Public Engagement Digest
Total Page:16
File Type:pdf, Size:1020Kb
http://www.nentnda.gov.hk North East New Territories New Development Areas Planning and Engineering Study Kwu Tung Fanling North New Ping Che / North New Development Area Ta Kwu Ling New Development Area Development Area “Mixed Development Node” - Making “Riverside Township” - A new “Quality Business/Residential Area” - good use of the transportation network to development area closely integrated with Capitalising on the strategic location to provide create a new development area with a mix the Fanling/Sheung Shui New Town development spaces for special industries and of commercial, residential and R&D uses, the industries where Hong Kong enjoys clear as well as land for ecological conservation advantages to support economic development, complemented with medium and low-density residential developments to create a quality living environment Kwu Tung North New Development Area | Pages 6-9 Fanling North New Development Area | Pages 10-13 Ping Che/Ta Kwu Ling New Development Area | Pages 14-17 STAGE 3 PUBLIC ENGAGEMENT DIGEST Foreword Man Kam To BCP With the commissioning of several large- scale planning studies and implementation of a number of infrastructure projects, economic integration between Hong Kong and Shenzhen is seen to be on the Ping Che/Ta Kwu Ling rise. The North East New Territories New Lo Wu BCP New Development Area Development Areas (NENT NDAs) will not only offer chances for promoting social and economic developments in Shenzhen and Hong Kong with their strategic locations, but also address the housing and employment demand resulted from population growth by the provision of approximately 533 ha of developable land. The Recommended Outline Development Plans (RODPs) for the NDAs have taken Fanling North heed of the long-term development of Hong Kwu Tung North New Development Area Kong as a whole, and that of the North East New Territories. Attention is also paid to New Development Area improving the livelihood of local residents, making appropriate arrangements for Sheung Shui the affected residents to minimize any inconvenience, and balancing the interests and requests of various stakeholders. Fanling Introduction The Civil Engineering and Development Che/Ta Kwu Ling (PC/TKL) NDAs to meet to ensure timely incorporation of public (PODPs) of the NDAs. These two stages of participate in the Stage Three Public Department (CEDD) and the Planning the long-term demand for housing and views into the planning and design of the public were completed in 2009 and 2010 Engagement to express your views on Department (PlanD) jointly commissioned employment. In view of the long-term NDAs. The Stage One Public Engagement respectively. the RODPs of the NDAs to facilitate the North East New Territories New impacts of the NDA developments on of the Study mainly aimed to solicit public enhancement of the development Development Areas Planning and residents of and in proximity to the NDAs, views on the visions and aspirations for Taking into account the public views proposals for formulating the Layout Plans. Engineering Study (the NENT NDAs Study) public participation is particularly important the NDAs to build a consensus for future received and results and recommendations in June 2008 to establish a planning and for establishing the developments of the developments. The Stage Two Public of the technical assessments, the Study development framework for the Kwu Tung NDAs. A series of public engagement Engagement aimed to consult the public on Consultants have formulated the RODPs. North (KTN), Fanling North (FLN) and Ping activities have been carried out in order the Preliminary Outline Development Plans We would like to cordially invite you to Update of Baseline Information and Review of Key Issues Public Comments and Response The public actively expressed their views on the Understand the Current State overall development strategies, development of the NDAs Initial Technical Assessments proposals and implementation arrangements of the Formulate the Vision of the NDAs NDAs in the Stage Two Public Engagement. The Stage One public views collected have been consolidated, analysed and summarised in the Stage Two Public Engagement Report. Formulate the Preliminary Outline Development Plans Both supportive and opposing views on the NDA developments were received from the public. In preparing the RODPs, the Study Consultants strived to balance different suggestions from the public to meet the needs of various stakeholders and public Discuss the Preliminary Preliminary Technical aspirations. We will continue to listen to public views Outline Development Plans Assessments to improve the planning of the NDAs. Stage Two Formulate the Environmental Impact Recommended Outline Assessments Development Plans Discuss the Recommended Outline Development Plans Detailed Technical Finalise Details of Layout Assessments Plans Present Stage Present Stage Three Formulate Layout Plans North East New Territories New Development Areas Planning and Engineering Study Major Amendments 2 to the PODPs MAJOR AMENDMENTS TO THE PODPs After taking into account the diverse public views and conducting the various technical assessments, we have made appropriate amendments to the land uses in the three NDAs and reflected the proposed land uses on the RODPs. The major amendments to the PODPs are as follows: Kwu Tung North NDA Increase plot ratios of Reserve land for development “Residential Zone 2” (“R2”) 8 of public housing for local and “Residential Zone 3” (“R3”) rehousing of eligible clearees. 1 sites to 3.5 and 2 respectively to better utilise infrastructure and increase housing supply. Reserve land to provide a District 9 Cooling System in the NDA to achieve energy saving. Provide large-scale recreation and sports facilities, including a sports ground, a swimming pool Enhance the layout of the open 2 space in the Town Centre for and an indoor sports centre. 10 Land is also reserved for the creating a more comprehensive provision of activity centres. green network. Provide land for research and Create a continuous cluster development uses in support of of commercial, research and 3 the Lok Ma Chau (LMC) Loop development sites to form a development. 11 distinctive development node to promote synergy and to increase the plot ratio from 2.5 to 3 to facilitate Increase the number of schools more efficient use of land resources. to cope with the additional population of the NDA. Revise the location of the school Designate Long Valley as a 4 cluster in the southern part of Nature Park to enhance and conserve the existing ecological the NDA and consolidate the 12 government, institution and environment and compensate community facilities. for the impacts of the NDA development on the wetland. Designate the former Ma Tso Lung Landfill site as “Open Retain the two areas in the south 5 Space” (“O”) to provide more and north of the Nature Park as open space for local residents. 13 the “Agriculture” (“AGR”) zone to continue the existing agricultural activities. Rezone the “R3” site to “Government Reserve” 6 according to the findings of Reserve land near the existing technical assessments. indigenous village as “R4” for low- density housing development, 14 which may also be used for Accommodate service reservoirs reprovisioning the affected village 7 in the northern part of the NDA. houses/building lots under the Major Amendments to the PODP of the Kwu Tung North New Development Area Village Removal Terms Stage 3 Public Engagement Digest Major Amendments to the PODPs North East New Territories New Development Areas 3 Fanling North NDA Retain the current “AGR” zone in Exclude the previously proposed 1 accordance with the prevailing low-density residential area Outline Zoning Plan (OZP). in the north of Ng Tung River 9 from the NDA according to the recommendations of the Designate an existing mitigation technical assessments. meander in the north of Ng Tung River as “Conservation Area” (“CA”) 2 to provide a habitat suitable for Construct a new road connecting egrets to replace the one affected Wo Tai Street and Fan Leng Lau by the NDA developments. 10 Road to enhance the linkage between the NDA and the existing New Town. Preserve the “Green Belt” (“GB”) zone to the south of Ng Tung River and north of Sheung Shui Heung rather Redesign the section of the 3 than designating the site for sewage elevated Fanling Bypass near treatment works expansion, and Belair Monte as a depressed 11 exclude it from the NDA boundary. road with underpass to mitigate impacts on the nearby environment. Rezone the land previously reserved for port backup uses and 4 open space to “Government” use Rezone the originally proposed for accommodating police facilities. PRH site in the immediate north of Ma Sik Road to “R2” with 12 lower development intensity and Increase plot ratios for “R2” and building height to enhance the “R3” sites to 3.5 and 2 respectively 5 spaciousness. to better utilise infrastructure and increase housing supply. Revise the Po Shek Wu Road improvement works by widening Reserve the government land at the existing Po Shek Wu Road the hillslope of Cheung Po Tau and 6 13 and construct a new elevated slip Tong Hang to accommodate service road above it to avoid impacts reservoirs for the NDA. on the “GB” zone between Tai Tau Leng and Tsung Pak Long. Restructure the land uses of this 7 area to reserve more land for Reserve land near the existing PRH development. indigenous village as “R4” for low- density housing development, which 14 may be used for reprovisioning the Reserve more sites for school affected village houses/building lots 8 development to cope with the under the Village Removal Terms. Major Amendments to the PODP of the Fanling North New Development Area additional population of the NDA. Ping Che/Ta Kwu Ling NDA Revise the land use of the area Excise the area within the village to the west of Ping Yuen River environs from the NDA. due to changes to the river alignment.