal Costs associated with the Compulsory Purchase Order THEME TOTAL £527,000 £488,000 £1,015,000 IC2a Strategic Road Capacity Improvements Strategic network monitoring Phase The Third phased deployment of an Internet Protocol closed-circuit £150,000 £150,000 3 television (IPCCTV) equipment at traffic signals, along strategic transport corridors. This phase would aim to further capture nodes along A956 Wellington Road and King Street and the A944 corridor. AWPR Signage in Aberdeenshire Development of Signage Strategy and Preliminary Design of Strategic £30,000 £30,000 Signage THEME TOTAL £30,000 £150,000 £180,000 IC2b Strategic Road Safety Improvements A947 Road Safety Improvements Delivery of Action Plan and Development of Business Cases for £80,000 £80,000 individual schemes along the corridor A92 / A90 Lower Northwater Bridge Reflective Road Studs £1,680 £1,680 A93 Peterculter to Braemar Reflective Road Studs £21,112 £21,112 A944 / B993 to A97 Reflective Road Studs £28,630 A97 / A944 to Formartine Reflective Road Studs £48,426 A93 Neth Knox Embankment Reconstruction (Gabions) £100,000 B9119 Queen’s Cross pedestrian Two pedestrian crossings at the Queens Cross Roundabout (Queens £25,000 £25,000 crossing upgrades Road and Carden Place) have been the location of child pedestrian injury accidents. It is proposed to provide additional and updated infrastructure at these locations to highlight the crossings to drivers, reducing red light running, and make a safer environment for pedestrians.
[Show full text]