DISTRICT 2 2021 CONSTRUCTION GUIDE

Fulton Lucas Williams 2 Ottawa BOWLING GREEN Sandusky Henry Wood Seneca

SERVING FULTON, HENRY, LUCAS, OTTAWA, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES , Mike DeWine, Governor | Jack Marchbanks, Ph.D., ODOT Director | Patrick McColley P.E., S.I., District Deputy Director DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

TABLE OF CONTENTS

Overview ...... page 3

Fulton County ...... page 5

Henry County ...... page 7

Lucas County ...... page 9

Ottawa County ...... page 13

Sandusky County ...... page 15

Seneca County ...... page 17

Williams County ...... page 20

Wood County ...... page 22

Local-Let Projects ...... page 24

TABLE OF CONTENTS 2 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

ABOUT ODOT PROGRAM KEY

The Ohio Department of Transportation is the state agency For purposes of brevity, ODOT uses several acronyms throughout this responsible for the maintenance and construction activities on Ohio’s programs. This key defines our abbreviations: transportation system, including federal and state routes outside of municipalities, and all interstate routes. I Interstate

U.S. Federal Route

SR State Route

CR County Rd.

TR Township Rd.

NB Northbound

SB Southbound

EB Eastbound

Each spring, we shift our priority from snow and ice operations WB Westbound to construction and maintenance investments in our state’s transportation system. Our yearly plans are outlined in our district PID Project Identification Number construction programs.

This construction program outlines plans within ODOT District 2, which serves Fulton, Henry, Lucas, Ottawa, Sandusky, Seneca, Williams, and Wood counties in northwest Ohio. District 2 is responsible for: 3,833 950 45 LANE MILES BRIDGES PROJECTS

OVERVIEW 3 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

LEARN MORE ONLINE CONTACT

This construction program offers baseline information on our plans Public Information Office for the upcoming construction season. For additional information on [email protected] | 419-373-4428 individual projects, visit our website: Rebecca Dangelo, Public Information Officer transportation.ohio.gov/projects Kelsie Hoagland, Public Information Specialist Rhonda Pees, Northwest Ohio Regional Public Information Officer Filter the library by the project’s identification number (PID) to find additional information on each project throughout the construction season.

CONNECT WITH US RECEIVE WEEKLY UPDATES

During the construction season, ODOT sends weekly updates on ongoing construction and maintenance projects in each county. To @ODOTD2 sign up for weekly updates, visit: public.govdelivery.com/accounts/OHDOT/ subscriber/new @ODOT_Toledo Subscriptions can be customized on a regional and county level. Follow the prompts at the link above to personalize your subscription to ODOT communication. For weekly project updates and traffic impacts, select “Construction Know Before You Go! Updates and Traffic Advisories” when selecting subscription topics. www.ohgo.com

OVERVIEW 4 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM 475

LYONS 120 METAMORA 127 108 101213 FAYETTE 64 20 20

109 66 108 FULTON

80 SWANTON 101152 DELTA 20A 20A 20A WAUSEON

2 101295

2 109 ARCHBOLD 108 92361

Resurfacing Intersection/Traffic Signal

FULTON COUNTY • 5

75 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

FULTON COUNTY

PID: 101295 PID: 101152 PID: 101213 U.S. Route 20A U.S. Route 20A at State Route 108 State Route 64 Resurface U.S. 20A between SR 109 Upgrade the existing traffic signal at Resurface SR 64 between U.S. 20 and and CR 3 through Delta. the intersection. the Ohio state line through Metamora. Estimated Begin: April 2021 Estimated Begin: April 2021 Estimated Begin: May 2021 Estimated End: October 2021 Estimated End: October 2021 Estimated End: September 2021 Project Cost: $2.7 million Project Cost: $265,000 Project Cost: $1 million Traffic Impacts: Lane restrictions are Traffic Impacts: Lane restrictions at Traffic Impacts: Lane restrictions are expected. the intersection are expected. expected. Note: PID includes work on SR 109. Note: PID includes work on SR 120.

PID: 92361 PID: 101295 PID: 101213 State Route 108 State Route 109 State Route 120 Resurface SR 108 between Henry Resurface SR 109 in Delta. Resurface SR 120 between Crockett County line and Elm St. in Wauseon. Estimated Begin: April 2021 Hwy. and Maple St. in Metamora. Estimated Begin: June 2021 Estimated End: October 2021 Estimated Begin: May 2021 Estimated End: September 2021 Project Cost: $2.7 million Estimated End: September 2021 Project Cost: $1.25 million Traffic Impacts: Lane restrictions are Project Cost: $1 million Traffic Impacts: Lane restrictions are expected. Traffic Impacts: Lane restrictions are expected. Note: PID includes work on US 20A. expected. Note: PID includes work on SR 64.

FULTON COUNTY 6 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

66 108 101274 109

LIBERTY CENTER 6 109641

6 6 110 GRAND RAPIDS NAPOLEON 65 24 22984 6 MCCLURE

H ENRY Resurfacing 109 108 MALINTA •Pedestrian Safety •Intersection/Traffic Signal 281 18 HOLGATE

HAMLER

18 DESHLER

NEW BAVARIA

109 108 65

HENRY COUNTY 7 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

HENRY COUNTY

PID: 22984 PID: 101274 PID: 109641 New Bridge U.S. Route 6 State Route 109 Construct a new bridge across the Resurface U.S. 6 between the Williams Install Rectangular Rapid Flashing Maumee River, connecting SR 110 to County line and SR 34. Beacons (RRFB) and related sidewalk Industrial Dr. in Napoleon. Estimated Begin: June 2021 and pavement improvements on SR Construction Began: March 2020 Estimated End: October 2021 109 at Cherry St. in Liberty Center. Estimated End: June 2022 Project Cost: $3 million Estimated Begin: August 2021 Project Cost: $10.3 million Traffic Impacts: Lane restrictions are Estimated End: October 2021 Traffic Impacts: Lane restrictions expected. Project Cost: $190,000 and closures are expected for the Traffic Impacts: Lane restrictions are construction of a roundabout, traffic expected. tie-ins, and other related work. Note: PID includes installation of RRFB and related in Seneca Co., SR 67

HENRY COUNTY 8 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

Resurfacing •Major Reconstruction •Noise Walls •Bridge/Culvert Project •Intersection/Traffic Signal

LUCAS COUNTY 9 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

LUCAS COUNTY

PID: 93594 PID 88563 PID: 113685 Interstate 75 Interstate 75 to Alexis Rd. Ramp Reconstruct I-75 between South Resurface I-75 between I-280 and the Apply a micro-surface course to the Avenue and Dorr St. through state line in North Toledo. ramp from northbound I-75 to Alexis Downtown Toledo. Estimated Begin: April 2021 Rd. (Exit 210) in North Toledo. Construction Began: August 2018 Estimated End: October 2021 Estimated Begin: September 2021 Estimated End: Summer 2023 Project Cost: $6.4 million Estimated End: October 2021 Project Cost: $158.7 million Traffic Impacts: Lane restrictions are Project Cost: $287,000 Traffic Impacts: Long-term ramp and expected. Traffic Impacts: Lane restrictions are lane closures and restrictions are expected. required. Note: PID includes multiple locations Note: Adjacent to Wood County I-75 in Lucas County. Reconstruction, PID 93592

PID: 106163 PID: 113685 PID: 88084 Interstate 280 Place a concrete overlay on the Apply a micro-surface course to the Construct a new at Dorr driving surface of the Veterans’ Glass northbound lanes of I-280 near Pickle St. and widen I-475 between Central City Skyway bridge in East Toledo. Rd. in Northwood. Avenue and Airport Hwy. in Springfield Construction Began: March 2020 Estimated Begin: September 2021 Township. Estimated End: October 2021 Estimated End: October 2021 Construction Began: November 2019 Project Cost: $18 million Project Cost: $287,000 Estimated End: August 2021 Traffic Impacts: Ramp closures and Traffic Impacts: Lane restrictions are Project Cost: $45.3 million lane restrictions are expected. expected. Traffic Impacts: Lane restrictions and Note: PID includes multiple locations closures are expected. in Lucas County.

LUCAS COUNTY 10 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

LUCAS COUNTY

PID: 113685 PID: 88563 PID: 103647 Interstate 475 Ramp Interstate 475 Interstate 475/U.S. Route 23 Apply a micro-surface course to the Resurface I-475 between Douglas Road Construct noise walls along I-475 and ramp from westbound to southbound and I-75 in Toledo. U.S. 23 in Sylvania/Toledo. I-475 in Sylvania Township. Estimated Begin: April 2021 Estimated Begin: March 2021 Estimated Begin: September 2021 Estimated End: October 2021 Estimated End: August 2021 Estimated End: October 2021 Project Cost: $6.4 million Project Cost: $6.6 million Project Cost: $287,000 Traffic Impacts: Lane restrictions are Traffic Impacts: and/or lane Traffic Impacts: Lane restrictions are expected. restrictions are possible. expected. Note: PID includes multiple locations in Lucas County.

PID: 110486 PID: 110490 PID: 110500 U.S. Route 20 U.S. Route 20/Reynolds Rd. U.S. Route 20/Reynolds Rd. A safety project to improve the A safety project to improve the A safety project to improve the intersection of U.S. 20/Central Ave. & intersection of U.S. 20/Reynolds Rd. intersection of U.S. 20/Reynolds Rd. McCord Rd. in Sylvania Twp./Toledo. and Hill Ave. in Toledo. and Heatherdowns Blvd. in Toledo. Estimated Begin: May 2021 Estimated Begin: April 2021 Estimated Begin: September 2021 Estimated End: August 2021 Estimated End: October 2021 Estimated End: June 2022 Project Cost: $400,000 Project Cost: $400,000 Project Cost: $1 million Traffic Impacts: Lane restrictions are Traffic Impacts: Lane restrictions are Traffic Impacts: Lane restrictions are expected. expected. expected.

LUCAS COUNTY 11 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

LUCAS COUNTY

PID: 102928 PID: 111022 PID: 110495 U.S. Route 24 at Fallen Timbers Lane U.S. Route 24 at Berdan Ave. State Route 184 Rehabilitate the Fallen Timbers Ln. Convert /Berdan/Cherry St. A safety project to improve the bridge over U.S. 24. in Maumee. roundabout from a two lane by intersection of SR 184/Alexis Rd. and Estimated Begin: February 2021 two lane to a two lane by one lane Lewis Ave. in Toledo. Estimated End: May 2021 roundabout in Toledo. Estimated Begin: September 2021 Project Cost: $1.7 million Estimated Begin: July 2021 Estimated End: October 2021 Traffic Impacts: Fallen Timbers Ln. Estimated End: October 2021 Project Cost: $287,000 closed over U.S. 24 for 90 days. Project Cost: $1.3 million Traffic Impacts: Lane restrictions are Lane restrictions possible on U.S. 24. Traffic Impacts: Overnight and expected. weekend closures, and lane restrictions are expected.

PID: 110068 PID: 110071 PID: 113269 Various Various Various Maintenance of three bridges and four Operation of Craig Memorial Bridge Pedestrian safety improvement water pump stations. and Port Clinton Lift Bridge. project for 70 intersections located Began: January 2021 Began: January 2021 within the City of Toledo. Estimated End: December 2021 Estimated End: December 2021 Estimated Begin: May 2021 Project Cost: $117,400 Project Cost: $428,600 Estimated End: November 2021 Traffic Impacts: Lane restrictions are Traffic Impacts: Lane restrictions and Project Cost: $1.3 million possible. bridge closures are possible. Traffic Impacts: Lane restrictions are Note: PID includes maintenance of Note: PID includes operation of bridge expected. bridges in Ottawa County. in Ottawa County.

LUCAS COUNTY 12 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

Resurfacing •Geological Repair

357 PUT-IN-BAY 95759

579 2

CLAY CENTER 19 2 53

MARBLEHEAD 590 95758 ROCKY RIDGE 51 OTTAWA 358

GENOA 163 OAK HARBOR PORT CLINTON 163 269 163 105

53 111075 2 ELMORE

OTTAWA COUNTY 13 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

OTTAWA COUNTY

PID: 111075 PID: 95758 PID: 95759 State Route 105 State Route 269 State Route 579 Slope repair on SR 105 between Resurface SR 269 between SR 2 and Resurface SR 579 in Williston. S. Elliston Trowbridge Rd. and S. SR 163, in Port Clinton/Lakeside Began: September 2020 Graytown Rd. in Elmore. Marblehead. Estimated End: June 2021 Estimated Begin: April 2021 Estimated Begin: September 2021 Project Cost: $2.1 million Estimated End: October 2021 Estimated End: October 2021 Traffic Impacts: Lane restrictions are Project Cost: $270,000 Project Cost: $1.4 million expected. Traffic Impacts: One 2-week closure Traffic Impacts: Lane restrictions are is necessary, and lane restrictions are expected. expected.

PID: 110068 PID: 110071 PID: 105631 Various Various Various Maintenance of three bridges and four Operation of Craig Memorial Bridge Replace signs in various locations water pump stations. and Port Clinton Lift Bridge. in Ottawa County, not within Began: January 2021 Began: January 2021 municipalities. Estimated End: December 2021 Estimated End: December 2021 Estimated Begin: April 2021 Project Cost: $117,400 Project Cost: $428,600 Estimated End: October 2021 Traffic Impacts: Lane restrictions are Traffic Impacts: Lane restrictions and Project Cost: $620,000 possible. bridge closures are possible. Traffic impacts: Lane and shoulder Note: PID includes maintenance of Note: PID includes operation of bridge restrictions are expected. bridges in Lucas County. in Lucas County.

OTTAWA COUNTY 14 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

Geological Repair 80 • Bridge/Culvert Project

20 • 105 51 WOODVILLE 523

LINDSEY

20 6

GIBSONBURG 19 108868 600 6 412 99085 300 80 23 FREMONT 6 HELENA 510 101 53 SANDUSKY

CLYDE 19 590 20 635 101 BURGOON 101329

GREEN SPRINGS

SANDUSKY COUNTY 15 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

SANDUSKY COUNTY

PID: 99085 PID: 108868 PID: 101329 U.S. Route 6/U.S. Route 20 U.S. Route 6 State Route 19 Repair a slope on eastbound US 6 east Replace bridge structure over South Replace existing bridge structure of the US 6/US 20 interchange. Creek northeast of Fremont. between Maple St. and Academy Ln. Estimated Begin: January 2021 Estimated Begin: May 2021 and perform safety grading, in Green Estimated End: September 2021 Estimated End: October 2021 Springs. Project Cost: $1.5 million Project Cost: $765,000 Estimated Begin: June 2021 Traffic Impacts: Lane restrictions are Traffic Impacts: Road closure is Estimated End: August 2021 expected. required. Project Cost: $687,000 Traffic Impacts: Road closure is required.

SANDUSKY COUNTY 16 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

GREEN SPRINGS 101 18 BETTSVILLE 19 23 53

12 97424 SENECA 19 101

FOSTORIA 635 97424 4 18 REPUBLIC TIFFIN 587 18 162

23 224

110482 224

ATTICA 95778 67 BLOOMVILLE 224 NEW RIEGEL 53 100 102934 85264 109641 587 19 4 23 231 67 100 Resurfacing •Pedestrian Safety •Bridge/Culvert Project •Intersection/Traffic Signal SENECA COUNTY 17 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

SENECA COUNTY

PID: 85264 PID: 110482 PID: 102934 U.S. Route 23 U.S. Route 224 at State Route 53 State Route 19 Resurface U.S. 23 between the A safety funded project to upgrade Rehabilitate SR 19 bridge structure Wyandot County line and Fostoria. the existing signal, install eastbound over Silver Creek, south of Bloomville. Replace bridge over Wolf Creek. and westbound left turn lanes and Estimated Begin: March 2021 Estimated Begin: May 2021 restripe to create positive offset for Estimated End: August 2021 Estimated End: October 2021 left turn lanes, southwest of Tiffin. Project Cost: $400,000 Project Cost: $4.3 million Estimated Begin: July 2021 Traffic Impacts: Road closure is Traffic Impacts: Road closure is Estimated End: October 2021 required. required and lane restrictions are Project Cost: $1.4 million expected. Traffic Impacts: Lane restrictions are expected.

PID: 97424 PID: 95778 PID: 109641 State Route 19 State Route 53 State Route 67 Replace two culverts on SR 19: one Resurface SR 53 in Tiffin. Install Rectangular Rapid Flashing north of Republic, and one northeast Estimated Begin: June 2021 Beacons (RRFB) and related sidewalk of Lowell. Estimated End: November 2021 and pavement improvements on SR 67 Estimated Begin: June 2021 Project Cost: $3 million near TR 1066 in Melmore. Estimated End: October 2021 Traffic Impacts: Lane restrictions are Estimated Begin: August 2021 Project Cost: $1.1 million expected. Estimated End: October 2021 Traffic Impacts: Road closures are Note: PID includes work on SR 100. Project Cost: $190,000 required. Traffic Impacts: Lane restrictions are Note: PID includes work on SR 101. expected. Note: PID includes installation of RRFB and related on SR 109 in Henry Co.

SENECA COUNTY 18 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

SENECA COUNTY

PID: 95778 PID: 97424 State Route 100 State Route 101 Resurface SR 100 between Crawford A culvert replacement and bridge County line and Riverside Dr. in Tiffin. replacement on SR 101, northeast of Estimated Begin: June 2021 Lowell. Estimated End: November 2021 Estimated Begin: June 2021 Project Cost: $3 million Estimated End: October 2021 Traffic Impacts: Lane restrictions are Project Cost: $1.1 million expected. Traffic Impacts: Road closures are Note: PID includes work on SR 53. required. Note: PID includes work on SR 19.

SENECA COUNTY 19 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

15 49 576 PIONEER 20 99575 ALVORDTON 20A 127 20 576 80 49 95998 HOLIDAY CITY

80

107 107 20A MONTPELIER WEST UNITY

34 191 EDON WILLIAMS 15 BLAKESLEE 2 127 34 STRYKER 49 2 34 576 BRYAN EDGERTON 95996 191 6 6 2 127 66 Resurfacing •Bridge/Culvert Project WILLIAMS COUNTY 20 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

WILLIAMS COUNTY

PID: 95998 PID: 95996 PID: 99575 U.S. Route 20A State Route 2 State Route 576 Resurface U.S. 20A between U.S. 20 Paint the structural steel on the SR 2 Resurface SR 576 between U.S. 20 and and SR 15. Rehabilitate bridge over St. bridge over the Tiffin River. the Michigan state line; rehabilitate Joseph River Estimated Begin: May 2021 bridge over Clear Fork Creek, and Estimated Begin: March 2021 Estimated End: August 2021 replace culvert between County Rds. Estimated End: October 2021 Project Cost: $242,000 R and S. Project Cost: $1.5 million Traffic Impacts: Lane restrictions are Estimated Begin: July 2021 Traffic Impacts: Road closures and lane expected. Estimated End: October 2021 restrictions are expected. Project Cost: $2.2 million Traffic Impacts: Road closures and lane restrictions are expected.

WILLIAMS COUNTY 21 WOOD COUNTY

93592 ROSSFORD NORTHWOOD Resurfacing 75 Bridge/Culvert Project WALBRIDGE

795 •Major Reconstruction MILLBURY 20 280 475

PERRYSBURG 163 199 420 25

HASKINS

LUCKEY 65 582 582

TONTOGANY 199 107613 64 75 DISTRICT 2•2021CONSTRUCTIONPROGRAM

235 105 PEMBERVILLE

BOWLING GREEN

6 102930 23 6

WESTON 95801

BRADNER PORTAGE WOOD MILTON CENTER 281 92133 25 101286 WAYNE 281 CUSTAR

JERRY CITY RISING SUN

CYGNET

WEST MILLGROVE 235 75 23

18 199

HOYTVILLE NORTH BALTIMORE

18 BLOOMDALE BAIRDSTOWN 22 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

WOOD COUNTY

PID: 93592 PID: 102930 PID: 95801 Interstate 75 Interstate 75 U.S. Route 6 Reconstruct I-75 between Wales Rehabilitate Gypsy Ln. bridge over Resurface U.S. 6 between SR 235 and Rd. and South Ave. in Rossford/ I-75 and Poe Rd. bridge over I-75 in Township Rd. 133. Intersection and Northwood/Toledo. Bowling Green. drainage improvements at U.S. 6 and Construction Began: August 2018 Estimated Begin: April 2021 SR 235. Estimated End: Summer 2023 Estimated End: October 2021 Estimated Begin: August 2020 Project Cost: $180 million Project Cost: $2.8 million Estimated End: July 2021 Traffic Impacts: Long-term ramp and Traffic Impacts: Road closures are Project Cost: $3 million lane closures and restrictions will be required on Gypsy Ln. and Poe Rd. Traffic Impacts: Lane and intersection in effect. Lane restrictions are expected on I-75. restrictions are expected. Note: Adjacent to Lucas County I-75 Reconstruction, PID 93594

PID: 92133 PID: 101286 PID: 107613 State Route 25 State Route 199 State Route 199 Reconstruct SR 25 between Cygnet Rd. Micro-surface SR 199 between north of Replace bridge on SR 199 over North and U.S. 6 south of Bowling Green, Cygnet Rd. to U.S. 6. Branch Portage River, south of SR 105, including Portage. Estimated Begin: May 2021 west of Pemberville. Estimated Begin: June 2021 Estimated End: September 2021 Estimated Begin: May 2021 Estimated End: October 2022 Project Cost: $443,100 Estimated End: September 2021 Project Cost: $17.8 million Traffic Impacts: Lane restrictions are Project Cost: $492,000 Traffic Impacts: Lane restrictions are expected. Traffic Impacts: Road closure is expected. required.

WOOD COUNTY 23 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

LOCAL LET PROJECTS

(PID, Description, Bid Award Date)

FULTON 108954 - Pedestrian improvements in Swanton - April 15, 2021 110333 - Replace guardrail in various locations - July 30, 2021

LUCAS 98909 - Reconstruct Bennett Rd. in Toledo - March 19, 2021 103417 - Pave Chessie Cr. Trail between Bowman Park and University Hills - May 14, 2021 103758 - Replace Marengo St. bridge - February 5, 2021 104417 - Reconstruct Wenz Rd. in Toledo - January 29, 2021 104487 - Resurface Holland-Sylvania Rd. between Bancroft St. and Elmer Dr.- March 15, 2021 107480 - Construct pedestrian bridge over Main St. in Toledo - December 16, 2020 107485 - Construct cycle track along Jefferson Ave. in Toledo - January 15, 2021 108444 - Construct turn lanes on SR 64 in Waterville - August 27, 2021 108457 - Install architectural signage - April 23, 2021 108793 - Resurface Airport Hwy. between Byrne Rd. and South Ave. - April 16, 2021 108794 - Resurface Dorr St. between Reynolds Rd. and Byrne Rd. - April 9, 2021 109391 - Add bike lanes on Kilburn Rd. - March 5, 2021 111374 - Resurface approximately 3/4 mile of King Rd. - March 25, 2021 111374 - Resurface approximately 3/4 mile of Stickney Ave. - March 25, 2021 113429 - Replace traffic signal head at Indiana Ave. & Washington St. in Toledo - April 14, 2021 113677 - Reconstruct traffic signals in Ottawa Hills - June 16, 2021

LOCAL LET PROJECTS 24 DISTRICT 2 • 2021 CONSTRUCTION PROGRAM

LOCAL LET PROJECTS

OTTAWA 104087 - Replace bridge on Wildacre Rd. over Cedar Creek - February 11, 2021 107061 - Construct pile wall prior to pedestrian project in Port Clinton - May 22, 2021 110834 - Pedestrian improvements on W. Fremont Rd. from Port Clinton Pointe to Lay Dr. - May 14, 2021 111047 - Ferry boat ramp project - February 18, 2021

SANDUSKY 108631 - Construct Fremont bike trail - June 22, 2020 112062 - Minor roadway and drainage project on US 20 and SR 101 in Clyde - April 14, 2021

WOOD 101104 - Resurface SR 64 in Bowling Green - June 4, 2021 101863 - Maumee River multi-use path - September 15, 2020 104428 - Resurface Oregon Rd. between and Binker Rd. - June 4, 2021 104493 - Intersection improvements at SR 25 and Roachton Rd. in Perrysburg - May 28, 2021 104496 - Intersection improvements at SR 25 and W. Boundary St. in Perrysburg - April 9, 2021 109082 - Replace guardrail on Pemberville Rd. - April 16, 2021 109559 - Replace bridge on Stony Ridge Rd. - May 21, 2021 109672 - Pavement markings in various locations - March 15, 2021 110334 - Replace guardrail in various locations - July 30, 2021 111509 - Construct turn lanes on SR 25 near Ft. Meigs in Perrysburg - June 9, 2021 112132 - Pedestrian and corridor improvements on SR 65 in Rossford - April 1, 2021

LOCAL LET PROJECTS 25 OUR MISSION

To provide safe and easy movement of people and goods from place to place, we will: • Improve safety; • Make our system better; • Take care of what we have; • Enhance capacity.

OUR VISION

A long-term, reliable, professional and highly productive organization.

OUR GUIDING PRINCIPLES

We will serve, innovate, and communicate with purpose. We will be productive, lean, efficient and effective. We will utilize the public resources entrusted to us by satisfying the State’s transportation needs. We will be the standard of excellence for winter maintenance. We will create a working environment based on trust and mutual respect. We will value the diversity of all ODOT people. We will work together - one team; the Ohio Department of Transportation. ODOT DISTRICT 2 • MAJOR MAINTENANCE PROJECTS

County Route Section Work Date Description Drainage, 440' of pipe and catch basin Wood 6 4.50 April replacements Wood 18 7.18 July / August Ditch enclosure 460" of 60" poly pipe Wood All All Routes Spring Berming all routes, in progress Wood 18 0.0 - 5.55 June Chip Seal Wood 199 21.1 September Ditch enclosure 260" of 42" poly pipe Wood 18 6.8 - 10.6 June / July Paving train / multiple areas Wood 235 0.0 - 1.05 June / July Paving train / multiple areas Wood 281 5.0 - 12.0 June / July Paving train / multiple areas Ottawa 590 7.00 July Ditch fill Ottawa 53 14.24 October Culvert replacement Ottawa 53 14.84 October Culvert replacement Williams 20A 7.49 May / June Tile and basin installation and ditch fill 750' Williams 127 15.09 May / June Tile and basin installation and ditch fill 1020' August / Williams 576 2.96 - 9.77 Chip seal September Williams 191 0.55 Summer Tile and basin install ditch fill 1000' Henry 109 2.78 Summer Ditch Fill Henry 6 9.61 - 16 Summer Paving & deck repairs Henry 24 0 - 20 Fall Berming County Route Section Work Date Description

Full depth pavement repairs from Erlin to the Sandusky 6 23 - 32 Summer Erie County line Full depth pavement repairs from U.S. 23 to Sandusky 105 0.0 - 2.14 Summer Woodville Full depth pavement repairs from the Ohio Sandusky 53 13.45 - 17.5 Summer Turnpike to the Ottawa County line Full depth pavement repairs from Clyde to Sandusky 510 0.8 - 6.36 Summer U.S. 6 Sandusky 300 3.51 - 6.33 July Chip seal from Gibsonburg to U.S. 20 Sandusky 53 13.82 Summer Culvert repair Sandusky 6 17.51 Summer Embankment and tile repair Sandusky 635 1.9 - 2.01 June Storm sewer installation Culvert replacement or improvement at CR Sandusky 19 1.01 Summer 181 Sandusky 6 8.39 Summer Culvert replacement or improvement Sandusky 20 7.42 Spring Culvert replacement under TR 70 Sandusky 6 23.2 Summer Storm sewer installation Fulton 20 .2 - .5 Summer Storm sewer replacement Fulton 20 0.20 Summer Culvert replacement Fulton 127 3.27 Summer Culvert replacement Seneca 53 15.60 Summer Linear pipe replacement Seneca 587 11.50 Summer Linear pipe replacement Seneca 224 8.27 Summer Culvert replacement Seneca 224 8.35 Summer Culvert replacement Seneca 224 8.76 Summer Culvert replacement Seneca 224 8.84 Summer Culvert replacement County Route Section Work Date Description

Seneca 19 3.04 Summer Culvert replacement Seneca 162 6.50 Summer Culvert replacement Culvert replacement Seneca 162 8.70 Summer Seneca 162 1.10 Summer Culvert replacement Lucas 24 62.48 Summer Concrete pavement repairs Lucas 64 2.17 Summer Concrete pavement repairs Lucas 20 0 - 8.2 Summer Reconditioning shoulders Lucas 64 8.91 - 11.06 Summer Ditch clean out Lucas 295 15.01 - 21.54 Summer Ditch clean out Lucas 23 11.88 Summer Bridge deck repairs Northwood 20 4.41 - 11.07 Early Summer Crack seal Outpost Northwood IR280 3.21 - 8.63 Summer Crack seal Outpost Northwood IR280 4 - 4.6 Summer Full depth joint repair Outpost Northwood 420 2.50 Summer Full depth joint repair Outpost Northwood 20 10.47 Summer Full depth joint repair Outpost Northwood 579 0 - 3 Late Summer Crack seal Outpost Northwood Northwood – 51 Early Fall Crack seal Outpost Genoa Northwood Lemoyne Road – Crack seal (in preparation for chip seal in 795 Fall / Spring Outpost SR 51 2022) County Route Section Work Date Description

Northwood EB Exit Ramp at I-475 Summer Drainage/embankment repair Outpost Secor Road Northwood NB I-280 to I-280 April Drainage repairs Outpost SB I-75 Northwood I-75 SB I75 to Early Summer Drainage repairs/berming Outpost Lagrange/Stickney