ACAT - a PART of MÖDLING’S MUNICIPAL SEWAGE TREATMENT PLANT HISTORY Today the Catchment Area of the Sewage Treatment Plant Mödling Has a Capacity of 130.000 PE
Total Page:16
File Type:pdf, Size:1020Kb
ACAT - A PART OF MÖDLING’S MUNICIPAL SEWAGE TREATMENT PLANT HISTORY Today the catchment area of the Sewage Treatment Plant Mödling has a capacity of 130.000 PE. It comprises the municipalities of Mödling, Brunn am Gebirge, Maria Enzers- dorf, Wiener Neudorf, Hinterbrühl, Gaaden, Wienerwald, Gießhübl, and Biedermannsdorf. Its history as a first biological se wage treatment plant in Central Europe goes back to 1904. The ARA Mödling, whose history can be In 1964 the ARA Mödling was reconstructed traced back until far into the last century, has for the first time to a treatment capacity of currently a treatment capacity of 130.000 PE 36.000PE and the treatment plant was de- per year. signed as the first activated-sludge plant in Already in 1898 it was decided to construct a Austria. sewage plant according to a design of an Eng- The continued growth of the population of lish engineer. The official opening ceremony the surrounding communities rendered it of the first biological sewage treatment of necessary to extend the treatment capacity Central Europe took place in 1904 with the up to 72.000 PE in 1972 and up to 100.000 PE presence of the Austrian Emperor Franz Jo- in 1982. seph I. AUTHOR: RONALD POELGEEST Article from: inside acat 14/2011, page 1 of 2 ACAT - A PART OF MÖDLING’S MUNICIPAL SEWAGE TREATMENT PLANT HISTORY Due to the ever-increasing requirements set old, unprofitable screening drums are re- on treatment performance the reconstruction placed by the latest technology, and because of the sewage plant started in 1988 and it was of the low operating and maintenance costs finished in 1990. the investment in this installation pays off within a reasonable period of time. In 2006 the municipality Biedermannsdorf The strainer bed (belt thickener) is used for was connected and therefore the last recon- sludge thickening. Each of the two belt thick- struction to a treatment capacity up to eners type „Fast Drain FD 120“has a through- 130.000 PE was necessary. The list of the nu- put capacity of 30 m³/h or 240 kg DS/h. merous reconstruction shows that the Munic- In accordance with state-of-the-art technolo- ipal Sewage Treatment Plant Mödling can look gy ACAT has not only replaced the belt thick- back on a long history. ener of W+AT GmbH, but modernized also the Therefore, ACAT is proud to become part of complete switch and control system for the this history with the rebuilding of the existing MÜSE (mechanical surplus sludge dewater- excess sludge thickening. ing). In summer 2011 ACAT received an order to Thanks to the experience and the commit- rebuild the mechanical excess sludge thicken- ment of the operating manager of the Munic- ing of the Municipal Sewage Treatment Plant ipal Sewage Treatment Plant Mödling, Mr. Mödling. Aftera short construction time, work Herbert Huber, that this project was executed was completed by the end of October. The so smoothly. AUTHOR: RONALD POELGEEST Article from: inside acat 14/2011, page 2 of 2 .