Comment Sheet
Total Page:16
File Type:pdf, Size:1020Kb
COMMENT SHEET PUBLIC MEETING LUC-Interstate 475-7.53 Interchange @ Dorr St. Wednesday, March 18, 2015 – 4:00 P.M. to 6:00 P.M. Springfield Township Hall 7617 Angola Rd. Holland, Ohio 43528 Anyone wishing to submit comments concerning the alternatives for the new interchange on Interstate 475 at Dorr Street in Lucas County, Ohio, may do so by presenting this form at this meeting or by mailing it to the Ohio Department of Transportation, Office of Planning and Engineering, 317 East Poe Rd., Bowling Green, Ohio 43402. The Final date for submission of comments is April 1, 2015. You may also submit your comments directly from our Web Page at: http://www.dot.state.oh.us/districts/D02/Pages/I-475atUS20AandDorr.aspx NAME_______________________________TELEPHONE___________________________ ADDRESS:___________________________CITY and ZIP Code______________________ Email: _______________________________________________________________________ COMMENTS: This sheet can be folded in thirds, taped or stapled, and mailed without an envelope. Postage is required. OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF PLANNING AND PROGRAMS ATTN: Tricia Hines 317 EAST POE ROAD BOWLING GREEN, OHIO 43402 PROJECT INFORMATION SHEET I-475 & Dorr Street Interchange Project March 18, 2015 – Springfield Township Hall PROJECT DESCRIPTION ALTERNATIVES Construct a freeway interchange along Dorr Street at I-475, widen ■ Alternative 1 – Roundabout Interchange existing Dorr Street from two to five lanes between McCord Road ■ Alternative 2 – Tight Diamond Interchange and Holland-Sylvania Road, and provide sidewalk along both sides of Dorr Street. ESTIMATED SCHEDULE ■ Select Preferred Alternative – April 2015 PROJECT PURPOSE ■ Design – 2015-2016 To address future congestion at adjacent interchanges along I-475 ■ R/W Acquisition & Utility Relocation – TBD and to improve access to and from I-475 for the University of Construction – TBD Toledo and other existing and new development within the City of ■ Toledo and Springfield Township. NEXT STEPS PROJECT NEEDS ■ Select Preferred Alternative ■ Capacity – Adjacent interchanges at I-475/Central Avenue and ■ Begin Detailed Design and determine the exact I-475/Airport Highway may face capacity concerns in order to R/W needs handle the future traffic demands ■ Return to TRAC to request R/W and ■ Safety – Congestion at adjacent interchanges along I-475 have Construction Funding contributed to a high number of crashes CONTACT: PROJECT GOALS ■ Improve safety by reducing future traffic congestion and Michael Stormer, P.E. delays in the area Planning Engineer ■ Improve existing connectivity between I-475 and the Ohio Department of Transportation University of Toledo and the Dorr Street Corridor District 2 ■ Accommodate pedestrians and improve connectivity along 317 East Poe Road Dorr Street Bowling Green, Ohio 43402 419.373.4472 [email protected] http://www.dot.state.oh.us/districts/D02/Pages/I-475atUS20AandDorr.aspx SW-2 0 MARCH 18,2015 ALTERNATIVE 1-ROUNDABOUTS DORR INTERCHANGE 100 SIGNIFICANTLY IMPACTEDPARCEL IMPACTED PARCEL SW-3 250 NW-1 500 B SW-4 NW-4 SW-7 SW-5 NW-5 N SW-6 600' MIN.TOLA NW-6 SW-8 NW-2 NW-7 SW-9 A NW-8 SW-10 N W-9 NW-3 475 INTERSTATE NE-1 SE-1 SE-2 NE-2 SE-3 SE-4 A Joyce Lane SE-5 NE-3 SE-6 NE-4 SE-7 SE-8 600 Saturn Drive ' M I NE-5 N . SE-9 T O L SE-10 A B CUBA-SATURN PARK SE-11 SE-12 Cuba Street Birdie Drive D o SE-13 rr S t SE-14 r ee SE-15 t SE-16 Raynor Drive Rochelle Road SE-17 SE-18 SE-19 NE-6 SW-2 0 MARCH 18,2015 ALTERNATIVE 2-TIGHTDIAMOND DORR INTERCHANGE 100 SIGNIFICANTLY IMPACTEDPARCEL IMPACTED PARCEL SW-3 250 NW-1 500 B SW-4 NW-4 SW-7 SW-5 NW-5 N SW-6 600' MIN.TOLA NW-6 SW-8 NW-2 NW-7 SW-9 NW-8 SW-10 NW-9 NW-3 A 475 INTERSTATE NE-1 SE-1 A SE-2 NE-2 SE-3 Joyce Lane 600' MIN.TOLA SE-5 NE-3 SE-6 NE-4 SE-7 SE-8 Saturn Drive NE-5 SE-9 SE-10 B CUBA-SATURN PARK SE-11 SE-12 Cuba Street Birdie Drive D o SE-13 rr S t SE-14 r ee SE-15 t SE-16 Raynor Drive Rochelle Road SE-17 SE-18 SE-19 NE-6.