ENHANCING CAPABILITY of HYDRO POWER in THAILAND Mr 1 ENHANCING CAPABILITY OF HYDRO POWER IN THAILAND Mr. Chatchai Mawong Director, Hydro and Renewable Energy Power Plant Development Division Electricity Generating Authority of Thailand EGAT Business Generation Transmission Power Purchase Affiliates To generate electricity by To solely operate the To purchase bulk electricity To invest in electricity more than 50 power transmission system. from IPPs and SPPs and generation and energy- plantslocated in different (Main voltage levels 500, from neighboring countries, related businesses in the parts of the country. 230, 132, and 115 kV.) i.e. Lao PDR and Malaysia. following 5 affiliates. Installed Generating Capacity Transmission Line Length Contract Capacity EGAT’s Investment 16,034.83 MW 35,981.449 Circuit-Kilometers 30,167.42 MW 34,290.40 Million Baht Ref: EGAT Annual Report 2019 Thailand System Generating Capacity EGAT’s Power Plant System Installed Other Generating Capacity in 31 July, 2020 (Lamtakong Jolabha Vadhana and Diesel) 6.43 % Combined cycle 1,030.40 MW 45,543.87 MW 51.53 % Thermal 8,262.00 MW 22.98 % 3,687.00 MW Foreign 12.56 % 5,720.60 MW EGAT SPPs 35.21 % 16,034.83 MW Renewable 20.95 % 19.06 % 9,539.94 MW 3,055.43 MW Renewable Capacity (MW) IPPs 31.28 % 1. Hydro Power Plant 3,021.63 14,248.50 MW 2. Wind, Solar, Geothermal 33.8 Total 3,055.43 Ref: EGAT Power System Control and Operation Division Status of Hydro Power Status Currently, EGAT has been developed hydro projects more than 50 years. It started with large hydro power plant and later more developed in small hydro power plants and downstream irrigation dams 3,021.63 MW Projects Capacity (MW) 1. Bhumibol Dam 779.2 2. Sirikit Dam 500 3. Ubol Ratana Dam 25.2 4. Sirindhorn Dam 36 5. Chulaphorn Dam 40 6. Srinagarin Dam 720 7. Vajiralongkorn Dam 300 8. Thathungna Dam 39 Large Hydro Large 9. Kaeng Krachan Dam 19 10. Bang Lang Dam 84 11. Rajjaprabha Dam Unit 240 12. Pak Mun Dam 136 13. Small Hydro Power Plant (<10 MW) 17.78 14. Irrigation Dams 85.45 Total 3,021.63 Ref: EGAT Power System Control and Operation Division Hydro Power Plant Project: Large and Small Hydro Large and small hydro power plant is built in multipurpose dam in order to store water, control flooding, and generate electricity. The large and small hydro power plant play an important role in Thailand serving the water to many large urban areas and a vast agricultural industry. Status Trend Under Operation . The large hydro plants are likely limited the development of new Projects Capacity (MW) capacity caused by high CAPEX cost and increased environmental 1. Bhumibol Dam 779.2 consciousness. There are only 3 new hydro power plant projects in 2. Sirikit Dam 500 PDP 2018 with total capacity of 34.5 MW as follows: 3. Ubol Ratana Dam 25.2 Projects Capacity (MW) COD 4. Sirindhorn Dam 36 5. Chulaphorn Dam 40 1. Khlong Tron Dam 2.5 2020 6. Srinagarin Dam 720 2. Pha Chuk Dam 14 2021 7. Vajiralongkorn Dam 300 3. Ban Chan De 18 2023 8. Thathungna Dam 39 Total 34.5 Large Hydro Large 9. Kaeng Krachan Dam 19 10. Bang Lang Dam 84 Key 11. Rajjaprabha Dam Unit 240 . Minimize the CAPEX costs and control environmental consciousness. 12. Pak Mun Dam 136 13. Small Hydro Power Plant (<10 MW) 17.78 Total 2,936.18 Ref: EGAT Power System Control and Operation Division Hydro Power Plant Project: Downstream Irrigation Dams The project were originated by the cooperation of Ministry of Agriculture and Cooperatives and Ministry of Energy and are developed by EGAT. There are a lot of existing irrigation dams designed and constructed for irrigation, flood control, etc. The downstream will be developed through redevelopment of Existing Irrigation Dams to maximized utilization of water resources. Status Trend Under Operation . 24 Projects of total 69 MW* Projects Capacity (MW) * It is under reviewing granted approval by National Energy Policy Council 1. Chao Pharaya Dam 12 (NEPC) 2. Naresuan Dam 8 3. Mae Klong Dam 12 4. Khun Dan Prakan Chon Dam 10 Key 5. Pasak Jolasid Dam 6.7 . Completive Cost compared with Solar or Wind Energy (less 6. Kwai Noi Bumrung Dan Dam 30 than or equal to other RE) 7. Kiew Kho Ma Dam 5.5 . Selected New Hydro Technology such as variable speed 8. Chulabhorn Dam (EGAT’s dam) 1.25 turbine or compact hydro to reduce the construction cost/time and O&M lead time. Total 85.45 Under Construction Projects Capacity (MW) COD 1. Khlong Tron Dam 2.5 2020 2. Pha Chuk Dam 14 2021 Total 16.5 Ref: EGAT Annual Report 2019 Hydro Power Plant Project: Renovation Many of hydro power plants are aging due to a longtime operation (more than 30 years). The renovation is effective method to Trend increase availability and efficiency. In 2019-2037 EGAT’s Hydro Power Plant Renovation Plan Status over 2,000 MW Under Operation MW Projects Capacity (MW) 1. Bhumibol Dam Unit 1-2 164.4 2. Bhumibol Dam Unit 3-4 164.4 3. Bhumibol Dam Unit 5-6 164.4 4. Sirikit Dam Unit 1-3 375 5. Renovation Project for 5 Hydro Power Plants (Kaeng Krachan Dam, 125 Ubol Ratana Dam, Sirindhorn Dam, Chulaphorn Dam, Nam Pung Dam) Total 993.2 Under Renovation Projects Capacity (MW) COD 1. Bhumibol Dam Unit 7 115 2020 2. Srinagarind Dam Unit 1-3 300 2020 2019 2037 Total 415 Key Under Feasibility Study Projects Capacity (MW) COD . Design fit to the existing location and well prepare the 1. Srinagarind Dam Unit 4-5 360 2025 sequence of dismantle and installation . Least shut-down time 2. Rajaprabha Unit 1-3 240 2027 Total 600 Ref: EGAT Deputy Governor Generation Hydro Power Renovation Plan Hydro Power Plant Project Pumped-Storage The pumped-storage is designed to provide electricity generation at peak-load time. Water cycles is controlled by pump in a closed loop between the upper and lower reservoirs, using surplus energy at times of low demand. During periods of high electrical demand, the stored water is released through turbines to produce electric power. The pumped-storage hydro power plant helps increase flexible dispatch, support Grid Modernization to maintain Energy security of the country. Status Under Operation Projects Capacity (MW) Trend 1. Srinagarin Dam Unit 4-5 360 . As renewables energy such as solar and wind occupy a larger portion, the future pumped-storage project will enhance grid 2. Bhumibol Dam Unit 8 171 stability and support Grid Modernization. 3. Lamtakong Jolabha Vadhana Unit 1-4 1,000 . Grid Modernization is EGAT’s policy by adapting the new Total 1,531 technologies for increase of the intelligence or smarts of the grid. The grid modernization which is comprised of flexible plant, energy Under Feasibility Study storage, digital substation, RE forecast center, national energy Projects Capacity (MW) COD trading platform, demand response control center, and grid connectivity. 1. Chulabhorn Pumped-Storage 800 2031 Hydro Power Plant (3 Units) Key 2. Srinagarind Pumped-Storage 800 2033 Hydro Power Plant (3 Units) . Site selection required both geographical height and water Total 1,600 availability. Support from the policy maker and permission authority for project Ref: EGAT Annual Report 2019 approval. Hydro-Floating Solar Hybrid Project . The concept is to develop hybrid system with a combination of hydro power and floating solar in order to in crease flexibility and stability of electricity generation. The hybrid plants are controlled by EMS to generate electricity from solar power in day time and from hydro power during peak hours at night. Status Trend . 1st Hydro-Floating Solar Hybrid Pilot Project at Sirindhorn Dam 9 Dams Hybrid Projects . Capacity : 58.5 MWdc (45 MWac) . Location : Sirindhorn Dam , Ubon Ratchathani . Energy: 87,892,000 Unit / year 16 Projects . Investment Cost : 842 MB (14.39 MB/1 MW) In EGAT’s Multipurpose Dams . COD (Commercial Operation Date): 2020 2,725 MW During 2018-2037 (PDP 2018) Key North Northeast West South 1,278 MW 109 MW 1,020 MW 318 MW . Cost: More Competitive Cost . Technology: Security of Renewable Energy and Control with one platform. Social & Environment: Less Impact Summary Hydro Power Plant 1 Decrease the development of Large hydro power projects in Thailand due to high CAPEX cost and increased environmental consciousness. 2 Increase more small hydro power projects downstream of irrigation dams for the maximum utilization of water resources. 3 Integrate existing hydro power plants with other renewable energy and renovate the aging plants with more than 30 years lifetime. 4 Promote pumped-storage hydro plants with high opportunity to support grid modernization. “Innovate Power Solutions for a Better Life”.
Recommended publications
  • EGAT Overview
    BACK FRONT With concern for sustainable power security, EGAT has considered various factors and limitations in all aspects, including power capacity planning, development of innovation and technology, public participation, and social and environmental responsibility. EGAT is determined to innovate power solutions for a better life of Thais both today and in the future. “EGAT Power for Thai Happiness” INCOVER INCOVER Introduction Over a half century, the Electricity Generating Authority of Thailand (EGAT) has existed alongside the Thai Society as a state enterprise responsible for power system security. With advanced and eco-friendly power generation technology and transmission system, EGAT ensures the response to electricity demand, a crucial driver for development of economic growth and the country. To keep itself abreast of rapid changes, EGAT gets ready to be adjusted and has developed innovations on electrical power, including Hydro-Floating Solar Hybrid System, RE Forecast Center, Energy Storage System, coupled with the power generation from EGAT main power plants, to enhance security and stability of the power system. In addition to power generation, EGAT continually promotes the responsibility on society, communities, and environment, through energy-saving and environmental conservation projects, such as EGAT Reforestation Project, Green Learning Room Project, No.5 Energy Saving Labeling Project, along with EGAT Leaning Centers nationwide to share knowledge with the society. All of these are to bring about sustainable happiness of all Thais. Electricity Generating Authority of Thailand March 2020 2 EGAT Overview EGAT Profile The Electricity Generating Authority of Thailand (EGAT) was established by virtue of the EGAT Act B.E. 2511 (1968) on May 1, 1969 which merges assets and operations of the 3 previous state enterprises, namely Yanhee Electricity Authority (YEA), Lignite Authority (LA), and North-East Electricity Authority (NEEA).
    [Show full text]
  • Deborah's M.A Thesis
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by ScholarBank@NUS Created in its own sound: Hearing Identity in The Thai Cinematic Soundtrack Deborah Lee National University of Singapore 2009 Acknowledgements Heartfelt thanks goes out to the many people that have helped to bring this thesis into fruition. Among them include the many film-composers, musicians, friends, teachers and my supervisors (both formal and informal) who have contributed so generously with their time and insights. Professor Rey, Professor Goh, Prof Irving, Prof Jan, Aajaarn Titima, Aajaarn Koong, Aajaarn Pattana, I really appreciate the time you took and the numerous, countless ways in which you have encouraged me and helped me in the process of writing this thesis. Pitra and Aur, thank you for being such great classmates. The articles you recommended and insights you shared have been invaluable to me in the research and writing of my thesis. Rohani, thanks for facilitating all the administrative details making my life as a student so much easier. Chatchai, I’ve been encouraged and inspired by you. Thank you for sharing so generously of your time and love for music. Oradol, thank you so much for the times we have had together talking about Thai movies and music. I’ve truly enjoyed our conversations. There are so many other people that have contributed in one way or the other to the successful completion of this thesis. The list goes on and on, but unfortunately I am running out of time and words…. Finally, I would like to thank God and acknowledge His grace that has seen me through in the two years of my Masters program in the Department of Southeast Asian Studies.
    [Show full text]
  • König Bhumibol (Rama IX) Von Thailand
    rama_ix_ab pjd 01.14 exc. König Bhumibol (Rama IX) von Thailand www.joachim-dietze.de Rama V Quelle: Wikipedia Prinz Nakkhathra Mangala Bua Kitiyakara Rama VI Prinz Mahidol Adulyadej Srinagarindra 1892-1929 1900-1995 Rama VII Chakri-Dynastie Rama VIII Herrscherhaus Thailands seit 1782 absolute Monarchie (1) Ehe geschieden seit 1932 konstitutionelle Monarchie (2) durch Ehe mit einem Bürgerlichen Hochzeitsfoto 28.4.1950 Rama I Verlust des königlichen Titels Chao Fa 1782-1809 (3) durch Sonderregelung trotz Ehe Phra Putthajotfa Chulalok Sirikit ist eine Urenkelin von Rama V. mit einem Bürgerlichen Erhalt des Ihr Vater war Botschafter von Thailand königlichen Titels Chao Fa Rama II in Frankreich, Dänemark und England. 1809-1824 (4) Prinz Maha führte 3 Ehen, von Sie begegnete Bhumibol zum ersten Phra Putthaloetla Naphalai denen die ersten zwei geschieden Mal 1947 in Paris. wurden. 28.4.1950 Rama III König Bhumibol lebte von 1933 bis 1824-1851 (5) Thronfolge 1949 mit seinem älteren Bruder in der Phra Nang Klao Da die vier Söhne der zweiten Ehe Schweiz. Dieser wurde 1935 als 9- von Prinz Maha vor der Hochzeit Sirikit Kitiyakara jähriger König Rama VIII von Thailand. Rama IV geboren wurden, scheiden sie für Bhumibol Adulyadej 1946 wurde er erschossen in seinem 1851-1868 die (männliche) Thronfolge aus. der Grosse Zimmer aufgefunden, Bhumibol wurde Mongkut Nach der ehelichen Geburt der Königin von Thailand dadurch sein Nachfolger. folgenden Tochter wurde das thail. Rama IX Bei einem Autounfall am Genfer See Rama V Recht geändert: auch Frauen können König von Thailand 12.8.1932 Bangkok 1948 verlor er ein Auge und erlitt eine 1868-1910 den Thron besteigen.
    [Show full text]
  • SWAT Model for Sediment and Nutrient Simulation in the Mekong River Basin
    Mekong River Commission Technical Support Division Information and Knowledge Management Program Component 4: Modelling Draft Working Paper The SWAT Model for Sediment and Nutrient Simulation in the Mekong River Basin December 2015 CONTENTS AMENDMENT RECORD This report has been issued and amended as follows: Issue Revision Description Date Signed 1 0 First Version of 10/12/2015 Ornanong, Documentation Rattykone, Vannaphone Key Person who contributed work: Riparian and National Team Ms. Ornanong Vonnarart Regional Modelling Consultant Mr. Rattykone Sayasane Regional Modelling Consultant Ms.Sopheap Lim Modeller – IKMP Mr. Vannaphone Phetpaseuth National Modelling Expert, 2015 Mr. Simarron Chhoeun National Modelling Expert, 2015 Mr.Pory Sakhon Assistant Modeller for CS, 2015 Mr.Bounmy Chayavong Assistant Modeller for CS, 2015 Mr.Direk Kongpae Assistant Modeller for CS, 2015 Mr.Nguyen Thanh Dat Assistant Modeller for CS, 2015 International Expert: Dr.Srinivasan USDA Agricultural Research Service/Texas A&M AgriLife Research Dr.Anthony Green DSF Technical Advisor for CS CONTENTS Page 1. Introduction 1 2. The Data Available and Analysis 2 2.1 The Sediment and Nutrient monitoring station 2 2.2 Approach for the data analysis 3 3. SWAT Sediment and Nutrient Process 6 4. SWAT Sediment Model Set-up and Calibration Process 12 4.1 Model Configuration 12 4.2 Calibration Location 14 4.3 Calibration Criteria 20 5. Calibration Result 21 5.1 Sediment Calibration Result 21 5.2 Total Nitrogen Calibration Result 25 5.3 Total Phosphorus Calibration Result 27 6. The SWAT Model Output 37 7. Conclusion and area for improvement 40 8. Reference 41 Annex A: Sediment and Nutrient Parameter of model Calibration Annex B: Sediment and Nutrient calibration Result on the Mekong Key station Annex C: SWAT Check result from SWAT model A0-A9 1.
    [Show full text]
  • Disaster Management Partners in Thailand
    Cover image: “Thailand-3570B - Money flows like water..” by Dennis Jarvis is licensed under CC BY-SA 2.0 https://www.flickr.com/photos/archer10/3696750357/in/set-72157620096094807 2 Center for Excellence in Disaster Management & Humanitarian Assistance Table of Contents Welcome - Note from the Director 8 About the Center for Excellence in Disaster Management & Humanitarian Assistance 9 Disaster Management Reference Handbook Series Overview 10 Executive Summary 11 Country Overview 14 Culture 14 Demographics 15 Ethnic Makeup 15 Key Population Centers 17 Vulnerable Groups 18 Economics 20 Environment 21 Borders 21 Geography 21 Climate 23 Disaster Overview 28 Hazards 28 Natural 29 Infectious Disease 33 Endemic Conditions 33 Thailand Disaster Management Reference Handbook | 2015 3 Government Structure for Disaster Management 36 National 36 Laws, Policies, and Plans on Disaster Management 43 Government Capacity and Capability 51 Education Programs 52 Disaster Management Communications 54 Early Warning System 55 Military Role in Disaster Relief 57 Foreign Military Assistance 60 Foreign Assistance and International Partners 60 Foreign Assistance Logistics 61 Infrastructure 68 Airports 68 Seaports 71 Land Routes 72 Roads 72 Bridges 74 Railways 75 Schools 77 Communications 77 Utilities 77 Power 77 Water and Sanitation 80 4 Center for Excellence in Disaster Management & Humanitarian Assistance Health 84 Overview 84 Structure 85 Legal 86 Health system 86 Public Healthcare 87 Private Healthcare 87 Disaster Preparedness and Response 87 Hospitals 88 Challenges
    [Show full text]
  • EGAT Sustainability Report 2019 EGAT Sustainability Report
    ISSN : 2351-0439 ISSN EGAT Sustainability Report 2019 EGAT Sustainability Report Sustainability EGAT Electricity Generating Authority of Thailand (EGAT) 53 Moo 2 Charan Sanitwong Road, Bang Kruai, Nonthaburi 11130 Tel. +66 (0) 2436 4610, +66 (0) 2436 4613 2019 Fax. +66 (0) 2436 4695 www.egat.co.th ENERGY for stability and sustainability Be the country’s main organization to secure the power reliability and enhance competitiveness of the nation through innovation for Thai happiness to secure the power reliability and enhance competitiveness Content Prosperity : 4 Message from the Governor Ensure prosperous and fulfilling lives in 04 7 About EGAT harmony with nature 11 About This Report 12 Material Topics of Sustainability Goal 7 : Ensure access to 15 Corporate Governance affordable, reliable, sustainable 21 Business Ethics and modern energy for all 22 Stakeholder Relationship Page : 55 Management 25 Risk Management Goal 9 : Build resilient infrastructure, promote Economic Performance sustainable industrialization 28 29 Supply Chain Management and foster innovation 31 Anti-Corruption Page : 47-51 33 Availability and Reliability 42 System Efficiency 44 Demand-side Management People : 47 Research and Development End poverty and hunger in all forms and ensure dignity and equality Environmental Performance Goal 2 : End hunger, achieve 52 55 Materials food security and improved 56 Energy nutrition and promote 57 Water sustainable agriculture 59 Greenhouse Gas and Page : 83-84 Air Pollution Management 67 Biodiversity 71 Effluents and Waste Planet
    [Show full text]
  • Status of Hydropower Development in the GMS”
    Keynote Session “Status of Hydropower Development in the GMS” Mr. Nikom Kraitud Engineer Level 6, Civil and Hydro Power Engineering Division Electricity Generating Authority of Thailand (EGAT) 1 Installed Capacity in Power System in Thailand June 2017 Total Installed Capacity for Thailand's Power System: 41,723.25 MW 56.48 % 8.3% Hydropower in Thailand 3,448.4 MW 5% Hydropower from Lao PDR 2,104.60 MW EGAT’s Hydropower Plant 2 Neighboring Country’s EGAT’s Hydropower Plants Hydropower Plants NO. HYDROPOWER PLANT INSTALLED CAPACITY NO. HYDROPOWER PLANT Capacity (MW) (MW) 1 BHUMIBOL 779.2 Existing Hydropower Development in Lao PDR 1 Theun-Hinboun 214 2 SIRIKIT 500 2 Houay Ho 126 3 SRINAGARIND 720 3 Nam Theun 2 948 4 KHAO LAEM / VAJIRALONGKORN 300 4 Nam Ngum 2 596.6 5 RAJJAPRABHA 240 5 Theun-Hinboun Expansion 220 6 PAK MUN 136 7 UBOL RATANA 25.2 Sub Total 2,104.60 8 SIRINDHORN 36 Future Hydropower Development in Lao PDR 1 Xe-Pian Xe-Namnoy 354 9 CHULABHORN 40 2 Nam Ngiep 1 269 10 KANG KRACHAN 19 3 Xayaburi 1220 11 BANG LANG 76 4 Nam Theun 1 500 12 THA THUNG NA 39 13 NAM PUNG 6 Sub Total 2,343.00 14 MAE NGAT 9 15 HUAI KUM 1.06 16 BAN SANTI 1.28 17 BAN YANG 0.12 18 BAN KHUN KLANG 0.2 19 KLONG CHONG KLAM 0.02 20 HUAI KUI MANG 0.1 21 LAM TA KONG UNIT 1-2 500 22 Naresuan 8 23 Chao Phraya 12 24 Khun Dan Prakan Chon 10 25 Khwae Noi 30 Total Installed Capacity 3,488.18 In June 2017 3 HP Development in GMS Existing Hydropower Project NO.
    [Show full text]
  • Assessment of Greater Mekong Subregion Economic Corridors
    About the Assessment of Greater Mekong Subregion Economic Corridors The transformation of transport corridors into economic corridors has been at the center of the Greater Mekong Subregion (GMS) Economic Cooperation Program since 1998. The Asian Development Bank (ADB) conducted this Assessment to guide future investments and provide benchmarks for improving the GMS economic corridors. This Assessment reviews the state of the GMS economic corridors, focusing on transport infrastructure, particularly road transport, cross-border transport and trade, and economic potential. This assessment consists of six country reports and an integrative report initially presented in June 2018 at the GMS Subregional Transport Forum. About the Greater Mekong Subregion Economic Cooperation Program The GMS consists of Cambodia, the Lao People’s Democratic Republic, Myanmar, the People’s Republic of China (specifically Yunnan Province and Guangxi Zhuang Autonomous Region), Thailand, and Viet Nam. In 1992, with assistance from the Asian Development Bank and building on their shared histories and cultures, the six countries of the GMS launched the GMS Program, a program of subregional economic cooperation. The program’s nine priority sectors are agriculture, energy, environment, human resource development, investment, telecommunications, tourism, transport infrastructure, and transport and trade facilitation. About the Asian Development Bank ADB is committed to achieving a prosperous, inclusive, resilient, and sustainable Asia and the Pacific, while sustaining
    [Show full text]
  • Optimising Existing Hydro Power Stations in Scotland with Floating
    Department of Mechanical and Aerospace Engineering Optimising Existing Hydro Power Stations in Scotland with Floating Photovoltaics Author: Darren MacIntyre Supervisor: Nick Kelly A thesis submitted in partial fulfilment for the requirement of degree in Master of Science in Sustainable Engineering: Renewable Energy Systems and the Environment 2020 1 Copyright Declaration This thesis is the result of the author’s original research. It has been composed by the author and has not been previously submitted for examination which has led to the award of a degree. The copyright of this thesis belongs to the author under the terms of the United Kingdom Copyright Acts as qualified by University of Strathclyde Regulation 3.50. Due acknowledgement must always be made of the use of any material contained in, or derived from, this thesis. Signed: Darren MacIntyre Date:14/07/2020 2 Abstract The UK has committed to ambitious targets relating to renewable energy technology and greenhouse gas reduction. Electrical power generation from non-polluting and sustainable sources plays an important role in this regard. Floating photovoltaic farms (FPV) have great potential when co-located with hydropower plant. Benefits include water preservation and higher power generation efficiency, no land costs, lower construction costs, reduction of algae, and lowering of natural methane emissions that come from standing bodies of water. The market for FPV is dominated by nations where tropical or dry arid conditions prevail. The extent to which an FPV-PHS plant in the North of Scotland is feasible was assessed in this study. Foyer PHS operational data was collected and analysed, then modelled in HOMER Pro with proposed FPV of 125MW and 250MW installed capacities overlaid, using generic bifacial and standard monocrystalline PV panels.
    [Show full text]
  • Part Iii Hydro-Hydraulic Modelling
    PART III HYDRO-HYDRAULIC MODELLING Vol. I: Main Report, Part III: Hydro-Hydraulic Modelling WUP-JICA, March 2004 PART III HYDRO-HYDRAULIC MODELLING 1. DEVELOPMENT OF HYDRO-HYDRAULIC MODEL FOR THE CAMBODIAN FLOODPLAINS 1.1 Background of Model Development This Part III of the Main Report outlines all modelling activities carried out during the entire period of the WUP-JICA project/study including the model origin in the Mekong Basin and a similar improvement in the related project. In the initial stage of the study, some hydro-hydraulic simulation models were needed simultaneously with the monitoring activities to verify the observed data and to clarify the hydrological or hydraulic mechanisms in the basin. After a series of discussions with the MRCS due to the apprehension on overlapping of activities with the WUP-A and WUP-FIN projects, the WUP-JICA Team had decided to take over and further develop the model developed by the recently completed project of MRC. A brief description of the first study on the Mekong where MIKE 11 has been applied applied and the link to the other project where the model was used simultaneously with the WUP-JICA study for detailed flood analysis is herein presented. The part also explains the concepts of the two model systems applied; namely, the rainfall-runoff model and the hydraulic river and floodplain model. The coupling of the two models was studied as well. A detailed description of the topographical and structural data used for model construction is herein given, the hydrological and hydraulic data applied for model calibration or verification is described, and the detailed layout of the models together with the calibration or verification results for the years 1998-2001 is presented.
    [Show full text]
  • König Bhumibol Erneuerer Seines Landes
    KöNIG BHUMIBOL ERNEUERER SEINES LANDES (1) KöNIG BHUMIBOL - Erneuerer seines Landes KING BHUMIBOL : Strength of the Land 3XEOLVKHGE\WKH1DWLRQDO,GHQWLW\2I¿FH 7KH2I¿FHRIWKH3HUPDQHQW6HFUHWDU\ 2I¿FHRIWKH3ULPH0LQLVWHU5R\DO7KDL*RYHUQPHQW )LUVWSXEOLVKHG&RSLHV *HUPDQ(GLWLRQ &RS\ULJKWE\WKH2I¿FHRIWKH3HUPDQHQW6HFUHWDU\ $OOULJKWVUHVHUYHG ,6%1 6XSSRUWHGE\ 7KDL$LUZD\V,QWHUQDWLRQDO3XEOLF&RPSDQ\/LPLWHG 3ULQWHGE\ $PDULQ3ULQWLQJDQG3XEOLVKLQJ&RPSDQ\/LPLWHG 7HO )D[ (PDLOLQIR#DPDULQFRWK+RPHSDJHKWWSZZZDPDULQFRWK :LWK&RPSOLPHQWVRIWKH2I¿FHRIWKH3ULPH0LQLVWHU (2) Seine Majestät König Bhumibol Adulyadej (3) (4) 'DV.|QLJOLFKH=HUHPRQLDO(PEOHP ]XP*HGHQNHQDQGLH )HLHUOLFKNHLWHQDXV$QODGHU 6HFK]LJVWHQ:LHGHUNHKUYRQ 6HLQHU0DMHVWlWGHV.|QLJV7KURQEHVWHLJXQJ 'DV N|QLJOLFKH (PEOHP JLEW GDV 0RQRJUDPP 6HLQHU 0DMHVWlWGHV.|QLJVZLHGHULQJROGJHOEHU)DUEHGHU)DUEHGHV :RFKHQWDJHVDQZHOFKHP6HLQH0DMHVWlWJHERUHQZXUGH(VLVW JROGHQJHUlQGHUWXQGHUKDEHQJHVWDOWHWDXIEODXHP+LQWHUJUXQG GHU )DUEH GHU 0RQDUFKLH XPULQJW YRQ YLHUXQGVLHE]LJ NOHLQHQ HUOHVHQHQ'LDPDQWHQZHOFKHVLHEHQXQGGUHLLJJURHNRVWEDUVWH 'LDPDQWHQEHLGVHLWLJXPUDQGHQ'LHVHV\PEROLVLHUHQZHLVH0lQ QHU KHUDXVUDJHQGH +RÀLWHUDWHQ ZHLWKLQ EHNDQQWH .XQVWKDQG ZHUNHU EHGHXWHQGH (OHIDQWHQ OLHEHQVZUGLJH 'DPHQ WDSIHUH 6ROGDWHQXQG+|ÀLQJH'LHVHUK|FKVWJHVFKlW]WHXQGHLQ]LJDUWLJ HKUHQKDIWH.UHLVLQN|QLJOLFKHQ'LHQVWHQLVWNRVWEDUHUDOV(GHO VWHLQHZHVKDOEGHVVHQ/HEHZHVHQPLW'LDPDQWHQJOHLFK]XVHW]HQ VLQG6HLQHU0DMHVWlWQDKHXQGLKP]X(KUHQK|FKVWVHOEVWNRVW EDUHUGHQQDOOGLHHGOHQ'LDPDQWHQ'HU.|QLJLVWGHUDOOHUNRVW EDUVWH 'LDPDQW JHERUJHQ LQ GHU +HU]HQ GHU 0HQVFKHQ GHUHQ /HLGHQHUOLQGHUWXQGGHUHQ*OFNVHOLJNHLWHUVFKDIIW(ULVWGHU
    [Show full text]
  • THE COUNCIL STUDY the Study on the Sustainable Management and Development of the Mekong River Basin, Including Impacts of Mainstream Hydropower
    MEKONG RIVER COMMISSION THE COUNCIL STUDY The Study on the Sustainable Management and Development of the Mekong River Basin, including Impacts of Mainstream Hydropower Projects Modelling the Impacts of Climate Change and Development Infrastructure on Mekong Flow, Sediment Regimes and Water Quality Modelling Volume 1: Summary Report January 2018 Disclaimer: These Council Study reports are considered final drafts prepared by the technical experts and specialists of the Mekong River Commission, through a process of consultation with representatives of member countries. The contents or findings of the reports are not necessarily the views of the MRC member countries but will serve as knowledge base and reference in the work of the MRC and its member countries in their ongoing technical and policy dialogues in ensuring the sustainable development of the Mekong river basin. The MRC is funded by contribution from its member countries and development partners of Australia, Belgium, European Union, Finland, France, Germany, Japan, Luxembourg, the Netherlands, Sweden, Switzerland, the United States and the World Bank Council Study Modelling Report Volume 1 of 10 - Summary Report CONTENTS AMENDMENT RECORD This report has been issued and amended as follows: Issue Revision Description Date Prepared By 1 1 Baseline and Main 15 April MRC Modelling Team Sopheap Scenarios 2017 Lim and Anthony Green with contributions by Nguyen Dinh Dat, Ornanong Vonnarat, Rattykone Sayasane, Rachel Blakers and Jorma Koponnen 1 2 Update for May 2017 19 May As above including
    [Show full text]