THE COUNCIL STUDY the Study on the Sustainable Management and Development of the Mekong River Basin, Including Impacts of Mainstream Hydropower

Total Page:16

File Type:pdf, Size:1020Kb

THE COUNCIL STUDY the Study on the Sustainable Management and Development of the Mekong River Basin, Including Impacts of Mainstream Hydropower MEKONG RIVER COMMISSION THE COUNCIL STUDY The Study on the Sustainable Management and Development of the Mekong River Basin, including Impacts of Mainstream Hydropower Projects Modelling the Impacts of Climate Change and Development Infrastructure on Mekong Flow, Sediment Regimes and Water Quality Modelling Volume 1: Summary Report January 2018 Disclaimer: These Council Study reports are considered final drafts prepared by the technical experts and specialists of the Mekong River Commission, through a process of consultation with representatives of member countries. The contents or findings of the reports are not necessarily the views of the MRC member countries but will serve as knowledge base and reference in the work of the MRC and its member countries in their ongoing technical and policy dialogues in ensuring the sustainable development of the Mekong river basin. The MRC is funded by contribution from its member countries and development partners of Australia, Belgium, European Union, Finland, France, Germany, Japan, Luxembourg, the Netherlands, Sweden, Switzerland, the United States and the World Bank Council Study Modelling Report Volume 1 of 10 - Summary Report CONTENTS AMENDMENT RECORD This report has been issued and amended as follows: Issue Revision Description Date Prepared By 1 1 Baseline and Main 15 April MRC Modelling Team Sopheap Scenarios 2017 Lim and Anthony Green with contributions by Nguyen Dinh Dat, Ornanong Vonnarat, Rattykone Sayasane, Rachel Blakers and Jorma Koponnen 1 2 Update for May 2017 19 May As above including WUPFIN 2017 1 3 Subscenarios formulation 25 August As above results 2017 1 4 Additional Information for 19 As above ISIS and Subscenarios September results 2017 1 5 Additional Sub Scenario 31 As above results including WUPFIN October and Coastal 2 0 Draft Final Following 25 As above Consultation comments January iii | Page MRC Council Study: Volume 1 Summary Modelling Report v2.0 January 2018 Council Study Modelling Report Volume 1 of 10 - Summary Report CONTENTS Executive Summary ...................................................................................................................................... x 1 Introduction........................................................................................................................................... 1 1.1 Background ................................................................................................................................... 1 1.2 Objectives of the Council Study modelling ............................................................................. 1 1.3 The Mekong Basin (MB) ............................................................................................................ 2 1.4 List of the modelling reports for all model packages ............................................................. 4 2 Modelling Approach and Tools use to simulate and assess the scenario ................................... 5 2.1 Overview of the modelling approach ....................................................................................... 5 2.2 Overview of the modelling process .......................................................................................... 7 3 Description of Simulation Models and Assessment Tools Used in the Council Study ........... 8 3.1 Decision Support Framework (DSF) ....................................................................................... 8 3.1.1 Soil and Water Assessment Tool (SWAT) ...................................................................... 8 3.1.2 Integrated Quantity and Quality Model(IQQM) ........................................................... 9 3.1.3 ISIS Model ............................................................................................................................ 9 3.2 eWater Source Model ................................................................................................................ 11 3.3 WUP-FIN 3D-EIA Model ....................................................................................................... 12 3.4 WUP-FIN Tools and Impact Assessment Tool ................................................................... 12 4 Modelling Scenarios Formulation .................................................................................................... 14 4.1 Background of the Scenarios Formulation ............................................................................ 14 4.1.1 Main Scenarios ................................................................................................................... 14 4.1.2 Sub Scenarios...................................................................................................................... 15 4.2 Data Inputs and Gap Filling .................................................................................................... 16 5 Data Input and Constraints .............................................................................................................. 17 5.1 Requirements of the Council Study for MRC Modelling .................................................... 17 5.2 Requirements for additional modelling .................................................................................. 18 5.3 Sediment and Nutrient Data Analysis and constraints ........................................................ 19 5.4 Channel Data Pakse to Kratie .................................................................................................. 24 5.5 Ground Elevations DEM ......................................................................................................... 25 5.6 Agricultural Modelling ............................................................................................................... 25 5.7 Fisheries and Aquaculture Modelling ..................................................................................... 26 5.8 Sedimentation in Floodplains .................................................................................................. 26 5.9 Coastal Modelling ....................................................................................................................... 26 5.10 Scenario Data .............................................................................................................................. 27 iv | Page MRC Council Study: Volume 1 Summary Modelling Report v2.0 January 2018 Council Study Modelling Report Volume 1 of 10 - Summary Report 5.11 1960s Data ................................................................................................................................... 28 5.12 Sand Mining ................................................................................................................................ 29 5.13 Conclusions on Data Constraints............................................................................................ 29 6 Main and Sub Scenario Results ........................................................................................................ 30 6.1 Land Phase and Irrigation Modelling (SWAT & IQQM) ................................................... 30 6.1.1 Irrigation .............................................................................................................................. 42 6.1.2 Hydropower Production .................................................................................................. 45 6.1.3 Flood Flows in the Upper Basin above Kratie ............................................................. 50 6.2 eWater Source Modelling .......................................................................................................... 51 6.2.1 Source Modelling of Sediment Flux for Main Scenarios ............................................ 51 6.2.2 Sensitivity Analysis of Sediment Trapping Efficiency in Mainstream Dams for 2040 57 6.2.3 Sediment Trapping Sensitivity Results for Changes in LMB Mainstream dams .... 58 6.2.4 Modelling of Nutrient Fluxes .......................................................................................... 59 6.3 ISIS modelling ............................................................................................................................ 61 6.3.1 Changes in Flow and Water level downstream of Kratie ........................................... 61 6.3.2 Salinity Intrusion Modelling ............................................................................................. 66 6.3.3 Flood Modelling and Analysis ......................................................................................... 66 6.3.4 Sediment Modelling in ISIS for Mainstream Dams ..................................................... 69 6.3.5 Sediment Modelling in ISIS for bank erosion, sand mining and overbank sedimentation ...................................................................................................................................... 72 6.4 WUPFIN Tools Application .................................................................................................... 72 6.4.1 Methodology....................................................................................................................... 72 6.5 WUPFIN Tools: Summary of Applications ........................................................................ 73 6.5.1 Impacts on hydrological condition including groundwater........................................ 73 6.5.2 Fisheries Impacts ..............................................................................................................
Recommended publications
  • EGAT Overview
    BACK FRONT With concern for sustainable power security, EGAT has considered various factors and limitations in all aspects, including power capacity planning, development of innovation and technology, public participation, and social and environmental responsibility. EGAT is determined to innovate power solutions for a better life of Thais both today and in the future. “EGAT Power for Thai Happiness” INCOVER INCOVER Introduction Over a half century, the Electricity Generating Authority of Thailand (EGAT) has existed alongside the Thai Society as a state enterprise responsible for power system security. With advanced and eco-friendly power generation technology and transmission system, EGAT ensures the response to electricity demand, a crucial driver for development of economic growth and the country. To keep itself abreast of rapid changes, EGAT gets ready to be adjusted and has developed innovations on electrical power, including Hydro-Floating Solar Hybrid System, RE Forecast Center, Energy Storage System, coupled with the power generation from EGAT main power plants, to enhance security and stability of the power system. In addition to power generation, EGAT continually promotes the responsibility on society, communities, and environment, through energy-saving and environmental conservation projects, such as EGAT Reforestation Project, Green Learning Room Project, No.5 Energy Saving Labeling Project, along with EGAT Leaning Centers nationwide to share knowledge with the society. All of these are to bring about sustainable happiness of all Thais. Electricity Generating Authority of Thailand March 2020 2 EGAT Overview EGAT Profile The Electricity Generating Authority of Thailand (EGAT) was established by virtue of the EGAT Act B.E. 2511 (1968) on May 1, 1969 which merges assets and operations of the 3 previous state enterprises, namely Yanhee Electricity Authority (YEA), Lignite Authority (LA), and North-East Electricity Authority (NEEA).
    [Show full text]
  • ENHANCING CAPABILITY of HYDRO POWER in THAILAND Mr
    1 ENHANCING CAPABILITY OF HYDRO POWER IN THAILAND Mr. Chatchai Mawong Director, Hydro and Renewable Energy Power Plant Development Division Electricity Generating Authority of Thailand EGAT Business Generation Transmission Power Purchase Affiliates To generate electricity by To solely operate the To purchase bulk electricity To invest in electricity more than 50 power transmission system. from IPPs and SPPs and generation and energy- plantslocated in different (Main voltage levels 500, from neighboring countries, related businesses in the parts of the country. 230, 132, and 115 kV.) i.e. Lao PDR and Malaysia. following 5 affiliates. Installed Generating Capacity Transmission Line Length Contract Capacity EGAT’s Investment 16,034.83 MW 35,981.449 Circuit-Kilometers 30,167.42 MW 34,290.40 Million Baht Ref: EGAT Annual Report 2019 Thailand System Generating Capacity EGAT’s Power Plant System Installed Other Generating Capacity in 31 July, 2020 (Lamtakong Jolabha Vadhana and Diesel) 6.43 % Combined cycle 1,030.40 MW 45,543.87 MW 51.53 % Thermal 8,262.00 MW 22.98 % 3,687.00 MW Foreign 12.56 % 5,720.60 MW EGAT SPPs 35.21 % 16,034.83 MW Renewable 20.95 % 19.06 % 9,539.94 MW 3,055.43 MW Renewable Capacity (MW) IPPs 31.28 % 1. Hydro Power Plant 3,021.63 14,248.50 MW 2. Wind, Solar, Geothermal 33.8 Total 3,055.43 Ref: EGAT Power System Control and Operation Division Status of Hydro Power Status Currently, EGAT has been developed hydro projects more than 50 years. It started with large hydro power plant and later more developed in small hydro power plants and downstream irrigation dams 3,021.63 MW Projects Capacity (MW) 1.
    [Show full text]
  • Pak Mun Dam Case Study
    Introduction: Pak Mun Dam Case Study As part of a two-year work programme to review the development effectiveness of large dams, The World Commission on Dams (WCD) has commissioned TDRI to lead the case study on Pak Mun dam on the Mun river in Thailand’s northeast. Pak Mun was selected as one of the case studies on dams located in major river basins in different regions of the world. The Electricity Generating Authority of Thailand (EGAT) started construction of Pak Mun dam in June 1990, and has been operating Pak Mun as a run-of-the-river hydropower project since 1994. TDRI was assigned to re-examine the premises of the underlying economic case for Pak Mun, and to review the project’s justification in the light of material evidence and developments to date bearing on its impact on the environment, in particular on fisheries. WCD’s mandate is to propose a framework for weighing the alternatives in water resources and energy management, and to set internationally acceptable criteria in the planning, design, construction, monitoring, operation and decommissioning of dams. WCD’s final report was released on November 16th, 2000 in London. With the issue of its final report, WCD has completed its mandate and was formally decommissioned. Pak Mun case study was part of the knowledge base which supported the Commission’s conclusions. TDRI’s report, which was submitted to WCD in its final form in March 2000, was previously circulated with other commissioned papers to participants at a stakeholders’ meeting convened by WCD in Bangkok on 23rd February, 2000.
    [Show full text]
  • SWAT Model for Sediment and Nutrient Simulation in the Mekong River Basin
    Mekong River Commission Technical Support Division Information and Knowledge Management Program Component 4: Modelling Draft Working Paper The SWAT Model for Sediment and Nutrient Simulation in the Mekong River Basin December 2015 CONTENTS AMENDMENT RECORD This report has been issued and amended as follows: Issue Revision Description Date Signed 1 0 First Version of 10/12/2015 Ornanong, Documentation Rattykone, Vannaphone Key Person who contributed work: Riparian and National Team Ms. Ornanong Vonnarart Regional Modelling Consultant Mr. Rattykone Sayasane Regional Modelling Consultant Ms.Sopheap Lim Modeller – IKMP Mr. Vannaphone Phetpaseuth National Modelling Expert, 2015 Mr. Simarron Chhoeun National Modelling Expert, 2015 Mr.Pory Sakhon Assistant Modeller for CS, 2015 Mr.Bounmy Chayavong Assistant Modeller for CS, 2015 Mr.Direk Kongpae Assistant Modeller for CS, 2015 Mr.Nguyen Thanh Dat Assistant Modeller for CS, 2015 International Expert: Dr.Srinivasan USDA Agricultural Research Service/Texas A&M AgriLife Research Dr.Anthony Green DSF Technical Advisor for CS CONTENTS Page 1. Introduction 1 2. The Data Available and Analysis 2 2.1 The Sediment and Nutrient monitoring station 2 2.2 Approach for the data analysis 3 3. SWAT Sediment and Nutrient Process 6 4. SWAT Sediment Model Set-up and Calibration Process 12 4.1 Model Configuration 12 4.2 Calibration Location 14 4.3 Calibration Criteria 20 5. Calibration Result 21 5.1 Sediment Calibration Result 21 5.2 Total Nitrogen Calibration Result 25 5.3 Total Phosphorus Calibration Result 27 6. The SWAT Model Output 37 7. Conclusion and area for improvement 40 8. Reference 41 Annex A: Sediment and Nutrient Parameter of model Calibration Annex B: Sediment and Nutrient calibration Result on the Mekong Key station Annex C: SWAT Check result from SWAT model A0-A9 1.
    [Show full text]
  • Modelling the Impacts of Climate Change Council Study
    MEKONG RIVER COMMISSION THE COUNCIL STUDY The Study on the Sustainable Management and Development of the Mekong River Basin including Impacts of Mainstream Hydropower Projects Modelling the Impacts of Climate Change and Development Infrastructure on Mekong Flow, Sediment Regimes and Water Quality Modelling Volume 1: Summary Report January 2018 Disclaimer The Council Study reports are considered final drafts prepared by specialists of the Mekong River Commission and international experts through an extensive process of consultation with representatives of the Member Countries and interested stakeholders. The contents or findings of the reports are not necessarily the views of the MRC Member Countries but serve as knowledge base and reference in the work of the MRC and its Member Countries in their ongoing technical and policy dialogues to ensure sustainable development of the Mekong River Basin. The MRC is funded by contributions from its Member Countries and Development Partners: Australia, Belgium, European Union, Finland, France, Germany, Japan, Luxembourg, the Netherlands, Sweden, Switzerland, the United States and the World Bank. Council Study Modelling Report Volume 1 of 10 - Summary Report CONTENTS AMENDMENT RECORD This report has been issued and amended as follows: Issue Revision Description Date Prepared By 1 1 Baseline and Main 15 April MRC Modelling Team Sopheap Scenarios 2017 Lim and Anthony Green with contributions by Nguyen Dinh Dat, Ornanong Vonnarat, Rattykone Sayasane, Rachel Blakers and Jorma Koponnen 1 2 Update for May
    [Show full text]
  • Disaster Management Partners in Thailand
    Cover image: “Thailand-3570B - Money flows like water..” by Dennis Jarvis is licensed under CC BY-SA 2.0 https://www.flickr.com/photos/archer10/3696750357/in/set-72157620096094807 2 Center for Excellence in Disaster Management & Humanitarian Assistance Table of Contents Welcome - Note from the Director 8 About the Center for Excellence in Disaster Management & Humanitarian Assistance 9 Disaster Management Reference Handbook Series Overview 10 Executive Summary 11 Country Overview 14 Culture 14 Demographics 15 Ethnic Makeup 15 Key Population Centers 17 Vulnerable Groups 18 Economics 20 Environment 21 Borders 21 Geography 21 Climate 23 Disaster Overview 28 Hazards 28 Natural 29 Infectious Disease 33 Endemic Conditions 33 Thailand Disaster Management Reference Handbook | 2015 3 Government Structure for Disaster Management 36 National 36 Laws, Policies, and Plans on Disaster Management 43 Government Capacity and Capability 51 Education Programs 52 Disaster Management Communications 54 Early Warning System 55 Military Role in Disaster Relief 57 Foreign Military Assistance 60 Foreign Assistance and International Partners 60 Foreign Assistance Logistics 61 Infrastructure 68 Airports 68 Seaports 71 Land Routes 72 Roads 72 Bridges 74 Railways 75 Schools 77 Communications 77 Utilities 77 Power 77 Water and Sanitation 80 4 Center for Excellence in Disaster Management & Humanitarian Assistance Health 84 Overview 84 Structure 85 Legal 86 Health system 86 Public Healthcare 87 Private Healthcare 87 Disaster Preparedness and Response 87 Hospitals 88 Challenges
    [Show full text]
  • EGAT Sustainability Report 2019 EGAT Sustainability Report
    ISSN : 2351-0439 ISSN EGAT Sustainability Report 2019 EGAT Sustainability Report Sustainability EGAT Electricity Generating Authority of Thailand (EGAT) 53 Moo 2 Charan Sanitwong Road, Bang Kruai, Nonthaburi 11130 Tel. +66 (0) 2436 4610, +66 (0) 2436 4613 2019 Fax. +66 (0) 2436 4695 www.egat.co.th ENERGY for stability and sustainability Be the country’s main organization to secure the power reliability and enhance competitiveness of the nation through innovation for Thai happiness to secure the power reliability and enhance competitiveness Content Prosperity : 4 Message from the Governor Ensure prosperous and fulfilling lives in 04 7 About EGAT harmony with nature 11 About This Report 12 Material Topics of Sustainability Goal 7 : Ensure access to 15 Corporate Governance affordable, reliable, sustainable 21 Business Ethics and modern energy for all 22 Stakeholder Relationship Page : 55 Management 25 Risk Management Goal 9 : Build resilient infrastructure, promote Economic Performance sustainable industrialization 28 29 Supply Chain Management and foster innovation 31 Anti-Corruption Page : 47-51 33 Availability and Reliability 42 System Efficiency 44 Demand-side Management People : 47 Research and Development End poverty and hunger in all forms and ensure dignity and equality Environmental Performance Goal 2 : End hunger, achieve 52 55 Materials food security and improved 56 Energy nutrition and promote 57 Water sustainable agriculture 59 Greenhouse Gas and Page : 83-84 Air Pollution Management 67 Biodiversity 71 Effluents and Waste Planet
    [Show full text]
  • New Means, Old Ends? World Bank Governmentality in Thailand and Lao People's Democratic Republic
    University of Tennessee, Knoxville TRACE: Tennessee Research and Creative Exchange Masters Theses Graduate School 5-2012 New Means, Old Ends? World Bank Governmentality in Thailand and Lao People's Democratic Republic Nicholas Ryan Zeller [email protected] Follow this and additional works at: https://trace.tennessee.edu/utk_gradthes Part of the Politics and Social Change Commons Recommended Citation Zeller, Nicholas Ryan, "New Means, Old Ends? World Bank Governmentality in Thailand and Lao People's Democratic Republic. " Master's Thesis, University of Tennessee, 2012. https://trace.tennessee.edu/utk_gradthes/1224 This Thesis is brought to you for free and open access by the Graduate School at TRACE: Tennessee Research and Creative Exchange. It has been accepted for inclusion in Masters Theses by an authorized administrator of TRACE: Tennessee Research and Creative Exchange. For more information, please contact [email protected]. To the Graduate Council: I am submitting herewith a thesis written by Nicholas Ryan Zeller entitled "New Means, Old Ends? World Bank Governmentality in Thailand and Lao People's Democratic Republic." I have examined the final electronic copy of this thesis for form and content and recommend that it be accepted in partial fulfillment of the equirr ements for the degree of Master of Science, with a major in Sociology. Paul K. Gellert, Major Professor We have read this thesis and recommend its acceptance: Rachelle Scott, Damayanti Banerjee Accepted for the Council: Carolyn R. Hodges Vice Provost and Dean of the Graduate School (Original signatures are on file with official studentecor r ds.) New Means, Old Ends? World Bank Governmentality in Thailand and Lao People’s Democratic Republic A Thesis Presented for the Master of Arts Degree The University of Tennessee, Knoxville Nicholas Ryan Zeller May 2012 Copyright © 2012 by Nicholas R.
    [Show full text]
  • Case Study: Pak Mun Dam, Mekong River Basin, Thailand
    WCD Case Study Pak Mun Dam Mekong River Basin Thailand Final Report: November 2000 Prepared for the World Commission on Dams (WCD) by: Sakchai Amornsakchai - Asian Institute of Technology, Bangkok Philippe Annez - Griffon Ltd., Bangkok Suphat Vongvisessomjai - Asian Institute of Technology, Bangkok Sansanee Choowaew - Mahidol University, Bangkok Thailand Development Research Institute (TDRI), Bangkok Prasit Kunurat - Department of Social Sciences, Khon Kaen University Jaruwan Nippanon, - Department of Health, Khon Kaen University Roel Schouten- Seatec International - Consulting Engineers, Bangkok Pradit Sripapatrprasite- Seatec International - Consulting Engineers, Bangkok Chayan Vaddhanaphuti - Chiang Mai University, Chiang Mai Chavalit Vidthayanon - Royal Thai Government Fisheries Department, Bangkok Wanpen Wirojanagud, - Faculty of Engineering, Khon Kaen University Ek Watana - Department of Ecological Science, Khon Kaen University Secretariat of the World Commission on Dams P.O. Box 16002, Vlaeberg, Cape Town 8018, South Africa Phone: 27 21 426 4000 Fax: 27 21 426 0036. Website: http://www.dams.org E-mail: [email protected] Pak Mun Dam - Mekong River Basin, Thailand i Disclaimer This is a working paper of the World Commission on Dams - the report published herein was prepared for the Commission as part of its information gathering activity. The views, conclusions, and recommendations are not intended to represent the views of the Commission. The Commission's views, conclusions, and recommendations will be set forth in the Commission's own report. Please cite this report as follows: Amornsakchai, S., Annez, P., Vongvisessomjai, S., Choowaew, S., Thailand Development Research Institute (TDRI), Kunurat, P., Nippanon, J., Schouten, R., Sripapatrprasite, P., Vaddhanaphuti, C., Vidthayanon, C., Wirojanagud, W., Watana, E. 2000. Pak Mun Dam, Mekong River Basin, Thailand.
    [Show full text]
  • A Lesson Learnt from Pak Mun Dam
    Woraya Som-in and Savitri Gadavanij Hydropower Dam and Development, Whose Development and for Whom?: A Lesson Learnt from Pak Mun Dam Woraya Som-in* and Savitri Gadavanij** Abstract Pak Mun hydropower dam is one of several government’s development projects in which emerged from the claim of national security and rural development. Due to the long and continuing protests against Pak Mun Dam, the project is one of the most outstanding cases that capture the interest of the civil society in local, national and international context. The case is also considered as one of the longest social movements by grassroot people in Thailand and the world. In 1991 since the dam was built and up until now, the requests and protests of the Assembly of the Poor (affected people) against Pak Mun dam have continued for more than two decades due to the dam’s severe impact to thousands of livelihoods and the ecology of the Mun River and many local communities at large. The impact of the EBNǰIBTǰBMTPǰHFOFSBUFEǰUIFǰDPOŴJDUTǰBNPOHǰTUBLFIPMEFSTǰJOǰUIFǰTPDJFUZǰ#ZǰDPOEVDUJOHǰ FUIOPHSBQIJDǰTUVEZǰJOǰUIFǰųFMEǰTJUFǰPGǰUIFǰJTTVFǰBMPOHǰXJUIǰFNQJSJDBMǰFWJEFODFT elicited from the community, the study presents the authentic data rooted from the ųMFǰTJUFǰ5IFSFGPSF ǰUIJTǰBSUJDMFǰJTǰBJNJOHǰUPǰTIFEǰMJHIUǰPOǰNBLJOHǰVOEFSTUBOEJOHǰPGǰIPXǰ * Faculty of Humanities and Social Sciences, Mahasarakham University, Khamraing Sub-District, Kantarawichai District, Maha Sarakham 44150, THAILAND. E-mail: [email protected] ** Graduate School of Language and Communication, National Institute
    [Show full text]
  • Assessment of Greater Mekong Subregion Economic Corridors
    About the Assessment of Greater Mekong Subregion Economic Corridors The transformation of transport corridors into economic corridors has been at the center of the Greater Mekong Subregion (GMS) Economic Cooperation Program since 1998. The Asian Development Bank (ADB) conducted this Assessment to guide future investments and provide benchmarks for improving the GMS economic corridors. This Assessment reviews the state of the GMS economic corridors, focusing on transport infrastructure, particularly road transport, cross-border transport and trade, and economic potential. This assessment consists of six country reports and an integrative report initially presented in June 2018 at the GMS Subregional Transport Forum. About the Greater Mekong Subregion Economic Cooperation Program The GMS consists of Cambodia, the Lao People’s Democratic Republic, Myanmar, the People’s Republic of China (specifically Yunnan Province and Guangxi Zhuang Autonomous Region), Thailand, and Viet Nam. In 1992, with assistance from the Asian Development Bank and building on their shared histories and cultures, the six countries of the GMS launched the GMS Program, a program of subregional economic cooperation. The program’s nine priority sectors are agriculture, energy, environment, human resource development, investment, telecommunications, tourism, transport infrastructure, and transport and trade facilitation. About the Asian Development Bank ADB is committed to achieving a prosperous, inclusive, resilient, and sustainable Asia and the Pacific, while sustaining
    [Show full text]
  • Optimising Existing Hydro Power Stations in Scotland with Floating
    Department of Mechanical and Aerospace Engineering Optimising Existing Hydro Power Stations in Scotland with Floating Photovoltaics Author: Darren MacIntyre Supervisor: Nick Kelly A thesis submitted in partial fulfilment for the requirement of degree in Master of Science in Sustainable Engineering: Renewable Energy Systems and the Environment 2020 1 Copyright Declaration This thesis is the result of the author’s original research. It has been composed by the author and has not been previously submitted for examination which has led to the award of a degree. The copyright of this thesis belongs to the author under the terms of the United Kingdom Copyright Acts as qualified by University of Strathclyde Regulation 3.50. Due acknowledgement must always be made of the use of any material contained in, or derived from, this thesis. Signed: Darren MacIntyre Date:14/07/2020 2 Abstract The UK has committed to ambitious targets relating to renewable energy technology and greenhouse gas reduction. Electrical power generation from non-polluting and sustainable sources plays an important role in this regard. Floating photovoltaic farms (FPV) have great potential when co-located with hydropower plant. Benefits include water preservation and higher power generation efficiency, no land costs, lower construction costs, reduction of algae, and lowering of natural methane emissions that come from standing bodies of water. The market for FPV is dominated by nations where tropical or dry arid conditions prevail. The extent to which an FPV-PHS plant in the North of Scotland is feasible was assessed in this study. Foyer PHS operational data was collected and analysed, then modelled in HOMER Pro with proposed FPV of 125MW and 250MW installed capacities overlaid, using generic bifacial and standard monocrystalline PV panels.
    [Show full text]