4.13 TRANSPORTATION AND TRAFFIC

This chapter describes the existing traffic conditions of the EA Study Area and evaluates the potential envi- ronmental consequences of future development that could occur by adopting and implementing the pro- posed Housing Element Update, General Plan Consistency Update, and associated Zoning Ordinances amendments, together referred to as the “Plan Components” on transportation and traffic. A summary of the relevant regulatory setting and existing conditions is followed by a discussion of Plan Components and cumulative impacts.

The chapter is based on the traffic analysis prepared by TJKM Transportation Consultants dated March 8, 2013, herein referred to as “Traffic Study.” The future baseline traffic volumes have been developed from output of the City/County Association of Governments of San Mateo County (C/CAG) travel demand model run by the Santa Clara Valley Transportation Authority (VTA). The travel demand associated with the Plan Components have been obtained from the C/CAG Model based upon the anticipated future land uses that have been developed resulting from the land use controls under Near-Term 2014 and 2035 condi- tions.

The complete Traffic Study and technical appendices are included in Appendix F of this EA.

A. Regulatory Framework

1. Federal Laws and Regulations a. Federal Highway Administration The Federal Highway Administration (FHWA) is the agency of the United States (U.S.) Department of Transportation (DOT) responsible for the federally-funded roadway system, including the interstate high- way network and portions of the primary State highway network, such as Interstate 280 (I-280).

b. Americans with Disabilities Act The Americans with Disabilities Act (ADA) of 1990 provides comprehensive rights and protections to indi- viduals with disabilities. The goal of the ADA is to assure equality of opportunity, full participation, inde- pendent living, and economic self-sufficiency for people with disabilities. To implement this goal, the US Access Board, an independent Federal agency created in 1973 to ensure accessibility for people with disabili- ties, has created accessibility guidelines for public rights-of-way. While these guidelines have not been for- mally adopted, they have been widely followed by jurisdictions and agencies nationwide in the last decade. The guidelines, last revised in July 2011, address various issues, including roadway design practices, slope and terrain issues, and pedestrian access to streets, sidewalks, curb ramps, street furnishings, pedestrian sig-

4.13-1

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

nals, parking, and other components of public rights-of-way. These guidelines would apply to proposed roadways in the EA Study Area.

2. State Laws and Regulations a. Department of Transportation The California Department of Transportation (Caltrans) is the primary State agency responsible for trans- portation issues. One of its duties is the construction and maintenance of the State highway system. Cal- trans approves the planning, design, and construction of improvements for all State-controlled facilities in- cluding I-280, US 101, State Route (SR) 82 (El Camino Real), and the associated interchanges for these facili- ties located in the EA Study Area. Caltrans has established standards for roadway traffic flow and developed procedures to determine if State-controlled facilities require improvements. For projects that may physical- ly affect facilities under its administration, Caltrans requires encroachment permits before any construction work may be undertaken. For projects that would not physically affect facilities, but may influence traffic flow and levels of services at such facilities, Caltrans may recommend measures to mitigate the traffic im- pacts of such projects.

The following Caltrans procedures and directives are relevant to the Plan Components, particularly State roadway facilities:

¨ Level of Service Target. Caltrans maintains a minimum level of service (LOS) at the transition be- tween LOS C and LOS D for all of its facilities.1 Where an existing facility is operating at less than the LOS C/D threshold, the existing measure of effectiveness should be maintained.2

¨ Caltrans Project Development Procedures Manual. This manual outlines pertinent statutory re- quirements, planning policies, and implementing procedures regarding transportation facilities. It is continually and incrementally updated to reflect changes in policy and procedures. For example, the most recent revision incorporates the Complete Streets policy from Deputy Directive 64-R1, which is detailed below.

¨ Caltrans Deputy Directive 64. This directive requires Caltrans to consider the needs of non- motorized travelers, including pedestrians, bicyclists, and persons with disabilities, in all programming, planning, maintenance, construction, operations, and project development activities and products. This includes incorporation of the best available standards in all of the Caltran’s practices.

1 Level of service is explained further in Section B.2.a, Level of Service Methodology. 2 California Department of Transportation, 2002. Guide for the Preparation of Traffic Impact Studies.

4.13-2

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ Caltrans Deputy Directive 64-RI. This directive requires Caltrans to provide for the needs of travel- ers of all ages and abilities in all planning, programming, design, construction, operations, and mainte- nance activities and products on the State highway system. Caltrans supports bicycle, pedestrian, and transit travel with a focus on “complete streets” that begins early in system planning and continues through project construction and maintenance and operations.

¨ Caltrans Director’s Policy 22. This policy establishes support for balancing transportation needs with community goals. Caltrans seeks to involve and integrate community goals in the planning, design, construction, and maintenance and operations processes, including accommodating the needs of bicy- clists and pedestrians.

¨ Environmental Assessment Review and Comment. Caltrans, as a responsible agency under the Cali- fornia Environmental Quality Act (CEQA), is available for early consultation on projects to provide guidance on applicable transportation analysis methodologies or other transportation related issues, and is responsible for reviewing traffic impact studies for errors and omissions pertaining to the State high- way facilities. In relation to this role, Caltrans published the Guide for the Preparation of Traffic Im- pact Studies (December 2002), which establishes the Measures of Effectiveness as described under “Level of Service Target” above. The Measures of Effectiveness are used to determine significant impacts on State facilities. This Guide also mandates that traffic analyses include mitigation measures to lessen po- tential project impacts on State facilities and to meet each project’s fair share responsibility for the im- pacts. However, the ultimate mitigation measures and their implementations are to be determined based on consultation between Caltrans, the City of Menlo Park, and the project applicants. b. Complete Streets Act of 2008 The California Complete Streets Act (Assembly Bill 1358) requires cities and counties, when updating their general plans, to ensure that local streets meet the needs of all users. c. California Transportation Commission The California Transportation Commission (CTC) consists of nine members appointed by the Governor. The CTC is responsible for the programming and allocation of funds for the construction of highway, pas- senger rail, and transit improvements throughout the state, including in the EA Study Area. The CTC is also responsible for managing the State Transportation Improvement Program (STIP) and the State High- way Operation and Protection Program (SHOPP) funding programs.

4.13-3

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

3. Regional Agencies, Plans, and Policies a. Metropolitan Transportation Commission The Metropolitan Transportation Commission (MTC) is the transportation planning, coordinating, and financing agency for the nine-county Bay Area, including San Mateo County. It also functions as the feder- ally mandated metropolitan planning organization (MPO) for the region. It is responsible for regularly up- dating the Regional Transportation Plan (RTP), a comprehensive blueprint for the development of mass transit, highway, airport, seaport, railroad, bicycle, and pedestrian facilities. The current RTP, Transporta- tion 2035, was adopted on April 22, 2009. Transportation 2035 was prepared by MTC in partnership with the Association of Bay Area Governments (ABAG), the Bay Area Air Quality Management District (BAAQMD), and the Bay Conservation and Development Commission (BCDC). MTC updates the RTP every four years. Transportation 2035 specifies a detailed set of investments and strategies throughout the region from 2010 through 2035 to maintain, manage, and improve the surface transportation system, speci- fying how anticipated federal, State, and local transportation funds will be spent.

MTC has established its policy on Complete Streets in the Bay Area. The policy states that projects funded all, or in part, with regional funds (e.g. federal, State Transportation Improvement Program, bridge tolls) must consider the accommodation of bicycle and pedestrian facilities, as described in Caltrans Deputy Di- rective 64. These recommendations do not replace locally-adopted policies regarding transportation plan- ning, design, and construction. Instead, these recommendations facilitate the accommodation of pedestri- ans, including wheelchair users, and bicyclists into all projects where bicycle and pedestrian travel is con- sistent with current adopted regional and local plans. b. San Mateo City/County Association of Governments i. 2011 Congestion Management Plan The C/CAG is designated as the Congestion Management Agency for the county. C/CAG’s Congestion Management Plan (CMP) identifies strategies to respond to future transportation needs, identifies proce- dures to alleviate and control congestion, and promotes countywide solutions. Pursuant to the US EPA’s transportation conformity regulations and the Bay Area Conformity State Implementation Plan (also known as the Bay Area Air Quality Conformity Protocol), the CMP is required to be consistent with the MTC planning process including regional goals, policies, and projects for the Regional Transportation Im- provement Program (RTIP).3 MTC cannot approve any transportation plan, program, or project unless these activities conform to the State Implementation Plan (SIP).

3 City/County Association of Governments of San Mateo (C/CAG), 2011. Final San Mateo County Congestion Management Program (CMP) 2011. http://www.ccag.ca.gov/pdf/Studies/Final%202011%20CMP_Nov11.pdf.

4.13-4

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

The CMP roadway system is comprised of 53 roadway segments and 16 intersections, including all of the State highways within the County in addition to Mission Street, Geneva Avenue, and Bayshore Boulevard. The intersections are located mostly along El Camino Real. ii. Countywide Transportation Plan The Countywide Transportation Plan was adopted by C/CAG in 2001, to reduce traffic congestion, in- crease demand for transit, decrease demand for automobile travel, and increase capacity for all modes. The plan also targets to increase the safety, reliability, and convenience of all transportation systems. iii. Comprehensive Bicycle and Pedestrian Plan 2011 The C/CAG, with support from the San Mateo County Transportation Authority (SMCTA) have devel- oped the 2011 San Mateo County Comprehensive Bicycle and Pedestrian Plan (CBPP) to addresses the planning, design, funding, and implementation of bicycle and pedestrian projects of countywide signifi- cance. Relevant goals and policies are listed as following:

¨ Goal 2: More People Riding and Walking for Transportation and Recreation

¨ Policy 2.4: Encourage local agencies and transit operators, such as SamTrans, , and BART to work cooperatively to promote bicycling and walking to transit by improving access to and through stations and stops, installing bicycle parking, and maximizing opportunities for on-board bicycle access.

¨ Policy 2.5: Promote integration of bicycle-related and walking-related services and activities into broad- er countywide transportation demand management and commute alternatives programs.

¨ Policy 2.6: Serve as a resource to county employers on promotional information and resources related to bicycling and walking.

¨ Goal 4: Complete Streets and Routine Accommodation of Bicyclists and Pedestrians

¨ Policy 4.1: Comply with the complete streets policy requirements of Caltrans and the Metropolitan Transportation Commission concerning safe and convenient access for bicyclists and pedestrians, and assist local implementing agencies in meeting their responsibilities under the policy.

¨ Policy 4.2: For local transportation projects funded by county or regional agencies, encourage that local implementing agencies incorporate complete streets principles as appropriate; that they provide at least equally safe and convenient alternatives if they result in the degradation of bicycle or pedestrian access; and that they provide temporary accommodations for pedestrians and bicyclists during construction.

4.13-5

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ Policy 4.5: Encourage local agencies to adopt policies, guidelines, standards, and regulations that result in truly bicycle-friendly and pedestrian-friendly land use developments, and provide them technical as- sistance and support in this area.

¨ Policy 4.6: Discourage local agencies from removing, degrading, or blocking access to bicycle and pedes- trian facilities without providing a safe and convenient alternative. c. Bay Area Air Quality Management District The air quality district that addresses air pollution in the EA Study Area is the BAAQMD. Since a primary source of air pollution in the Menlo Park region is from motor vehicles, air district regulations affect trans- portation planning in the EA Study Area. The BAAQMD is a public agency tasked with regulating air pol- lution in the nine-county Bay Area, including San Mateo County. The BAAQMD’s goals include reducing health disparities due to air pollution, achieving and maintaining air quality standards, and implementing exemplary regulatory programs and compliance of federal, State, and regional regulations. Air quality im- pacts are discussed in detail in Chapter 4.2, Air Quality, of this EA.

4. Local Regulations and Policies a. Menlo Park General Plan The City of Menlo Park General Plan Land Use and Circulation (adopted 1994, with amendments through 2012) includes goals, policies, and actions relevant to transportation and traffic that would apply to the Plan Components. These include the following:

¨ Goal II-A: To maintain a circulation system using the Roadway Classification System that will provide for the safe and efficient movement of people and goods throughout Menlo Park for residential and commercial purposes.

¨ Policy II-A-1: Level of Service D (40 seconds average stopped delay per vehicle) or better shall be main- tained at all City-controlled signalized intersections during peak hours, except at the of Ra- venswood Avenue and Middlefield Road and at intersections along Willow Road from Middlefield Road to US 101.

¨ Policy II-A-2: The City should attempt to achieve and maintain average travel speeds of 14 miles per hour (Level of Service D) or better on El Camino Real and other arterial roadways controlled by the State and at 46 miles per hour (Level of Service D) or better on US 101. The City shall work with Cal- trans to achieve and maintain average travel speeds and intersection level of service consistent with standards established by the San Mateo County Congestion Management Plan.

4.13-6

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ Policy II-A-3: The City shall work with Caltrans to ensure that average stopped delay on local ap- proaches to State-controlled signalized intersections does not exceed Level of Service E (60 seconds per vehicle).

¨ Policy II-A-4: New development shall be restricted or required to implement mitigation measures in order to maintain the levels of service and travel speeds specified in Policies II-A-1 through II-A-3.

¨ Policy II-A-8: New development shall be reviewed for its potential to generate significant traffic vol- umes on local streets in residential areas and shall be required to mitigate potential significant traffic problems.

¨ Policy II-A-14: The City staff shall work and consult actively with other agencies that have transporta- tion impacts on the City of Menlo Park. b. Menlo Park Municipal Code Other than the existing General Plan, the City of Menlo Park Municipal Code is the primary tool that shapes the form and character of physical development in the City. Standards and regulations established in the Municipal Code are used to implement the goals, objectives, and policies of the General Plan and to reg- ulate all land use within the City.

Title 13, Street, Sidewalks, and Utilities establishes the Transportation Impact Fee (TIF) structure in Chap- ter 13.26.4 As described in Section 13.26.020, TIFs are charged as a requirement of development approval to defray the cost of certain transportation improvements required to serve development within the City of Menlo Park. The City levies a TIF, by establishing the nexus among the trips associated with development, their impacts on the transportation system, and the cost to improve the City’s impacted transportation sys- tem. The detailed TIF study, the current version of which was developed in 2009, establishes the required nexus between anticipated future development in the City of Menlo Park and the need for certain im- provements to the local transportation facilities.

The TIF study reviewed the improvement measures on a preliminary level. The adoption of the TIF ordi- nance does not require the City to construct all of the improvements in the plan. The mix of projects and the details related to each individual project can be modified and prioritized by the Council over time. A more detailed design would need to be developed for each improvement measure prior to implementation.

4 The City of Menlo Park Transportation Impact Fee was enacted pursuant to the Mitigation Fee Act contained in Government Code Section 66000 et seq. (Ordinance 964 Section 2 (part), 2009).

4.13-7

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Not every mitigation measure may ultimately be feasible, depending on variables such as right-of-way acqui- sition. c. City’s Public Works Department The City of Menlo Park maintains several environmental programs under the City’s Public Works De- partment. The City’s Public Works Department is responsible for developing a more functional and effi- cient roadway network for the effective movement of people and goods. The division promotes the use of public transit, ride sharing, bicycles, and walking as commuting alternatives to single-occupant automobiles. The City operates a trip reduction program and was the first City on the Peninsula to establish a shuttle program. Transit programs are discussed below under Section B.1.c, Existing Roadway Network. d. City of Menlo Park Comprehensive Bicycle Development Plan The 2005 Comprehensive Bicycle Development Plan (Bike Plan) provides a broad vision, strategies, and actions for the improvement of bicycling in the City. The Bike Plan recommends the enhancement of the existing network with the addition of approximately 0.3 miles of new Class I Bike Paths, 3.6 miles of new Class II Bike Lanes, and 16.8 miles of new Class III Bike Routes5 (see Section B.4 below for a description of bike classifications). Several long-term projects are also identified; including two short Class I connector segments near the Bayfront Expressway and two new bicycle/pedestrian undercrossings, including the Cal- train crossing near Middle Avenue.

The plan outlines new educational and promotional programs aimed at bicyclists and motorists. These pro- grams include bicycle parking improvements, multi-modal (transit) support facilities, bicycle safety and edu- cation programs for cyclists and motorists, safe routes to schools programs, community and employer out- reach programs, continued development of bikeway network maps, and bike-to-work and school day events, among others. The prioritization and budgeting of individual bicycle improvements takes place through City Council approval of the five-year Capital Improvement Program (CIP). This process incorpo- rates public comment.

The goals of the Bike Plan provide the context for the specific policies and actions discussed in the Bike Plan. The goals provide the long-term vision and serve as the foundation of the Bike Plan, while the policies of the Bike Plan provide more specific descriptions of actions to undertake to implement the Bike Plan.

5 City of Menlo Park, 2005. Menlo Park Comprehensive Bicycle Development Plan.

4.13-8

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

The following are the relevant bicycle-related goals and policies:

¨ Goal 1: Expand and Enhance Menlo Park’s Bikeway Network.

¨ Policy 1.1: Complete a network of bike lanes, bike routes, and shared use paths that serve all bicycle user groups, including commuting, recreation, and utilitarian trips.

¨ Goal 2: Plan for the Needs of Bicyclists.

¨ Policy 2.1: Accommodate bicyclists and other non-motorized users when planning, designing, and de- veloping transportation improvements.

¨ Policy 2.2: Review capital improvement projects to ensure that needs of bicyclists and other non- motorized users are considered in programming, planning, maintenance, construction, operations, and project development activities.

¨ Policy 2.3: Encourage traffic calming, intersection improvements, or other similar actions that improve safety for bicyclists and other non-motorized users.

¨ Policy 2.4: Require developers to adhere to the design standards identified in this Comprehensive Bicy- cle Development Plan.

¨ Goal 3: Provide for Regular Maintenance of the Bikeway Network.

¨ Policy 3.3: Develop a program to ensure that bicycle loop detectors are installed at all signalized inter- sections on the bike network and are tested regularly to ensure they remain functional.

¨ Goal 4: Encourage and Educate Residents, Businesses, and Employers in Menlo Park on Bicycling.

¨ Policy 4.6: Encourage major Menlo Park employers and retailers to provide incentives and support fa- cilities for existing and potential employees and customers that commute by bicycle.

¨ Policy 4.9: Promote bicycling as a healthy transportation alternative. e. Sidewalk Master Plan The Sidewalk Master Plan6 identifies segments with no standard walkway or discontinuous walkway facili- ties; identifies opportunities and constraints for future walkway facilities; recommends changes and addi- tions to existing programs, policies, and municipal codes; and develops prioritization criteria and procedures for installing standard sidewalks.7 The Sidewalk Master Plan identified priority streets as those roadways

6 City of Menlo Park, 2009. Sidewalk Master Plan. 7 City of Menlo Park, 2009. Sidewalk Master Plan.

4.13-9

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

that provide network connectivity and access to important pedestrian destinations, such as schools, parks, and downtown. The priority streets make up over a third of the roadways under Menlo Park’s jurisdiction. As with bicycle improvements, the prioritization and budgeting of individual sidewalk improvements takes place through City Council approval of the five-year CIP which incorporates public comment. f. Menlo Park Complete Streets Policy The City’s Complete Streets policy was adopted by Resolution No. 6123 by the City Council on March 22, 2013 consistent with AB 1358 to ensure that local streets meet the needs of all users. As described in the Complete Streets Policy, the City of Menlo Park is committed to creating and maintaining Complete Streets that provide safe, comfortable, and convenient travel along and across streets (including streets, roads, highways, bridges, and other portions of the transportation system) through a comprehensive, inte- grated transportation network that serves all categories of users, including pedestrians, bicyclists, persons with disabilities, motorists, movers of commercial goods, users and operators of public transportation, sen- iors, children, youth, and families, emergency vehicles and freight.

B. Existing Conditions

This section describes the existing transportation environment in the EA Study Area including roadway network, routes of regional significance, City street system, transit facilities, and bicycle facilities. Figure 4.13-1 shows the existing street network serving Menlo Park. The City of Menlo Park General Plan desig- nates a roadway classification system for the existing roadway network within the City of Menlo Park. Such roadway classification system includes Freeway/Expressway, Primary Arterial, Minor Arterial, Col- lector, and Local.

1. Routes of Regional Significance Roadway Network The San Mateo County CMP Land Use Analysis Program guidelines require that Routes of Regional Signif- icance be evaluated in land use impact analysis to identify potential candidates for the capital improvement program. Within the City of Menlo Park, the following freeways/expressways/state highways are designat- ed as Routes of Regional Significance:

4.13-10

CITY OF MENLO PARK City of MenHOUSINGlo Park - Hous ELEMENTing Eleme UPDATE,nt GENERAL PLAN CONSISTENCY UPDATE,Figu ANDre ZONING AMENDMENTS Vicinity Map TRANSPORTATION AND TRAFFIC1

38 To Dumbarton Bridge

U N I V E R 37 S I 42 T . 41 BAYF Y

I RO 4 N N 5 E T .

V D . EXPWY D HAVEN A 40 E R R

1 45 C 4

P E H E L VE. N . A

RD. D S I

YSHORE E L ON EAST BA N R T 39 Y IL CE C AM 36 D H D R 101 R. O H R. LOW C . D 1 44 ST . . AVE 3 3 DR AL WIL TT MIN O TER C . 35

S R O’BR IVY DR. IEN D 22 N NO 2 2 34 46 21 BOHAN NEWBRIDGE LORENCE PIE ST RD. F BAY R . AY T. R CE B S 2 D. R 33 D. 20

A

V

E

. . E. D BA Y R S HO H 32 RE S RD. MID 3 R HOS D P LE I S F AVE TAL DURHAM T. IELD MA .

. 19 . E RD V - 8 IR A IC . COLEMAN M D D 1 SE R R AVE. A O UL O 4 . C E 9 V GW A 18 N ILBERT AVE. I G H T R E. 5 10 17 AV E D L C A E 14 M V IN . D O O . N RE E 15 . R A A NWOO L V E L D G D A E V D 5 10 R

L . O L A K O G E A LA A O O UR V E O W L A W ST. S E. N V 12 E A ENCIN V A 14 16 24 R 47 25 13 DR. 6 LINFIELD W . 26 LO E IL V 27 W A 8 28 LTO . 29 A DR. MI . 9 E D E DLE V V A ON F . 30 A IE E LD O Y 43 V RD L O YTT T A I N L L . A S E E 31 L P R M 7 B E E 11 V O G I D N U R I 48 NI U VE R R B E. SI T . V Y M A A E RO D E R C V . A RCAD ON A T . MB R E E VE A VE. TH A

A 82 Z SO 11 . I E ARB V ORE CRU A TUM 12 . ARA RD T P A . . LE . S L T D A R V E SAN L DR L MIDD L CAM O M LI RD. L VE HI Y I R A N

ST R Z O . A P U E RE SANDQ V A ELDER L L

A

AVE. 49 G 51

ALA ME DA PASTEUR DE LA S S P A 15 DR. UL N

G T A O S A

A C

K T R

S U V A IN E Z E S V T. E W A . V .

E R . 7 D 52 S

U

P

M T

A S C A

6 E M . R

O D

N 5 JUNIPERO T A S

U E L P 4 ER P 13 AM I C S NN N 50 N PAR R A HARO K DR. A E S O G BR S 3 R. R S A E D D R A L R

N . A S D . R . . B A LEGEND LV N 2 D. WY 5 D 1 H D. Study Intersection R EXP IL HILL L ND L C SA L IR. I 13 Roadway Segment M 23 6 Freeway Segment GE A Proposed Housing P 280 # NORTH 6 Element Sites

002-029Source: - 01/07/13 TJKM Transportation - CK Consultants.

FIGURE 4.13-1

VICINITY MAP CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ US 101 () is an eight-lane north-south freeway that runs between , Cali- fornia and Olympia, Washington and is a major regional freeway on the Peninsula. It connects Menlo Park with the other cities in the from San Jose to San Francis- co. There is one high occupancy vehicle (HOV) lane on both directions within the City of Menlo Park. Two interchanges serve Menlo Park at Willow Road and Marsh Road.

¨ I-280 (Junipero Serra Freeway) is an eight-lane north-south freeway that connects San Jose with San Francisco. There is one high occupancy vehicle (HOV) lane on both directions within the City of Menlo Park. One serves Menlo Park at .

¨ SR 84 (Bayfront Expressway) is a six-lane east-west expressway that connects the San Francisco Peninsu- la to the cities on the east side of via Dumbarton Bridge. Within the City of Menlo Park, it connects Marsh Road with the Dumbarton Bridge.

¨ SR 82 (El Camino Real) is a primary north-south arterial that connects San Jose with San Francisco. It enters the City of Menlo Park north of Sand Hill Road as a six-lane arterial, becomes a four-lane arterial near downtown Menlo Park, and exits the City as a five-lane arterial (three southbound lanes and two northbound lanes) north of Encinal Avenue.

¨ SR 114 (Willow Road) is a primary four-lane east-west arterial that extends from Bayfront Expressway, becomes a minor two-lane arterial at the US 101 interchange, and ends as a two-lane collector at Alma Street.

¨ SR 109 (University Avenue) is a four-lane east-west street east of US 101 and a two-lane arterial west of US 101 that connects the Bayfront Expressway and the . Within the City of Menlo Park, it is a primary four-lane east-west arterial between the City limits and the Bayfront Expressway.

2. City of Menlo Park Street System a. Freeways and Expressways As designated in the current City of Menlo Park General Plan, freeways/expressways are access-controlled or limited-access-controlled facilities that carry regional and/or sub-regional traffic. Within the EA Study Area, the following facilities are designated as freeways/expressways: ¨ US 101 ¨ I-280 ¨ Bayfront Expressway (SR 84)

4.13-12

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

b. Primary Arterial Streets Primary Arterial Streets serve major centers of activity and high volume traffic corridors within the urban- ized area and accommodate a high proportion of through trips. Within the City, the following streets are designated as primary arterial streets: ¨ El Camino Real (SR 82) ¨ Marsh Road between Bohannon Drive and Bayfront Expressway ¨ Sand Hill Road between I-280 and Santa Cruz Avenue ¨ University Avenue (SR 109) ¨ Willow Road (SR 114) c. Minor Arterial Streets Minor Arterial Streets interconnect with and augment the freeway and primary arterial street network. Minor Arterial Streets provide greater access to abutting property and carry more locally-oriented traffic than do the Primary Arterial Streets. Within the City, the following streets are designated as minor arterial streets: ¨ Alameda de las Pulgas ¨ Alpine Road ¨ ¨ Marsh Road between Bay Road and Bohannon Drive ¨ Middlefield Road ¨ Newbridge Street between Willow Road and South City Limit ¨ Ravenswood Avenue ¨ Sand Hill Road between Santa Cruz Avenue and East City Limit ¨ Santa Cruz Avenue ¨ Valparaiso Avenue ¨ Willow Road between Middlefield Road and Bayshore Expressway d. Collector Streets Collector Streets serve to channel the traffic from local streets within residential, commercial, and industrial areas into the arterial system. Within the City, the following streets are designated as collector streets: ¨ Alma Street ¨ Avy Road ¨ Bay Road ¨ Bohannon Drive

4.13-13

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ Chilco Street ¨ Chrysler Drive ¨ Constitution Drive ¨ Crane Street ¨ Encinal Avenue ¨ Glenwood Avenue ¨ Hamilton Avenue ¨ Haven Avenue ¨ Laurel Street ¨ Menlo Avenue ¨ Middle Avenue ¨ Newbridge Street between Willow Road and Chilco Street ¨ O’Brien Drive ¨ Oak Grove Avenue ¨ Ringwood Avenue ¨ Scott Drive ¨ Sharon Park Drive ¨ Sharon Road ¨ University Drive ¨ Willow Road between Alma Street and Middlefield Road e. Local Streets Local Streets primarily carry traffic from the immediate land use and typically serve relatively low volumes of short trips. Within Menlo Park, all streets not otherwise classified are designated local streets.

3. Existing Transit Facilities The EA Study Area is served by two major transit providers as well as some free shuttles services. San Mateo County Transit District (SamTrans) provides local and regional bus service, and Caltrain provides commuter rail service. Local shuttles are also provided in Menlo Park during commute hours by Caltrain and during midday hours by the City. Both shuttles operate on weekdays (Monday through Friday) only. Transit service and facilities, including bus routes, major bus stops, Caltrain tracks, and the Caltrain station are shown in Figure 4.13-2.

4.13-14

City of Menlo Park - Housing Element Figure Existing Shuttle and Transit Routes CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND2 ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

E T E R A N S B ¬ L «8 V 1 4 D 0 1 £¤

H 5 AVE U3 N A 9 270 VE 7 U CO NS TIT UT U E DR IO V TT N D A SCO R N O S HAMILTON AVE

M I 4 D D U R D 2 L 8 E D 1 W 3 O'BRIEN DR F R I O E 281 L H U L L D S I R D R W UK A X U83 2 M U281 BAY RD

D

R

7

E 9

3 D U I

S D ¬82 O « E O L C E W A V 6 M 9

I A 2 U NO U L 1 RE A AL IN C N E L A 6 U 9 U39 R 2 0 E U L U39 E S 7 V T A E E V V A OUK A 1 X L Y R M IT 0 G A S 1 S R £¤ K E T E A V O V I A N O U L N E E 5 M V 8 A E U M V O A ID S E D I Z V U2 L 8 A U A 1 E R F R E U2 IE A C L 8 P 1 L D D L A U 7 R A T ID K 9 V N X 3 D Y M U2 P A 8 U X S 1 RD E RO E L DE N U28 CA 1 C BAR O A EM G A M E E L IN V R A A O M 5 O E 8 L D D R IL A U R E D L A H E L L C L I R A H A S D U L P N H M U A C A LG S S AS T

E 2 V 8

A ¬«

Y

V

A U85 2 5 U95 U29

ILL RD SAND H

JU N IP E Legend R O S E R R Proposed Housing Element Sites A 0 8 B 2 LV ¨¦§ D Shuttle Routes

Menlo Park Bus Routes D

R Railroad

E N NORTH 5 I 8 U P U L City of Menlo Park

8 A 5

Source: TJKM Transportation Consultants. Miles

Source: TJKM Transportation Consultants, March 5 2013

8 U U 0 0.5 1 FIGURE 4.13-2

EXISTING SHUTTLE AND TRANSIT ROUTES CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

For fiscal year 2011-2012, Caltrain has proposed a service reduction that could eliminate weekend and off- peak service, among other changes. However, Menlo Park would retain commute-hour service on a par with current service, which would help limit the potential immediate impact on the City. Caltrain and as- sociated transit agencies are currently investigating both short and long-term solutions to restore service to current levels. a. SamTrans SamTrans operates bus service in San Mateo County. There are 54 routes in the county that can be catego- rized as community, express, BART connection, Caltrain connection, and BART and Caltrain connection routes. These routes serve approximately 14,630,000 annual riders. Most bus routes typically operate along major arterial corridors and operate from early morning into the late evening.

¨ Route KX provides Express and local service to Palo Alto, Menlo Park, Atherton, Redwood City, San Carlos, Belmont, SFO, and San Francisco. In Menlo Park, the route travels through El Camino Real. The mixed-service buses operate approximately every hour through the day.

¨ Route 83 serves public schools in Menlo Park via various roadways. The route operates on school days only, approximately every 3 to 10 minutes during the school peak periods.

¨ Route 85 serves Portola Valley, Woodside and Skylonda, via Alameda de Las Pulgas, Alpine Road, and Sharon Park Drive. The route operates on Mondays, Tuesday, Thursdays, and Fridays only, with two buses on both directions during the morning peak period and one southbound bus and four north- bound buses in the afternoon.

¨ Route 281 serves , Palo Alto Caltrain Station, East Palo Alto, and Onetta Harris Community Center, via Newbridge Street, Bay Road, and University Avenue in Menlo Park. The route operates approximately every 30 minutes through the day.

¨ Route 295 serves Downtown San Mateo, Hillsdale Shopping Center, , Redwood City, and Menlo Park. In Menlo Park, the route travels through Marsh Road, Bay Road, Willow Road, Mid- dlefield Road, Ravenswood Avenue, Oak Grove Avenue, and Santa Cruz Avenue. The route operates on weekdays only, every 30 to 70 minutes.

¨ Route 296 serves Redwood City, Atherton, Menlo Park, and East Palo Alto. In Menlo Park, the route travels through Middlefield Road and Willow Road, and connects to the Caltrain . The route operates about every 5 to10 minutes during the weekday peak hours, and every hour for the rest of operating hours on weekdays and over the weekend.

4.13-16

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ Route 390 serves Daly City BART, Colma, South San Francisco, San Bruno, Millbrae, Burlingame, San Mateo, Belmont, San Carlos, Redwood City, Atherton, Menlo Park, and Palo Alto, via El Camino Re- al. The route operates on the weekdays only, with an approximately 30 minutes’ headway.

¨ Route 397 serves San Francisco, South San Francisco, San Francisco International Airport, Burlingame, San Mateo, Belmont, San Carlos, Redwood City, and Palo Alto. In Menlo Park, the route travels through Middlefield Road and Willow Road. The route provides late-night service only, every 60 minutes.

¨ Route ECR serves Daly City BART, Colma BART, South San Francisco, San Bruno, Millbrae Transit Center, Burlingame, San Mateo, Belmont, San Carlos, Redwood City Caltrain, Menlo Park, and Palo Alto Transit Center, via El Camino Real. The route operates only on weekends, with a 20 to 30 minutes’ headway.

¨ Route 270 mainly provides local service and serves as Caltrain connection in Redwood City. In Menlo Park, the route travels through Havens Avenue and Marsh Road. The route operates every 60 minutes through the day. i. SamTrans Short Range Transit Plan Planned short-range improvements to SamTrans service focus on optimizing the current system’s condition and performance.8 These planned improvements include vehicle replacement, vehicle expansion, adding Clipper (formerly TransLink) and other fare collection equipment, installing information technology, and planning for transit oriented development (TOD), defined as being within a reasonable walking distance of a transit station. SamTrans planning efforts are being curtailed by their current financial constraints. b. Caltrain Caltrain operates 50 miles of commuter rail between San Francisco and San José, and limited service trains to Morgan Hill and Gilroy during weekday commute periods. Caltrain is owned by the Peninsula Corridor Joint Powers Board, operated under contract with Amtrak, and managed under contract with SamTrans.

On weekdays, Caltrain operates approximately 100 trains per day including local, limited stop, and express services in both directions. Travel time between Menlo Park and San Francisco is approximately 60 minutes and travel time between Menlo Park and San Jose is approximately 40 minutes for local and limited stop services. Caltrain’s express service travels between Menlo Park and San Francisco or San Jose in less

8 San Mateo County Transit District (SamTrans), 2008. Short Range Transit Plan 2008-2017.

4.13-17

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

than 45 minutes or 25 minutes, respectively. Caltrain offers 22 weekday commute-hour express trains, some of which serve Menlo Park southbound in the AM peak period and northbound in the PM peak period.

The Menlo Park Caltrain Station is located east of El Camino Real between Ravenswood Avenue and Santa Cruz Avenue. Lockable, sheltered bike parking is provided adjacent to the station platform, and bus and shuttle access is provided at the nearby bus transfer facility. On weekends, Caltrain operates approximately 30 trains per day with local stops only. Currently, approximately 1,400 passengers board and alight daily at the Menlo Park Caltrain station, including approximately 100 daily passengers with bikes.9 i. Caltrain Short-Range Transit Plan Planned short-range improvements to Caltrain focus on a strategy called the State of Good Repair which will concentrate on a systematic approach in optimizing the current system’s condition and performance.10 These planned improvements include upgrading signaling and communications systems, replacing old bridg- es, enhancing approach speeds and flexibility at the San Francisco terminus, and eliminating all of the re- maining hold-out stations. Hold-out stations are areas where trains are required to wait while another train is in the main station and therefore increase service delays. Planned long-range improvements to Caltrain include electrification of the entire line to improve operating efficiency and provide environmental benefits. Caltrain planning efforts are being curtailed by their current financial constraints. c. Free Shuttles Two employee shuttles are provided between the Menlo Park Caltrain station and Marsh Road/Willow Road office buildings during the commute hours. These shuttles, which operate during the AM and PM peak hours, take passengers from Caltrain to their workplaces, schools, shopping, or appointments. The Willow and Marsh bus routes carried 51,000 passengers in 2010. These two shuttles are funded jointly by the BAAQMD Transportation Fund for Clean Air, Peninsula Corridor Joint Powers Board, and the City of Menlo Park and local employers. The shuttles operate based on the Caltrain schedule.

The City also provides a free community midday shuttle service during weekdays approximately every hour. The free shuttle is a community service route open to the general public but focusing on the senior community. The major stops include Menlo Park Library, Belle Haven library, Menlo Park Senior Center, downtown Menlo Park, Caltrain, Menlo Medical Clinic, Safeway, Little House, Stanford Shopping Center,

9 Peninsula Corridor Joint Powers Board (Caltrain), 2008. Short Range Transit Plan 2008-2017. 10 Peninsula Corridor Joint Powers Board (Caltrain), 2008. Short Range Transit Plan 2008-2017.

4.13-18

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

and Stanford Medical Center. The shuttle stops at all SamTrans stops. It is also a flag down service for the convenience of the passengers. For residents who do not live within an easy walking distance of a SamTrans stop or the Midday shuttle service stop, Menlo Park offers a shuttle service that picks up passengers at their homes and provides rides to specific shopping areas.11 d. Other Transit Services In addition, Dumbarton Express Bus Service line DB, administered and governed by the Alameda-Contra Cos- ta Transit District, serves commuters between Stanford University and the East Bay, via SR 84, Willow Road, and University Avenue. The bus line operates on weekdays only every 30 to 45 minutes.

4. Existing Bicycle Facilities Bikeway planning and design in California typically relies on the guidelines and design standards established by Caltrans in the Highway Design Manual (Chapter 1000: Bikeway Planning and Design).12,13 Chapter 1000 follows standards developed by the American Association of State Highway and Transportation Officials and the FHWA, and identifies specific design standards for various conditions and bikeway-to-roadway rela- tionships. Under California Law, bicyclists are allowed to use all roadways in California unless posted as closed. Therefore, even for the roadways that have no designated (or planned) bikeways identified, a major- ity are open for cycling.

The three types of bikeways identified by Caltrans are described below:

¨ Class I Bikeway. Typically called a “bike path,” a Class I bikeway provides bicycle travel on a paved right-of-way completely separated from any street or highway.

¨ Class II Bikeway. Often referred to as a “bike lane,” a Class II bikeway provides a striped and stenciled lane for one-way travel on a street or highway.

¨ Class III Bikeway. Generally referred to as a “bike route,” a Class III bikeway provides for shared use with pedestrian or motor vehicle traffic and is identified only by signing.

11 City/County Association of Governments of San Mateo (C/CAG), 2011. Final San Mateo County Conges- tion Management Program (CMP) 2011. http://www.ccag.ca.gov/pdf/Studies/Final%202011%20CMP_Nov11.pdf. 12 California Department of Transportation, 2002. Guide for the Preparation of Traffic Impact Studies. 13 California Department of Transportation, 2006. Highway Design Manual, 6th Edition.

4.13-19

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

The existing and proposed bicycle facilities in the EA Study Area identified in the Bike Plan are illustrated in Figure 4.13-3. Currently, there are a total of 2.83 miles of bike path in Menlo Park, including Dumbar- ton Bridge and Bayfront Expressway Bike Path, Bayfront Park Bike Paths, and Alpine Road Class I. In ad- dition, there are a total of 16.44 miles of bike lane and 0.2 miles of bike route along various arterials and collectors in the City.

5. Existing Pedestrian Facilities A survey of the existing pedestrian facilities was prepared as part of the City of Menlo Park’s 2009 Sidewalk Master Plan. The existing pedestrian facilities within the EA Study Area include off-street paths, sidewalks along roadways, pedestrian signals, and crosswalks. Two main types of crosswalks exist: marked (striped) crosswalks and unmarked (no striping) crosswalks. Controlled, marked crosswalks include those striped and controlled by traffic/pedestrian signals or stop signs. Uncontrolled, marked crosswalks can exist mid- block or at intersections with side-street stop control only (or all-way yield control intersection with low volumes).

C. Existing Traffic Operations

1. Intersection Peak Hour Traffic Volumes Intersection operations are evaluated for the weekday AM and PM peak hours. These conditions represent the regularly occurring peak time for the potential land uses under the Plan Components. Under the exist- ing conditions scenario the current 2012 traffic volumes and roadway conditions are based on existing counts provided by City staff, including AM and PM peak hour turning movement counts for the study intersections.

2. Intersection Level of Service The operational performance of a roadway network is commonly described with the term level of service. The level of service describes the operating conditions experienced by persons on a transportation system. For motorized vehicles, level of service is a qualitative measure of the effects of a number of factors, includ- ing speed and travel time, traffic interruptions, freedom to maneuver, driving comfort, and convenience. The level of service are designated LOS A through F, from best to worst, which cover the entire range of traffic operations that might occur. LOS A through E generally represent traffic volumes at less than road- way capacity (free flow conditions), while LOS F represents conditions where traffic demands exceed capac- ity and the flow of traffic breaks down, resulting in stop-and-go conditions and long queues of vehicles. The level of service methodology is detailed in Appendix A of the Traffic Report (see Appendix F of this EA).

4.13-20

City of Menlo Park - Housing Element Figure Bike Facilities CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND3 ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

E T E R A N S B ¬ L «8 V 1 4 D 0 1 £¤

HA 5 VEN AVE

CO NS TIT UT E DR IO V TT N D A SCO R N O S D R AVE HAMILTON H M S ID R 4 D A R D LE M 3 'BRIEN DR F W O IE O L L D L R I D W 2

BAY RD

D

R

E

D I

S D ¬82 O « E O L C E W A M V I A NO L 1 RE A AL IN C N E LA UR EL E S V T A E V O A 1 R LM 0 G A 1 S K T £¤ A E O V A O L E N V E A E M Y V IT A E M V S O R ID A E IS E D Z V V L A U A I E N F R R E IE A C L U P L D D L A R A T ID V N D Y M P A X S RD E RO E L DE N CA C BAR O A EM G A M E E LA IN V R M O A O E L D D R IL A R E D L A H E L L C L I R A H A S D U L P N H M U A C A LG S S AS T

E 2 V 8

A ¬«

Y

V

A Legend

ILL RD Proposed Housing Element Sites SAND H Existing Class I Bike Path JU N IP E DExisting Class II Bike Lane R R O L S L E I R M R Existing Class III Bike Route A E 0 B G 8 L A 2 V P ¨¦§ D Proposed Class I Bike Path

Proposed Class II Bike Lane D

R Proposed Class III Bike Route

E N

NORTH I P

L City of Menlo Park A

SSource:ource TJKM: TJK TransportationM Transpo r Consultants.tation Consultants, Jan 2013 Miles 0 0.5 1 FIGURE 4.13-3

EXISTING AND PROPOSED BICYCLE FACILITIES CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

a. Signalized Intersections Operating conditions at the EA Study Area intersections were evaluated using the methodology outlined in the 2000 Highway Capacity Manual (HCM 2000) Operations. A signalized intersection’s delay measured in seconds-per-vehicle. Control delay includes initial deceleration based on the weighted average control delay measured in seconds-per-vehicle. Control delay includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration.

Table 4.13-1 summarizes the relationship between the control delay and level of service for signalized inter- sections.

3. Intersection Levels of Service Standards a. Caltrans As previously stated, Caltrans endeavors to maintain a target service level at the transition between LOS C and LOS D on State highway facilities; however, the agency acknowledges that this may not always be fea- sible, particularly in urban environments where right-of-way is constrained. Where maintaining LOS C/D is not feasible, Caltrans attempts to maintain the existing level of service when assessing the impact of new development. A volume-to-capacity ratio of 0.80 corresponds to the C/D threshold. b. C/CAG 2011 CMP Intersection Standards The C/CAG level of service standards for the CMP roadway system are described as below: ¨ LOS D: Bayfront Expressway (SR 84) between US 101 and Willow Road ¨ LOS E: Bayfront Expressway (SR 84) between Willow Road and University Avenue ¨ LOS F: US 101 ¨ LOS D: I-280 ¨ LOS F: Intersection of Bayfront Expressway (SR 84) and University Avenue (SR 109) ¨ LOS F: Intersection of Bayfront Expressway (SR 84) and Willow Road (SR 114) ¨ LOS F: Intersection of Bayfront Expressway (SR 84) and Marsh Road c. Menlo Park Standards for Intersections on Arterial Streets The addition of project traffic causes an intersection operating at LOS D or better degrade to LOS E or F; or have an increase of 23 seconds or greater in average vehicle delay; or causes an increase of more than 0.8 seconds of average delay to vehicles on the most critical movements for intersections operating at LOS E or F prior to the addition of project traffic.

4.13-22

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-1 SIGNALIZED INTERSECTION LEVEL OF SERVICE CRITERIA

Average Level of Control Delay Service Description (Seconds) Operations with very low delay occurring with favorable traffic signal pro- A < 10.0 gression and/or short cycle lengths. Operations with low delay occurring with good progression and/or short B > 10.0 to 20.0 cycle lengths. Operations with average delays resulting from fair progression and/or long- C > 20.0 to 35.0 er cycle lengths. Individual cycle failures begin to appear. Operations with longer delays due to a combination of unfavorable pro- D gression, long cycle lengths, or high V/C ratios. Many vehicles stop and > 35.0 to 55.0 individual cycle failures are noticeable. Operations with high delay values indicating poor progression, long cycle E lengths, and high V/C ratios. Individual cycle failures are frequent occur- > 55.0 to 80.0 rences. This is considered to be the limit of acceptable delay. Operations with delays unacceptable to most drivers occurring due to over- F > 80.0 saturation, poor progression, or very long cycle lengths. Source: Highway Capacity Manual, Transportation Research Board, 2000.

d. Menlo Park Standards for State Controlled Intersections The addition of project traffic causes an intersection operating at LOS D or better degrade to LOS E or F; or have an increase of 23 seconds or greater in average vehicle delay; or causes an increase of more than 0.8 seconds of average delay to vehicles on the most critical movements for intersections operating at LOS E or F prior to the addition of project traffic. e. Menlo Park Standards for Intersections on Collector Streets The addition of project traffic causes an intersection operating at LOS C or better degrade to LOS D, E, or F; or have an increase of 23 seconds or greater in average vehicle delay; or causes an increase of more than 0.8 seconds of average delay to vehicles on the most critical movements for intersections operating at LOS D, E, or F prior to the addition of project traffic.

4.13-23

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

f. Palo Alto Intersection Standards The addition of project traffic causes an intersection operating at LOS E or better degrade to LOS F; or for intersections currently operating at LOS F causes an increase of more than 4 seconds of average delay to vehicles on the most critical movements, and an increase of more than 0.01 of volume-to-capacity (v/c) ra- tio. g. Town of Atherton Intersections Standards The addition of project traffic causes an intersection operating at LOS D or better degrade to LOS E or F; or causes an intersection operating at LOS E to LOS F; or have an increase of 4 seconds or greater in average vehicle delay for intersections currently operating at LOS F. h. County of San Mateo Intersection Standards San Mateo County does not have specific level of service standards for intersections under the County’s ju- risdiction. Therefore, the Traffic Report prepared for the Plan Components applied the City of Menlo Park standards for intersections under the County’s jurisdiction. i. County of Santa Clara Intersection Standards The addition of project traffic causes an intersection operating at LOS F an increase of more than 4 seconds of average delay to vehicles on the most critical movements, and an increase of more than 0.01 of volume-to- capacity (v/c) ratio.

4. Existing Levels of Service The level of service was evaluated for the 52 intersections in the EA Study Area under existing 2012 condi- tions. Detailed level of service calculations are contained in Appendix C of the Traffic Report (see Appen- dix F of this EA). Figures 4.13-4a and 4.13-4b illustrates the existing peak hour turning movement volumes at the study intersections, as well as existing lane geometry and traffic controls.

As shown in Table 4.13-2 under existing 2012 conditions, three of the 52 study intersections operate at un- acceptable levels of service at the PM peak hour as described below: ¨ Middlefield Road and Willow Road (Menlo Park) operates at LOS E ¨ Bayfront Expressway and University Avenue (Caltrans) operates at LOS F ¨ Bayfront Expressway and Marsh Road (Caltrans) operates at LOS E

4.13-24

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

5. Roadway and Freeway Volumes The Average Daily Traffic Volume (ADT) and level of service was analyzed for 15 local roadway and six freeway segments. Appendix B of the Traffic Report (see Appendix F of this EA) includes the data sheets for the roadway segment ADT counts. The selected study roadway and freeway segments are shown on Figure 4.13-1.

6. Roadway and Freeway Standards a. Menlo Park Standards for Minor Arterial Streets If the existing ADT is: (1) greater than 18,000 (90 percent of capacity), and there is a net increase of 100 trips or more in ADT due to project related traffic; (2) the ADT is greater than 10,000 (50 percent of capacity) but less than 18,000, and the project related traffic increases the ADT by 12.5 percent or the ADT becomes 18,000 or more; or (3) the ADT is less than 10,000, and the project related traffic increases the ADT by 25 percent. b. Menlo Park Standards for Collector Streets If the existing ADT is: (1) greater than 9,000 (90 percent of capacity), and there is a net increase of 50 trips or more in ADT due to project related traffic; (2) the ADT is greater than 5,000 (50 percent of capacity) but less than 9,000, and the project related traffic increases the ADT by 12.5 percent or the ADT becomes 9,000 or more; or (3) the ADT is less than 5,000, and the project related traffic increases the ADT by 25 percent. c. Menlo Park Standards for Local Streets If the existing ADT is: (1) greater than 1,350 (90 percent of capacity), and there is a net increase of 25 trips or more in ADT due to project related traffic; (2) the ADT is greater than 750 (50 percent of capacity) but less than 1,350, and the project related traffic increases the ADT by 12.5 percent or the ADT becomes 1,350; or (3) the ADT is less than 750, and the project related traffic increases the ADT by 25 percent. d. San Mateo County Standards for Freeway Segments If the addition of project traffic causes a freeway segment to operate at a level of service that violates the standard adopted in the current San Mateo County CMP; or increases traffic demand by an amount equal to one percent or more of the segment’s capacity for a segment violating the CMP level of service prior to the addition of project traffic.

4.13-25

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

Intersection #5 Intersection #1 Intersection #2 Intersection #3 Intersection #4 Intersection #6 Intersection #5 Alpine Rd./Santa Cruz Ave. Intersection #1 Intersection #2 Intersection #3 Addison WIntersectionesley & #4Sand Hill Rd. Saga Ln. & Sand Hill Rd. IntersectionBranner #6 Dr. & Sand Hill Rd. Sharon Park Dr. & Sand Hill Rd. Santa Cruz Ave. & Sand Hill Rd. Alpine Rd./Santa Cruz Ave. Addison Wesley & Sand Hill Rd. Saga Ln. & Sand Hill Rd. Branner Dr. & Sand Hill Rd. Sharon Park Dr. & Sand Hill Rd. Santa Cruz Ave. & Sand Hill Rd. & Junipero Serra Blvd. & Junipero Serra Blvd.

208 (131) 208 (131) 670 (537) 670 (537) 264 (21 39 (244) 264 (21 39 (244) 290 (249) 290 (249) 14 (43) 3 (13) 14 (43) 3 (13) 17 (21) 17 (21) 46 (10) 53 (14) 197 (230) 46 (10) 53 (14) 540 (1,193) 197 (230) 540 (1,193) 3 (5) 186 (273) 3 (5) 186 (273) 879 (1,888) 769 (1,619) 944 (1,701) 301 (420) 944 (1,701) 301 (420) 554 (821) 769 (1,619)

3 (1) 791 (1,432)879 (1,888) 699 (382) 5 (109) 1 (2) 7(49) 554 (821)

2 (50) 2 2 (0) 2 699 (382)

9 (95) 9 25 (36) 266 (466) 3 (1) 791 (1,432) 5 (109) 1 (2) 7(49)

2 (50) 2 2 (0) 2 108 (72) 136 (36) 1) 33 (10) (95) 9 25 (36) 266 (466) 108 (72) 136 (36) 1) 88 (504) 33 (10) 88 (504)

409 (218) 609 (669) 148 (192) 409 (218) 38 (29) 134 (5) 6 (2) 1 (19) 609 (669) 253 (68) 10 (9) 2 (5) 148 (192) 0 (26) 2,022 (818) 38 (29) 1,631 (833) 46 (18) 134 (5) 6 (2) 1 (19) 226 (95) 253 (68) 10 (9) 2 (5) 175 (17) 0 (26) 5 (2) 2,022 (818) 297 (341) 1,632 (1,053)9 (5) 177 (168) 1,631 (833) 1) 46 (18)

35 (81) 226 (95) 28 (161) 28

13 (144) 13 1,157 (573) 24 (146) 23 (2) 175 (17) 1,473 (861) 5 (2) 289 (21 9 (5) 297 (341) 892 (625) 1,632 (1,053) 709 (108) 177 (168) 1)

35 (81) 28 (161) 28

13 (144) 13 1,157 (573) 24 (146) 1,473 (861)23 (2) 289 (21 Intersection #7 Intersection #8 Intersection #9 892 (625) Intersection #10 Intersection #11 Intersection #12 709 (108) Oak Ave. & Sand Hill Rd. Middlefield Rd. & Marsh Rd. Encinal Ave & Middlefield Rd. Middlefield Rd. & Oak Grove Ave. University Dr. (S) & Santa Cruz Ave. Laurel St. & Oak Grove Ave. Intersection #7 Intersection #8 Intersection #9 Intersection #10 Intersection #11 Intersection #12 Oak Ave. & Sand Hill Rd. Middlefield Rd. & Marsh Rd. Encinal Ave & Middlefield Rd. Middlefield Rd. & Oak Grove Ave. University Dr. (S) & Santa Cruz Ave. Laurel St. & Oak Grove Ave. 667 (159) 165 (42) 141 (153) 56 (40) 540 (446) 429 (271) 478 (303) 206 (37) 38 (96) 394 (388) 132 (50) 236 (61) 355 (449) 30 (34) 717 (1,790) 15 (37) 249 (441) 539 (830) 21 (8) 77 (109) 536 (447) 151 (53) 117 (186) 75 (36) 132 (170) 106 (29) 25 (64) 179 (1 77 (125) 328 (1 178 (149) 281 (400) 667 (159) 165 (42) 18) 141 (153) 56 (40) 17) 540 (446) 429 (271) 478 (303) 75 (32) 206 (37) 87 (89) 38 (96) 394 (388) 132 (50) 236 (61) 355 (449) 30 (34) 717 (1,790) 15 (37) 249 (441) 539 (830) 21 (8) 77 (109) 536 (447) 151 (53) 117 (186) 75 (36) 14) 106 (29) 179 (1 7 (24) 132 (170) 77 (125) 25 (64) 164 (440) 328 (1 125 (595) 178 (149) 281 (400) 90 (1 18) 1 (25) 17) 439 (393) 355 (355) 75 (32) 275 (440) 82 (103) 1 440 (595) 492 (339) 87 (89) 542 (809) 1,816 (979) Intersection #13 Intersection #14 Intersection #15 Intersection #16 Intersection #17 Intersection #18 14) Laurel St. & Ravenswood Ave. Middlefield Rd. & Ravenswood Ave. Middlefield Rd. & Ringwood Ave. Middlefield Rd. & Willow Rd. Gilbert Ave. & Willow Rd. Coleman Ave. & Willow Rd. 7 (24) 164 (440) 125 (595) 1 (25) 90 (1 439 (393) 355 (355) 275 (440) 82 (103) 1 10) 440 (595) 492 (339) 3 (15) 82 (77) 542 (809) 745 (837) 728 (850) 12 (28) 1,816 (979) 515 (586) 1 (345) 33 (55) 2 (7) 18 (37) 305 (203) 371 (419) 68 (1 4 (5) 52 (1) 105 (86) 41 201 (91) 478 (387) 148 (59) 309 (528) 176 (88) 32 (43) 427 (665) 655 (832) Intersection #13 40 (26) Intersection95 (59) #14 Intersection4 (4) #15 Intersection #16 Intersection #17 Intersection #18 178 (138) 1 437 (467) 39 (29) 105 (43) 10 (148) 89 (97) 503 (487) 244 (345) 48 (8) 436 (421) 68 (32)6 (5) 7 (3) 165 (197) 842 (684) Laurel St. & Ravenswood80 (1 Ave. 7 (4) Middlefield Rd. 1&12 Ravenswood (72) Ave. Middlefield Rd. & Ringwood Ave. Middlefield Rd. & Willow Rd. Gilbert Ave. & Willow Rd. Coleman Ave. & Willow Rd. 67 (33) 449 (409) 16) 90 (2) 16 (15)

5 (7) 10)

0 (0) 3 (15) 82 (77) 28 (16) 4 (5) 745 (837) 728 (850) 9 (51) 12 (28) 515 (586) 55 (64) 1 (345) 33 (55) 2 (7) 22 (15) 371 (419) 4 (75) 18 (37) 305 (203) 103 (224) 10 (83) 52 (1) 68 (1 4 (5) 3 (51) 864 (1,120) 105 (86) 41 201 (91) 74 (109) 184 (182) 478 (387) 148 (59) 309 (528) 701 (688) 127 (175) 40 (26) 176 (88) 32 (43) 427 (665) 971 (1,164) 655 (832) 95 (59) 4 (4) Intersection #23 437 (467) 39 (29) 105 (43) Intersection #19 Intersection #20 Intersection #21 178 (138)Intersection #22 110 (148) 89 (97) 503 (487)Intersection244 (345) #24 6 (5) 7 (3) Sand Hill Circle & Sand Hill Rd. 48 (8) 436 (421) 1 68 (32) Durham St. & Willow Rd. Bay Rd. & Marsh Rd. Bohannon Dr./ Florence St. Scott Dr./Rolison at Marsh165 Rd. (197) El Camino 842Real &(684) Encinal Ave. 80 (1 7 (4) 12 (72) & Marsh Rd. 67 (33) I-280 NB Off-Ramp & Sand Hill Rd. 449 (409) 16) 90 (2) 16 (15)

5 (7)

52 (7) 0 (0) 50 (239) 58 (98) 28 (16) 4 (5) 9 (51) 765 (2,362) 22 (15) 55 (64) 6 (8) 10 (83)4 (75) 101 (36) 103 (224) 318 (347) 3 (51) 864 (1,120) 790 (872) 1,506 (1,106) 184 (182) 31 (68) 74 (109) 145 (239) 405 (62) 701 (688) 127 (175) 971 (1,164) 41 (42) 442 (403) 3 (4) 956 (923) 1,145 (851) 105 (106) 129 (132) 116 (100) 366 (159) 25 (33) 62 (481) Intersection #21 Intersection #23 57 (81) 19 (2) Intersection #19 Intersection #20 894 (1,800) Intersection #22 Intersection #24

6 (10) 14) 185 (159) 16 (65) 241 (287) Bohannon1 Dr./ Florence St. Sand Hill Circle & Sand Hill Rd. 5 (1) 66 (37) Durham St. & Willow13 Rd.(20) Bay Rd. & Marsh Rd. 152 (80) 1 (32) Scott Dr./Rolison at Marsh Rd. El Camino Real & Encinal Ave. 90 (71) 10 (1 16 (31) 1,946 (1,201) & Marsh Rd. I-280 NB Off-Ramp & Sand Hill Rd. 6 (19) 467 (472) 16 (12) (2) 5 64 (20) 1) 40 (123) 59 (57) 54 ( 1 4 (0) 46 (14) 3 (3) 57 (9) 185 (179) (52) 238

1)

1) 7 (1 5 (6) 1 (6) 51 (6) 36 (22) 3 (5) 52 (7) 18 (45) 1 12 (24) 131 (27) 50 (239) 58 (98) 765 (2,362) 19 (21 82 (64) 102 (84) 1 806 (923) 1,716 (615) 804 (778) 6 (8) 1,140 (1,234) 101 (36) 1,183 (1,339) 318 (347) 790 (872) 1,506 (1,106) 31 (68) (22) 72 405 (62) 145 (239) 41 (42) 442 (403) 3 (4) 956 (923) 105 (106) 527 (238) 527 1,145 (851) 129 (132) 116 (100) 366 (159) 25 (33) 62 (481) 57 (81) 19 (2) 894 (1,800)

Intersection #25 6 (10) 14) Intersection #26 Intersection #27 Intersection #28 Intersection #29 185 (159)Intersection #30 16 (65) 241 (287) 11 (32) El Camino Real & 5 (1) 66 (37) 90 (71) 13 (20) 152 (80) El Camino Real & Oak Grove Ave. El Camino Real & Santa Cruz Ave. El Camino Real & Ravenswood Ave. El Camino Real & Roble Ave. 10 (1El Camino Real & Middle Ave. 16 (31) 1,946 (1,201) Valparaiso Ave./Glenwood Ave. 6 (19) 467 (472) 16 (12) (2) 5 64 (20) 1) 40 (123) 59 (57) 54 ( 1 4 (0) 46 (14) 3 (3) 57 (9) 185 (179) (52) 238 10 (41) 53 (88) LEGEND 31 (60) 61 (82) 0 (29) 1) 15 (29) 232 (214) 224 (268) 174 (172) 55 (35) 2 (50) 102 (83) 482 (468) 57 (49) 73 (11 59 (78) 55 (83) 15 (31) 30 (50) 397 (651) 1) 1) 1,970 (1,563) 1,048 (2,007) 7 (1 778 (1,446) 30 (78) 1,180 (1,957) 5 (6) Study Intersection 709 (1,476) 1 (6) 51 (6) 728 (1,620) 36 (22) 749 (1,326) 3 (5) 102 (125) 1,761 (1,427) 187 (372) 18 (45) 1 81 (64) 123 (85) 0 (0) 168 (179) 41 (95) 0 (0) 1,289 (1,021) 98 (105) 1,435 (1,006) 1,421 (1,095) 12 (24)85 (11 24 (58) XX AM Peak Hour Volumes 1,465 (1,10 (0) 1) 131 (27) 82 (105) 19 (21 642 (298) 82 (64) 80 (97) 18) 15 (34) 102 (84) 1 (XX) PM Peak Hour Volumes 88 (105) 806 (923) 1,716 (615) 804 (778) 1,140 (1,234)

Traffic Signal 1,183 (1,339) 72 (22) 72 15) 1 (8) 54 (57) 25 (52) 73 (156) (238) 527 50 (65) 65 (39) 141 (248) 91 (162) 189 (259) 294 (384) 323 (270)69 (1 76 (128) 62 (128) 333 (215) 151 (140) 48 (152) Intersection #25 Intersection #26 Intersection #27 Intersection #28 Intersection #29 Intersection #30 El Camino Real & El Camino Real & Oak Grove Ave. El Camino Real & Santa Cruz Ave. El Camino Real & Ravenswood Ave. El Camino Real & Roble Ave. El Camino Real & Middle Ave. Source: TJKM Transportation Consultants. Valparaiso Ave./Glenwood Ave.

10 (41) 53 (88) LEGEND 31 (60) 61 (82) 0 (29) 15 (29) 232 (214) 224 (268) 174 (172) 55 (35) 2 (50) 102 (83) 482 (468) 57 (49) 59 (78) 55 (83) 15 (31) 30 (50) 73 (11 397 (651) 1) 778 (1,446) 1,970 (1,563)30 (78) 1,180 (1,957) 1,048 (2,007) Study Intersection 728 (1,620) 709 (1,476) 749 (1,326) 102 (125) 0 (0) 168 (179) 41 (95) 1,761 (1,427)0 (0) 187 (372) 1,289 (1,021)81 (64) 98 (105) 1,435 (1,006) 123 (85) 1,421 (1,095) 85 (11 XX AM Peak Hour Volumes 1,465 (1,10 (0) 24 (58) 1) 82 (105) 642 (298) 80 (97) (XX) PM Peak Hour Volumes 88 (105)18) 15 (34) Traffic Signal

15) 1 (8) 54 (57) FIGURE 4.13-4A 25 (52) 73 (156) 50 (65) 65 (39) 141 (248) 91 (162) 189 (259) 294 (384) 323 (270)69 (1 76 (128) 62 (128) 333 (215) 151 (140) 48 (152) EXISTING CONDITIONS PEAK HOUR VOLUMES AND LANE CONFIGURATIONS CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

Intersection #31 Intersection #32 Intersection #33 Intersection #34 Intersection #35 Intersection #36 El Camino Real & Cambridge Ave. Bay Rd. & Willow Rd. Newbridge St. & Willow Rd. O'Brien Dr. & Willow Rd. Ivy Dr. & Willow Rd. Hamilton Ave. & Willow Rd.

)

) 093 , ) ) ) ) (1 165 (4 , ) (3 ) ) (12 (1 1 ) 2 365 (373) (0 ) (75 (754 3 163 (18 7 (12) 0 , 1 (18 83 (62) 400 (86 59 1,207 (2,385) 13 , 10 (35) 1,277 (1,005) 973 1 65 125 (304) 49 23 (49)

38 (62) 1,049 (1,063) 2,206 (1,665)23 (20) 50 (48) 50 (60) 124 (173) 8 (10) 168 (222) 34 (126) 10 (22) 39 (33) 373 (205) 9 (20) 181 (152) 137 (123) 378 (246) 118 (65) 16 (8) 51 (74) ) 18 (13) ) 56 (36)

(48

477 , 82 (1 152 (290) 19 (139) 89 (106) 59 (13) 1

143 (373) 229 (164)

391 726 (1,697) 635 (1,491) , 1,014 (1,628) 940 (1,751) 1 Intersection #37 Intersection #38 Intersection #39 Intersection #40 Intersection #41 Intersection #42 Bayfront Exp. & Willow Rd. Bayfront Exp. & University Ave. O'Brien Dr. & University Ave. Bayfront Exp. & Chilco St. Bayfront Exp. & Chrysler Dr. Bayfront Exp. & Marsh Rd.

) ) )

) ) (921 )

0 (1) (540 )

)

) (365 ) (6 (45

226 (19 , (9 881) 2,786 ( 46 (16) (73 (176 (68 2,839 (1,023) 3 431

2,669 (710) 532 , , 10 44

10 1 1 49 400 (80)

17 27 17 218 (27) 27 (10) 633 (439) 2,587 (1,326)

1,080 (2,531) 0 (9) 415 (1,733) 16 (127) 64 (513) 194 (91) 27 (78) 976 (2,433) 34 (23) 275 (249) 87 (9) 148 (183)

859 (2,418) 5 (69)

45 (52)

27 (246)

52 (14)

275 (179) 130 (394) 171 (161)

173 (47) 112 (180) 208 (42)

596 (1,732)

458 (1,450) 201 (131) 1,078 (3,717) 1,070 (2,063)

Intersection #43 Intersection #44 Intersection #45 Intersection #46 Intersection #47 Intersection #48 Valparaiso Ave. & University Dr. US 101 SB Ramps & Marsh Rd. US 101 NB Ramps & Marsh Rd. University Ave. & Bay Rd. Middlefield Rd. & Lytton Ave. Sand Hill Rd. & El Camino Real

) 101 ) 217 132 ) ) ) (40 ) (414 (144 (83 )

(238 (9 (48 1,005 (1,390) ) (990 (450 71 (2 21 (78) (0 0 (0) 504 0 0 (0) 640 18 102 , 1,253 (672) ) 65 (41) 156 ) 12 581 (468) 1 ) 504 (1,146) 45 (57) 506 (1,098) 7 (11) 49 (28) 378 (505) 179 (146) 62 (60) 104 (49) 47 (91) 124 (100) 56 (23) 284 (191) 499 (443) 798 (593) 11 (18) 66 (177) 651 (594) 1,425 (91 414 (199) 1)

84 (1 447 (386) ) 101 (98) 215 (21 51 (93) ) ,160 (0 1,095 (505) 0 23 (40) 13) 0 (0) (2 12) 1) 161 (35) 58 (84) 910 (1,222) 487 40 (177) , 171 (349) 213 (236) 1 218 (587) 551 (486) 187 (1

Intersection #52 Intersection #51 Intersection #49 Intersection #50 Santa Cruz Ave./ Santa Cruz Ave & Elder Ave. Sand Hill Rd. & Pasteur Dr. Campus Dr. & Junipero Serra Blvd. Alameda De Las Pulgas

347 (413)

1 (2) LEGEND 7 (2) 1 (672) 5 (4) 587 (1,220) 231 (76) 143 (49)

195 (505) 41 Study Intersection

82 (194) 82 7 (13) 7 9 (6) (461) 49 0 (0) 83 (302) 231 (479) 687 (459) AM Peak Hour Volumes 15 (4) 6 (1) 106 (38) XX 34 (8) 103 (43) 8 (9) (XX) PM Peak Hour Volumes 12 (17) 536 (527) 372 (156) 394 (656) 2 (12) Traffic Signal 689 (244) 7 (5) 11 (0) 3 (0) 11 (7)

51 (40) 4 (30) 77 (32)

10 (44) 10 (10)

172 (62) 742 (614)

1,312 (982)

Source: TJKM Transportation Consultants.

FIGURE 4.13-4B

EXISTING CONDITIONS PEAK HOUR VOLUMES AND LANE CONFIGURATIONS CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-2 INTERSECTION LEVELS OF SERVICE – 2012 EXISTING CONDITIONS

AM PM Peak Hour Peak Hour

LOS Delay Delay No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) Addison Wesley and 1 Signal Menlo Park D B 11.4 B 17.5 Sand Hill Rd. 2 Saga Ln. and Sand Hill Rd. Signal Menlo Park D A 8.4 B 11.8

3 Branner Dr. and Sand Hill Rd. Signal Menlo Park D A 4.5 A 5.4 Sharon Park Dr. and 4 Signal Menlo Park D C 21.9 C 25.2 Sand Hill Rd. Alpine Rd./Santa Cruz Ave. 5 Signal Menlo Park D D 52.4 D 48.3 and Junipero Serra Blvd. Santa Cruz Ave. and 6 Signal Menlo Park D D 45.0 D 45.3 Sand Hill Rd. 7 Oak Ave. and Sand Hill Rd. Signal Menlo Park D B 10.6 A 6.2

8 Middlefield Rd. and Marsh Rd. Signal Atherton D C 25.7 C 26.7 Encinal Ave. and 9 Signal Atherton D B 19.8 A 9.8 Middlefield Rd. Middlefield Rd. and 10 Signal Atherton D B 13.7 B 10.5 Oak Grove Ave. University Dr. (S) and 11 Signal Menlo Park D B 12.2 B 15.6 Santa Cruz Ave. 12 Laurel St. and Oak Grove Ave. Signal Menlo Park C B 14.8 B 11.6 Laurel St. and 13 Signal Menlo Park D B 16.3 B 12.7 Ravenswood Ave. Middlefield Rd. and 14 Signal Menlo Park D C 23.9 D 35.5 Ravenswood Ave. Middlefield Rd. and 15 Signal Menlo Park D C 27.4 C 26.3 Ringwood Ave. Middlefield Rd. and 16 Signal Menlo Park D D 47.6 E 62.2 Willow Rd. 17 Gilbert Ave. and Willow Rd. Signal Menlo Park D B 12.9 A 9.4

18 Coleman Ave. and Willow Rd. Signal Menlo Park D B 17.1 A 9.5

19 Durham St. and Willow Rd. Signal Menlo Park D B 12.1 B 11.8

4.13-28

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-2 INTERSECTION LEVELS OF SERVICE – 2012 EXISTING CONDITIONS

AM PM Peak Hour Peak Hour

LOS Delay Delay No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) 20 Bay Rd. and Marsh Rd. Signal Menlo Park D B 17.6 B 13.1 Bohannon Dr./Florence St. 21 Signal Menlo Park D C 33.6 D 39.5 and Marsh Rd. Scott Dr./Rolison Rd. and 22 Signal Menlo Park D C 25.3 D 40.1 Marsh Rd. Sand Hill Circle and 23 Signal Menlo Park D C 25.8 C 32.5 Sand Hill Rd. I-280 NB Off-Ramp and Signal Caltrans D C 22.1 C 21.2 Sand Hill Rd. El Camino Real and 24 Signal Caltrans D B 15.8 B 18.9 Encinal Ave. El Camino Real and Valparaiso 25 Signal Caltrans D C 32.3 C 34.1 Ave./Glenwood Ave. El Camino Real and 26 Signal Caltrans D C 30.3 C 32.6 Oak Grove Ave. El Camino Real and 27 Signal Caltrans D B 12.6 B 18.3 Santa Cruz Ave. El Camino Real and 28 Signal Caltrans D D 39.4 D 41.7 Ravenswood Ave./Menlo Ave. El Camino Real and 29 Signal Caltrans D B 11.9 B 16.7 Roble Ave. El Camino Real and 30 Signal Caltrans D C 29.3 D 45.0 Middle Ave. El Camino Real and 31 Signal Caltrans D B 11.4 B 15.2 Cambridge Ave. 32 Bay Rd. and Willow Rd. Signal Caltrans D C 20.0 B 19.5

33 Newbridge St. and Willow Rd. Signal Caltrans D D 50.2 D 40.7

34 O'Brien Dr. and Willow Rd. Signal Caltrans D B 15.3 D 37.9

35 Ivy Dr. and Willow Rd. Signal Caltrans D B 13.7 B 12.6 Hamilton Ave. and 36 Signal Caltrans D C 24.2 C 22.7 Willow Rd.

4.13-29

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-2 INTERSECTION LEVELS OF SERVICE – 2012 EXISTING CONDITIONS

AM PM Peak Hour Peak Hour

LOS Delay Delay No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) 37 Bayfront Exp. and Willow Rd. Signal Caltrans D C 22.1 D 42.0 Bayfront Exp. and 38 Signal Caltrans D C 22.0 F 124.6 University Ave. O'Brien Dr. and 39 Signal Caltrans D A 5.5 A 9.5 University Ave. 40 Bayfront Exp. and Chilco St. Signal Caltrans D B 19.4 B 16.3 Bayfront Exp. and 41 Signal Caltrans D A 8.0 C 21.4 Chrysler Dr. 42 Bayfront Exp. and Marsh Rd. Signal Caltrans D C 34.1 E 67.7 Valparaiso Ave. and 43 Signal Menlo Park D B 13.0 B 15.6 University Dr. US 101 SB Ramps and 44 Signal Caltrans D C 23.9 C 21.0 Marsh Rd. US 101 NB Ramps and 45 Signal Caltrans D B 15.8 B 16.3 Marsh Rd. 46 University Ave. and Bay Rd. Signal Caltrans E C 25.6 C 32.7 Middlefield Rd. and 47 Signal Palo Alto E D 35.2 D 36.8 Lytton Ave. Sand Hill Rd. and 48 Signal Caltrans D C 21.3 C 24.2 El Camino Real 49 Sand Hill Rd. and Pasteur Dr. Signal Palo Alto E C 22.9 C 26.9 Campus Dr. and Santa Clara 50 Signal E B 17.7 C 33.7 Junipero Serra Blvd. Co. Santa Cruz Ave. and 51 Signal Menlo Park D B 13.2 A 6.0 Elder Ave. Santa Cruz Ave./ 52 Signal San Mateo Co. D B 11.9 B 12.2 Alameda De Las Pulgas Notes: 1. LOS = Level of Service, Delay = Average control delay per vehicle 2. Delay/LOS are for overall intersection 3. Bold indicates unacceptable operational conditions based on applicable City/Caltrans standards. Source: TJKM Transportation Consultants, March 2013.

4.13-30

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

7. Existing Roadway and Freeway Volumes a. 2012 Roadway Volumes For the roadway segments, the ADTs are over 32,000 vehicles per day for the primary arterial segments. As shown in Table 4.13-3, one primary and 14 minor arterial segments exceed 90 percent capacity with ADTs over 18,000 vehicles per day, and the remaining four minor arterial segments are at less than 50 percent ca- pacity with ADTs less than 10,000 vehicles per day. Three collector street segments exceed 90 percent ca- pacity with ADTs over 9,000 vehicles per day, and nine collector streets exceed 50 percent capacity with ADTs over 5,000 vehicles per day. The remaining three collector streets have ADTs less than 5,000 vehicles per day. The two local street segments both exceed 90 percent capacity with ADTs over 1,350 vehicles per day. b. 2012 Freeway Volumes Per the 2011 CMP Monitoring Report, the freeway segments operate under existing conditions as follows: ¨ US 101 currently operate at LOS F ¨ SR 84 segment between Marsh Road and Willow operates at LOS B ¨ SR 84 segment between Willow Road and University Avenue operates at LOS F ¨ I-280 segments operate at LOS E

All the study freeway segments currently meet the CMP level of service standards except for the SR 84 seg- ment between Willow Road and University Avenue.

D. Impact Analysis Methodology

This section describes the key elements of the transportation impact analysis methodology, including: ¨ Scenarios Analyzed ¨ Traffic Operations and Capacity Analysis ¨ Project Trip Generation, Distribution and Assignment

1. Scenarios Analyzed The traffic generated from the Plan Components was estimated through a process that involved vehicle trip generation, trip distribution, and assignment of the trips to the roadway network using the C/CAG travel demand model run by the Santa Clara VTA the various study scenarios. This analysis takes a conservative

4.13-31

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-3 ROADWAY TRAFFIC VOLUMES – EXISTING 2012 CONDITIONS

Existing No. Roadway Segment Classification ADT 1 Haven Ave City Limits-Bayfront Expwy/Marsh Rd Collector 5,751

2-1 Bay Rd-Bohannon Dr/Florence St Minor Arterial 27,013 Marsh Rd 2-2 Bohannon Dr/Florence St-Scott Dr Primary Arterial 32,768

3 Hamilton Ave Chilco St-Willow Rd Collector 3,010

4-1 Laurel St-Middlefield Rd Collector 5,181

4-2 Middlefield Rd-Gilbert Ave Minor Arterial 26,213

4-3 Willow Rd Gilbert Ave-Coleman Ave Minor Arterial 26,336

4-4 Coleman Ave-Durham St/Hospital Ave Minor Arterial 28,038

4-5 Durham St/Hospital Ave-Bay Rd Minor Arterial 32,148

5 Middlefield Rd Ravenswood Ave-Willow Rd Minor Arterial 20,668

6-1 Glenwood Ave-Oak Grove Ave Collector 3,916

6-2 Laurel St Oak Grove Ave-Ravenswood Ave Collector 4,404

6-3 Ravenswood Ave-Willow Rd Collector 4,917

7-1 Middle Ave-Menlo Ave Collector 5,666

7-2 Menlo Ave-Santa Cruz Ave Collector 17,641 University Dr 7-3 Santa Cruz Ave-Oak Grove Ave Collector 7,052

7-4 Oak Grove Ave-Valparaiso Ave Collector 5,376

8-1 Valparaiso Ave/ University Dr-El Camino Real Minor Arterial 13,238 8-2 Glenwood Ave El Camino Real-Laurel St Collector 5,899

9-1 University Dr -El Camino Real Collector 10,038

9-2 Oak Grove Ave El Camino Real-Laurel St Collector 9,677

9-3 Laurel St-Middlefield Rd Collector 8,556

10-1 El Camino Real-Alma St Minor Arterial 24,076

10-2 Ravenswood Ave Alma St-Laurel St Minor Arterial 19,912

10-3 Laurel St-Middlefield Rd Minor Arterial 17,977

4.13-32

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Existing No. Roadway Segment Classification ADT Alameda de las Pulgas- Avy Ave/Orange 11-1 Minor Arterial 9,238 Ave 11-2 Avy Ave/Orange Ave-Olive St Minor Arterial 16,097

11-3 Santa Cruz Ave Olive St-University Dr Minor Arterial 17,179

11-4 University Dr-Crane St Minor Arterial 8,895

11-5 Crane St-El Camino Real Minor Arterial 8,074

12-1 Olive St-University Dr Collector 7,222 Middle Ave 12-2 University Dr-El Camino Real Collector 7,519

13-1 Alpine Rd/ Junipero Serra Blvd-City Limits Minor Arterial 23,406 13-2 Santa Cruz Ave Sand Hill Rd-Junipero Serra Blvd Minor Arterial 30,187

14 Linfield Dr Middlefield Rd - Laurel St Local 1,583

15 Oak Ave Sand Hill Rd - Olive St Local 2,518 Source: TJKM Transportation Consultants, March 2013.

approach by applying both a one percent compound growth per year and the traffic generated by the pend- ing/approved projects within the City of Menlo Park shown on Table 4.13-4. The following four scenarios were modeled with and without the future trips that could be generated Plan Components:

¨ Near-Term 2014 without Plan Components Condition. Under this scenario a one percent compound growth per year is assumed for the increase in traffic volume within two years plus the traffic generated by the pending/approved projects within the City of Menlo Park.

¨ Near-Term 2014 plus Plan Components Conditions. This scenario adds traffic generated by the future de- velopment to the one percent compound growth per year assumed for the increase in traffic volume within two years plus traffic generated by the pending/approved projects within Menlo.

¨ 2035 Without Plan Components Conditions. Under this scenario a one percent compound growth per year is assumed for the increase in traffic volume within 23 years plus traffic generated by the pend- ing/approved projects within Menlo Park.

4.13-33

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-4 LIST OF APPROVED/PENDING PROJECTS IN THE EA STUDY AREA

Units of Project Address Type of Use Size Measure Status

Office 3.8 ksf Under Construction 1283 Willow Road (Police/City Service Center) Retail 5.1 ksf Under Construction

Residential 16 Du Approved New Construction

1460 El Camino Real Office 26.8 ksf Approved New Construction

Commercial -12.0 ksf Replace

Commercial 110.1 ksf Approved New Construction 1300 El Camino Real Commercial -28.6 ksf Demolished

Shell Complete; No Tenant Medical Office 9.8 ksf Improvements 1906 El Camino Real Restaurant -5.7 ksf Demolished

Medical Office 10.2 ksf Approved New Construction 1706 El Camino Real Restaurant -6.9 ksf Demolished

Office 694.7 ksf Approved New Construction

Health Club 69.0 ksf Approved New Construction

100-155 Constitution Drive and Restaurant 4.3 ksf Approved New Construction 100-190 Independence Drive (Menlo Gateway) Hotel 230 rooms Approved New Construction

Office -133.7 ksf Replace on Constitution Site

Office -63.4 ksf Replace on Independence Site

Shell Complete; No Tenant 100 Middlefield Road Office 9.0 ksf Improvements

4.13-34

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Units of Project Address Type of Use Size Measure Status

Office 11.3 ksf Approved New Construction 2484 Sand Hill Road -1.8 ksf Replace (Demolition at Building #1) (Quadrus Bldg. 9) -0.7 ksf Replace (Demolition at Building #4)

Residential 26 du Approved New Construction 389 El Camino Real Residential -4 du Replace

Facebook East Office n/a n/a Employee increase from 3,600 to 6,600 1601 Willow Road

Office 433.7 ksf Proposed Construction West 312-314 Constitution Drive

Office 260.0 ksf Proposed Construction

Office -19.2 ksf Proposed Demolition Commonwealth Corp. Center 151 Commonwealth – Sobrato Warehouse -55.6 ksf Proposed Demolition

Manufacturing -163.1 ksf Proposed Demolition

VA/Core Residential 60 du Proposed Construction

Notes: du =dwelling unit ksf = thousand square feet Source: City of Menlo Park, August 2012.

4.13-35

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ 2035 Plus Plan Components Conditions. This scenario adds traffic generated by the future development to the one percent compound growth per year assumed for the increase in traffic volume within 23 years plus traffic generated by the pending/approved projects within Menlo Park and the El Camino Real/Downtown Specific Plan project, plus the Stanford University Medical Center (SUMC), a City of Palo Alto project, which consists of a net increase of 854,970 square feet of hospital space and 24,330 square feet of medical office. For the SUMC project, it is only the trips that go through Menlo Park that were considered under this scenario.

2. Traffic Operations and Capacity Evaluation a. Near-Term 2014 without Plan Components Conditions Figures 4.13-5a and 4.13-5b illustrates the peak hour turning movement traffic volumes at the study intersec- tions under Near-Term 2014 without Plan Components conditions. Anticipated traffic controls and lane geometries for the 52 study intersections are also included in this figure. Detailed level of service calcula- tions are contained in Appendix D of the Traffic Report (see Appendix F of this EA). i. Intersection Levels of Service Under Near-Term 2014 without Plan Components conditions, ten intersections operate at unacceptable levels as described below:

¨ Alpine Road/Santa Cruz Avenue and Junipero Serra Boulevard operates at LOS E during AM peak hour.

¨ Middlefield Road and Marsh Road (Atherton) operates at LOS E during AM peak hour.

¨ Middlefield Road and Willow Road operates at LOS E during AM peak hour and operates at LOS F during PM peak hour.

¨ Scott Drive/Rolison Road and Marsh Road operates at LOS E during PM peak hour.

¨ Newbridge Street and Willow Road (Caltrans) operates at LOS F during both AM and PM peak hours.

¨ Bayfront Expressway and Willow Road (Caltrans) operates at LOS F during both AM and P.M peak hours.

¨ Bayfront Expressway and University Avenue (Caltrans) operates at LOS F during PM peak hour.

¨ Bayfront Expressway and Marsh Road (Caltrans) operates at LOS F during AM and PM peak hours.

4.13-36

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ Bohannon Drive/Florence Street and Marsh Road: LOS E during PM peak hour

¨ US 101 NB Ramps & Marsh Road (Caltrans): LOS E during AM peak hour

The Near-Term 2014 without Plan Components conditions for the study intersections are identified and compared to Near-Term 2014 plus Plan Components are shown in Table 4.13-7. See Section F, Impacts Discussion, below. ii. Roadway Traffic Volumes a) Arterial Streets The following arterial segments (primary and minor) exceed 90 percent capacity with ADTs over 18,000 vehicles per day and under Near-Term 2014 conditions more than 100 trips would be added to each of these segments, which would exceed the City’s threshold of significance for arterial streets.

¨ Marsh Road from Bohannon Drive/Florence St to Scott Drive

¨ Marsh Road from Bay Road to Bohannon Drive/Florence Street

¨ Willow Road from Middlefield Road to Bay Road

¨ Willow Road from Gilbert Ave-Coleman Ave

¨ Willow Road from Coleman Ave-Durham St/Hospital Ave

¨ Willow Road from Durham St/Hospital Ave to Bay Road

¨ Middlefield Road from Ravenswood Avenue to Willow Road

¨ Ravenswood Avenue from El Camino Real to Alma Street

¨ Ravenswood Avenue from Alma Street to Laurel Street

¨ Ravenswood Avenue from Laurel Street to Middlefield Road

¨ Santa Cruz Avenue from Olive Street to University Drive

¨ Alpine Road/Santa Cruz Avenue from Junipero Serra Boulevard to City Limits

¨ Alpine Road/Santa Cruz Avenue from Sand Hill Road to Junipero Serra Boulevard

4.13-37

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC Intersection #5 Intersection #1 Intersection #2 Intersection #3 Intersection #4 Intersection #6 Alpine Rd./Santa Cruz Ave. Addison Wesley & Sand Hill Rd. Saga Ln. & Sand Hill Rd. Branner Dr. & Sand Hill Rd. Sharon Park Dr. & Sand Hill Rd. Santa Cruz Ave. & Sand Hill Rd. Intersection #5 & Junipero Serra Blvd. Intersection #1 Intersection #2 Intersection #3 Intersection #4 Intersection #6 Alpine Rd./Santa Cruz Ave. Addison Wesley & Sand Hill Rd. Saga Ln. & Sand Hill Rd. Branner Dr. & Sand Hill Rd. Sharon Park Dr. & Sand Hill Rd. Santa Cruz Ave. & Sand Hill Rd. & Junipero Serra Blvd. 212 (134) 269 (217) 691 (562) 296 (261) 40 (249) 14 (43) 3 (13) 17 (22) 202 (235) 12) 47 (11) 57 (15) 212 (134) 557 (1,243) 269 (217) 691 (562) 40 (249)3 (5) 191 (279) 296 (261) 970 (1,768) 14 (43) 3 (13) 307 (428) 17 (22) 202 (235) 789 (1,683) 12) 921 (2,007) 57 (15) 557 (1,243) 565 (837)

47 (11) 3 (1) 813 (1,493)1) 720 (406)

3 (5) 5 ( 1 1 (2) 7(50)

3 (56) 3

2 (0) 2 191 (279) (103) 10 26 (37) 921 (2,007) 789 (1,683) 970 (1,768) 110 (73) 139 (37) 307 (428) 565 (837) 34 (1

3 (1) 813 (1,493)1) 720 (406) 5 ( 1 1 (2) 7(50)

3 (56) 3 280 (489)

2 (0) 2 10 (103) 10 26 (37) 110 (73) 139 (37) 34 (1 280 (489) 89 (514) 89 (514) 418 (222) 418 (222) 630 (695) 630 (695) 151 (196) 151 (196) 38 (29) 1 (19) 38 (29) 137 (5) 1 (19) 6 (2) 137 (5) 6 (2) 1 2 (5) 267 (71) 1 2 (5) 267 (71) 1 (9) 0 (26) 2,133 (878) 47 (18) 1 (9) 2,133 (878) 0 (26) 47 (18) 230 (97) 1,707 (857) 230 (97) 1,707 (857) 179 (17) 10) 5 (2) 179 (17) 10) 1,710 (1,087)10 (5) 181 (171) 5 (2) 319 (356)1,710 (1,087)10 (5) 319 (356)

36 (83) 181 (171) 28 (165) 28

14 (147) 14 1,209 (589) 24 (149)

1,547 (890)23 (2) 36 (83) 28 (165) 28

14 (147) 14 294 (216) 1,209 (589) 24 (149) 910 (637) 724 (1 1,547 (890)23 (2) 294 (216)

910 (637) 724 (1 Intersection #7 Intersection #8 Intersection #9 Intersection #10 Intersection #11 Intersection #12 Oak Ave. & Sand Hill Rd. Middlefield Rd. & Marsh Rd. Encinal Ave & Middlefield Rd. MiddlefieldIntersection Rd. & Oak Grove#7 Ave. University Dr. (S)Intersection & Santa Cruz A#8ve. Laurel St. & Oak GroveIntersection Ave. #9 Intersection #10 Intersection #11 Intersection #12 Oak Ave. & Sand Hill Rd. Middlefield Rd. & Marsh Rd. Encinal Ave & Middlefield Rd. Middlefield Rd. & Oak Grove Ave. University Dr. (S) & Santa Cruz Ave. Laurel St. & Oak Grove Ave.

752 (633) 168 (43) 1) 144 (156) 57 (41) 625 (477) 438 (276) 550 (315) 216 (150) 41 (98) 898 (488) 134 (51) 241 (63) 376 (533) 31 (34) 734 (1,851) 308 (824) 22 (9) 78 (11 15 (38) 580 (958) 108 (30) 1) 571 (563) 154 (54) 752 (633)1 168 (43) 78 (37) 335 (121) 19 (190) 144 (156) 57 (41) 186 (122) 134 (173) 625 (477) 438 (276) 550 (315)78 (128) 216 (150)25 (65) 41 (98) 898 (488) 241 (63) 31 (34) 181 (152) 322 (409) 134 (51) 376 (533) 734 (1,851) 308 (824)78 (40) 22 (9) 78 (11 15 (38) 89 (90) 580 (958) 108 (30) 78 (37) 571 (563) 154 (54) 335 (121) 119 (190) 186 (122) 134 (173) 78 (128) 25 (65) 16) 181 (152) 322 (409) 78 (40) 180 (173)125 (38) 15 (25) 89 (90) 92 (1 1 (26) 469 (470) 362 (363) 289 (558) 84 (105) 1 572 (638) 536 (349) 593 (929)

1,881 (1,003) 16) Intersection #13 Intersection #14 Intersection #15 Intersection #16 Intersection #17 Intersection #18 180 (173)125 (38) 15 (25) Laurel St. & Ravenswood Ave. Middlefield Rd. & Ravenswood Ave. Middlefield Rd. & Ringwood Ave. Middlefield Rd. & Willow Rd. Gilbert Ave. & Willow Rd. Coleman Ave. & Willow Rd. 92 (1 1 (26) 469 (470) 362 (363) 289 (558) 84 (105) 1 572 (638) 536 (349) 593 (929)

1,881 (1,003) 84 (79) 13 (28) 807 (1,210) 532 (628) 410 (553) 3 (15) 2 (7) 18 (38) 316 (207) Intersection85 (167) #13 819 (1,169)Intersection #14 Intersection4 (5) #15 Intersection #16 Intersection #17 Intersection #18 53 (1) 108 (88) 439 (495) 491 (572) 37 (92) 553 (410) 151 (61) 138 (67) 206 (97) 4 (4) 180 (89) 33 (44) 464 (780) 698 (975) Laurel St. & Ravenswood453 (475)Ave. Middlefield Rd. & Ravenswood Ave. Middlefield Rd. & Ringwood Ave. Middlefield Rd. & Willow Rd. Gilbert Ave. & Willow Rd. Coleman Ave. & Willow Rd. 182 (141) 93 (105) 536 (446) 41 (26) 112 (43) 8 (3) 113 (151) 518 (522) 250 (352) 49 (9) 85 (128) 7 (5) 68 (34) 187 (265) 952 (719) 458 (423) 44 (29) 122 (89) 69 (33) 16 (15) 92 (2) 8 (4) 84 (79) 13 (28) 807 (1,210) 1) 2 (7) 532 (628) 5 (8) 410 (553) 3 (15) 18 (38) 4 (5) 316 (207) 85 (167) 819 (1,169) 4 (5) 0 (0) 28 (16) 439 (495) 37 (92) 9 (52) 53 (1) 108 (88) 491 (572) 553 (410) 59 (85) 151 (61) 138 (67) 206 (97) 4 (4) 13 (232) 180 (89) 25 (15) 33 (44) 453 (475) 4 (77) 464 (780) 698 (975) 1 10 (85) 182 (141) 1 747 (71 3 (52) 93 (105) 536 (446) 41 (26) 12 (43) 8 (3) 232 (222) 1 250 (352) 124 (158) 13 (151) 518 (522) 85 (128) 132 (189) 1,187 (1,213) 1,341 (1,263) 49 (9) 122 (89) 7 (5) 68 (34) 187 (265) Intersection #23 952 (719) 458 (423) 44 (29) 69 (33) Intersection #19 Intersection #20 Intersection #21 Intersection #22 Intersection #24 Sand Hill Circle & Sand Hill Rd. Durham St. & Willow Rd. Bay Rd. & Marsh Rd. Bohannon Dr./ Florence St. Scott Dr./Rolison at Marsh Rd. El Camino Real & Encinal Ave. 16 (15) 8 (4) & Marsh Rd. I-280 NB Off-Ramp & Sand Hill Rd. 92 (2)

1) 5 (8) 4 (5) 0 (0) 28 (16) 9 (52) 59 (85) 5313 (232) (7) 25 (15) 1) 51 (244) 59 (100) 7981 (2,484) 10 (85)4 (77) 747 (71 3 (52) 232 (222) 124 (158) 1,187 (1,213) 1,341 (1,263) 103 (37) 12 (24) 132 (189) 871 (1,229) 324 (354) 31 (69) 1,583 (1,494) Intersection #23 413 (63) 14 (244) Intersection #21 41 (43) 451 (41 Intersection #19 Intersection #20 3 (4) Intersection #22 Intersection #24 1,021 (1,303) 1,215 (1,221) 107 (108) 1 373 (162) 129 (134) Sand Hill Circle & Sand Hill Rd. 18 (102) 25 (34) Durham St. & Willow 63Rd. (491) Bay Rd. & Marsh Rd. Bohannon Dr./ Florence St. Scott Dr./Rolison at Marsh Rd. El Camino Real & Encinal Ave. 59 (83) 20 (2) 954& Marsh (1,896) Rd. I-280 NB Off-Ramp & Sand Hill Rd.

6 (10) 16) 67 (38) 189 (162) 16 (66) 246 (293) 12 (32) 5 (1) 13 (21) 155 (82) 91 (72) 1 16 (32) 2,033 (1,292) 7 (19) 1 (1 476 (482) 16 (12) (2) 5 65 (20) 1) 41 (125) 93 (183) 55 ( 1 4 (0) 47 (15) 3 (3) 58 (10) 189 (183) (53) 242 1) 53 (7)

7 (1 1) 51 (244) 59 (100) 5 (6) 3 (5) 1 (7) 52 (6) 798 (2,484) 37 (22) 18 (46) 1 12 (24) 103 (37) 134 (28) 12 (24) 83 (65) 871 (1,229) 324 (354) 122 (216) 31 (69) 1,808 (658) 1,583 (1,494) 14 (244) 1,513 (1,338) 240 (144) 413 (63) 41 (43) 3 (4) 1,702 (1,434) 451 (41 1,326 (860) 1,021 (1,303) 1,215 (1,221) 107 (108) 373 (162) 129 (134) 1,312 (1,009) 1 (22) 73 18 (102) 25 (34) 63 (491)

59 (83) 20 (2) (254) 549 954 (1,896)

6 (10) 16) 67 (38) 189 (162) 16 (66) 246 (293) 12 (32) 5 (1) 91 (72) 13 (21) 155 (82) Intersection #25 1 16 (32) 2,033 (1,292) Intersection #26 Intersection #27 7 (19) Intersection #28 Intersection #29 1 (1 Intersection476 (482) #30 16 (12) (2) 5 El Camino Real & 65 (20) 1) 41 (125) El Camino Real & Oak Grove Ave. El Camino Real & Santa Cruz Ave. El Camino Real & Ravenswood Ave. El Camino Real & Roble Ave. 93 (183)El Camino Real & Middle Ave. 55 ( 1 Valparaiso Ave./Glenwood Ave. 4 (0) 47 (15) 3 (3) 58 (10) 189 (183) (53) 242

1)

10 (41) 78 (137) 28 (15) 63 (131) 49 (155) 0 (30) 7 (1 51 (66) 13 (231) 235 (305) 5 (6) LEGEND 189 (186) 144 (253) 495 (489) 2 (51) 3 (5) 1 (7) 52 (6) 60 (55) 75 (159) 1 102 (80) 37 (22) 1,102 (2,104) 32 (58) 81 (99) 416 (669) 2,025 (1,672) 15 (32) 18 (46) 1 1,562 (1,391) 12 (24) 30 (80) 192 (383) Study Intersection 774 (1,706) 1,546 (1,345) 790 (1,406) 1,241 (2,056) 1,81 134 (28) 126 (87) 888 (1,698)0 (0) 0 (0) 203 (224) 87 (1 42 (97) 1 (1,532) 1,349 (1,100)83 (65) 102 (121) 832 (1,797) 104 (127) 1,462 (1,182) 25 (60) 83 (65) 1,808 (658) 14) 83 (107) 122 (216) XX AM Peak Hour Volumes 56 (85) 1,513 (1,338) 240 (144) 662 (316) 82 (1 39 (172) 1,702 (1,434) 14) 1,326 (860)

(XX) PM Peak Hour Volumes 1,312 (1,009) (22) 73 549 (254) 549 Traffic Signal 1 (9) 18) 55 (58)

105 (92) 61 (79) 79 (163) 66 (39) 196 (266) 54 (90) 56 (36) 314 (395) 71 (1 339 (220) 174 (147)81 (143) 237 (218) 32 (61) Intersection369 (285) #25 Intersection #26 Intersection #27 Intersection #28 Intersection #29 Intersection #30 El Camino Real & El Camino Real & Oak Grove Ave. El Camino Real & Santa Cruz Ave. El Camino Real & Ravenswood Ave. El Camino Real & Roble Ave. El Camino Real & Middle Ave. Valparaiso Ave./Glenwood Ave. Source: TJKM Transportation Consultants.

10 (41) 78 (137) 28 (15) 63 (131) 49 (155) 0 (30) 51 (66) 13 (231) 235 (305) LEGEND 189 (186) 144 (253) 495 (489) 2 (51) 60 (55) 75 (159) 1 102 (80) 1,102 (2,104) 32 (58) 81 (99) 416 (669) 2,025 (1,672) 15 (32) 1,562 (1,391) 30 (80) 192 (383) Study Intersection 774 (1,706) 1,546 (1,345) 790 (1,406) 1,241 (2,056) 1,81 102 (121) 126 (87) 888 (1,698)0 (0) 0 (0) 203 (224) 87 (1 42 (97) 1 (1,532) 1,349 (1,100)83 (65) 832 (1,797) 104 (127) 1,462 (1,182) 14) 25 (60) XX AM Peak Hour Volumes 83 (107) 662 (316) 82 (1 56 (85) 39 (172) (XX) PM Peak Hour Volumes 14) Traffic Signal FIGURE 4.13-5A 1 (9) 18) 55 (58)

105 (92) 61 (79) 79 (163) 66 (39) 196 (266) 54 (90) 56 (36) 314 (395) 71 (1 339 (220) NEAR-TERM 2014 WITHOUT PLAN COMPONENTS174 (147)81 (143) PEAK HOUR237 (218) VOLUMES AND 32 (61) 369 (285) LANE CONFIGURATIONS CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

Intersection #31 Intersection #32 Intersection #33 Intersection #34 Intersection #35 Intersection #36 El Camino Real & Cambridge Ave. Bay Rd. & Willow Rd. Newbridge St. & Willow Rd. O'Brien Dr. & Willow Rd. Ivy Dr. & Willow Rd. Hamilton Ave. & Willow Rd.

) )

454 ) ) , 281 ) ) , (4 (1 (3 (2 (13 ) 1 ) 2 (180 16 (2,079) 3 7 (13) 507 (437) (0 251 0 , 541 (87 60 (77) 1 (37) 1,278 (2,492) 1 28 , 1,1 85 (63) 1 1 66 (19) 1,420 (2,306) 50 1,191 (2,362) 128 (310) 39 (63) 51 (49) 51 (61) 23 (50) 2,280 (1,773)23 (20) 504 (320) 172 (230) 8 (10) 10 (22) 1 250 (54) 381 (209) 35 (129) 1 (22) 271 (473) 146 (137) 442 (466) 121 (67) 16 (8)

) ) 18 (14) ) 19) 52 (75) ) 57 (37) ) (49

586 (142 679 , , (13 84 99 (1 (1 409 (388) (1

235 (171) 129 60 146 (381)

769 163 , 2,319 (1,802) 2,161 (1,892) 2,413 (1,939) , 1 2 Intersection #37 Intersection #38 Intersection #39 Intersection #40 Intersection #41 Intersection #42 Bayfront Exp. & Willow Rd. Bayfront Exp. & University Ave. O'Brien Dr. & University Ave. Bayfront Exp. & Chilco St. Bayfront Exp. & Chrysler Dr. Bayfront Exp. & Marsh Rd.

) ) 063 ) , ) ) ) (1 ) )

) 25 (4) (712 ) (376 (7 (263 (46 966 (667 , (20 (392 (12 2,926 (1,349)

3 2,932 (1,491) 1 47 (16)

563 474 1 1 3,218 (963) , , 32 45

66 1 1 1 42 51 427 (248) 72 (13) 408 (81) 683 (829) 2,713 (2,068)

1,724 (2,652) 0 (9) 424 (1,771) 17 (133) 553 (61) 388 (1 1647 (2,597) 65 (523) 28 (80) 35 (24) 151 (187) 281 (254) 943 (2,861) 12) 15)

8 (1 159 (449) 46 (53) 169 (662)

53 (14)

175 (165)

281 (182) 238 (444)

696 (95) 219 (286) 1,180 (4,355) 796 (1,788) 1,095 (140) 1,733 (2,176) 469 (1,485)

Intersection #43 Intersection #44 Intersection #45 Intersection #46 Intersection #47 Intersection #48 Valparaiso Ave. & University Dr. US 101 SB Ramps & Marsh Rd. US 101 NB Ramps & Marsh Rd. University Ave. & Bay Rd. Middlefield Rd. & Lytton Ave. Sand Hill Rd. & El Camino Real

) ) 19) 103 ) 235 135 ) ) (41 (456 363 , )

(50 (147 ) 72 1,535 (1,499) ) (1 (396 (84 (459 (9 (0 537 0 (0) (2 104 0 712 66 (42) 21 (80) , 1,321 (1,1 18 ) 159 0 (0) 599 (482) 1 ) 12 46 (59) ) 517 (1,120) 8 (11) 555 (1,217) 50 (28) 106 (50) 48 (93) 65 (61) 570 (556) 183 (149) 58 (24) 378 (200) 127 (102) 509 (452) 67 (180) 818 (606) 11 (19) 687 (762) 1,479 (990) 422 (203) 86 (1 412 (235) 459 (405) ) 103 (100) 413 (237) 1) ) 17 (515) 337 (0 1,1 , 16) 14) 107 (356) 0 (0) (2 164 (36) 59 (85) 547 41 (180) 604 (514) , 174 (356) 191 (1 1,410 (1,31 2 226 (608) 217 (241)

Intersection #52 Intersection #51 Intersection #49 Intersection #50 Santa Cruz Ave./ Santa Cruz Ave & Elder Ave. Sand Hill Rd. & Pasteur Dr. Campus Dr. & Junipero Serra Blvd. Alameda De Las Pulgas

361 (436)

1 (2) 5 (4) LEGEND 8 (2) 601 (1,270) 195 (50) 238 (90) 203 (525) 436 (755)

9 (7) 0 (0) Study Intersection

91 (213) 91 7 (14) 7 88 (308) (470) 50 236 (488) 15 (4) 6 (1) 158 (39) 702 (474) XX AM Peak Hour Volumes 35 (8) 130 (44) 12 (18) 8 (10) (XX) 566 (557) PM Peak Hour Volumes 79 (159) 407 (671) 3 7 (5) 2 (12) Traffic Signal 712 (249) 11 (0) 3 (0) 11 (8)

52 (41)

4 (30)

10 (45) 10 (10) 103 (33) 179 (65) 780 (693)

1,367 (1,005)

Source: TJKM Transportation Consultants.

FIGURE 4.13-5B

NEAR-TERM 2014 WITHOUT PLAN COMPONENTS PEAK HOUR VOLUMES AND LANE CONFIGURATIONS CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

b) Collector Streets Under Near-Term 2014 without Plan Components conditions more than a net total of 50 trips would be added to the following collector streets that are currently at 90 percent capacity with ADTs over 9,000 vehi- cles per day:

¨ University Drive from Menlo Avenue to Santa Cruz Avenue

¨ Oak Grove Avenue from University Drive to El Camino Real

¨ Oak Grove Avenue from El Camino Real to Laurel Street

c) Local Streets Under Near-Term 2014 without Plan Components conditions future trips more than a net total of 25 trips would be added to the following local streets that are currently at 90 percent capacity with ADTs over 1,350 vehicles per day:

¨ Linfield Drive from Middlefield Road to Laurel Street

¨ Oak Avenue from Sand Hill Road to Olive Street iii. Freeway Traffic Volumes The freeway segments would continue to operate the same as under the existing 2012 conditions as follows:

¨ US 101 currently operate at LOS F

¨ SR 84 segment between Marsh Road and Willow operates at LOS B

¨ SR 84 segment between Willow Road and University Avenue operates at LOS F

¨ I-280 segments operate at LOS E

All the study freeway segments would continue to meet the CMP level of service standards except for the SR 84 segment between Willow Road and University Avenue, which would remain at LOS F.

The Near-Term 2014 without Plan Components conditions for roadway and freeway segments are identi- fied and compared to Near-Term 2014 plus Plan Components conditions in Table 4.13-8 and 4.13-9, respec- tively. See Section F, Impacts Discussion, below.

4.13-40

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

b. 2035 Without Plan Components Conditions Figures 4.13-6a and 4.13-6b illustrates the peak hour turning movement volumes at the study intersections, as well as lane geometry and traffic controls under 2035 without Plan Components conditions. Anticipated traffic controls and lane geometries for the study intersections are also included in the figure. Detailed level of service calculations are contained in Appendix F of the Traffic Study (see Appendix F of this EA). i. Intersection Levels of Service Under 2035 without Plan Components conditions, 29 of the EA Study intersections are anticipated to oper- ate at unacceptable levels as described below:

¨ Addison Wesley and Sand Hill Road operates at LOS E during AM peak hour.

¨ Sharon Park Drive and Sand Hill Road operates at LOS E during PM peak hour.

¨ Alpine Road/Santa Cruz Avenue and Junipero Serra Boulevard operates at LOS F during AM peak hour and operates at LOS E during PM peak hour.

¨ Santa Cruz Avenue and Sand Hill Road operates at LOS E during both AM and PM peak hours.

¨ Middlefield Road and Marsh Road (Atherton) operates at LOS F during both AM and PM peak hours.

¨ Middlefield Road and Ravenswood Avenue operates at LOS E during PM peak hour.

¨ Middlefield Road and Willow Road operates at LOS F during both AM and PM peak hours.

¨ Gilbert Avenue and Willow Road operates at LOS E during PM peak hour.

¨ Coleman Avenue and Willow Road operates at LOS F during both AM and PM peak hour.

¨ Durham Street and Willow Road operates at LOS E during PM peak hour.

¨ Bay Road and Marsh Road operates at LOS E during AM peak hour.

¨ Bohannon Drive/Florence Street and Marsh Road operates at LOS E during AM peak hour and oper- ates at LOS F during PM peak hour.

¨ Scott Drive/Rolison Road and Marsh Road operates at LOS E during AM peak hour and LOS F during PM peak hour.

¨ Sand Hill Circle and Sand Hill Road (Caltrans) operates at LOS F during PM peak hour.

¨ El Camino Real and Valparaiso Avenue/Glenwood Avenue (Caltrans) operates at LOS E during PM peak hour.

4.13-41

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

Intersection #5 Intersection #1 IntersectionIntersection #5 #2 Intersection #3 Intersection #4 Intersection #6 Intersection #1 Intersection #2 Intersection #3 Intersection #4 Intersection #6 Alpine Rd./Santa Cruz Ave. Alpine Rd./Santa Cruz Ave. Addison Wesley & Sand Hill Rd. Saga Ln. & Sand Hill Rd. Branner Dr. & Sand Hill Rd. AddisonSharon Park Wesley Dr. & &Sand Sand Hill Rd.Hill Rd. Saga Ln. & Sand Hill Rd.Santa Cruz Ave. &Branner Sand Hill DRd.r. & Sand Hill Rd. Sharon Park Dr. & Sand Hill Rd. Santa Cruz Ave. & Sand Hill Rd. & Junipero Serra Blvd. & Junipero Serra Blvd.

262 (165) 262 (165) 332 (269) 862 (704) 405 (370) 49 (307) 862 (704) 17 (53) 4 (16) 332 (269) 49 (307) 21 (27) 249 (289) 405 (370) 58 (13) 69 (18) 71017 (53) (1,616)4 (16) 4 (7) 21 (27) 1,258 (2,317) 236 (344)58 (13) 69 (18) 382 (536) 249 (289) 710 (1,616) 1,193 (2,598) 1,036 (2,209) 4 (7)

4 (0) 1,066 (1,973) 236 (344)

6 (138) 1 (3) 9 (62)

4 (68) 4 1,258 (2,317) 3 (0) 3 697 (1,032)

13 (125) 13 31 (45) 382 (536) 136 (90) 171 (46) 1,193 (2,598) 902 (519) 1,036 (2,209)

42 (13) 4 (0) 1,066 (1,973) 6 (138) 1 (3) 9 (62)

4 (68) 4

3 (0) 3 697 (1,032) 13 (125) 13 31 (45) 136 (90) 360 (629) 171 (46) 902 (519) 110 (634) 42 (13) 524(283) 360 (629) 781 (875) 187 (241) 110 (634) 47 (36) 168 (7) 8 (3) 1 (23) 524(283) 327 (87) 13 (1 3 (6) 2,745 (1,235) 0 (32) 781 (875) 2,225 (1,217) 58 (23) 187 (241) 1) 47 (36) 284 (119) 168 (7) 8 (3) 1 (23) 220 (21) 1) 327 (87) 13 (1 3 (6) 6 (2) 2,229 (1,503)12 (7) 2,745 (1,235)223 (21 416 (504) 0 (32)

2,225 (1,217) 58 (23) 35 (203) 35

17 (181) 17 1,588 (822)

30 (183) 44 (102) 1) 2842,029 (1 19)(1,255)29 (3) 363 (266) 220 (21) 1) 6 (2) 416 (504) 892 (136) 2,229 (1,503)12 (7) 223 (21

1,121 (785) 35 (203) 35

17 (181) 17 1,588 (822) Intersection #7 Intersection #8 Intersection #9 Intersection #10 30 (183) 44 (102) Intersection #11 Intersection #12 2,029 (1,255)29 (3) 363 (266) Oak Ave. & Sand Hill Rd. Middlefield Rd. & Marsh Rd. Encinal Ave & Middlefield Rd. Middlefield Rd. & Oak Grove Ave. University Dr. (S) & Santa Cruz Ave. Laurel St. & Oak Grove Ave. 892 (136)

1,121 (785) Intersection #7 Intersection #8 Intersection #9 Intersection #10 Intersection #11 Intersection #12 Oak Ave. & Sand Hill Rd. Middlefield Rd. & Marsh Rd. Encinal Ave & Middlefield Rd. Middlefield Rd. & Oak Grove Ave. University Dr. (S) & Santa Cruz Ave. Laurel St. & Oak Grove Ave. 944 (81 207 (52) 177 (193) 71 (51) 754 586) 503 (696) 535 (336) 663 (387) 320 (223) 50 (120) 1,017 (589) 166 (63) 297 (77) 38 (42) 918 (2,331) 132 (161) 367 (984) 1) 729 (1,184) 27 (10) 18 (46) 788 (752) 133 (37) 147 (234) 96 (45) 191 (66) 166 (213) 242 (197) 109 (200) 412 (149) 31 (81) 223 (187) 410 (518) 161 (93) 944 (81 207 (52) 114 (107) 177 (193) 71 (51) 754 586) 503 (696) 535 (336) 663 (387) 320 (223) 50 (120) 1,017 (589) 297 (77) 166 (63) 132 (161) 38 (42) 918 (2,331) 367 (984) 1) 27 (10) 18 (46) 729 (1,184) 147 (234) 96 (45) 788 (752) 191 (66) 133 (37) 234 (341)155 (48) 242 (197) 47 (95) 166 (213) 586 (636) 109 (200) 412 (149) 31 (81) 13 (143) 223 (187) 660 (456) 451 (443) 410 (518) 354 (662) 99 (125) 13 (31) 1 161 (93) 716 (868) 114 (107) 2,429 (1,343) 724 (1,123) Intersection #13 Intersection #14 Intersection #15 Intersection #16 Intersection #17 Intersection #18 Laurel St. & Ravenswood Ave. Middlefield Rd. & Ravenswood Ave. Middlefield Rd. & Ringwood Ave. Middlefield Rd. & Willow Rd. Gilbert Ave. & Willow Rd. Coleman Ave. & Willow Rd.

234 (341)155 (48) 47 (95) 586 (636) 13 (143) 660 (456) 451 (443) 354 (662) 99 (125) 13 (31) 1 716 (868) 16 (35) 642 (758) 794 (876) 4 (19) 103 (97) 22 (47) 181 (167) 1,195 (1,617) 385 (254) 1,210 (1,573) 65 (1) 538 (597) 574 (700) 3 (9) 5 (7) 133 (109) 46 (109) 724 (1,123) 222 (1 672 (499) 561 (934) 187 (75) 2,429 (1,343)557 (586) 5 (5) 40 (54) 1,001 (1,278) 162 (82) 224 (174)10) 139 (187) 114 (131) 782 (746) 694 (446)Intersection #13105 (163) 50 (32) Intersection #14 254 (1 Intersection9 (4) #15 Intersection #16 Intersection #17 Intersection #18 1,208308 (1,019) (435) 61 (10) 138 (55) 18) 84 (41) 302 (41 564Laurel (423) St. & Ravenswood Ave. 54 (37)Middlefield Rd.156 & Ravenswood(126) 8 A(7)ve. Middlefield Rd. & Ringwood Ave. Middlefield Rd. & Willow Rd. Gilbert Ave. & Willow Rd. Coleman Ave. & Willow Rd. 1) 20 (15) 9 (5) 86 (41) 113 (3)

7 (9) 15) 5 (7) 0 (0) 35 (20)

12 (64) 16 (35) 30 (18) 6 (94) 81 (1 642 (758) 103 (97) 138 (285) 794 (876) 4 (19) 4 (64) 22 (47) 181 (167) 1,195 (1,617) 189 (268) 12 (105) 385 (254) 1,210 (1,573) 316 (346) 1,667 (1,746) 538 (597) 574 (700) 3 (9) 5 (7) 963 (1,014) 1,484 (1,689) 65 (1) 46 (109) 172 (237) 672 (499) 187 (75) 133 (109) Intersection #21 222 (1 40 (54) Intersection #23 561 (934) 557 (586) 162 (82) 5 (5) Intersection #19 Intersection #20 Intersection #22 Intersection #24 1,001 (1,278) 254 (1 Bohannon Dr./ Florence St. 224 (174)10) 139 (187) Sand114 Hill (131) Circle & Sand Hill Rd. 782 (746) 694 (446) 105 (163) 50 (32) 9 (4) Durham St. & Willow Rd. Bay Rd. & Marsh Rd. Scott Dr./Rolison at Marsh Rd. El Camino1,208 Real308 (1,019)& Encinal (435) Ave. 61 (10) 138 (55) 18) & Marsh Rd. 84 (41) 302 (41 I-280 NB Off-Ramp & Sand Hill Rd. 564 (423) 54 (37) 156 (126) 8 (7) 1) 20 (15) 9 (5) 86 (41) 113 (3)

65 (9) 7 (9) 62 (300) 72 (123) 15) 5 (7) 1,006 (3,123)0 (0) 35 (20) 12 (64) 49 (97) 30 (18) 324 (354) 81 (1 127 (45) 6 (94) 1,274 (1,639) 2,030 (1,862) 138 (285) 413 (63) 209 (326) 4 (64) 39 (86) 51 (53) 189 (268) 581 (534) 4 (5) 12 (105) 1,667 (1,746) 1,337 (1,607) 1,649 (1,588) 963 (1,014) 133 (138) 316 (346) 146 (126) 460 (200) 159 (165) 172 (237) 1,484 (1,689) 32 (44) 63 (491) 1,243 (2,423) Intersection #23 72 (102) Intersection #196 (10) Intersection #20 Intersection #21 Intersection #24 24 (3) 233 (200) 25 (107) 246 (293) 14 (40) Intersection #22 7 (1) 83 (47) 113 (89) 13 (21) 191 (102) Bohannon Dr./ Florence St. Sand Hill Circle & Sand Hill Rd. 8 (23) 13 (13) 25 51) Durham St. & Willow Rd. Bay Rd. & Marsh Rd.2,548 (1,680) Scott Dr./Rolison at Marsh Rd. El Camino Real & Encinal Ave. 80 (25) 665 (694) 61 (202) 16 (12) (2) 6 & Marsh Rd. I-280 NB Off-Ramp & Sand Hill Rd. 110 (254) 68 (143) 5 (0) 66 (21) 3 (3) 72 (12) 264 (264) (65) 299

1 (7) 9 (13) 45 (27) 4 (7) 64 (8) 22 (46) 1 7 (8) 15 (30) 65 (9) 1 (92) 165 (34) 62 (300) 72 (123) 1,006 (3,123) 162 (303) 11 2,276 (878) 1,879 (1,836) 290 (173) 2,024 (1,842) 49 (97)

1,545 (1,317) (28) 91 1,686 (1,292) 127 (45) 324 (354) 1,274 (1,639) 2,030 (1,862) 39 (86) 413 (63) 209 (326) 51 (53) (393) 742 581 (534) 4 (5) 1,337 (1,607) 1,649 (1,588) 133 (138) 146 (126) 460 (200) 159 (165) 32 (44) 63 (491) Intersection #25 1,243 (2,423) Intersection #26 Intersection #27 72 (102) Intersection #28 Intersection #29 Intersection #30 6 (10) El Camino Real & 24 (3) 233 (200) 25 (107) 246 (293) 14 (40) El Camino Real & Oak Grove Ave. El Camino Real & Santa Cruz Ave. 7 El(1) Camino Real & Ravenswood83 A(47)ve. El1 13Camino (89) Real & Roble Ave. El Camino Real & Middle Ave. 13 (21) 191 (102) Valparaiso Ave./Glenwood Ave. 8 (23) 13 (13) 25 51) 2,548 (1,680) 80 (25) 665 (694) 61 (202) 16 (12) (2) 6

110 (254) 68 (143) 5 (0) 66 (21) 3 (3) 72 (12) 10 (41) (65) 299 LEGEND 100 (174) 264 (264) 32 (23) 78 (162) 40 (79) 0 (29) 70 (44) 324 (418) 231 (231) 179 (317) 828 (765) 2 (50) 73 (67) 92 (197) 98 (141) 88 (148) 39 (65) 101 (123) 582 (1,029) 15 (31) Study Intersection 1,1 2,847 (2,351)37 (98) 1,469 (2,935) 981 (2,163) 1,940 (1,624) 15 (2,144) 1,023 (1,843) 1,687 (2,895) 2,567 (2,133) 1,995 (1,710) 0 (0) 249 (552) 1 (7) 9 (13) 107 (84) 125 (142) 163 (1 124 (157) 0 (0) 264 (280) 45 (27) 145 (182) 4 (7) 64 (8) AM Peak Hour Volumes 1,706 (1,407) 1,916 (1,533) 52 (1 22 (46) 1 XX 1,031 (2,220)14) 31 (72) 108 (142) 7 (8) 133 (215) 15 (30) 19) 838 (437) 1 (92) 165 (34) (XX) PM Peak Hour Volumes 112 (185) 48 (194) 162 (303) 11 2,276 (878) Traffic Signal 1,879 (1,836) 290 (173) 2,024 (1,842)

1 (8) 1,545 (1,317) (28) 91 68 (72) 1,686 (1,292)

93 (197) 250 (336) 50 (82) 82 (48) (393) 742 429 (545) 175 (140) 455 (300) 97 (171) 69 (104) 460 (393) 213 (183) 295 (271) 141 (285) 94 (218) 101 (196) Intersection #25 Intersection #26 Intersection #27 Intersection #28 Intersection #29 Intersection #30 El Camino Real & El Camino Real & Oak Grove Ave. El Camino Real & Santa Cruz Ave. El Camino Real & Ravenswood Ave. El Camino Real & Roble Ave. El Camino Real & Middle Ave. Source: TJKM Transportation Consultants. Valparaiso Ave./Glenwood Ave.

10 (41) LEGEND 100 (174) 32 (23) 78 (162) 40 (79) 0 (29) 70 (44) 324 (418) 231 (231) 179 (317) 828 (765) 2 (50) 73 (67) 92 (197) 98 (141) 88 (148) 39 (65) 101 (123) 582 (1,029) 15 (31) Study Intersection 1,1 2,847 (2,351)37 (98) 1,469 (2,935) 981 (2,163) 1,940 (1,624) 15 (2,144) 1,023 (1,843) 1,687 (2,895) 2,567 (2,133) 107 (84) 125 (142) 1,995 (1,710)0 (0) 0 (0) 264 (280) 145 (182) 249 (552) 1,706 (1,407) 163 (1 124 (157) 1,916 (1,533) 52 (1 XX AM Peak Hour Volumes 1,031 (2,220)14) 31 (72) 108 (142) 133 (215) 19) 838 (437) (XX) PM Peak Hour Volumes 112 (185) 48 (194) Traffic Signal FIGURE 4.13-6A

1 (8) 68 (72)

93 (197) 82 (48) 250 (336) 2035 WITHOUT PLAN COMPONENTS429 (545) PEAK HOUR175 (140) VOLUMES AND50 (82) 455 (300) 97 (171) 69 (104) 460 (393) 213 (183) 295 (271) 141 (285) LANE CONFIGURATIONS 94 (218) 101 (196) CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

Intersection #31 Intersection #32 Intersection #33 Intersection #34 Intersection #35 Intersection #36 El Camino Real & Cambridge Ave. Bay Rd. & Willow Rd. Newbridge St. & Willow Rd. O'Brien Dr. & Willow Rd. Ivy Dr. & Willow Rd. Hamilton Ave. & Willow Rd.

) )

) ) 916 , 340 ) , ) (71 ) (1 ) 634 , (2 ) (4 (25 ) (2 ) 51 (94 1 620 (535) (0 3 1 742 (184 (23 20 (24) 0 , 451 74 , 104 (78) 1 (108 1 976 1,759 (3,358) 30 , 13 (35) 81 1 1,823 (2,625) 29 (61) 157 (382) 61

47 (78) 1,535 (2,693) 2,955 106(2,327) (81) 62 (61) 62 (75) 10 (12) 608 (387) 212 (282) 43 (159) 13 (27) 259 (62) 469 (258) 12 (26) 179 (166) 324 (654) 149 (82) 538 (618) 20 (10)

) 64 (93) ) 22 (17) 71 (45) (61

142 ,

(2 103 74 (16) 492 (475) 157 (175) 120 (144)

180 (469) 289 (210) 195 , 2 2,595 (2,287) 2,350 (2,137) 2,671 (2,457)

2,367 (2,396) Intersection #37 Intersection #38 Intersection #39 Intersection #40 Intersection #41 Intersection #42 Bayfront Exp. & Willow Rd. Bayfront Exp. & University Ave. O'Brien Dr. & University Ave. Bayfront Exp. & Chilco St. Bayfront Exp. & Chrysler Dr. Bayfront Exp. & Marsh Rd.

) ) 385 ) , ) ) ) )

(1 ) ) (845 )

25 (4) (466 (8 (57 (280 890 (24 (709 , (14 (408 ,572) 99 (1 ,5 3 58 (20) 3,616 (1,748) 4 941 825 3,903 (1,160) , , 13 36 56

72 13 1 1 63 46 503 (100) 513 (269) 78 (15) 3,342 (2,446) 939 (1,011) 1,983 (3,266) 0 (11) 574 (63) 528 (2,197) 21 (163) 80 (645) 434 (134) 34 (99) 1,881 (3,187) 43 (29) 346 (2314) 1,149 (3,527) 186 (230) 178 (492) 9 (132) 57 (65)

65 (18)

346 (225) 250 (583) 202 (803) 215 (203)

737 (106) 1 (1,929)

1,144 (150) 61

265 (317) 943 (2,214) 1,474 (5,427) 1,990 (2,679)

Intersection #43 Intersection #44 Intersection #45 Intersection #46 Intersection #47 Intersection #48 Valparaiso Ave. & University Dr. US 101 SB Ramps & Marsh Rd. US 101 NB Ramps & Marsh Rd. University Ave. & Bay Rd. Middlefield Rd. & Lytton Ave. Sand Hill Rd. & El Camino Real

) 127 ) ) 299 ) 166 ) ) (51 635 0 (0) (589 , (181 (104 )

(457 (12 (80 1,792 (1,836) ) (1 (566 0 (0) 89 (3 26 (99) (0 674 0 125 22 142 , 1,630 (1,300) ) 82 (51) 196 ) 15 801 (639) 2 ) 718 (1,574) 56 (72) 637 (1,380) 9 (14) 62 (35) 131 (62) 670 (687) 225 (184) 59 (1 101 (97) 156 (126) 71 (29) 15) 445 (245) 13 (23) 83 (222) 1,021 (762) 850 (929) 520 (250) 627 (557) 106 (142) 268 (297) 127 (123) 468 (300) 432 (961) ) 496 (284) 1,376 (635) 1,861 (1,273) ,871 0 (0) 122 (509) (2 674 (592)

203 (44) 50 (222) 73 (105) 927 ) 214 (439) 1,663 (1,680) , 770 (671) 2 (0 235 (140) 0

Intersection #52 Intersection #51 Intersection #49 Intersection #50 Santa Cruz Ave./ Santa Cruz Ave & Elder Ave. Sand Hill Rd. & Pasteur Dr. Campus Dr. & Junipero Serra Blvd. Alameda De Las Pulgas

491 (597) LEGEND 1 (3) 6 (5) 9 (3) 754 (1,615) 305 (123) 229 (62)

261 (667) 602 (981) Study Intersection

125 (281) 125 9 (17) 9 62 (580) 62 0 (0) 11 (8) XX AM Peak Hour Volumes 108 (380) 291 (602) 869 (588) 19 (5) 8 (1) 183 (48) 43 (9) 154 (55) 10 (12) (XX) PM Peak Hour Volumes 15 (22) 716 (756) 467 (196) 510 (842) Traffic Signal 878 (307) 9 (9) 3 (15) 14 (0) 4 (0) 14 (9)

64 (50) 5 (37)

13 (55)

13 (13) 121 (41) 220 (79) 976 (930)

1,797 (1,347)

Source: TJKM Transportation Consultants.

FIGURE 4.13-6B

2035 WITHOUT PLAN COMPONENTS PEAK HOUR VOLUMES AND LANE CONFIGURATIONS CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ El Camino Real and Ravenswood Avenue/Menlo Avenue (Caltrans) operates at LOS F during both AM and PM peak hours.

¨ El Camino Real and Middle Avenue (Caltrans) operates at LOS F during PM peak hour.

¨ Bay Road and Willow Road (Caltrans) operates at LOS E during AM peak hour.

¨ Newbridge Street and Willow Road (Caltrans) operates at LOS F during both AM and PM peak hours.

¨ Hamilton Avenue and Willow Road (Caltrans) operates at LOS E during AM peak hour.

¨ Bayfront Expressway and Willow Road (Caltrans) operates at LOS F during both AM and PM peak hours.

¨ Bayfront Expressway and University Avenue (Caltrans) operates at LOS F during both AM and PM peak hours.

¨ Bayfront Expressway and Chilco Street (Caltrans) operates at LOS F during PM peak hour.

¨ Bayfront Expressway and Chrysler Drive (Caltrans) operates at LOS F during PM peak hour.

¨ Bayfront Expressway and Marsh Road (Caltrans) operates at LOS F during both AM and PM peak hour.

¨ US 101 SB Ramps and Marsh Road (Caltrans) operates at LOS F during AM peak hour and LOS E dur- ing PM peak hour. ¨ US 101 NB Ramps and Marsh Road (Caltrans) operates at LOS F during AM peak hour and LOS E during PM peak hour.

¨ University Avenue and Bay Road (Caltrans) operates at LOS E during both AM and PM peak hours.

¨ Middlefield Road and Lytton Avenue (Palo Alto) operates at LOS E during both AM and PM peak hours.

The 2035 without Plan Components for the study intersections are identified and compared to 2035 plus Plan Components Table 4.13-10. See Section F, Impacts Discussion, below.

4.13-44

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

ii. Roadway Traffic Volumes a) Arterial Streets The following arterial segments (primary and minor) exceed 90 percent capacity with ADTs over 18,000 vehicles per day and under 2035 without Plan Components conditions more than 100 trips would be added to each of these segments; therefor, City’s threshold of significance for arterial streets would be exceeded.

¨ Marsh Road from Bohannon Drive/Florence Street to Scott Drive (primary arterial)

¨ Marsh Road from Bay Road to Bohannon Drive/Florence Street

¨ Willow Road from Middlefield Road to Gilbert Avenue

¨ Willow Road from Gilbert Avenue to Coleman Avenue

¨ Willow Road from Coleman Avenue to Durham Street/Hospital Avenue

¨ Willow Road from Durham Street/Hospital Ave to Bay Road

¨ Middlefield Road from Ravenswood Avenue to Willow Road

¨ Ravenswood Avenue from El Camino Real to Alma Street

¨ Ravenswood Avenue from Alma Street to Laurel Street

¨ Ravenswood Avenue from Laurel Street to Middlefield Road

¨ Alpine Road/Santa Cruz Avenue from Junipero Serra Boulevard to City Limits

¨ Alpine Road/Santa Cruz Avenue from Sand Hill Road to Serra Boulevard

Future trips would exceed the City’s threshold by adding more than 12.5 percent additional trips or result- ing in an ADT that would exceed 18,000 vehicles per day for the minor arterial segments which exceed 50 percent capacity with ADTs over 10,000 vehicles per day at the following segments:

¨ Valparaiso Ave/Glenwood Ave from University Drive to El Camino Real

¨ Santa Cruz Ave from Avy Avenue/Orange Ave to Olive Street

¨ Santa Cruz Ave from Olive Street to University Drive

b) Collector Streets More than a net total of 50 trips would be added to the following collector streets that are currently at 90 percent capacity with ADTs over 9,000 vehicles per day:

4.13-45

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ University Drive from Menlo Avenue to Santa Cruz Avenue

¨ Oak Grove Avenue from University Drive to El Camino Real

¨ Oak Grove Avenue from El Camino Real to Laurel Street

Future trips would exceed the City’s threshold by adding more than 12.5 percent additional trips or result- ing in an ADT that would exceed 9,000 vehicles per day for the collector streets which exceed 50 percent capacity with ADTs over 5,000 vehicles per day.

¨ Haven Avenue from City Limits to Bayfront Expressway/Marsh Road

¨ University Drive from Middle Avenue to Menlo Avenue

¨ Valparaiso Ave/Glenwood Ave from El Camino Real to Laurel Street

¨ Oak Grove Avenue from Laurel Street to Middlefield Road

¨ Middle Avenue from Olive Street to University Drive

¨ Middle Avenue from University Drive to El Camino Real

Future trips would exceed the City’s threshold by adding more than 25 percent additional trips for the col- lector streets with ADTs of less than 5,000 vehicles per day at the following collector street segments:

¨ Hamilton Avenue from Chilco Street to Willow Road

¨ Willow Road from Laurel Street to Middlefield Rd

¨ Laurel Street from Glenwood Avenue to Oak Grove Avenue

¨ Laurel Street from Oak Grove Avenue to Ravenswood Avenue

¨ Laurel Street from Ravenswood Avenue to Willow Road

c) Local Streets Future trips more than a net total of 25 trips would be added to the following local streets that are currently at 90 percent capacity with ADTs over 1,350 vehicles per day:

¨ Linfield Drive from Middlefield Road to Laurel Street

¨ Oak Avenue from Sand Hill Road to Olive Street

4.13-46

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

iii. Freeway Traffic Volumes The freeway segments would continue to operate the same as under the existing 2012 and Near-Term 2014 conditions as follows:

¨ US 101 currently operate at LOS F

¨ SR 84 segment between Marsh Road and Willow operates at LOS B

¨ SR 84 segment between Willow Road and University Avenue operates at LOS F

¨ I-280 segments operate at LOS E

All the study freeway segments would continue to meet the CMP level of service standards except for the SR 84 segment between Willow Road and University Avenue, which would remain at LOS F.

The 2035 without Plan Components conditions for roadway and freeway segments are identified and com- pared to 2035 plus Plan Components conditions in Table 4.13-11 and 4.13-12, respectively. See Section F, Impacts Discussion, below.

3. Project Trip Generation, Distribution and Assignment a. Plan Components Trip Generation Table 4.13-5 summarizes the potential future residential development under the Plan Components. Also shown in Table 4.13-5, the traffic generated from the Plan Components was calculated based on ITE Trip Generation rates. b. Plan Components Trip Distribution and Assignment Trip distribution is a process that determines in what proportion vehicles would travel between a particular site and various destinations outside a study area. The process of trip assignment determines the various routes that vehicles would take from a site to each destination using the calculated trip distribution.

The City of Menlo Park has developed the origins and destinations of Menlo Park residential trips for four subareas within the City, based on the reported household travel diary and interview survey conducted in 1999. Table 4.13-6 shows the percentages of trips for each neighborhood for residential, employment and commercial trips. For the Plan Components, traffic generated by the housing planned for under the Plan Components was assigned to the roadway network based on different distribution patterns depending on the analysis subarea.

4.13-47

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-5 TRIP GENERATION ESTIMATES

AM PM Net Peak Hour Peak Hour Potential Daily No. Site Name Dwelling Tripsa In Out Total In Out Total I-280 and Sand Hill Road (Banana 1 52 346 5 21 27 21 11 32 Site) 2 Hewlett Foundation 98 652 10 40 50 39 21 61

3 Corpus Christi 30 200 3 12 15 12 7 19

4 401-445 Burgess Drive 16 106 2 7 8 6 3 10

5 8 Homewood Place 25 166 3 10 13 10 5 16

6 St. Patrick's Seminary 25 166 3 10 13 10 5 16

7 125-135 Willow Road 10 67 1 4 5 4 2 6

8 555 Willow Road 8 53 1 3 4 3 2 5

9 Veterans Affairs Clinic 60 399 6 24 31 24 13 37

10 MidPen's Gateway Apts 42 279 4 17 21 17 9 26

11 MidPen's Gateway Apts 36 239 4 15 18 15 8 22

12 Hamilton Avenue East 216 1,436 22 88 110 87 47 134

13 Main Post Office 76 502 8 31 39 30 16 47

14 Haven Avenue 464 3,086 47 189 237 187 101 288

Downtown Infill Units 118 785 12 48 60 48 26 73

Second Unitsb 40 266 4 16 20 16 9 25

Total 1,316 8,748 134 537 671 530 285 816 a ITE Land Use Code 220 (Apartment) is used for all project sites v Second Units have been distributed throughout the City. Source: Institute of Transportation Engineers (ITE), Trip Generation, 8th Edition, 2008. TJKM Transportation Consultants, March 2013.

4.13-48

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-6 TRIP DISTRIBUTION PATTERN

Residential Employment Commercial w/o e/o w/o e/o w/o e/o Gateway SH WM 101 101 SH WM 101 101 SH WM 101 101

1. I-280 North 10% 5% 2% - 20% 12% 4% - 13% 7% 2% -

2. I-280 South 18 9 - - 33 16 - - 6 3 - -

3. Sand Hill West 1 1 1 1 1 1 1 1 1 1 1 1

4. SR 84 East 2 2 2 2 20 20 20 20 1 1 1 1

5. US 101 South - 9 18 26 - 17 33 37 - 3 6 13

6. US 101 North - 2 5 7 - 4 12 10 - 2 7 7

7. Alameda North 13 6 2 - 7 4 - - 6 4 - -

8. El Camino North - 10 5 4 - 7 5 3 - 6 5 2

9. Alpine South ------

10. Junipero South 8 5 - - 4 3 - - 7 4 - -

11. Sand Hill East 14 3 - - 7 1 - - 15 3 - -

12. Middlefield South - - 19 12 - - 10 5 - - 19 10

14. El Camino South 1 14 3 1 - 7 1 1 - 15 3 1

15. Middlefield North - - 9 13 - - 6 14 - - 5 10

16. Local Sharon Hts 10 5 2 - 2 1 - - 15 8 3 -

17. Local Downtown 20 26 25 5 5 6 6 1 31 38 38 8

18. Local Willows 3 3 7 3 1 1 2 1 5 5 10 5

19. Local Belle Haven - - - 26 - - - 7 - - - 42

Total 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Notes: SH = Sharon Heights Local (Sharon Park Drive/Shopping Center Area) WM = West Menlo/Downtown Local (Downtown area bounded by University Drive, El Camino Real, Menlo Avenue, Roble Avenue) w/o 101 = West of US 101 Local (Willows area east of Willow Road near Gilbert Avenue) e/o 101 = East of US 101 Local (Belle Haven area near Newbridge Street and Chilco Street) Source: Adoption of City of Menlo Park Circulation System Assessment Update, 2004.

4.13-49

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

E. Standards of Significance

The City of Menlo Park, the City of Palo Alto, the Town of Atherton, the County of San Mateo, and the County of Santa Clara each has traffic impact guidelines and standards of significance that apply to the EA Study Area. The standard of significance criteria from these agencies was previously described in Section C.3 and C.6 above. The transportation items of the CEQA checklist are addressed through these local, re- gional, and state guidelines. Therefore, the Plan Components would have a significant impact with regard to transportation and traffic if they would:

1. Conflict with an applicable plan, ordinance, or policy establishing measures of effectiveness for the per- formance of the circulation system, taking into account all modes of transportation including mass transit and non-motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit.

2. Conflict with an applicable congestion management program, including but not limited to level of ser- vice standards and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways.

3. Result in a change in air traffic patterns, including either an increase in traffic levels or a change in loca- tion that results in substantial safety risks.

4. Substantially increase hazards due to a design feature (e.g. sharp curves or dangerous intersections) or incompatible uses (e.g. farm equipment).

5. Result in inadequate emergency access.

6. Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facili- ties, or otherwise decrease the performance or safety of such facilities.

F. Impact Discussion

This section presents the potentially significant impacts as a result of implementation of the Plan Compo- nents, and the mitigation measures that would reduce the future effects of the planned for development. For a discussion of impacts relating to increased traffic noise associated with increased traffic volumes, see Chapter 4.10, Noise, of this EA.

1. Conflict with an applicable plan, ordinance, or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation

4.13-50

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

including mass transit and non-motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit. a. Near-Term 2014 Plus Plan Components Conditions i. Intersection Level of Service Analysis Figures 4.13-7a and 4.13-7b illustrate intersection peak hour turning movement traffic volumes under Near- Term 2014 plus Plan Components conditions. Anticipated traffic controls and lane geometries for the 52 study intersections are also included in this figure. Table 4.13-7 shows the corresponding intersection ser- vice levels. Detailed level of service calculations are contained in Appendix E of the Traffic Study (see Ap- pendix F of this EA).

Under Near-Term 2014 plus Plan Components conditions, all study intersections operate within acceptable standards, with the exception of the intersections listed below:

¨ Alpine Road/Santa Cruz Avenue and Junipero Serra Boulevard operates at LOS E during AM peak hour.

¨ Middlefield Road and Marsh Road (Atherton) operates at LOS E during AM peak hour.

¨ Middlefield Road and Willow Road operates at LOS E during AM peak hour and operates at LOS F during PM peak hour.

¨ Scott Drive/Rolison Road and Marsh Road operates at LOS E during PM peak hour.

¨ Newbridge Street and Willow Road (Caltrans) operates at LOS F during both AM and P.M peak hours.

¨ Bayfront Expressway and Willow Road (Caltrans) operates at LOS F during both AM and P.M peak hours.

¨ Bayfront Expressway and University Avenue (Caltrans) operates at LOS F during PM peak hour.

¨ Bayfront Expressway and Marsh Road (Caltrans) operates at LOS F during both AM and PM peak hour.

¨ Bohannon Drive/Florence Street and Marsh Road operates at LOS E during PM peak hour.

¨ 101 NB Ramps and Marsh Road (Caltrans) operates at LOS E during AM peak hour.

4.13-51

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC Intersection #5 Intersection #1 Intersection #2 Intersection #3 Intersection #4 Intersection #6 Alpine Rd./Santa Cruz Ave. Addison Wesley & Sand Hill Rd. Saga Ln. & Sand Hill Rd. Branner Dr. & Sand Hill Rd. Sharon Park Dr. & Sand Hill Rd. Santa Cruz Ave. & Sand Hill Rd. Intersection #5 & Junipero Serra Blvd. Intersection #1 Intersection #2 Intersection #3 Intersection #4 Intersection #6 Alpine Rd./Santa Cruz Ave. Addison Wesley & Sand Hill Rd. Saga Ln. & Sand Hill Rd. Branner Dr. & Sand Hill Rd. Sharon Park Dr. & Sand Hill Rd. Santa Cruz Ave. & Sand Hill Rd. & Junipero Serra Blvd. 212 (134) 270 (219) 692 (566) 40 (249) 31 14 (43) 3 (13) 212 (134) 17 (22) 202 (235) 12) 568 (1,261) 270 (219) 47 (11) 57 (15)692 (566) 40 (249) 1 (278) 31 3 (5) 193 (281) 14 (43) 3 (13) 17 (22) 202 (235) 1,001 (1,797) 12) 47 (11) 57 (15) 820 (1,712) 568 (1,261) 310 (432) 3 (5) 952 (2,037) 1 (278) 567 (843) 193 (281) 4 (5) 833 (1,514) 727 (409)

5 ( 1 1 (2) 7(50)

1,001 (1,797) (56) 3 2 (0) 2 952 (2,037) 820 (1,712) (103) 10 310 (432) 26 (37) 567 (843) 139 (37)

4 (5) 833 (1,514) 727 (409)

5 ( 1 1 (2) 7(50) 110 (73)

3 (56) 3 2 (0) 2 38 (27) 10 (103) 10 26 (37) 282 (495) 110 (73) 139 (37) 38 (27) 282 (495) 89 (516) 89 (516) 421(224) 421(224) 634 (700) 634 (700) 152 (199) 152 (199) 38 (29) 18 (28) 38 (29) 137 (5) 6 (2) 137 (5) 6 (2) 18 (28) 267 (71) 1 6 (7) 267 (71) 1 6 (7) 1 (9) 13 (32) 2,155 (913) 1 (9) 13 (32) 1,728 (892) 47 (18) 2,155 (913) 47 (18) 230 (97) 1,728 (892)1) 179 (17) 1) 5 (2) 230 (97) 1,731 (1,121)10 (5) 181 (171) 179 (17) 335 (378) 5 (2) 335 (378)

36 (83) 1,731 (1,121)10 (5) 28 (165) 28 181 (171)

14 (147) 14 1,224 (599) 24 (149) 1,565 (912)

27 (13) 36 (83) 298 (218) 916 (640) 726 (11 (165) 28

14 (147) 14 1,224 (599) 24 (149) 1,56527 (912) (13) 298 (218) 916 (640) 726 (11 Intersection #7 Intersection #8 Intersection #9 Intersection #10 Intersection #11 Intersection #12 Oak Ave. & Sand Hill Rd. Middlefield Rd. & Marsh Rd. Encinal Ave & Middlefield Rd. Middlefield Rd. & Oak Grove Ave. University Dr. (S) & Santa Cruz Ave. Laurel St. & Oak Grove Ave. Intersection #7 Intersection #8 Intersection #9 Intersection #10 Intersection #11 Intersection #12 Oak Ave. & Sand Hill Rd. Middlefield Rd. & Marsh Rd. Encinal Ave & Middlefield Rd. Middlefield Rd. & Oak Grove Ave. University Dr. (S) & Santa Cruz Ave. Laurel St. & Oak Grove Ave.

12) 776 (659) 168 (43) 146 (157) 57 (41) 650 (498) 440 (277) 553 (326) 219 (153) 382 (541) 42 (99) 908 (529) 134 (51) 241 (63) 80 (1 31 (34) 741 (1,866) 349 (847) 597 (984) 22 (9) 15 (38) 12) 108 (30) 119 (191) 80 (38) 608 (585) 154 (54) 776 (659) 168 (43) 193(131) 134 (175) 146 (157) 57 (41) 336 (122) 25 (65) 650 (498) 440 (277) 553 (326)79 (130) 219 (153) 382 (541)80 (1 181 (152) 42 (99) 329908 (419) (529) 134 (51) 241 (63) 31 (34) 741 (1,866) 349 (847)90 (45) 22 (9) 15 (38) 89 (90) 597 (984) 1 608 (585) 154 (54) 108 (30) 19 (191) 193(131)80 (38) 134 (175) 336 (122) 25 (65) 16) 79 (130) 181 (152) 329 (419) 90 (45) 17 (37) 182 (176)125 (38) 89 (90) 1 (26) 475 (477) 92 (1 1 (954) 362 (365) 299 (564) 84 (105) 1 583 (675) 546 (356) 61

1,894 (1,012) 16) Intersection #13 Intersection #14 Intersection #15 Intersection #16 Intersection #17 Intersection #18 Laurel St. & Ravenswood Ave. Middlefield Rd. & Ravenswood Ave. Middlefield Rd. & Ringwood Ave. Middlefield Rd. & Willow Rd. Gilbert Ave. & Willow Rd. Coleman Ave. & Willow Rd.182 (176)125 (38) 17 (37)

1 (26) 475 (477) 92 (1 1 (954) 362 (365) 299 (564) 84 (105) 1 583 (675) 546 (356) 61

1,894 (1,012) 84 (79) 13 (28) 410 (553) 572 (656) 3 (15) 894 (1,269) 18 (39) 316 (207) 85 (167) 2 (7) Intersection439 (495) #13491 (572) 894 (1,222)Intersection #14 Intersection #15 Intersection #16 Intersection #17 Intersection #18 53 (1) 108 (88) 49 (98) 4 (5) 565 (425) 151 (61) 140 (78) 34 (45) 476 (794) 741 (1,015) Laurel St. & Ravenswood453 (475)Ave. Middlefield Rd. & Ravenswood Ave.206 (97) Middlefield 4Rd. (4) & Ringwood Ave. Middlefield Rd. & Willow Rd. Gilbert Ave. & Willow Rd. Coleman Ave. & Willow Rd. 180 (89) 1 103 (1 536 (446) 112 (43) 13 (152) 547 (549) 250 (352) 49 (9) 85 (128) 41 (26) 7 (5) 8 (3) 183 (142) 191 (269) 12) 985 (765) 458 (423) 124 (98) 68 (34) 44 (29) 69 (33) 16 (15) 92 (2) 8 (4)

84 (79) 13 (28) 5 (8) 410 (553) 894 (1,269) 0 (0) 572 (656) 3 (15) 18 (39) 28 (16) 4 (5) 316 (207) 85 (167) 2 (7) 439 (495) 491 (572) 894 (1,222) 9 (52) 53 (1) 108 (88) 49 (98) 4 (5) 17 (242) 25 (15) 565 (425) 68 (90) 151 (61) 140 (78) 1 10 (85)4 (77) 476 (794) 453 (475) 206 (97) 3 (52) 180 (89) 34 (45) 741 (1,015) 4 (4) 763 (751) 232 (222) 103 (1 1,377 (1,350) 536 (446) 112 (43) 128 (163) 132 (189) 113 (152) 547 (549) 250 (352) 85 (128) 7 (5) 1,221 (1,292) 49 (9) 41 (26) 183 (142) Intersection12) #23 458 (423) 124 (98) 8 (3) Intersection #19 Intersection #20 Intersection #21 Intersection #22 191 (269) Intersection985 (765) #24 44 (29) 69 (33) Bohannon Dr./ Florence St. 68 (34) Sand Hill Circle & Sand Hill Rd. Durham St. & Willow Rd. Bay Rd. & Marsh Rd. Scott Dr./Rolison at Marsh Rd. El Camino Real & Encinal Ave. 16 (15) 8 (4) & Marsh Rd. I-280 NB Off-Ramp & Sand Hill Rd. 92 (2)

10) 5 (8)

0 (0) 28 (16) 4 (5) 9 (52) 57 (23) 25 (15) 68 (90) 53 (245) 78 ( 1 17 (242) 8121 (2,492) 10 (85)4 (77) 3 (52) 3 (4) 232 (222) 1,377 (1,350) 103 (37) 763 (751) 25 (31) 128 (163) 132 (189) 937 (1,282) 324 (354) 1,221 (1,292) 31 (69) 1,654 (1,555) 413 (63) 107 (244) Intersection #23 41 (43) 471 (434) Intersection #21 1,095 (1,346) 1,340 (1,327) Intersection #19 Intersection #20 148 (108) Intersection #22 Intersection #24 1 373 (162) 12 (134) 18 (102) 33 (59) Sand Hill Circle & Sand Hill Rd. Durham St. & Willow 63Rd. (491) Bay Rd. & Marsh Rd. Bohannon965 (1,901)Dr./ Florence St. Scott Dr./Rolison at Marsh Rd. El Camino Real & Encinal Ave. 59 (83) 20 (2) 50 (103) 246 (293) 6 (10) 2,035 155(1,299) (82) 129& Marsh(32) Rd. I-280 NB Off-Ramp & Sand Hill Rd. 5 (1) 67 (38) 189 (162) 13 (21) 91 (72) 1 20 (41) 7 (19) 1 (1 16 (12) (2) 5 65 (20) 1) 540 (563) 60 (171) 58 (10) 99 (187) 70 (124)

4 (0) 53 (17) 3 (3) 10) 214 (214) (59) 243

1) 57 (23)

37 (22) 53 (245) 78 ( 1 3 (5) 1 (7) 12 (24) 18 (46) 1 7 (1 812 (2,492) 52 (6) 5 (6) 135 (30) 25 (31) 3 (4) 92 (84) 103 (37) 1,552 (1,408) 132 (246) 937 (1,282) 1,812 (671) 324 (354) 244 (150) 31 (69) 1,654 (1,555) 107 (244) 1,744 (1,513) 413 (63) 41 (43) 471 (434) 1,095 (1,346) 148 (108) 1,333 (1,083) (26) 74 1,340 (1,327) 12 (134) 1,455 (1,053) 1 373 (162) 18 (102) 33 (59) 63 (491) 552 (267) 552 965 (1,901) 59 (83) 20 (2) 6 (10) 189 (162) 50 (103) 246 (293) 2,035 155(1,299) (82) 129 (32) Intersection #25 5 (1) 67 (38) 91 (72) 13 (21) Intersection #26 Intersection #27 Intersection #28 Intersection #29 1 Intersection #30 20 (41) El Camino Real & 7 (19) 1 (1 16 (12) (2) 5 El Camino Real & Oak Grove Ave. El Camino Real & Santa Cruz Ave. El Camino Real & Ravenswood Ave. 65El Camino (20) Real & Roble Ave. 1)El Camino Real540 & (563) Middle Ave. 60 (171) 58 (10) 99 (187) 70 (124) Valparaiso Ave./Glenwood Ave. 4 (0) 53 (17) 3 (3) 214 (214) (59) 243

10 (41) 83 (140) 0 (29) 1) 29 (16) 66 (133) 49 (155) 51 (66) 13 (235) 273 (328) 2 (50) LEGEND 192 (191) 144 (253) 49937 (495) (22) 1 60 (55) 32 (58) 75 (159) 106 (182) 421 (674) 3 (5) 1 (7) 81 (99) 12 (24) 2,034 (1,680) 15 (32) 18 (46) 1 7 (1 780 (1,709) 1,574 (1,402) 792 (1,410) 30 (80) 1,106 (2,1 52 (6) 1,547 (1,351) 1,819 (1,538) 5 (6) Study Intersection 127 (89) 0 (0) 0 (0) 207 (229) 1,247 (2,065) 193 (386) 135 (30) 1,350 (1,104)83 (67) 103 (121) 838 (1,801) 104 (127) 896 (1,713) 1,466 (1,185) 87 (1 12) 14) 25 (60) 42 (97) 92 (84) 1,812 (671) XX AM Peak Hour Volumes 1,552 (1,408) 83 (109) 132 (246) 662 (318) 86 (128) 56 (85) 47 (175) 244 (150) (XX) PM Peak Hour Volumes 1,744 (1,513)

1,333 (1,083) (26) 74 1,455 (1,053)

Traffic Signal (267) 552 18) 1 (8) 55 (58) 18 (98) 1 61 (79) 82 (170) 198 (267) 54 (90) 56 (36) 66 (39) 319 (397) 71 (1 343 (222) 175 (150)82 (144) 237 (218) 32 (61) Intersection381 (321) #25 Intersection #26 Intersection #27 Intersection #28 Intersection #29 Intersection #30 El Camino Real & El Camino Real & Oak Grove Ave. El Camino Real & Santa Cruz Ave. El Camino Real & Ravenswood Ave. El Camino Real & Roble Ave. El Camino Real & Middle Ave. Source: TJKM Transportation Consultants. Valparaiso Ave./Glenwood Ave.

10 (41) 83 (140) 0 (29) 29 (16) 66 (133) 49 (155) 51 (66) 13 (235) 273 (328) 2 (50) LEGEND 192 (191) 144 (253) 499 (495) 60 (55) 32 (58) 75 (159) 1 106 (182) 421 (674) 81 (99) 2,034 (1,680) 15 (32) 780 (1,709) 1,574 (1,402) 792 (1,410) 30 (80) 1,106 (2,1 Study Intersection 1,547 (1,351) 1,247 (2,065)1,819 (1,538) 103 (121) 127 (89) 896 (1,713)0 (0) 0 (0) 207 (229) 87 (1 193 (386) 12) 1,350 (1,104)83 (67) 838 (1,801) 104 (127) 1,466 (1,185) 14) 42 (97) XX AM Peak Hour Volumes 25 (60) 83 (109) 662 (318) 86 (128) 56 (85) 47 (175) (XX) PM Peak Hour Volumes Traffic Signal FIGURE 4.13-7A 18) 1 (8) 55 (58) 18 (98) 1 61 (79) 82 (170) 198 (267) 54 (90) 56 (36) 66 (39) 319 (397) 71 (1 343 (222) NEAR-TERM 2014 PLUS PLAN COMPONENTS175 (150)82 (144) PEAK HOUR237 (218) VOLUMES AND 32 (61) 381 (321) LANE CONFIGURATIONS CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

Intersection #31 Intersection #32 Intersection #33 Intersection #34 Intersection #35 Intersection #36 El Camino Real & Cambridge Ave. Bay Rd. & Willow Rd. Newbridge St. & Willow Rd. O'Brien Dr. & Willow Rd. Ivy Dr. & Willow Rd. Hamilton Ave. & Willow Rd.

) ) )

508 ) ) , 087 ) 333 , ) , ) (4 (1 (3 (2 (13 ) (2 ) 1 2 ) (77 508 (444) (0 3 (197 18 7 (13) 317 (19 0 , 1 (87 60 , 1 639 1,284 (2,505) 85 (63) 64 , 1 (37) 1 1 1 66 1,532 (2,369) 50 23 (50) 1,299 (2,425) 128 (310) 39 (63) 51 (49) 51 (61) 2,292 (1,782)23 (20) 8 (10) 504 (320) 172 (230) 10 (22) 35 (129) 1 259 (85) 381 (209) 1 (22) 271 (473) 146 (137) 458 (524) 123 (68) 16 (8)

18 (14) 2 (27) 151 (126) ) 57 (37) ) 19)

(49

656 , 99 (1 84 472 (420) (1 60 (13) 235 (171) 154 (235) 146 (381)

808 2,348 (1,890) 2,191 (1,998) 2,445 (2,046) , 2,168 (1,681) 1 Intersection #37 Intersection #38 Intersection #39 Intersection #40 Intersection #41 Intersection #42 Bayfront Exp. & Willow Rd. Bayfront Exp. & University Ave. O'Brien Dr. & University Ave. Bayfront Exp. & Chilco St. Bayfront Exp. & Chrysler Dr. Bayfront Exp. & Marsh Rd.

) ) ,074 ) ) ) ) ) (1 )

) 25 (4) (712 ) (376 (7 (46 969 , (20 (263 (12 2,927 (1,354) (667 (392 3 2,933 (1,496) 1 47 (16)

563 474 3,219 (967) 1 1

, , 45

1 1 1

32 51 66 409 (85) 42 427 (248) 72 (13) 684 (836) 2,714 (2,069)

1,729 (2,655) 0 (9) 424 (1,771) 17 (133) 388 (1 1652 (2,599) 69 (525) 553 (61) 28 (80) 35 (24) 151 (187) 473 (362) 12) 15) 947 (2,864)

8 (1

46 (53)

169 (662)

53 (14)

221 (360)

281 (182) 159 (449) 238 (444)

696 (95) 219 (286) 1,191 (4,361) 796 (1,788) 1,095 (140) 476 (1,490) 1,734 (2,177)

Intersection #43 Intersection #44 Intersection #45 Intersection #46 Intersection #47 Intersection #48 Valparaiso Ave. & University Dr. US 101 SB Ramps & Marsh Rd. US 101 NB Ramps & Marsh Rd. University Ave. & Bay Rd. Middlefield Rd. & Lytton Ave. Sand Hill Rd. & El Camino Real

) ) 103 ) 235 135 ) ) (41 (458 418 , )

(54 (147 ) 72 1,538 (1,538) ) (1 (396 (84 (459 (9 (0 542 0 (0) (2

106 0 781 1,507 (1,215) 66 (42) , 18 ) 159 ) 0 (0) 600 (486) 1 12 21 (80) 46 (59) ) 517 (1,120) 8 (1 50 (28) 1) 68 (63) 106 (50) 585 (616) 557 (1,227) 48 (93) 512 (453) 58 (24) 409 (332) 127 (102) 183 (150) 67 (180) 835 (632) 11 (19) 1,489 (995) 750 (796) 422 (203) 463 (410) 86 (1 ) 412 (235) 103 (100) 413 (237) ) 17 (515) ,403 (0 1,1 0 16) 14) 0 (0) (2 107 (356) 164 (36) 565 59 (85) , 41 (180) 605 (518) 1,428 (1,365) 2 174 (356) 191 (1 229 (613) 218 (241)

Intersection #52 Intersection #51 Intersection #49 Intersection #50 Santa Cruz Ave./ Santa Cruz Ave & Elder Ave. Sand Hill Rd. & Pasteur Dr. Campus Dr. & Junipero Serra Blvd. Alameda De Las Pulgas

375 (449) LEGEND 2 (2) 5 (4) 8 (2) 605 (1,275) 195 (50) 239 (90) 203 (526) 455 (770) Study Intersection

9 (7) 0 (0)

99 (217) 99 7 (14) 7 91 (319) (470) 50 236 (488) XX AM Peak Hour Volumes 15 (4) 6 (1) 158 (39) 704 (483) 35 (8) 130 (44) (XX) 12 (18) 8 (10) PM Peak Hour Volumes 577 (579) 415 (676) Traffic Signal 379 (159) 2 (12) (249) 7 (5) 712 3 (0) 11 (0) 1) 11 (8)

52 (41)

4 (30)

10 (45) 10 (10) 103 (33) 189 (70) 793 (71

1,371 (1,009)

Source: TJKM Transportation Consultants.

FIGURE 4.13-7B

NEAR-TERM 2014 PLUS PLAN COMPONENTS PEAK HOUR VOLUMES AND LANE CONFIGURATIONS CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-7 PEAK HOUR INTERSECTION LEVELS OF SERVICE – EXISTING AND NEAR-TERM 2014 CONDITIONS

AM Peak Hour PM Peak Hour

Near-Term Near-Term Near-Term Plus Project Near-Term Plus Project Delay Delay LOS Delay Delay Diff Sig. Delay Delay Diff Sig. No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) (sec) Impact? LOS (sec) LOS (sec) (sec) Impact? Addison Wesley and 1 Signal Menlo Park D B 12.8 B 13.1 0.3 No B 18.2 B 18.3 0.1 No Sand Hill Rd. 2 Saga Ln. and Sand Hill Rd. Signal Menlo Park D A 8.6 A 8.6 0.0 No B 12.1 B 12.0 -0.1 No Branner Dr. and 3 Signal Menlo Park D A 4.5 A 4.5 0.0 No A 5.5 A 5.5 0.0 No Sand Hill Rd. Sharon Park Dr. and 4 Signal Menlo Park D C 22.4 C 23.1 0.7 No C 26.4 C 27.3 0.9 No Sand Hill Rd. Alpine Rd./Santa Cruz Ave. and Junipero Serra E 55.7 E 56.3 0.6 D 49.2 D 49.5 0.3 No 5 Blvd. Signal Menlo Park D Yes WB Critical Approach on F 96.6 F 97.6 1.0 Junipero Serra Blvd. Santa Cruz Ave. and 6 Signal Menlo Park D D 45.7 D 45.9 0.2 No D 46.0 D 46.5 0.5 No Sand Hill Rd. Oak Ave. and Sand Hill 7 Signal Menlo Park D B 10.9 B 11.3 0.4 No A 6.4 A 6.9 0.5 No Rd. Middlefield Rd. and 8 Signal Atherton D E 59.0 E 65.2 6.2 No D 41.8 D 47.6 5.8 No Marsh Rd. Encinal Ave. and 9 Signal Atherton D C 20.2 C 20.7 0.5 No B 10.0 B 10.2 0.2 No Middlefield Rd. Middlefield Rd. and 10 Signal Atherton D B 14.7 B 15.1 0.4 No B 11.4 B 11.6 0.2 No Oak Grove Ave. University Dr. (S) and 11 Signal Menlo Park D B 13.1 B 13.3 0.2 No B 15.7 B 15.9 0.2 No Santa Cruz Ave.

4.13-54

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-7 PEAK HOUR INTERSECTION LEVELS OF SERVICE – EXISTING AND NEAR-TERM 2014 CONDITIONS

AM Peak Hour PM Peak Hour

Near-Term Near-Term Near-Term Plus Project Near-Term Plus Project Delay Delay LOS Delay Delay Diff Sig. Delay Delay Diff Sig. No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) (sec) Impact? LOS (sec) LOS (sec) (sec) Impact? Laurel St. and 12 Signal Menlo Park C B 15.2 B 15.5 0.3 No B 11.7 B 11.8 0.1 No Oak Grove Ave. Laurel St. and 13 Signal Menlo Park D B 18.3 B 18.9 0.6 No B 14.0 B 14.5 0.5 No Ravenswood Ave. Middlefield Rd. and 14 Signal Menlo Park D C 25.7 C 27.2 1.5 No D 38.8 D 41.5 2.7 No Ravenswood Ave. Middlefield Rd. and 15 Signal Menlo Park D C 27.4 C 27.2 -0.2 No C 26.3 C 25.9 -0.4 No Ringwood Ave. Middlefield Rd. and 16 Signal Menlo Park D E 66.3 E 73.8 7.5 Yes F 90.0 F 105.8 15.8 Yes Willow Rd. Gilbert Ave. and 17 Signal Menlo Park D B 19.3 C 21.0 1.7 No B 12.2 B 15.5 3.3 No Willow Rd. Coleman Ave. and 18 Signal Menlo Park D C 33.3 D 36.3 3.0 No B 13.5 B 16.4 2.9 No Willow Rd. Durham St. and Willow 19 Signal Menlo Park D B 12.0 B 12.5 0.5 No B 15.3 B 16.7 1.4 No Rd. 20 Bay Rd. and Marsh Rd. Signal Menlo Park D C 27.6 C 28.7 1.1 No B 17.6 B 17.9 0.3 No Bohannon Dr./ 21 Florence St. and Marsh Signal Menlo Park D C 32.9 D 41.4 8.5 No D 46.4 E 68.3 21.9 Yes Rd. Scott Dr./Rolison Rd. and 22 Signal Menlo Park D C 27.8 C 30.5 2.7 No E 69.8 E 74.6 4.8 Yes Marsh Rd. Sand Hill Circle and 23 Signal Menlo Park D C 25.6 C 26.5 0.9 No D 41.4 D 45.1 3.7 No Sand Hill Rd. 4.13-55

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-7 PEAK HOUR INTERSECTION LEVELS OF SERVICE – EXISTING AND NEAR-TERM 2014 CONDITIONS

AM Peak Hour PM Peak Hour

Near-Term Near-Term Near-Term Plus Project Near-Term Plus Project Delay Delay LOS Delay Delay Diff Sig. Delay Delay Diff Sig. No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) (sec) Impact? LOS (sec) LOS (sec) (sec) Impact? I-280 NB Off-Ramp and Signal Caltrans D C 24.0 C 26.3 2.3 No C 21.9 C 22.7 0.8 No Sand Hill Rd. El Camino Real and 24 Signal Caltrans D B 15.8 B 15.8 0.0 No B 19.1 B 19.0 -0.1 No Encinal Ave. El Camino Real and 25 Valparaiso Ave./ Signal Caltrans D C 34.8 D 35.2 0.4 No C 34.9 D 35.4 0.5 No Glenwood Ave. El Camino Real and 26 Signal Caltrans D C 30.0 C 30.2 0.2 No C 33.0 C 33.2 0.2 No Oak Grove Ave. El Camino Real and 27 Signal Caltrans D B 13.3 B 13.2 -0.1 No B 19.8 B 20.0 0.2 No Santa Cruz Ave. El Camino Real and 28 Ravenswood Ave./ Signal Caltrans D D 42.9 D 44.0 1.1 No D 49.6 D 53.1 3.5 No Menlo Ave. El Camino Real and 29 Signal Caltrans D B 11.9 B 11.9 0.0 No B 17.2 B 17.2 0.0 No Roble Ave. El Camino Real and 30 Signal Caltrans D C 29.6 C 29.9 0.3 No D 48.9 D 49.5 0.6 No Middle Ave. El Camino Real and 31 Signal Caltrans D B 11.4 B 11.4 0.0 No B 15.3 B 15.3 0.0 No Cambridge Ave. 32 Bay Rd. and Willow Rd. Signal Caltrans D C 27.0 C 27.7 0.7 No C 22.7 C 23.4 0.7 No Newbridge St. and 33 Signal Caltrans D F 144.8 F 162.0 17.2 Yes F 192.7 F 211.7 19.0 Yes Willow Rd.

4.13-56

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-7 PEAK HOUR INTERSECTION LEVELS OF SERVICE – EXISTING AND NEAR-TERM 2014 CONDITIONS

AM Peak Hour PM Peak Hour

Near-Term Near-Term Near-Term Plus Project Near-Term Plus Project Delay Delay LOS Delay Delay Diff Sig. Delay Delay Diff Sig. No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) (sec) Impact? LOS (sec) LOS (sec) (sec) Impact? SB Critical Local Approach on F 240.2 F 281.7 41.5 F 321.1 F 356.4 35.3 Newbridge St. O'Brien Dr. and 34 Signal Caltrans D B 13.5 B 13.6 0.1 No B 17.4 B 18.2 0.8 No Willow Rd. 35 Ivy Dr. and Willow Rd. Signal Caltrans D B 14.4 B 14.7 0.3 No B 18.5 B 19.5 1.0 No Hamilton Ave. and 36 Signal Caltrans D C 24.0 C 34.4 10.4 No C 29.4 D 45.9 16.5 No Willow Rd. Bayfront Exp. and D F 111.3 F 111.3 0.0 No F 136.6 F 137.2 0.6 Willow Rd. WB Critical Approach 37 Signal Caltrans F 199.5 F 200.3 .84 Yes on Willow Rd. SB Critical Approach on F 166.0 F 167.0 1.0 Bayfront Exp. Bayfront Exp. and 38 Signal Caltrans D C 32.4 C 32.5 0.1 No F 172.1 F 172.4 0.3 No University Ave. O'Brien Dr. and 39 Signal Caltrans D A 5.4 A 5.4 0.0 No A 9.5 A 9.5 0.0 No University Ave. Bayfront Exp. and 40 Signal Caltrans D C 26.0 C 26.1 0.1 No D 44.4 D 44.5 0.1 No Chilco St. Bayfront Exp. and 41 Signal Caltrans D B 10.1 B 10.1 0.0 No D 43.2 D 43.3 0.1 No Chrysler Dr. Bayfront Exp. and 42 Signal Caltrans D D 38.7 F 86.8 48.1 Yes F 81.1 F 105.3 24.2 Yes Marsh Rd. 4.13-57

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-7 PEAK HOUR INTERSECTION LEVELS OF SERVICE – EXISTING AND NEAR-TERM 2014 CONDITIONS

AM Peak Hour PM Peak Hour

Near-Term Near-Term Near-Term Plus Project Near-Term Plus Project Delay Delay LOS Delay Delay Diff Sig. Delay Delay Diff Sig. No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) (sec) Impact? LOS (sec) LOS (sec) (sec) Impact? Valparaiso Ave. and 43 Signal Menlo Park D B 13.2 B 13.3 0.1 No B 15.8 B 15.9 0.1 No University Dr. US 101 SB Ramps and 44 Signal Caltrans D D 40.2 D 44.5 4.3 No C 26.1 C 27.8 1.7 No Marsh Rd. US 101 NB Ramps and 45 Signal Caltrans D D 44.1 E 57.5 13.4 Yes C 21.4 C 30.0 8.6 No Marsh Rd. University Ave. and Bay 46 Signal Caltrans D D 37.1 D 37.1 0.0 No D 39.9 D 39.9 0.0 No Rd. Middlefield Rd. and 47 Signal Palo Alto D D 39.4 D 40.7 1.3 No D 39.8 D 41.6 1.8 No Lytton Ave. Sand Hill Rd. and El 48 Signal Caltrans D C 21.2 C 21.1 -0.1 No C 25.3 C 25.3 0.0 No Camino Real Sand Hill Rd. and 49 Signal Palo Alto D C 23.2 C 23.2 0.0 No C 28.1 C 28.1 0.0 No Pasteur Dr. Campus Dr. and Santa Clara 50 Signal D B 17.2 B 17.6 0.4 No C 34.3 C 34.3 0.0 No Junipero Serra Blvd. Co. Santa Cruz Ave. and 51 Signal Menlo Park D B 16.3 B 16.3 0.0 No A 5.9 A 5.9 0.0 No Elder Ave. Santa Cruz Ave./ San Mateo 52 Signal D B 11.6 B 11.8 0.2 No B 12.4 B 12.6 0.2 No Alameda De Las Pulgas Co. Note: Bold indicates unacceptable operational conditions based on applicable City/Caltrans standards, as well as potentially significant impacts. a LOS=Level of Service, Delay = Average control delay per vehicle b Delay / LOS are for overall intersection Source: TJKM Transportation Consultants, March 2013.

4.13-58

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

ii. Roadway Traffic Volumes a) Arterial Streets The following arterial segments (primary and minor) exceed 90 percent capacity with ADTs over 18,000 vehicles per day and under Near-Term 2014 plus Plan Components conditions more than 100 trips would be added to each of these segments; therefor, City’s threshold of significance for arterial streets would be exceeded. As shown in Table 4.13-8, the future development would result in significant impacts on the fol- lowing arterial roadway segments:

¨ Marsh Road from Bohannon Drive/Florence St to Scott Drive

¨ Marsh Road from Bay Road to Bohannon Drive/Florence Street

¨ Willow Road from Middlefield Road to Bay Road

¨ Willow Road from Gilbert Ave-Coleman Ave

¨ Willow Road from Coleman Ave-Durham St/Hospital Ave

¨ Willow Road from Durham St/Hospital Ave to Bay Road

¨ Middlefield Road from Ravenswood Avenue to Willow Road

¨ Ravenswood Avenue from El Camino Real to Alma Street

¨ Ravenswood Avenue from Alma Street to Laurel Street

¨ Ravenswood Avenue from Laurel Street to Middlefield Road

¨ Santa Cruz Avenue from Avy Ave/Orange Avenue to Olive Street

¨ Santa Cruz Avenue from Olive Street to University Drive

¨ Alpine Road/Santa Cruz Avenue from Junipero Serra Boulevard to City Limits

¨ Alpine Road/Santa Cruz Avenue from Sand Hill Road to Serra Boulevard

b) Collector Streets Under Near-Term 2014 without Plan Components conditions more than a net total of 50 trips would be added to the following collector streets that are currently at 90 percent capacity with ADTs over 9,000 vehi- cles per day:

¨ University Drive from Menlo Avenue to Santa Cruz Avenue

¨ Oak Grove Avenue from El Camino Real to Laurel Street

4.13-59

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-8 ROADWAY AVERAGE DAILY TRAFFIC VOLUMES – EXISTING AND NEAR-TERM 2014 CONDITIONS

Future Trip ADT Near- Contribution Term Near- Plus Added % of Segment Existing Term Project Daily Near- Significant No. Roadway Segment Classification ADT ADT ADT Volume Term Impact 1 Haven Ave City Limits-Bayfront Expwy/Marsh Rd Collector 5,751 5,873 7,512 1,639 27.9% Yes 2-1 Bay Rd-Bohannon Dr/Florence St Minor Arterial 27,013 33,251 34,534 1,284 3.9% Yes Marsh Rd 2-2 Bohannon Dr/Florence St-Scott Dr Primary Arterial 32,768 39,414 41,033 1,619 4.1% Yes 3 Hamilton Ave Chilco St-Willow Rd Collector 3,010 3,101 4,219 1,117 36.0% Yes 4-1 Laurel St-Middlefield Rd Collector 5,181 6,181 6,245 64 1.0% No 4-2 Middlefield Rd-Gilbert Ave Minor Arterial 26,213 32,189 34,046 1,857 5.8% Yes 4-3 Willow Rd Gilbert Ave-Coleman Ave Minor Arterial 26,336 32,581 34,448 1,867 5.7% Yes 4-4 Coleman Ave-Durham St/Hospital Ave Minor Arterial 28,038 34,239 35,932 1,694 4.9% Yes 4-5 Durham St/Hospital Ave-Bay Rd Minor Arterial 32,148 38,225 39,722 1,496 3.9% Yes 5 Middlefield Rd Ravenswood Ave-Willow Rd Minor Arterial 20,668 22,789 23,658 869 3.8% Yes 6-1 Glenwood Ave-Oak Grove Ave Collector 3,916 4,060 4,180 120 3.0% No 6-2 Laurel St Oak Grove Ave-Ravenswood Ave Collector 4,404 4,497 4,507 10 0.2% No 6-3 Ravenswood Ave-Willow Rd Collector 4,917 6,231 6,293 62 1.0% No 7-1 Middle Ave-Menlo Ave Collector 5,666 5,857 6,148 290 5.0% No 7-2 Menlo Ave-Santa Cruz Ave Collector 17,641 18,675 19,028 353 1.9% Yes University Dr 7-3 Santa Cruz Ave-Oak Grove Ave Collector 7,052 7,199 7,310 111 1.5% No 7-4 Oak Grove Ave-Valparaiso Ave Collector 5,376 5,499 5,560 61 1.1% No

8-1 Valparaiso Ave/ University Dr-El Camino Real Minor Arterial 13,238 14,119 14,243 124 0.9% No 8-2 Glenwood Ave El Camino Real-Laurel St Collector 5,899 6,363 6,459 95 1.5% No

4.13-60

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Future Trip ADT Near- Contribution Term Near- Plus Added % of Segment Existing Term Project Daily Near- Significant No. Roadway Segment Classification ADT ADT ADT Volume Term Impact 9-1 University Dr -El Camino Real Collector 10,038 10,246 10,296 50 0.5% No 9-2 Oak Grove Ave El Camino Real-Laurel St Collector 9,677 9,967 10,175 208 2.1% Yes 9-3 Laurel St-Middlefield Rd Collector 8,556 8,728 8,754 26 0.3% No 10-1 El Camino Real-Alma St Minor Arterial 24,076 26,451 27,189 738 2.8% Yes Ravenswood 10-2 Alma St-Laurel St Minor Arterial 19,912 22,044 22,695 651 3.0% Yes Ave 10-3 Laurel St-Middlefield Rd Minor Arterial 17,977 18,742 19,332 590 3.1% Yes Alameda de las Pulgas- Avy 11-1 Minor Arterial 9,238 9,723 10,025 303 3.1% No Ave/Orange Ave 11-2 Avy Ave/Orange Ave-Olive St Minor Arterial 16,097 18,020 18,399 379 2.1% Yes 11-3 Santa Cruz Ave Olive St-University Dr Minor Arterial 17,179 18,911 19,234 323 1.7% Yes 11-4 University Dr-Crane St Minor Arterial 8,895 9,858 10,004 146 1.5% No 11-5 Crane St-El Camino Real Minor Arterial 8,074 9,899 9,998 99 1.0% No 12-1 Olive St-University Dr Collector 7,222 7,583 7,796 212 2.8% No Middle Ave 12-2 University Dr-El Camino Real Collector 7,519 7,716 7,787 71 0.9% No

13-1 Alpine Rd/ Junipero Serra Blvd-City Limits Minor Arterial 23,406 23,868 23,988 120 0.5% Yes 13-2 Santa Cruz Ave Sand Hill Rd-Junipero Serra Blvd Minor Arterial 30,187 31,077 31,306 229 0.7% Yes 14 Linfield Dr Middlefield Rd - Laurel St Local 1,583 1,615 1,756 141 8.7% Yes 15 Oak Ave Sand Hill Rd - Olive St Local 2,518 2,615 2,759 143 5.5% Yes Notes: Bold indicates potentially significant impacts. Source: TJKM Transportation Consultants, March 2013.

4.13-61

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Future trips would exceed the City’s threshold by adding 12.5 percent additional trips or resulting in an ADT that would exceed 9,000 vehicles per day for the collector streets which exceed 50 percent capacity with ADTs greater than 5,000 vehicles per day at the following intersection:

¨ Haven Avenue from City Limits to Bayfront Expressway/Marsh Road

Future trips would exceed the City’s threshold by adding more than 25 percent additional trips for the col- lector streets with ADTs of less than 5,000 vehicles per day at the following collector street segment:

¨ Hamilton Avenue from Chilco Street to Willow Road

c) Local Streets Under Near-Term 2014 without Plan Components conditions future trips more than a net total of 25 trips would be added to the following local streets that are currently at 90 percent capacity with ADTs over 1,350 vehicles per day:

¨ Linfield Drive from Middlefield Road to Laurel Street

¨ Oak Avenue from Sand Hill Road to Olive Street

a) Freeway Peak Hour Volumes The six selected freeway segments are all considered as Routes of Regional Significance by the San Mateo County CMP. As shown in Table 4.13-9, all study segments currently operate at their CMP level of service standards or worse, with the exception of SR 84 between Marsh Road and Willow Road. The results shown in Table 4.13-9 also show that the addition of the traffic volumes generated by the future development per- mitted under the Plan Components would result in significant impacts on US 101 South of Marsh Road.

Within these intersections, the intersections of Bohannon Drive/Florence Street and Marsh Road and US 101 NB Ramps and Marsh Road operate at acceptable level of service prior to the addition of the future de- velopment under the Plan Components. The intersection of Bayfront Expressway and Marsh Road oper- ates at acceptable level of service during the AM peak hour prior to the addition of the future housing under the Plan Components.

4.13-62

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

As shown in Table 4.13-9, eight intersections listed below would have significant impacts with the addition of trips from future residential development under Near-Term 2014 plus Plan Components conditions dur- ing AM or PM peak hour.

¨ Alpine Road/Santa Cruz Avenue and Junipero Serra Boulevard during AM peak hour delay increases by more than 0.8 seconds.

¨ Middlefield Road and Willow Road during both AM and PM peak hour delay increases by more than 0.8 seconds.

¨ Bohannon Drive/Florence Street and Marsh Road during PM peak hour level of service degrades from LOS D to LOS E.

¨ Scott Drive/Rolison Road and Marsh Road during PM peak hour delay increases by more than 0.8 sec- onds.

¨ Newbridge Street and Willow Road (Caltrans) during both AM and PM peak hours delay increases by more than 0.8 seconds.

¨ Bayfront Expressway and Willow Road (Caltrans) during PM peak hour delay increases by more than 0.8 seconds.

¨ Bayfront Expressway and Marsh Road (Caltrans) during both AM and PM peak hour level of service degrades from LOS D to LOS F during AM Peak hour and delay increases by 23 seconds for PM peak hour.

¨ US 101 NB Ramps and Marsh Road (Caltrans) during AM peak hour level of service degrades from LOS D to LOS E. b. 2035 Plus Plan Components Conditions i. Intersection Levels of Service Analysis Figures 4.13-8a and 4.13-8b illustrate the peak hour turning movement volumes at the study intersections, as well as lane geometry and traffic controls under 2035 plus Plan Components conditions. Anticipated traffic controls and lane geometries for the study intersections are also included in this figure. The roadway seg- ment and freeway segment ADTs for 2035 plus Plan Components conditions were estimated based on the existing ADTs and the traffic volumes for the intersections along the segments.

4.13-63

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC Intersection #5 Intersection #1 Intersection #2 Intersection #3 Intersection #4 Intersection #6 Sharon Park Dr. & Sand Hill Rd. Alpine Rd./Santa Cruz Ave. Addison Wesley & Sand Hill Rd. IntersectionSaga Ln. #5& Sand Hill Rd. Branner Dr. & Sand Hill Rd. Santa Cruz Ave. & Sand Hill Rd. Intersection #1 Intersection #2 Intersection #3 Intersection #4 Intersection #6 & Junipero Serra Blvd. Alpine Rd./Santa Cruz Ave. Addison Wesley & Sand Hill Rd. Saga Ln. & Sand Hill Rd. Branner Dr. & Sand Hill Rd. Sharon Park Dr. & Sand Hill Rd. Santa Cruz Ave. & Sand Hill Rd. & Junipero Serra Blvd.

262 (165) 332 (271) 864 (708) 420 (389) 49 (307) 262 (165) 17 (53) 4 (16) 21 (27) 332 (271) 864 (708) 49 (307) 249 (289) 58 (13) 69 (18)420 (389) 719 (1,635) 17 (53) 4 (16) 21 (27) 4 (7) 239 (346) 58 (13) 69 (18) 249 (289) 719 (1,635) 1,290 (2,346) 385 (541) 4 (7) 239 (346)1,225 (2,629) 1,067 (2,209)

1,290 (2,346) 385 (541) 5 (5) 1,085 (1,995) 6 (138) 1 (3) 9 (62)

1,067 (2,209) (68) 4

3 (0) 3 699 (1,038) 1,225 (2,629) (125) 13 31 (45) 5 (5) 1,085 (1,995) 908 (522)

6 (138) 1 (3) 9 (62)

4 (68) 4 171 (46) 3 (0) 3 699 (1,038)

13 (125) 13 31 (45) 136 (90) 136 (90) 171 (46) 46 (29) 908 (522) 46 (29) 361 (635) 361 (635) 110 (636) 110 (636) 528(285) 528(285) 786 (879) 188 (244) 786 (879) 188 (244) 47 (36) 18 (33) 168 (7) 8 (3) 47 (36) 327 (87) 13 (1 168 (7) 7 (9) 8 (3) 18 (33) 2,767 (1,270) 13 (39) 327 (87) 13 (1 7 (9) 2,245 (1,217) 58 (23) 2,767 (1,270) 13 (39) 284 (119) 1) 2,245 (1,217) 58 (23) 220 (21) 1) 6 (3) 2,250 (1,538)12 (7) 284 223(119) (21 431 (525) 1) 220 (21) 1)

6 (3) 35 (203) 35 431 (525)

17 (181) 17 1,604 (833)2,250 (1,538) 30 (183) 44 (102) 12 (7) 223 (21

2,047 (1,277)32 (14) 366 (268) 35 (203) 35

17 (181) 17 1,604 (833) 894 (137) 30 (183) 44 (102) 2,047 (1,277)32 (14) 366 (268) 1,127 (789)

Intersection #7 Intersection #8 Intersection #9 Intersection #10 Intersection #11 Intersection #12 894 (137) Oak Ave. & Sand Hill Rd. Middlefield Rd. & Marsh Rd. Encinal Ave & Middlefield Rd. Middlefield Rd. & Oak Grove Ave. University Dr. (S) & Santa Cruz Ave. Laurel St. & Oak Grove Ave. 1,127 (789) Intersection #7 Intersection #8 Intersection #9 Intersection #10 Intersection #11 Intersection #12 Oak Ave. & Sand Hill Rd. Middlefield Rd. & Marsh Rd. Encinal Ave & Middlefield Rd. Middlefield Rd. & Oak Grove Ave. University Dr. (S) & Santa Cruz Ave. Laurel St. & Oak Grove Ave.

968 (836) 207 (52) 180 (194) 71 (51) 779 (607) 536 (337) 666 (398) 323 (226) 510 (704) 51 (121) 1,027 (631) 166 (63) 297 (77) 38 (42) 924 (2,345) 410 (1,007) 27 (10) 136 (162) 18 (46) 747 (1,21 147 (235) 826 (775) 191 (66) 133 (37) 249 98(207) (47) 166 (216) 1 968 (836) 207 (52) 10 (202) 414 (150) 31 (81) 180 (194) 71 (51) 779 (607) 536 (337) 1) 223 (187) 666 (398)415 (528) 323 (226) 510 (704) 51 (121) 1,027 (631) 173 (99) 166 (63) 297 (77) 38 (42) 115 (107) 924 (2,345) 410 (1,007) 27 (10) 136 (162) 18 (46) 747 (1,21 147 (235) 98 (47) 826 (775) 191 (66) 133 (37) 249 (207) 166 (216) 110 (202) 414 (150) 31 (81) 1) 223 (187) 415 (528) 236 (244)155 (48) 173 (99) 49 (106) 115 (107) 13 (143) 592 (645) 452 (444) 365 (668) 99 (125) 13 (31) 1 729 (905) 669 (462)

2,442 (1,353) 742 (1,147) Intersection #13 Intersection #14 Intersection #15 Intersection #16 Intersection #17 Intersection #18 Laurel St. & Ravenswood Ave. Middlefield Rd. & Ravenswood Ave. Middlefield Rd. & Ringwood Ave. Middlefield Rd. & Willow Rd. Gilbert Ave. & Willow Rd. Coleman Ave. & Willow236 Rd. (244)155 (48) 49 (106)

13 (143) 592 (645) 452 (444) 365 (668) 99 (125) 13 (31) 1 729 (905) 669 (462)

15) 742 (1,147) 16 (35) 103 (97) 835 (903) 674 (790) 2,442 (1,353) 1,282 (1,675) 22 (48) 385 (254) 182 (292) 4 (19) 3 (9) 65 (1) 584 (622) 586 (745) 1,284 (1,627) 5 (7) 41 (55) 133 (109) Intersection #13 57 Intersection(1 #14 254 (1 Intersection #15 Intersection #16 Intersection #17 Intersection #18 222 (1 683 (513) 574 (949) 187 (75) 560 (600) 164 (93) 5 (5) 139 (188) 124 (139) 1,044 (1,317) 720Laurel (720) St. & Ravenswood Ave. Middlefield Rd. & Ravenswood Ave.18) Middlefield Rd. & Ringwood Ave. Middlefield Rd. & Willow Rd. Gilbert Ave. & Willow Rd. Coleman Ave. & Willow Rd. 225 (175)10) 306 (417) 81 105 (165) 138 (55) 8 (7) 9 (4) 1 (773) 308 (435) 61 (10) 579 (528) 50 (32) 158 (135) 84 (41) 1,240 (1,064) 54 (37) 86 (41) 20 (18) 9 (5) 113 (3)

7 (9) 15) 16 (35) 103 (97) 835 (903) 5 (7) 0 (0) 35 (20) 674 (790) 1,282 (1,675) 22 (48) 182 (292) 4 (19) 12 (64) 385 (254) 3 (9) 65 (1) 584 (622) 586 (745) 1,284 (1,627) 5 (7) 30 (18) 41 (55) 57 (1 91 (121) 6 (94) 683 (513) 187 (75) 133 (109) 254 (1 144 (296) 5 (5) 193 (273) 4 (64) 222 (1 560 (600) 12 (105) 139 (188) 574 (949) 164 (93) 978 (1,055) 321 (349) 124 (139)1,518 (1,768) 1,044 (1,317) 18) 225 (175) 174 (238) 1,703 (1,834) 720 (720) 9 (4) 10) 306 (417) Intersection #23 81 105 (165) 138 (55) 8 (7) Intersection #19 Intersection #20 Intersection #21 Intersection #22 1 (773) Intersection308 #24(435) 61 (10) 579 (528) 50 (32) Sand Hill Circle & Sand Hill Rd. 1,240 (1,064) 158 (135) 86 (41) Durham St. & Willow Rd. Bay Rd. & Marsh Rd. Bohannon Dr./ Florence St. 84 (41)Scott Dr./Rolison at Marsh Rd. El Camino Real & Encinal Ave. 54 (37) & Marsh Rd. I-280 NB Off-Ramp & Sand Hill Rd. 20 (18) 9 (5) 113 (3)

7 (9) 5 (7) 0 (0) 35 (20) 12 (64) 69 (24)

64 (301) 92 (133) 30 (18) 1,021 (3,133) 91 (121) 144 (296) 6 (94) 193 (273) 4 (64) 1 (1,649) 62 (104) 12 (105) 127 (45) 978 (1,055) 321 (349) 1,341 (1,692) 400 (436) 174 (238) 1,518 (1,768) 1,703 (1,834) 39 (86) 2,101 (1,904) 209 (326) 509 (78) 4 (5) 51 (53) 581 (534) 133 (139) Intersection #21 Intersection #23 146 (126) 1,41 1,719 (1,627) Intersection #19 Intersection #20 159 (165) 460 (200) 39 (68) Intersection #22 Intersection #24 24 (3) 78 (605) Bohannon1,254 (2,428)Dr./ Florence St. Sand Hill Circle & Sand Hill Rd. 72 (102) Durham St. & Willow8 (12)Rd. Bay Rd. & Marsh Rd. Scott Dr./Rolison at Marsh Rd. El Camino Real & Encinal Ave. 83 (47) 233 (200) 55 (123) 303 (361) 14 (40) I-280 NB Off-Ramp & Sand Hill Rd. 113 (89) 16 (25) 191 (102) & Marsh Rd. 7 (1) 13 (13) 25 (51) 2,550 (1,688) 8 (23) 80 (25) 665 (694) 72 (209) 20 (15) (3) 6

117 (257) 83 (151) 5 (0) 66 (21) 4 (4) 72 (12) 264 (264) (72) 300 69 (24) 9 (13) 45 (27) 7 (8) 4 (7) 64 (8) 64 (301) 92 (133) 22 (56) 15 (30) 13 (8) 1,021 (3,133) 166 (36) 1 (1,649) 62 (104) 162 (303) 127 (45) 2,279 (891) 1,918 (1,906) 13 (101) 292 (180) 1,341 (1,692) 400 (436) 1 39 (86) 2,101 (1,904) 209 (326) 2,066 (1,921) 509 (78) 4 (5) 51 (53) 581 (534) 133 (139)

1,565 (1,391) (32) 92 1,706 (1,364) 146 (126) 1,41 1,719 (1,627) 159 (165) 460 (200) 39 (68) 24 (3) (405) 745 78 (605) 1,254 (2,428) 72 (102) 8 (12) 83 (47) 233 (200) 55 (123) 303 (361) 14 (40) Intersection #25 113 (89) 16 (25) 191 (102) Intersection #26 Intersection #27 7 (1) Intersection #28 Intersection #29 13 (13) Intersection #30 25 (51) 2,550 (1,688)

El Camino Real & (3) 6 El Camino Real & Oak Grove Ave. El Camino Real & Santa Cruz Ave. 8El (23) Camino Real & Ravenswood Ave. El80 Camino (25) Real & Roble Ave. El Camino Real665 & Middle(694) Ave. 72 (209) 20 (15)

Valparaiso Ave./Glenwood Ave. 117 (257) 83 (151) 5 (0) 66 (21) 4 (4) 72 (12) 264 (264) (72) 300

10 (41) 105 (178) 32 (24) 78 (163) 40 (79) 0 (29) 70 (44) 361 (441) 235 (237) 179 (317) 833 (770) 2 (50) LEGEND 73 (67) 92 (197) 98 (141) 88 (148) 9 (13) 39 (65) 45 (27) 587 (1,034) 15 (31) 7 (8) 101 (123) 2,856 (2,359) 4 (7) 64 (8) 1,123 (2,159) 37 (98) 22 (56) 985 (2,165) 1,940 (1,630) 15 (30) 1,025 (1,847) 1,694 (2,904) 2,575 (2,140) 1,474 (2,943) 13 (8) Study Intersection 107 (85) 126 (143) 2,008 (1,722)0 (0) 0 (0) 268 (285) 145 (182) 52 (1 250 (556) 166 (36) 1,707 (1,413) 163 (1 124 (157) 1,920 (1,535) 1,031 (2,223)16) 31 (73) 19) 109 (143) 162 (303) 2,279 (891) XX AM Peak Hour Volumes 137 (218) 1,918 (1,906) 13 (101) 839 (440) 292 (180) 112 (198) 54 (198) 1 (XX) PM Peak Hour Volumes 2,066 (1,921)

1,565 (1,391) (32) 92 Traffic Signal 1,706 (1,364) 1 (8) (405) 745 68 (72) 94 (203) 50 (82) 82 (48) 142 (289) 473 (429) 251 (337) 434 (549) 175 (146) 458 (302) 215 (185)98 (172) 295 (271)69 (104) 94 (218) Intersection101 (196) #25 Intersection #26 Intersection #27 Intersection #28 Intersection #29 Intersection #30 El Camino Real & El Camino Real & Oak Grove Ave. El Camino Real & Santa Cruz Ave. El Camino Real & Ravenswood Ave. El Camino Real & Roble Ave. El Camino Real & Middle Ave. Source: TJKM Transportation Consultants. Valparaiso Ave./Glenwood Ave.

10 (41) 40 (79) 105 (178) 0 (29) 32 (24) 78 (163) 361 (441) 235 (237) 179 (317) 70 (44) 2 (50) LEGEND 98 (141) 833 (770) 73 (67) 39 (65) 92 (197) 101 (123) 88 (148) 587 (1,034) 15 (31) 2,856 (2,359)37 (98) 985 (2,165) 1,940 (1,630) 1,123 (2,159) 1,025 (1,847) 1,694 (2,904) 2,575 (2,140) 1,474 (2,943) Study Intersection 107 (85) 126 (143) 2,008 (1,722)0 (0) 0 (0) 268 (285) 145 (182) 52 (1 250 (556) 1,707 (1,413) 163 (1 124 (157) 1,920 (1,535) 1,031 (2,223)16) 31 (73) 19) 109 (143) XX AM Peak Hour Volumes 137 (218) 839 (440) 1 54 (198) (XX) PM Peak Hour Volumes 12 (198)

Traffic Signal FIGURE 4.13-8A 1 (8) 68 (72) 94 (203) 50 (82) 82 (48) 142 (289) 473 (429) 251 (337) 434 (549) 175 (146) 458 (302) 2035 PLUS PLAN COMPONENTS215 (185)98 (172) PEAK HOUR295 (271)69 (104) VOLUMES AND 94 (218) 101 (196) LANE CONFIGURATIONS CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

Intersection #31 Intersection #32 Intersection #33 Intersection #34 Intersection #35 Intersection #36 El Camino Real & Cambridge Ave. Bay Rd. & Willow Rd. Newbridge St. & Willow Rd. O'Brien Dr. & Willow Rd. Ivy Dr. & Willow Rd. Hamilton Ave. & Willow Rd.

) )

) ) 349 ) 970 , , ) (71 ) ) 686 , (2

(25 (1 ) (4 ) ) (2 (94 51 3 1 1 622 (542) (0 (201 (23 20 (24) 452 809 74 , , 0 (108 1 104 (78) 073 1,765 (3,370) 1 66 , 13 (75) 81 2 1,935 (2,687) 29 (61) 157 (382) 61

47 (78) 1,644 (2,756) 2,966 106(2,335) (81) 62 (61) 62 (75) 10 (12) 608 (387) 212 (282) 43 (159) 13 (27) 268 (93) 469 (258) 12 (26) 179 (166) 324 (654) 151 (83) 554 (676) 20 (10) 163 (144) ) 22 (17) ) 71 (45) (61

212 ,

(2 74 (16) 103 556 (506) 182 (268) 120 (144)

180 (469) 289 (210)

233 , 2,624 (2,375) 2,355 (2,140) 2,704 (2,563) 2 2,398 (2,502) Intersection #37 Intersection #38 Intersection #39 Intersection #40 Intersection #41 Intersection #42 Bayfront Exp. & Willow Rd. Bayfront Exp. & University Ave. O'Brien Dr. & University Ave. Bayfront Exp. & Chilco St. Bayfront Exp. & Chrysler Dr. Bayfront Exp. & Marsh Rd.

) ) ,396 ) ) ) ) )

(1 ) ) 25 (4) (845 ) (466 (8 (57 893 (24 (14 (280 , ,577) ,600 (1 3 (709 58 (20) (408 3,617 (1,753)

4 825 941 3,904 (1,164) , , 13 56

13 1 1 63 36 504 (104) 72 46 513 (269) 78 (15) 941 (1,017) 3,342 (2,446)

1,987 (3,269) 0 (11) 528 (2,197) 21 (163) 84 (647) 574 (63) 434 (134) 34 (99) 1,885 (3,190) 43 (29) 538 (421)

1,154 (3,530) 186 (230)

9 (132) 57 (65)

178 (492) 65 (18) 346 (225) 250 (583) 202 (803) 262 (398)

737 (106)

265 (317) 943 (2,214)

1,144 (150) 618 (1,933) 1,485 (5,432) 1,990 (2,680)

Intersection #43 Intersection #44 Intersection #45 Intersection #46 Intersection #47 Intersection #48 Valparaiso Ave. & University Dr. US 101 SB Ramps & Marsh Rd. US 101 NB Ramps & Marsh Rd. University Ave. & Bay Rd. Middlefield Rd. & Lytton Ave. Sand Hill Rd. & El Camino Real

) 127 ) ) 299 ) 0 (0) 166 ) ) (51 690 (592 , (181 (104 )

(457 (12 (84 1,795 (1,849) ) (1 (566 0 (0) 89 (3 26 (98) (0 680 0 194 22 143 , ) 82 (51) 196 ) 15 802 (643) 2 ) 720 (1,583) 56 (72) 1,816 (1,397) 637 (1,380) 9 (14) 62 (35) 131 (62) 686 (747) 225 (185) 59 (1 105 (98) 156 (126) 71 (29) 13 (23) 15) 476 (368) 83 (222) 1,037 (788) 914 (962) 520 (250) 630 (558) 106 (142) 269 (297) 127 (123) 468 (300) 436 (966) ) 496 (284) 1,870 (1,279) ,937 1,376 (635) 0 (0) (2 122 (509) 678 (597)

203 (44) 50 (222) 944 ) 73 (105) , 214 (439) 771 (675) 1,681 (1,735) 2 (0 235 (140) 0

Intersection #52 Intersection #51 Intersection #49 Intersection #50 Santa Cruz Ave./ Santa Cruz Ave & Elder Ave. Sand Hill Rd. & Pasteur Dr. Campus Dr. & Junipero Serra Blvd. Alameda De Las Pulgas

506 (610)

1 (3) 6 (5) LEGEND 9 (3) 758 (1,620) 306 (124) 229 (62)

262 (668) 621 (995) Study Intersection

133 (286) 133 9 (17) 9 11 (8) (580) 62 0 (0) 11 291 (602) 871 (595) AM Peak Hour Volumes 19 (5) 1 (391) 8 (1) 183 (48) XX 43 (9) 154 (55) 10 (12) (XX) PM Peak Hour Volumes 15 (22) 727 (778) 467 (196) 510 (847) 3 (15) Traffic Signal 878 (307) 9 (7) 14 (0) 4 (0) 14 (9)

64 (50) 5 (37)

13 (55)

13 (13) 121 (41) 229 (85) 988 (948)

1,801 (1,351)

Source: TJKM Transportation Consultants.

FIGURE 4.13-8B

2035 PLUS PLAN COMPONENTS PEAK HOUR VOLUMES AND LANE CONFIGURATIONS CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-9 FREEWAY LEVELS OF SERVICE – EXISTING AND NEAR-TERM 2014 CONDITIONS

Segment Existing CMP LOS Project % of Significant No. Roadway Segment LOSa Standards Capacityb Trips Capacity Impact? 1 US 101 N/O Marsh Rd F F 9,200 20 0.21% No

2 US 101 S/O Marsh Rd F F 9,200 134 1.46% Yes

3 US 101 S/O Willow Rd F F 9,200 88 0.96% No

4 -1 SR 84 Marsh Rd – Willow Rd B D 4,500 4 0.09% No

4-2 SR 84 Willow Rd – University Ave F E 4,500 10 0.22% No

5 I-280 N/O Sand Hill E D 9,200 9 0.10% No

6 I-280 S/O Sand Hill E D 9,200 12 0.13% No Note: Bold indicates unacceptable operational conditions based on applicable City/Caltrans standards, as well as potentially significant impacts. a Source: 2011 CMP Monitoring Report. Based on average speed. b Capacity is based on number of lanes and 2,200 vehicles per hour per lane (vphpl) for four lane segments and 2,300 vphpl for six lane and more segments for US 101 and I- 280. Capacity of 1,500 vphpl is used for SR 84 segments. Source: TJKM Transportation Consultants, March 2013.

4.13-66

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

The level of service was evaluated for the study intersections under 2035 plus Plan Components conditions. Table 4.13-10 summarizes the results. Detailed level of service calculations are contained in Appendix G of the Traffic Report (see Appendix F of this EA).

As previously discussed, under 2035 without Plan Components conditions all study intersections operate within acceptable standards, with the exception of 29 intersections. With the addition of trips generated by future development under the Plan Components, no additional intersections operate at unacceptable levels of service. However, the levels of service for the five intersections listed below would be degraded:

¨ Laurel Street & Ravenswood Avenue operates at LOS E during AM peak hour

¨ Middlefield Road and Ravenswood Avenue operates at LOS E during AM peak hour.

¨ Gilbert Avenue and Willow Road operates at LOS E during AM peak hour and LOS F during PM peak hour.

¨ Bohannon Drive/Florence Street and Marsh Road operates at LOS F during AM peak hour.

¨ Hamilton Avenue and Willow Road (Caltrans) operates at LOS E during AM peak hour and LOS F during PM peak hour.

¨ US 101 NB Ramps and Marsh Road (Caltrans) operates at LOS F during PM peak hour.

As shown in Table 4.13-11, 25 intersections have significant impacts with the addition of trips from future development to the 2035 conditions during the AM or PM peak hours to the following intersections:

¨ Addison Wesley and Sand Hill Road during AM peak hour delay increases by more than 0.8 seconds.

¨ Sharon Park Drive and Sand Hill Road during PM peak hour delay increases by more than 0.8 seconds.

¨ Alpine Road/Santa Cruz Avenue and Junipero Serra Boulevard during both AM and PM peak hours delay increases by more than 0.8 seconds.

¨ Santa Cruz Avenue and Sand Hill Road during both AM and PM peak hours delay increases by more than 0.8 seconds.

¨ Middlefield Road and Marsh Road (Atherton) during both AM and PM peak hours delay increases by 4 seconds at LOS F.

¨ Laurel Street and Ravenswood Avenue during AM peak hour the LOS degrades from LOS D to LOS E.

4.13-67

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-10 PEAK HOUR INTERSECTION LEVELS OF SERVICE – EXISTING AND 2035 CONDITIONS

AM Peak Hour PM Peak Hour

2035 Plus 2035 Plus Cumulative Project Cumulative Project Delay Delay Int. LOS Delay Delay Diff Sig. Delay Delay Diff Sig. No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) (sec) Impact? LOS (sec) LOS (sec) (sec) Impact? Addison Wesley and 1 Signal Menlo Park D E 57.2 E 59.4 2.2 Yes D 42.5 D 44.6 2.1 No Sand Hill Rd. Saga Ln. and 2 Signal Menlo Park D B 11.1 B 11.3 0.2 No B 15.5 B 15.7 0.2 No Sand Hill Rd. Branner Dr. and 3 Signal Menlo Park D A 5.4 A 5.4 0.0 No A 7.9 A 8.1 0.2 No Sand Hill Rd. Sharon Park Dr. and 4 Signal Menlo Park D D 43.9 D 47.4 3.5 No E 64.3 E 69.2 4.9 Yes Sand Hill Rd. Alpine Rd./Santa Cruz 5 Ave. and Junipero Signal Menlo Park D F 108.1 F 109.2 1.1 Yes E 69.1 E 70.4 1.3 Yes Serra Blvd. Santa Cruz Ave. and 6 Signal Menlo Park D E 61.6 E 62.7 1.1 Yes E 58.0 E 60.4 2.4 Yes Sand Hill Rd. Oak Ave. and 7 Signal Menlo Park D B 14.3 B 14.9 0.6 No B 10.2 B 10.8 0.6 No Sand Hill Rd. Middlefield Rd. and 8 Signal Atherton D F 116.4 F 124.3 7.9 Yes F 87.5 F 99.5 12.0 Yes Marsh Rd. Encinal Ave. and 9 Signal Atherton D D 45.9 D 48.8 2.9 No B 15.2 B 15.8 0.6 No Middlefield Rd. Middlefield Rd. and 10 Signal Atherton D C 32.9 C 33.8 0.9 No B 16.9 B 17.6 0.7 No Oak Grove Ave. University Dr. (S) and 11 Signal Menlo Park D B 18.2 B 18.6 0.4 No C 20.0 C 20.5 0.5 No Santa Cruz Ave. Laurel St. and Oak 12 Signal Menlo Park C C 24.1 C 25.3 1.2 No B 14.3 B 14.7 0.4 No Grove Ave.

4.13-68

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-10 PEAK HOUR INTERSECTION LEVELS OF SERVICE – EXISTING AND 2035 CONDITIONS

AM Peak Hour PM Peak Hour

2035 Plus 2035 Plus Cumulative Project Cumulative Project Delay Delay Int. LOS Delay Delay Diff Sig. Delay Delay Diff Sig. No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) (sec) Impact? LOS (sec) LOS (sec) (sec) Impact? Laurel St. and Ra- 13 Signal Menlo Park D D 52.9 E 55.7 2.8 Yes D 41.3 D 47.3 6.0 No venswood Ave. Middlefield Rd. and 14 Signal Menlo Park D D 50.1 E 57.0 6.9 Yes E 69.4 E 78.3 8.9 Yes Ravenswood Ave. Middlefield Rd. and 15 Signal Menlo Park D C 29.9 C 29.9 0.0 No C 29.0 C 29.0 0.0 No Ringwood Ave. Middlefield Rd. and 16 Signal Menlo Park D F 144.3 F 156.0 11.7 Yes F 187.8 F 207.2 19.4 Yes Willow Rd. Gilbert Ave. and Wil- 17 Signal Menlo Park D D 51.6 E 58.5 6.9 Yes E 63.9 F 81.0 17.1 Yes low Rd. Coleman Ave. and 18 Signal Menlo Park D F 93.5 F 103.7 10.2 Yes F 80.9 F 97.4 16.5 Yes Willow Rd. Durham St. and Wil- 19 Signal Menlo Park D C 26.9 C 32.5 5.6 No E 55.1 E 61.6 6.5 Yes low Rd. Bay Rd. and Marsh 20 Signal Menlo Park D E 63.7 E 66.2 2.5 Yes C 31.8 D 35.8 4.0 No Rd. Bohannon 21 Dr./Florence St. and Signal Menlo Park D E 76.3 F 86.9 10.6 Yes F 128.1 F 132.9 4.8 Yes Marsh Rd. Scott Dr./Rolison Rd. 22 Signal Menlo Park D E 74.5 F 80.8 6.3 Yes F 138.9 F 144.0 5.1 Yes and Marsh Rd. Sand Hill Circle and D C 27.2 C 28.1 0.9 No F 142.7 F 148.4 5.7 Sand Hill Rd. 23 Signal Menlo Park Yes WB Critical Approach F 140.3 F 146.1 5.8 on Sand Hill Rd.

4.13-69

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-10 PEAK HOUR INTERSECTION LEVELS OF SERVICE – EXISTING AND 2035 CONDITIONS

AM Peak Hour PM Peak Hour

2035 Plus 2035 Plus Cumulative Project Cumulative Project Delay Delay Int. LOS Delay Delay Diff Sig. Delay Delay Diff Sig. No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) (sec) Impact? LOS (sec) LOS (sec) (sec) Impact? I-280 NB Off-Ramp D E 68.1 E 76.6 8.4 C 26.1 C 26.8 0.7 No and Sand Hill Rd. Signal Caltrans Yes EB Critical Approach E 60.2 E 69.1 8.9 on Sand Hill Rd. El Camino Real and 24 Signal Caltrans D B 18.7 B 18.7 0.0 No C 31.8 C 32.0 0.2 No Encinal Ave. El Camino Real and 25 Valparaiso Signal Caltrans D D 48.8 D 49.8 1.0 No E 57.3 E 58.9 1.6 Ave./Glenwood Ave. Yes EB Critical Local Ap- proach on Valparaiso F 99.4 F 101.3 1.9 Ave. El Camino Real and 26 Signal Caltrans D D 38.3 D 39.2 0.9 No D 52.1 D 52.6 0.5 No Oak Grove Ave. El Camino Real and 27 Signal Caltrans D B 16.5 B 16.5 0.0 No C 31.5 C 32.2 0.7 No Santa Cruz Ave. El Camino Real and Ravenswood F 82.2 F 84.6 2.4 F 123.4 F 130.1 6.7 Ave./Menlo Ave. 28 Signal Caltrans D Yes Yes WB Critical Local Approach on Ravens- F 114.7 F 117.1 2.4 F 223.0 F 235.0 12.0 wood Ave. El Camino Real and 29 Signal Caltrans D B 14.0 B 14.0 0.0 No D 47.6 D 48.1 0.5 No Roble Ave. El Camino Real and 30 Signal Caltrans D D 52.9 D 53.9 1.0 No F 134.8 F 136.5 1.7 Yes Middle Ave.

4.13-70

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-10 PEAK HOUR INTERSECTION LEVELS OF SERVICE – EXISTING AND 2035 CONDITIONS

AM Peak Hour PM Peak Hour

2035 Plus 2035 Plus Cumulative Project Cumulative Project Delay Delay Int. LOS Delay Delay Diff Sig. Delay Delay Diff Sig. No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) (sec) Impact? LOS (sec) LOS (sec) (sec) Impact? EB Critical Local Ap- F 223.8 F 225.6 2.8 proach on Middle Ave. El Camino Real and 31 Signal Caltrans D B 16.0 B 16.1 0.1 No C 22.1 C 22.1 0.0 No Cambridge Ave. Bay Rd. and Willow 32 D E 63.0 E 68.1 5.1 D 48.0 D 54.4 6.4 No Rd. Signal Caltrans Yes EB Critical Approach E 71.5 E 76.3 4.8 on Willow Rd. Newbridge St. and D F 235.3 F 255.1 19.8 F 292.4 F 315.4 23.0 Yes Willow Rd. 33 SB Critical Local Ap- Signal Caltrans Yes proach on Newbridge F 380.4 F 423.2 42.8 St. O'Brien Dr. and Wil- 34 Signal Caltrans D B 18.3 B 18.6 0.3 No C 34.3 D 39.6 5.3 No low Rd. Ivy Dr. and Willow 35 Signal Caltrans D C 22.3 C 23.5 1.2 No D 37.6 D 41.8 4.2 No Rd. Hamilton Ave. and 36 Signal Caltrans D D 37.6 E 55.7 18.1 Yes E 57.8 F 83.1 25.3 Yes Willow Rd. Bayfront Exp. and 37 Signal Caltrans D F 156.8 F 156.7 -0.1 No F 235.2 F 235.9 0.7 Willow Rd. Yes WB Critical Approach F 322.9 F 323.8 0.9 on Willow Road Bayfront Exp. and 38 Signal Caltrans D F 82.8 F 83.3 0.5 No F 293.1 F 293.2 0.1 No University Ave.

4.13-71

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-10 PEAK HOUR INTERSECTION LEVELS OF SERVICE – EXISTING AND 2035 CONDITIONS

AM Peak Hour PM Peak Hour

2035 Plus 2035 Plus Cumulative Project Cumulative Project Delay Delay Int. LOS Delay Delay Diff Sig. Delay Delay Diff Sig. No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) (sec) Impact? LOS (sec) LOS (sec) (sec) Impact? O'Brien Dr. and Uni- 39 Signal Caltrans D A 6.7 A 6.7 0.0 No B 12.3 B 12.3 0.0 No versity Ave. Bayfront Exp. and 40 Signal Caltrans D D 37.4 D 37.4 0.0 No F 103.9 F 104.0 0.1 No Chilco St. Bayfront Exp. and 41 Signal Caltrans D B 13.8 B 13.8 0.0 No F 102.6 F 102.7 0.1 No Chrysler Dr. Bayfront Exp. and 42 Signal Caltrans D F 94.6 F 159.2 64.6 Yes F 178.9 F 197.3 18.4 Marsh Rd. Yes EB Critical Approach F 174.7 F 213.3 38.6 on Marsh Rd. Valparaiso Ave. and 43 Signal Menlo Park D B 19.4 B 19.7 0.3 No C 21.2 C 21.5 0.3 No University Dr. US 101 SB Ramps and 44 Signal Caltrans D F 104.8 F 111.7 6.9 E 70.8 E 78.4 7.6 Marsh Rd. Yes Yes WB Critical Approach F 129.0 F 139.0 10.0 E 69.7 E 77.5 7.8 on Marsh Rd. US 101 NB Ramps and 45 Signal Caltrans D F 95.8 F 112.5 16.7 E 74.6 F 89.1 14.5 Marsh Rd. Yes Yes EB Critical Approach F 122.0 F 145.0 23.0 F 94.5 F 109.0 14.5 on Marsh Rd. University Ave. and 46 Signal Caltrans D E 60.0 E 60.0 0.0 No E 69.0 E 69.0 0.0 No Bay Rd. Middlefield Rd. and 47 Signal Palo Alto D E 64.1 E 69.9 5.8 No E 63.6 E 70.3 6.7 No Lytton Ave.

4.13-72

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-10 PEAK HOUR INTERSECTION LEVELS OF SERVICE – EXISTING AND 2035 CONDITIONS

AM Peak Hour PM Peak Hour

2035 Plus 2035 Plus Cumulative Project Cumulative Project Delay Delay Int. LOS Delay Delay Diff Sig. Delay Delay Diff Sig. No. Intersection Control Jurisdiction Threshold LOS (sec) LOS (sec) (sec) Impact? LOS (sec) LOS (sec) (sec) Impact? Sand Hill Rd. and El 48 Signal Caltrans D C 23.5 C 23.6 0.1 No C 34.0 C 34.3 0.3 No Camino Real Sand Hill Rd. and Pas- 49 Signal Palo Alto D C 34.5 C 34.7 0.2 No D 46.3 D 46.7 0.4 No teur Dr. Campus Dr. and Juni- Santa Clara 50 Signal D B 19.9 C 20.2 0.3 No D 50.3 D 50.3 0.0 No pero Serra Blvd. Co. Santa Cruz Ave. and 51 Signal Menlo Park D B 19.0 B 19.1 0.1 No A 7.2 A 7.2 0.0 No Elder Ave. Santa Cruz San Mateo 52 Ave./Alameda De Las Signal D B 13.5 B 13.8 0.3 No B 14.7 B 15.0 0.3 No Co. Pulgas Note: Bold indicates unacceptable operational conditions based on applicable City/Caltrans standards, as well as potentially significant impacts. a LOS = Level of Service. Delay = Average control delay per vehicle. b Delay / LOS are for overall intersection Source: TJKM Transportation Consultants, March 2013.

4.13-73

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-11 ROADWAY AVERAGE DAILY TRAFFIC VOLUMES – EXISTING AND 2035 CONDITIONS Trip ADT Contribution 2035 Plus Added Existing Plan Daily % of Significant No. Roadway Segment Classification ADT 2035 ADT ADT Volume 2035 Impact 1 Haven Ave City Limits-Bayfront Expwy/Marsh Rd Collector 5,751 7,235 8,874 1,639 22.7% Yes 2-1 Bay Rd-Bohannon Dr/Florence St Minor Arterial 27,013 43,338 44,616 1,278 2.9% Yes Marsh Rd Primary 2-2 Bohannon Dr/Florence St-Scott Dr 32,768 51,195 52,817 1,622 3.2% Yes Arterial 3 Hamilton Ave Chilco St-Willow Rd Collector 3,010 3,812 4,929 1,117 29.3% Yes 4-1 Laurel St-Middlefield Rd Collector 5,181 8,964 9,048 85 0.9% No 4-2 Middlefield Rd-Gilbert Ave Minor Arterial 26,213 43,774 45,626 1,852 4.2% Yes 4-3 Willow Rd Gilbert Ave-Coleman Ave Minor Arterial 26,336 43,885 45,747 1,862 4.2% Yes 4-4 Coleman Ave-Durham St/Hospital Ave Minor Arterial 28,038 45,853 47,549 1,697 3.7% Yes 4-5 Durham St/Hospital Ave-Bay Rd Minor Arterial 32,148 50,607 52,108 1,500 3.0% Yes 5 Middlefield Rd Ravenswood Ave-Willow Rd Minor Arterial 20,668 29,610 30,467 856 2.9% Yes 6-1 Glenwood Ave-Oak Grove Ave Collector 3,916 5,717 5,840 123 2.1% No 6-2 Laurel St Oak Grove Ave-Ravenswood Ave Collector 4,404 5,540 5,554 14 0.3% No 6-3 Ravenswood Ave-Willow Rd Collector 4,917 9,481 9,599 118 1.2% Yes 7-1 Middle Ave-Menlo Ave Collector 5,666 8,087 8,372 285 3.5% No 7-2 Menlo Ave-Santa Cruz Ave Collector 17,641 24,577 24,930 353 1.4% Yes University Dr 7-3 Santa Cruz Ave-Oak Grove Ave Collector 7,052 9,210 9,335 125 1.4% Yes 7-4 Oak Grove Ave-Valparaiso Ave Collector 5,376 7,197 7,253 56 0.8% No

8-1 Valparaiso Ave/ University Dr-El Camino Real Minor Arterial 13,238 18,279 18,422 143 0.8% Yes 8-2 Glenwood Ave El Camino Real-Laurel St Collector 5,899 7,854 7,957 102 1.3% No

4.13-74

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Trip ADT Contribution 2035 Plus Added Existing Plan Daily % of Significant No. Roadway Segment Classification ADT 2035 ADT ADT Volume 2035 Impact 9-1 University Dr -El Camino Real Collector 10,038 12,808 12,851 43 0.3% No 9-2 Oak Grove Ave El Camino Real-Laurel St Collector 9,677 13,196 13,399 203 1.5% Yes 9-3 Laurel St-Middlefield Rd Collector 8,556 10,710 10,742 31 0.3% No 10-1 El Camino Real-Alma St Minor Arterial 24,076 37,525 38,471 946 2.5% Yes 10-2 Ravenswood Ave Alma St-Laurel St Minor Arterial 19,912 31,116 31,972 856 2.8% Yes 10-3 Laurel St-Middlefield Rd Minor Arterial 17,977 25,237 25,827 589 2.3% Yes Alameda de las Pulgas- Avy Ave/ 11-1 Minor Arterial 9,238 12,973 13,282 308 2.4% No Orange Ave 11-2 Avy Ave/Orange Ave-Olive St Minor Arterial 16,097 23,277 23,644 367 1.6% Yes 11-3 Santa Cruz Ave Olive St-University Dr Minor Arterial 17,179 24,391 24,720 329 1.4% Yes 11-4 University Dr-Crane St Minor Arterial 8,895 13,298 13,466 168 1.3% No 11-5 Crane St-El Camino Real Minor Arterial 8,074 12,969 13,087 118 0.9% No 12-1 Olive St-University Dr Collector 7,222 9,936 10,162 226 2.3% Yes Middle Ave 12-2 University Dr-El Camino Real Collector 7,519 10,450 10,530 80 0.8% Yes

13-1 Alpine Rd/ Junipero Serra Blvd-City Limits Minor Arterial 23,406 29,425 29,550 125 0.4% Yes 13-2 Santa Cruz Ave Sand Hill Rd-Junipero Serra Blvd Minor Arterial 30,187 38,793 39,026 233 0.6% Yes 14 Linfield Dr Middlefield Rd - Laurel St Local 1,583 1,990 2,131 141 7.1% Yes 15 Oak Ave Sand Hill Rd - Olive St Local 2,518 3,482 3,645 163 4.7% Yes Notes: Bold indicates potentially significant impacts. Source: TJKM Transportation Consultants, March 2013.

4.13-75

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ Middlefield Road and Ravenswood Avenue during both AM and PM peak hours level of service de- grades from LOS D to LOS E during AM peak hour and delay increases by more than 0.8 seconds dur- ing PM peak hour.

¨ Middlefield Road and Willow Road during both AM and PM peak hour delay increases by more than 0.8 seconds.

¨ Gilbert Avenue and Willow Road during both AM and PM peak hour level of service degrades from LOS D to LOS E during AM peak hour and delay increases by more than 0.8 seconds during PM peak hour.

¨ Coleman Avenue and Willow Road during both AM and PM peak hours delay increases by more than 0.8 seconds.

¨ Durham Street and Willow Road during PM peak hour delay increases by more than 0.8 seconds ¨ Bay Road and Marsh Road during AM peak hour delay increases by more than 0.8 seconds. ¨ Bohannon Drive/Florence Street and Marsh Road during both AM and PM peak hours delay increases by more than 0.8 seconds.

¨ Scott Drive/Rolison Road and Marsh Road during both AM and PM peak hours delay increases by more than 0.8 seconds.

¨ I-280 NB Off-Ramp/Sand Hill Circle and Sand Hill Road (Caltrans) during both AM and PM peak hours delay increases by more than 0.8 seconds.

¨ El Camino Real and Valparaiso Avenue/Glenwood Avenue (Caltrans) during PM peak hour delay in- creases by more than 0.8 seconds

¨ El Camino Real and Ravenswood Avenue/Menlo Avenue (Caltrans) during both AM and PM peak hours delay increases by more than 0.8 seconds

¨ El Camino Real and Middle Avenue (Caltrans) during PM peak hour delay increases by more than 0.8 seconds

¨ Bay Road and Willow Road (Caltrans) during AM peak hour delay increases by more than 0.8 seconds

¨ Newbridge Street and Willow Road (Caltrans) during both AM and PM peak hours delay increases by more than 0.8 seconds during AM peak hour delay increases by 23 seconds for PM peak hour

¨ Hamilton Avenue and Willow Road (Caltrans) during both AM and PM peak hour level of service de- grades from LOS D to LOS E during AM peak hour delay increases by 23 seconds for PM peak hour

4.13-76

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ Bayfront Expressway and Willow Road (Caltrans) during PM peak hour delay increases by more than 0.8 seconds

¨ Bayfront Expressway and Marsh Road (Caltrans) during both AM and PM peak hour delay increase by 23 seconds during AM Peak hour

¨ The most critical movement delay increases by more than 0.8 seconds during PM peak hour

¨ US 101 SB Ramps and Marsh Road (Caltrans) during both AM and PM peak hours delay increases by more than 0.8 seconds

¨ US 101 NB Ramps and Marsh Road (Caltrans) during both AM and PM peak hours delay increases by more than 0.8 seconds ii. Roadway Traffic Volumes a) Arterial Streets The following arterial segments (primary and minor) exceed 90 percent capacity with ADTs over 18,000 vehicles per day and under 2035 plus Plan Components conditions more than 100 trips would be added to each of these segments; therefore, City’s threshold of significance for arterial streets would be exceeded.

¨ Marsh Road from Bohannon Drive/Florence Street to Scott Drive (primary arterial)

¨ Marsh Road from Bay Road to Bohannon Drive/Florence Street

¨ Willow Road from Middlefield Road to Gilbert Avenue

¨ Willow Road from Gilbert Avenue to Coleman Ave

¨ Willow Road from Coleman Avenue to Durham St/Hospital Avenue

¨ Willow Road from Durham Street/Hospital Ave to Bay Road

¨ Middlefield Road from Ravenswood Avenue to Willow Road

¨ Valparaiso Avenue/Glenwood Avenue from University Drive to El Camino Real

¨ Ravenswood Avenue from El Camino Real to Alma Street

¨ Ravenswood Avenue from Alma Street to Laurel Street

¨ Ravenswood Avenue from Laurel Street to Middlefield Road

¨ Santa Cruz Ave from Avy Avenue/Orange Ave to Olive Street

¨ Santa Cruz Ave from Olive Street to University Drive

4.13-77

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ Alpine Road/Santa Cruz Avenue from Junipero Serra Boulevard to City Limits

¨ Alpine Road/Santa Cruz Avenue from Sand Hill Road to Serra Boulevard

b) Collector Streets More than a net total of 50 trips would be added to the following collector streets that are currently at 90 percent capacity with ADTs over 9,000 vehicles per day:

¨ University Drive from Menlo Avenue to Santa Cruz Avenue

¨ University Drive from Santa Cruz Avenue to Oak Grove Avenue

¨ Oak Grove Avenue from University Drive to El Camino Real

¨ Oak Grove Avenue from El Camino Real to Laurel Street

¨ Middle Avenue from Olive Street to University Drive

¨ Middle Avenue from University Drive to El Camino Real

Future trips would exceed the City’s threshold by adding more than 12.5 percent additional trips or result- ing in an ADT that would exceed 9,000 vehicles per day for the collector streets which exceed 50 percent capacity with ADTs over 5,000 vehicles per day at the following segment. ¨ Haven Avenue from City Limits to Bayfront Expressway/Marsh Road

Future trips would exceed the City’s threshold by adding more than 25 percent additional trips for the col- lector streets with ADTs of less than 5,000 vehicles per day at the following collector street segment: ¨ Hamilton Avenue from Chilco Street to Willow Road

c) Local Streets Future trips more than a net total of 25 trips would be added to the following local streets that are currently at 90 percent capacity with ADTs over 1,350 vehicles per day:

¨ Linfield Drive from Middlefield Road to Laurel Street

¨ Oak Avenue from Sand Hill Road to Olive Street

d) Freeway Traffic Volumes The six selected freeway segments are all considered as Routes of Regional Significance by the San Mateo County CMP. As shown in Table 4.13-12, all study segments currently operate at their CMP level of ser-

4.13-78

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

vice standards or worse, with the exception of SR 84 between Marsh Road and Willow Road. The results shown in Table 4.13-12 also show that the addition of the traffic volumes generated by the future develop- ment under the Plan Components would bring potentially significant impact on US 101 South of Marsh Road.

2. Conflict with an applicable congestion management program, including, but not limited to level of service standards and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways. As discussed above in Section F.1, selected roadway and freeway segments on the C/CAG’s CMP system were assessed to determine compliance with the C/CAG’s CMP standards. The results for roadway and freeway segments are presented in Table 4.13-5 and Table 4.13-6, respectively.

As shown in Table 4.13-5, the future development would result in significant impacts on 12 roadway seg- ments under Near-Term 2014 plus Plan Components conditions. Out of the six freeway segments analyzed, as shown on Table 4.13-6, the addition of the traffic volumes generated by the future development permit- ted under the Plan Components would result in significant impacts on the freeway segment on US 101 South of Marsh Road.

3. Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks. The EA Study Area is located approximately two miles from Palo Alto Airport, but no portions of the City are within the airport safety zones identified in the Comprehensive Land Use Plan for the airport.14 Menlo Park is located more than two miles from the San Francisco International and San Carlos Airports to the north and Moffett Federal Airfield to the south. The Plan Components do not propose any land uses which could disrupt air traffic patterns and no impact would occur.

14 Santa Clara County Airport Land Use Commission, 2008. Palo Alto Airport Comprehensive Land Use Plan, Figure 7, http://www.sccgov.org/sites/planning/Plans%20-%20Programs/Airport%20Land-Use%20Commission/ Documents/PAO-adopted-11-19-08-CLUP.pdf, accessed on September 6, 2012.

4.13-79

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

TABLE 4.13-12 FREEWAY TRAFFIC VOLUMES – EXISTING AND 2035 CONDITIONS

Segment Existing CMP LOS Project % of Significant No. Roadway Segment LOSa Standards Capacityb Trips Capacity Impact? 1 US 101 N/O Marsh Rd F F 11,500 20 0.17% No

2 US 101 S/O Marsh Rd F F 11,500 134 1.17% Yes

3 US 101 S/O Willow Rd F F 11,500 88 0.77% No

4 -1 SR 84 Marsh Rd – Willow Rd B D 4,500 4 0.09% No

4-2 SR 84 Willow Rd – University Ave F E 4,500 10 0.22% No

5 I-280 N/O Sand Hill E D 9,200 7 0.08% No

6 I-280 S/O Sand Hill E D 9,200 14 0.16% No Note: Bold indicates unacceptable operational conditions based on applicable City/Caltrans standards, as well as potentially significant impacts. a Source: 2011 CMP Monitoring Report. Based on average speed. b Capacity is based on number of lanes and 2,200 vphpl for four lane segments and 2,300 vphpl for six lane and more segments for US 101 and I-280. Capacity of 1,500 vphpl is used for SR 84 segments. Source: TJKM Transportation Consultants, March 2013.

4.13-80

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

4. Substantially increase hazards due to a design feature (e.g. sharp curves or dangerous intersections) or incompatible uses (e.g. farm equipment). The Plan Components would result in an increase of residential and some mixed-use land uses. As these land uses develop, construction of new roadways would not be necessary; however, modifications to exist- ing roadways may be necessary to support the growth. As with current practice, the improvements would be designed and reviewed in accordance with the City’s Public Works Department Transportation Program. In addition, the future housing would be concentrated on sites either already developed and/or in close proximity to existing residential and residential-serving development, where impacts related to incompatible traffic related land uses would not likely occur with the exception of housing Site 5 (Haven Avenue).

Housing Site 5 (Haven Avenue) is located in an area surrounded by limited industrial uses and would not be compatible with the surrounding land uses. However, the General Plan contains policies that would reduce potential hazards due to roadway design or incompatible uses through establishing acceptable levels of ser- vice, travel speeds, and promote land use compatibility as follows: a. Current General Plan Land Use and Circulation Element

¨ Policy II-A-1: Level of service D (40 seconds average stopped delay per vehicle) or better shall be main- tained at all City-controlled signalized intersections during peak hours, except at the intersection of Ra- venswood Avenue and Middlefield Road and at intersections along Willow Road from Middlefield Road to US 101.

¨ Policy II-A-2: The City should attempt to achieve and maintain average travel speeds of 14 miles per hour (Level of Service D) or better on El Camino Real and other arterial roadways controlled by the State, and at 46 miles per hour (Level of Service D) or better on US 101. The City shall work with Cal- trans to achieve and maintain average travel speeds and intersection level of service consistent with standards established by the San Mateo County Congestion Management Plan.

¨ Policy II-A-3: The City shall work with Caltrans to ensure that average stopped delay on local ap- proaches to State-controlled signalized intersections does not exceed Level of Service E (60 seconds per vehicle).

¨ Policy II-A-4: New development shall be restricted or required to implement mitigation measures in or- der to maintain the levels of service and travel speeds specified in Policies II-A-1 through II-A-3.

4.13-81

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONS ISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

¨ Policy II-A-8: New development shall be reviewed for its potential to generate significant traffic vol- umes on local streets in residential areas and shall be required to mitigate potential significant traffic problems.

¨ Policy I-A-2: New residential developments shall be designed to be compatible with Menlo Park's resi- dential character.

¨ Policy I-A-4: Residential uses may be combined with commercial uses in a mixed use project, if the pro- ject is designed to avoid conflicts between the uses, such as traffic, parking, noise, dust, and odors.

¨ Policy I-A-7: Development of secondary residential units on existing developed residential lots shall be encouraged consistent with adopted City standards

Future developments and roadway improvements would be designed in accordance to City standards and will be subject to the General Plan policies. Compliance with the City standards and policies would ensure that the future housing would not significantly increase hazards due to design features or incompatible uses. Therefore, the Plan Components impact is less than significant.

5. Result in inadequate emergency access. Development permitted under the Plan Components would be dispersed throughout the City and does not propose any new major roadways or other physical features through existing neighborhoods that would obstruct emergency access to evacuation routes. Substantial land use changes would occur to the land use map with regards to potential housing Site 5 (Haven Avenue) where the Limited Industry land use designa- tion would change to a Residential land use designation allowing up to 40 dwelling units per acre. Howev- er, housing Site 5 (Haven Avenue) would rely on existing roadway infrastructure and would not obstruct existing emergency access to evacuation routes. In addition, buildings and site design for individual projects would be designed and built according to local Fire District standards and State Building Code standards, further ensuring that emergency access by fire or emergency services personnel would not be impaired. The Plan Components do not propose any new major roadways or other physical features through existing neighborhoods that would create new barriers in the EA Study Area under the Plan Components would be reviewed by City Planning, Engineering and Building Departments as well as the Menlo Park Fire Protec- tion District for compliance with the Zoning and Building Code and Engineering Standards and Fire Code to ensure adequate emergency vehicle access. Accordingly, emergency access impacts would be less than sig- nificant.

4.13-82

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

6. Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise decrease the performance or safety of such facilities. The new residential development permitted under the Plan Components is anticipated to generate new transit riders, bicyclists, and pedestrians. The General Plan includes current goals, policies, and programs that provide for an integrated network of bicycle and pedestrian facilities as well as for the needs of transit users. The future housing would be concentrated on sites either already developed and/or in close proximi- ty to existing residential and residential-serving development, and would be served by existing transit, bicy- cle, and pedestrian infrastructure.

The additional transit ridership on the transit network is estimated to be approximately 0.37 riders/unit, a total of 430 transit riders, based on the transit mode share for the multi-family residential in Menlo Park.15 Considering that the potential future residential development is dispersed throughout the City, the current transit service system is expected to have enough capacity to accommodate these additional riders.16 In addi- tion, as shown in Figure 4.13-2, most of the future housing would be located along the current transit or shuttle routes, so most of the riders would be able to walk or bike to the closest transit station. Therefore, the Plan Components would have a less-than-significant impact to the transit system.

The additional bicycle ridership is estimated to be approximately 0.26 riders/unit, a total of 300 bicycle rid- ers, based on the bike mode share for the multi-family residential in Menlo Park.17 Considering that the potential future residential development is dispersed throughout the City, the current bicycle network should be able to accommodate these additional bicycle riders. In addition, as illustrated in Figure 4.13-3, the current bikeways are along the major roadways of the City. There are also many bikeways proposed to fill in the current gap in the City. Housing Sites 2 and 3 are located along the existing Class II Bike Lanes and Sites 1, 4 and 4 are located along the proposed Class I and Class II Bike Lanes. Therefore, the future development under the Plan Components would have a less-than-significant impact to the bicycle system.

Implementation of the Plan Components would continue to promote the use of public transit, promote the safe use of bicycles as a commute alternative and for recreation and promotes walking as a commute alterna- tive and for short trips, under Goals II-B, II-D and II-E, respectively. In addition, the Plan Components

15 C/CAG Model, 2013. Santa Clara County VTA. 16 Personal correspondence with TJKM staff and Ted Yurek, Senior Planner, at SamTrans, February 2013. 17 C/CAG Model, 2013. Santa Clara County VTA.

4.13-83

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONS ISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

would be consistent with the following current, modified, and new General Plan goals, policies, and pro- grams regarding public transit, bicycle, and pedestrian facilities. a. Transit (Rail and Bus Service)

¨ Policy II-B-1: The City shall consider transit modes in the design of transportation improvements and the review and approval of development projects.

¨ Policy II-B-2: As many activities as possible should be located within easy walking distance of transit stops, and transit stops should be convenient and close to as many activities as possible.

¨ Policy II-B-5: The City shall work with appropriate agencies to agree on long-term peninsula transit service that reflects Menlo Park's desires and is not disruptive to the City. i. Pedestrian and Bicycle Facilities

¨ Policy I-G-11: Well-designed pedestrian facilities should be included in areas of intensive pedestrian ac- tivity.

¨ Policy II-D-2: The City shall, within available funding, work to complete a balanced system of bikeways within Menlo Park and implement the Comprehensive Bicycle Plan.

¨ Policy II-D-3: The design of streets within Menlo Park shall consider the impact of street cross section, intersection geometries and traffic control devices on bicyclists.

¨ Policy II-D-5: The City shall encourage transit providers within San Mateo County to provide im- proved bicycle access to transit including secure storage at transit stations and on-board storage where feasible.

¨ Policy II-E-1: The City shall require all new development to incorporate safe and attractive pedestrian facilities on-site.

¨ Policy II-E-2: The City shall endeavor to maintain safe sidewalks and walkways where existing within the public right-of-way.

¨ Policy II-E-3: Appropriate traffic control shall be provided for pedestrians at intersections

¨ Policy II-E-4: The City shall incorporate appropriate pedestrian facilities, traffic control, and street lighting within street improvement projects to maintain or improve pedestrian safety.

¨ Policy II-E-5: The City shall support full pedestrian access across all legs of an intersection at all signal- ized intersections which are City-controlled and at the signalized intersections along El Camino Real.

4.13-84

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

ii. Land Use and Transportation

¨ Policy I-I-2: Regional land use planning structure should be integrated within a larger transportation network built around transit rather than freeways and the City shall influence transit development so that it coordinates with Menlo Park's land use planning structure.

¨ Policy II-C-4: The City shall coordinate its transportation demand management efforts with other agencies providing similar services within San Mateo County.

a) Amended General Plan Open Space and Conservation Element

¨ Policy OSC-4.1: Sustainable Approach to Land Use Planning to Reduce Resource Consumption. En- courage, to the extent feasible, (1) a balance and match between jobs and housing, (2) higher density res- idential and mixed-use development to be located adjacent to commercial centers and transit corridors, and (3) retail and office areas to be located within walking and biking distance of transit or existing and proposed residential developments.

¨ Goal OSC-4: Promote Sustainability and Climate Action Planning. Promote a sustainable energy sup- ply and implement City’s Climate Action Plan to reduce greenhouse gas emissions and improve the sus- tainability of actions by City government, residents, and businesses in Menlo Park. This includes pro- moting land use patterns that reduce the number and length of motor vehicle trips and promotion of recycling, reduction, and reuse programs.

Furthermore, the introduction of additional residential land uses would not conflict with the City’s Side- walk Master Plan, Bike Plan and Complete Streets Policy. Implementation of the Plan Components would therefore support and would not conflict with plans, programs, and policies regarding bicycle or pedestrian facilities, or decrease the performance and safety of such facilities. Therefore, the Plan Components impact is less than significant.

7. Cumulative Impacts As discussed under Section D.1, this analysis takes a conservative approach by applying both a one percent compound growth per year and the traffic generated by the pending/approved projects within the City of Menlo Park shown on Table 4.13-3 under both the Near-Term 2014 plus Plan Components conditions and the 2035 plus Plan Components conditions. Therefore, the impact discussion above incorporates the cumu- lative scenario by default and no further discussion is warranted.

4.13-85

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONS ISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

G. Impacts and Mitigation Measures

1. Intersections Impact TR-1: As shown in Table 4.13-10, eight intersections have significant impacts with the addition of trips from future residential development during both AM or PM peak hours under Near-Term 2014 plus Plan Components conditions. Figure 4.13-9 illustrates the recommended geometry improvements to reduce these impacts.

Mitigation Measure TR-1a: At the intersection of Alpine Road/Santa Cruz Avenue and Junipero Serra Boulevard, the necessary mitigation measure is to re-stripe the northbound approach on Alpine Road from two through lanes and one right turn lane to one through lane, one shared through/right turn lane and one right turn lane. A bike lane is currently striped between the right-most thru lane and the right turn lane.

With the mitigation measure, the intersection level of service improves to LOS D during the AM peak hour, under the Near-Term 2014 plus Plan Components conditions. However, the re-striping for the northbound approach may not be feasible since this may create a challenge by placing bicyclists be- tween two right turn lanes and may, therefore, require further analysis for the existing bike lane. Therefore, this impact would remain significant and unavoidable.

Mitigation Measure TR-1b: At the intersection of Middlefield Road and Willow Road, the necessary mitigation measure is to re-stripe the northbound approach on Middlefield Road from one left turn lane, two through lanes and one right turn lane to one left turn lane, one through lane, one shared through/right turn lane and one right turn lane.

With the mitigation measure, the intersection level of service improves to LOS D during the AM peak hour and improves to LOS E during the PM peak hour, under the Near-Term 2014 plus Plan Compo- nents conditions. According to the 1601 Willow Road Development Agreement for the Facebook East Campus Project (FECPDA), Facebook is responsible for implementing this necessary mitigation meas- ure. Therefore, after applying the mitigation measure, the impact is less than significant.

4.13-86

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

Intersection #5 - Alpine Rd./Santa Cruz Ave. & Junipero Serra Blvd. Intersection #16 - Middlefield Rd. & Willow Rd. Intersection #21 - Bohannon Dr./ Florence St. & Marsh Rd. Existing Proposed Existing Proposed Existing Proposed

Intersection #22 - Scott Dr./Rolison Rd. at Marsh Rd. Intersection #33 - Newbridge St. & Willow Rd. Intersection #37 - Bayfront Exp. & Willow Rd. Existing Proposed Existing Proposed Existing Proposed

Intersection #42 - Bayfront Exp. & Marsh Rd. Intersection #45 - US 101 NB Ramps & Marsh Rd. Existing Proposed Existing Proposed

Source: TJKM Transportation Consultants.

FIGURE 4.13-9

NEAR-TERM 2014 WITH PLAN COMPONENTS INTERSECTION MITIGATIONS MEASURES CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONS ISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Mitigation Measure TR-1c: At the intersection of Bohannon Drive/Florence Street and Marsh Road, the necessary mitigation measure is to add one exclusive westbound right turn lane on Marsh Road.

With the mitigation measure, the intersection level of service improves to LOS D during the AM peak hour, under the Near-Term 2014 plus Plan Components conditions. Through the Development Agreement for the Menlo Gateway Project (MGDA), Bohannon Development Agreement is responsi- ble for implementing the necessary mitigation measure. Therefore, after applying the mitigation measures, this impact is less than significant.

Mitigation Measure TR-1d: At the intersection of Scott Drive/Rolison Road and Marsh Road, the nec- essary mitigation measure is to re-stripe the westbound approach on Marsh Road from two left turn lanes, one through lane and one shared through/right turn lane to one left turn lane, two through lanes and one right turn lane.

With the mitigation measure, the intersection level of service improves to LOS D while the average queue for the westbound left turn movement remains as one vehicle during the PM peak hour, under the Near-Term 2014 plus Plan Components conditions. The improvements may appear feasible in the existing right-of-way, but the intersection is under both City and Caltrans jurisdiction and coordination between the two jurisdictions would be required. As such, the City cannot guarantee implementation of the mitigation measure. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-1e: At the intersection of Newbridge Street and Willow Road, the necessary mitigation measure is to re-stripe the southbound approach on Newbridge Street from one left turn lane, one through lane and one right-turn lane to one shared left turn/through lane, one shared through/right turn lane and one right turn lane, and to add one additional receiving lane on the south leg on Newbridge Street accordingly.

With the mitigation measure, the intersection still operates at LOS F during both the AM and PM peak hours, but the delay for the most critical movements are reduced to be less than under the Near-Term 2014 plus Plan Components conditions. However, the improvements may not be feasible due to right- of-way constraints on the south leg of the intersection, which would impact private property in East Pa- lo Alto. In addition, this intersection is under Caltrans jurisdiction, and the City cannot guarantee im- plementation of the mitigation measure. Therefore, this impact remains significant and unavoidable.

4.13-88

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

It should be noted that FECPDA also suggests a mitigation measure for this intersection, which in- cludes an additional eastbound left-turn lane, an additional northbound receiving lane for the eastbound left turning traffic, an additional westbound through/right-turn lane, and an additional receiving lane for the westbound through traffic. With this mitigation measure, the intersection still operates at LOS F during both the AM and PM peak hours. The delay for the most critical movements are reduced to be less than under the Near-Term condition during the PM peak hour; however, during the AM peak hour, the delay for the eastbound through critical movement is 70 seconds higher than under the Near- Term 2014 plus Plan Components condition even though the overall delay of the intersection was re- duced. Therefore, this potential FPDA mitigation measure could be considered as a partial mitigation measure, under the Near-Term 2014 plus Plan Components conditions, and this impact remains signifi- cant and unavoidable.

Mitigation Measure TR-1f: At the intersection of Bayfront Expressway and Willow Road, the necessary mitigation measure is to add a third right turn lane for the eastbound approach on Willow Road.

With the mitigation measure, the intersection still operates at LOS F during the PM peak hour, but the delay for the most critical movements are reduced to be less than under 2014 plus Plan Components condition. According to the FECPDA, Facebook is responsible for implementing this mitigation measure. However, since this intersection is under Caltrans jurisdiction and the City cannot guarantee implementation of the mitigation measure, this impact remains significant and unavoidable.

Mitigation Measure TR-1g: At the intersection of Bayfront Expressway and Marsh Road, the necessary mitigation measure is to re-stripe the southbound approach on Bayfront Expressway from one shared left turn/through lane, one through lane and one right turn lane to one left turn/through lane, one through/right turn lane and one right turn lane and to add a third right turn lane for the eastbound ap- proach on Marsh Road.

With the mitigation measure, the intersection operates at LOS D during both AM and PM peak hours, under the Near-Term 2014 plus Plan Components conditions. However, this intersection is included in the City’s TIF Program and the improvements to each approach may appear feasible in the existing right-of-way. Since the intersection is under Caltrans jurisdiction, the City cannot guarantee implemen- tation of the mitigation measure. Therefore, this impact remains significant and unavoidable.

4.13-89

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONS ISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Mitigation Measure TR-1h: At the intersection of US 101 NB Ramps and Marsh Road, the necessary mitigation measure is to widen the northbound off-ramp on the western side of the approach and add an additional left-turn lane along with adding a second right-turn lane by restriping one of the existing left-turn lanes. This improvement will require relocation of existing traffic signal poles, utility reloca- tion, and reconstruction of the curb ramp on the southwest corner of the intersection.

With the mitigation measure, the intersection operates at LOS D during the AM peak hour, under the Near-Term 2014 plus Plan Components conditions. According to the FECPDA, Facebook is responsi- ble for implementing this mitigation measure. However, since this intersection is under Caltrans juris- diction, the City cannot guarantee implementation of the mitigation measure. Therefore this impact remains significant and unavoidable.

Impact TR-2: 2035 Plus Plan Components Condition. As shown in Table 4.13-10, 25 intersections would have significant impacts with the addition of project trips to 2035 plus Plan Components Condition during the AM or PM peak hours. Figure 4.13-10a and 4.13-10b illustrates the recommended geometry im- provements to reduce these impacts.

Mitigation Measure TR-2a: At the intersection of Addison Wesley and Sand Hill Road, the necessary mitigation measure is to restripe the eastbound approach on Sand Hill Road from one left turn lane, two through lanes and one right turn lane to one left turn lane, two through lanes and one shared through/right turn lane. One additional receiving lane on Sand Hill Road is recommended to be added accordingly. A bike lane currently exists between the right-most through lane and the right turn lane.

With the mitigation measure, the intersection level of service improves to LOS B during the AM peak hour, under the 2035 plus Plan Components conditions. However, the improvements may not be fea- sible due to right-of-way constraints affecting private property. In addition, the re-striping for the east- bound approach is not be feasible since this could result in increased safety hazards to bicyclist by plac- ing bicyclists between two through lanes. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-2b: At the intersection of Sharon Park Drive and Sand Hill Road, the necessary mitigation measure is to add one exclusive westbound right turn lane on Sand Hill Road.

With the mitigation measure, the intersection level of service improves to LOS D during the PM peak hour, under the 2035 plus Plan Components conditions. However, the improvements may not be fea-

4.13-90

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

sible due to right-of-way constraints and the presence of a dozen mature evergreen trees. Even though this impact remains significant and unavoidable, it should be noted that the width of the westbound bike lane of 10.5 feet enables this lane to function as a right turn lane in compliance with the California Manual on Uniform Traffic Control Devices (California MUTCD).

Mitigation Measure TR-2c: At the intersection of Alpine Road/Santa Cruz Avenue and Junipero Serra Boulevard, the necessary mitigation measure is to re-stripe the northbound approach on Alpine Road from two through lanes and one right turn lane to one through lane, one shared through/right turn lane and one right turn lane. In addition, a second westbound right turn lane is recommended to be added on Junipero Serra Boulevard.

With the mitigation measure, the intersection level of service improves to LOS D during the AM peak hour, under the 2035 plus Plan Components conditions; and remains LOS E during PM peak hour, with the delay for the most critical movements reduced to be less than under the 2035 plus Plan Com- ponents conditions. However, the re-striping for the northbound approach may not be feasible since this may create a challenge by placing bicyclists between two right turn lanes and may, therefore, re- quire further analysis for the existing bike lane. Therefore, this impact remains significant and unavoid- able.

Mitigation Measure TR-2d: At the intersection of Santa Cruz Avenue and Sand Hill Road, the neces- sary mitigation measure is to re-stripe both westbound and eastbound approaches on Sand Hill Road from two left turn lanes, two through lanes and one right turn lane to two left turn lanes, two through lanes and one shared through/right turn lane. One additional receiving lane is recommended to be add- ed on Sand Hill Road for the westbound direction.

With the mitigation measure, the intersection level of service remains LOS E during the AM peak hour, with the delay for the most critical movement reduced to be less than under the 2035 plus Plan Com- ponents conditions; and improves to LOS D during the PM peak hour, under the 2035 plus Plan Com- ponents conditions. However, the improvements may not be feasible due to right-of-way constraints, with the northwest corner of the intersection under the control of San Mateo County. Also, the re- striping for the eastbound and westbound approaches may not be feasible since this could result in in- creased safety hazards to bicyclist by placing bicyclists between two through lanes. Therefore, this im- pact remains significant and unavoidable.

4.13-91

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

Intersection #1 - Addison Wesley & Sand Hill Rd. Intersection #4 - Sharon Park Dr. & Sand Hill Rd. Intersection #5 - Alpine Rd./Santa Cruz Ave. & Junipero Serra Blvd. Existing Proposed Existing Proposed Existing Proposed

Intersection #6 - Santa Cruz Ave. & Sand Hill Rd. Intersection #8 - Middlefield Rd. & Marsh Rd. Intersection #13 - Laurel St. & Ravenswood Ave. Existing Proposed Existing Proposed

Intersection #14 - Middlefield Rd. & Ravenswood Ave. Intersection #16 - Middlefield Rd. & Willow Rd. Intersection #17 - Gilbert Ave. & Willow Rd. Existing Proposed Existing Proposed Existing Proposed

Intersection #18 - Coleman Ave. & Willow Rd. Intersection #19 - Durham St. & Willow Rd. Intersection #20 - Bay Rd. & Marsh Rd.

Existing Proposed Existing Proposed Existing Proposed

Intersection #21 - Bohannon Dr./ Florence St. & Marsh Rd. Intersection #23 - Sand Hill Circle & Sand Hill Rd. Intersection #22 - Scott Dr./Rolison at Marsh Rd. I-280 NB Off-Ramp & Sand Hill Rd. Existing Proposed Existing Proposed Existing Proposed

Source: TJKM Transportation Consultants.

FIGURE 4.13-10A

2035 PLUS PLAN COMPONENTS INTERSECTION MITIGATIONS MEASURES CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING AMENDMENTS TRANSPORTATION AND TRAFFIC

Intersection #25 - El Camino Real & Valparaiso Ave./Glenwood Ave. Intersection #28 - El Camino Real & Ravenswood Ave. Intersection #30- El Camino Real & Middle Ave. Existing Proposed Existing Proposed Existing Proposed

Intersection #32 - Bay Rd. & Willow Rd. Intersection #33 - Newbridge St. & Willow Rd. Intersection #36 - Hamilton Ave. & Willow Rd. Existing Proposed Existing Proposed Existing Proposed

Intersection #37 - Bayfront Exp. & Willow Rd. Intersection #42 - Bayfront Exp. & Marsh Rd. Intersection #44 - US 101 SB Ramps & Marsh Rd. Existing Proposed Existing Proposed Existing Proposed

Intersection #45 - US 101 NB Ramps & Marsh Rd. Existing Proposed

Source: TJKM Transportation Consultants.

FIGURE 4.13-10B

2035 PLUS PLAN COMPONENTS INTERSECTION MITIGATIONS MEASURES CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONS ISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Mitigation Measure TR-2e: At the intersection of Middlefield Road and Marsh Road, the necessary mit- igation measure is to add a second southbound left turn lane on Middlefield Road and to add one receiv- ing lane on Marsh Road accordingly.

With the mitigation measure, the intersection level of service improves to LOS D during the AM peak hour and LOS E during the PM peak hour, under the 2035 plus Plan Components conditions. Howev- er, this intersection is under the jurisdiction of Town of Atherton. Based on prior consultation with the Town of Atherton, the improvements may require covering Atherton Channel and removing nu- merous heritage trees. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-2f: At the intersection of Laurel Street and Ravenswood Avenue, the necessary mitigation measure is to add one exclusive eastbound right turn lane on Ravenswood Avenue.

With the mitigation measure, the intersection level of service improves to LOS D during the AM peak hour, under the 2035 plus Plan Component conditions

Both the City’s TIF Program and the El Camino Real/Downtown Specific Plan project suggest the mit- igation measures for this intersection, which are consistent with the necessary mitigation measure sug- gested for the Plan Components. However, the improvements may not be feasible due to right-of-way constraints. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-2g: At the intersection of Middlefield Road and Ravenswood Avenue, the nec- essary mitigation measure is to add one exclusive southbound right turn lane on Middlefield Road.

With the mitigation measure, the intersection level of service improves to LOS D during both the AM and the PM peak hours, under the 2035 plus Plan Components conditions. However, this intersection is included in the City’s TIF Program and could be constructed over the long term. However, the im- provements may not be feasible due to right-of-way constraints affecting private property in Atherton and would involve coordination with the Town of Atherton. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-2h: At the intersection of Middlefield Road and Willow Road, the necessary mitigation measure is to re-stripe the northbound approach on Middlefield Road from one left turn

4.13-94

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

lane, two through lanes and one right turn lane to one left turn lane, one through lane, one shared through/right turn lane and one right turn lane.

With the mitigation measure, the intersection level of service remains LOS F during both the AM and the PM peak hours, with the delay for the most critical movement reduced to be less than under the 2035 plus Plan Components conditions. According to the 1601 Willow Road Development Agreement for the Facebook East Campus Project (FECPDA), Facebook is responsible for implementing this nec- essary mitigation measure. Therefore, after applying the mitigation measure, the impact is less than sig- nificant.

Mitigation Measure TR-2i: At the intersection of Gilbert Avenue and Willow Road, the necessary mit- igation measure is to add one exclusive eastbound right turn lane and a second westbound left turn lane on Willow Road and to add one additional receiving lane on Gilbert Avenue accordingly.

With the mitigation measure, the intersection level of service improves to LOS D during the AM peak hour, under the 2035 plus Plan Components conditions; and remains LOS E during the AM peak hour, with the delay for the most critical movement reduced to be less than under the 2035 plus Plan Com- ponents conditions. However, the improvements may not be feasible due to right-of-way constraints due to impacts to private property. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-2j: At the intersection of Coleman Avenue and Willow Road, the necessary mitigation measure is to add one exclusive southbound left turn lane on Coleman Avenue and a second eastbound through lane on Willow Road and to add one receiving lane on Willow Road accordingly.

With the mitigation measure, the intersection level of service improves to LOS C during the AM peak hour and LOS D during the PM peak hour, under the 2035 plus Plan Components conditions. The in- stallation of one exclusive southbound left turn lane on Coleman Avenue may be accomplished in the existing right-of-way by re-striping work, but it may require the removal of one or two parking spaces.

The other improvements to Willow Road do not appear feasible due to right-of-way constraints affect- ing private property. Although the restriping on Coleman would partially mitigate the impact, this impact remains significant and unavoidable.

4.13-95

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONS ISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Mitigation Measure TR-2k: At the intersection of Durham Street/VA Driveway and Willow Road, the necessary mitigation measure is to add one exclusive westbound right turn lane on Willow Road.

With the mitigation measure, the intersection level of service improves to LOS D during the PM peak hour, under the 2035 plus Plan Components conditions. The improvements does not appear feasible due to right-of-way constrains. Therefore, this impact remains significant and unavoidable.

It should be noted that the El Camino Real/Downtown Specific Plan project also suggests a mitigation measure for this intersection, which includes adding a southbound left turn at the VA Driveway. With this mitigation measure, the intersection still operates at LOS E during the PM peak hour, with the de- lay for the southbound left turn and the westbound through critical movements about 11 seconds high- er than under the 2035 plus Plan Components conditions. However, the average delay for the intersec- tion, as well as the delay of the critical movements, is all reduced by about 1 to 3 seconds, compared to without any mitigation measures under the 2035 plus Plan Components conditions. Therefore, this po- tential El Camino Real/Downtown Specific Plan mitigation measure could be considered as a partial mitigation measure.

Mitigation Measure TR-2l: At the intersection of Bay Road and Marsh Road, the necessary mitigation measure is to add one exclusive eastbound right turn lane on Marsh Road.

With the mitigation measure, the intersection level of service improves to LOS D during the AM peak hour, under the 2035 plus Plan Components conditions. However, the improvements are not feasible due to right-of-way constraints and would require the approval of the County of San Mateo and Town of Atherton. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-2m: At the intersection of Bohannon Drive/Florence Street and Marsh Road, the necessary mitigation measure is to add one exclusive westbound right turn lane on Marsh Road.

With the mitigation measure, the intersection level of service improves to LOS D during the AM peak hour and LOS E during the PM peak hour, under the 2035 plus Plan Components conditions. Through the Development Agreement for the Menlo Gateway Project (MGDA), Bohannon Develop- ment Agreement is responsible for implementing the necessary mitigation measure. Therefore, after applying the mitigation measures, this impact is less than significant.

4.13-96

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Mitigation Measure TR-2n: At the intersection of Scott Drive/Rolison Road and Marsh Road, with the necessary mitigation measures suggested for the Near-Term 2014 plus Plan Components conditions (Mitigation Measure TR-1d), the intersection level of service remains LOS E during the AM peak hour and LOS F during the PM peak hours, and the delay for the critical movement was reduced to be lower than under the 2035 plus Plan Components conditions during the PM peak hour; however, during the AM peak hour, the westbound left turn critical movement delay is 54 seconds higher than under the Cumulative conditions. Therefore, such mitigation measures could only be considered as partial mitiga- tion.

Under the 2035 plus Plan Components condition, the necessary mitigation measure is to add one exclu- sive westbound right turn lane on Marsh Road.

With the mitigation measure, the intersection level of service improves to LOS D during the AM peak hour, under the 2035 plus Plan Components conditions; and remains LOS F during the PM peak hour, with the delay for the most critical movement reduced to be less than under the 2035 plus Plan Com- ponents conditions. The improvements may appear feasible in the existing right-of-way, but the inter- section is under both City and Caltrans jurisdiction and coordination between the two jurisdictions would be required. As such, the City cannot guarantee implementation of the mitigation measure. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-2o: At the intersection of I-280 NB Off Ramp/Sand Hill Circle and Sand Hill Road, the necessary mitigation measure is to add one exclusive westbound left turn lane and a third eastbound through lane on Sand Hill Road. In addition, one additional receiving lane is recommended to be added on Sand Hill Road accordingly.

With the mitigation measure, the intersection level of service improves to LOS C for the south part of the intersection of I-280 NB Off Ramp and Sand Hill Road, during the AM peak hour, under the 2035 plus Plan Components conditions; and remains LOS F for the north part of the intersection of Sand Hill Circle and Sand Hill Road during the PM peak hour, with the delay for the most critical move- ment reduced to be less than under the 2035 plus Plan Components conditions. However, the im- provements may not be feasible due to right-of-way constraints and would require the approval of Cal- trans. Therefore, this impact remains significant and unavoidable.

4.13-97

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONS ISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Mitigation Measure TR-2p: At the intersection of El Camino Real and Valparaiso Avenue/Glenwood Avenue, the necessary mitigation measure is to add one exclusive westbound right turn lane on Glen- wood Avenue.

With the mitigation measure, the intersection level of service remains LOS E during the PM peak hour, with the delay for the most critical movement reduced to be less than under the 2035 plus Plan Com- ponents conditions. This intersection is included in the City’s TIF program, and improvements could be constructed over time. However, the improvements may not be feasible in the short term due to right-of-way constraints. In addition, this intersection is under Caltrans jurisdiction. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-2q: At the intersection of El Camino Real and Ravenswood Avenue/Menlo Avenue, the necessary mitigation measure is to add one exclusive eastbound right turn lane on Menlo Avenue.

With the mitigation measure, the intersection level of service improves to LOS E during the A.M peak hour, under the 2035 plus Plan Components conditions; and remains LOS F during the PM peak hour, with the delay for the most critical movement reduced to be less than under the 2035 plus Plan Com- ponents conditions. This intersection is included in the City’s TIF program and improvements could be constructed over time. However, the improvements may not be feasible in the short term due to right-of-way constraints. In addition, this intersection is under Caltrans jurisdiction. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-2r: At the intersection of El Camino Real and Middle Avenue, the necessary mitigation measure is to add one exclusive southbound right turn lane and a second northbound left turn lane on El Camino Real.

With the mitigation measure, the intersection level of service remains LOS F during the PM peak hour, with the delay for the most critical movement reduced to be less than under the 2035 plus Plan Com- ponents conditions. The City’s TIF program includes this intersection and suggests the same intersec- tion improvements. However, these improvements may not be feasible due to right-of-way constraints. In addition, this intersection is under Caltrans jurisdiction. Therefore, this impact remains significant and unavoidable.

4.13-98

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Mitigation Measure TR-2s: At the intersection of Bay Road and Willow Road, the necessary mitigation measure is to re-stripe the southbound approach from one left turn lane and one right turn lane to one left turn lane and one shared left turn/right turn lane.

With the mitigation measure, the intersection level of service improves to LOS C during the AM peak hour, under the 2035 plus Plan Components conditions. However, since this intersection is under Cal- trans jurisdiction, this impact remains significant and unavoidable.

Mitigation Measure TR-2t: At the intersection of Newbridge Street and Willow Road, the necessary mitigation measure is to re-stripe the southbound approach on Newbridge Street from one left turn lane, one through lane and one right-turn lane to one shared left turn/through lane, one shared through/right turn lane and one right turn lane, and to add one additional receiving lane on the south leg on Newbridge Street accordingly.

With the mitigation measure, the intersection remains LOS F during both the AM and PM peak hours, with the delay for the most critical movement reduced to be less than under the 2035 plus Plan Com- ponents conditions. However, the improvements may not be feasible due to right-of-way constrains on the south leg of the intersection, which would impact private property in East Palo Alto. In addition, this intersection is under Caltrans jurisdiction, and the City cannot guarantee implementation of the mitigation measure. Therefore, this impact remains significant and unavoidable.

It should be noted that FPDA also suggests a mitigation measure for this intersection, which includes an additional eastbound left-turn lane, an additional northbound receiving lane for the eastbound left turn- ing traffic, an additional westbound through/right-turn lane, and an additional receiving lane for the westbound through traffic. With this mitigation measure, the intersection still operates at LOS F dur- ing both the AM and PM peak hours. The delay for the most critical movements are reduced to be less than under the 2035 plus Plan Components conditions during the PM peak hour; however, during the AM peak hour, the delay for the eastbound through critical movement was over 100 seconds higher than under the Cumulative condition even though the overall delay of the intersection was reduced. Therefore, this potential Facebook mitigation measure could be considered as a partial mitigation meas- ure, under the 2035 plus Plan Components conditions.

4.13-99

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Mitigation Measure TR-2u: At the intersection of Hamilton Avenue and Willow Road, the necessary mitigation measure is to add one exclusive southbound right turn lane on Hamilton Avenue and a sec- ond eastbound left turn lane on Willow Road and to add one receiving lane on Hamilton Avenue. With the mitigation measure, the intersection level of service improves to LOS C during both the AM and PM peak hours, under the 2035 plus Plan Components conditions. The installation of one exclu- sive southbound right turn lane on Hamilton Avenue may be done by re-striping work, but it would require the removal of on-street parking spaces. Since the other improvements along Willow Road may not be feasible due to right-of-way constraints and the intersection is under Caltrans jurisdiction, this impact remains significant and unavoidable.

Mitigation Measure TR-2v: At the intersection of Bayfront Expressway and Willow Road, the neces- sary mitigation measure is to add a third right turn lane on Willow Road.

With the mitigation measure, the intersection still operates at LOS F, but the delay for the most critical movements are reduced to be less than under the 2035 plus Plan Components conditions. According to the FECPDA, Facebook is responsible for implementing this mitigation measure. However, since this intersection is under Caltrans jurisdiction and the City cannot guarantee implementation of the mitiga- tion measure, this impact remains significant and unavoidable.

Mitigation Measure TR-2w: At the intersection of Bayfront Expressway and Marsh Road, the necessary mitigation measure is to re-stripe the southbound approach on Bayfront Expressway from one shared left turn/through lane, one through lane and one right turn lane to one left turn/through lane, one through/right turn lane and one right turn lane and to add a third right turn lane for the eastbound ap- proach on Marsh Road.

With the mitigation measure, the intersection level of service improves to LOS E during both the AM and PM peak hours, under the 2035 plus Plan Components conditions. However, this intersection is included in the City’s TIF Program and the improvements to each approach may appear feasible in the existing right-of-way. Since the intersection is under Caltrans jurisdiction, the City cannot guarantee implementation of the mitigation measure. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-2x: At the intersection of US 101 SB Ramps and Marsh Road, the necessary mitigation measure is to add one southbound shared left turn/right turn lane on US 101 SB ramp and one additional receiving lane on Marsh Road accordingly.

4.13-100

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

With both mitigation measures, the intersection level of service improves to LOS E during the AM peak hour and LOS D during the PM peak hour, under the 2035 plus Plan Components conditions. However, the improvements may not be feasible due to right-of-way requirements. In addition, this in- tersection is under Caltrans jurisdiction. Therefore, this impact remains significant and unavoidable.

Mitigation Measure TR-2y: At the intersection of US 101 NB Ramps and Marsh Road, the necessary mitigation measure is to widen the northbound off-ramp on the western side of the approach and add an additional left-turn lane along with adding a second right-turn lane by restriping one of the existing left-turn lanes. This improvement will require relocation of existing traffic signal poles, utility reloca- tion, and reconstruction of the curb ramp on the southwest corner of the intersection.

This mitigation measure is suggested for the Near-Term 2014 plus Plan Components conditions (Miti- gation Measure TR-1h), which according to the FECPDA, Facebook is responsible for implementing. With this mitigation measure, the intersection level of service remains LOS F during both the AM and PM peak hours, and the delay for the northbound left turn and the eastbound through critical move- ments is about 23 seconds and 14 seconds higher than under the Cumulative conditions, during the AM peak hour and PM peak hour, respectively. Therefore, such mitigation measures could only be consid- ered as partial mitigation.

Under the 2035 plus Plan Components conditions, in addition to the mitigation measures suggested for the Near-Term 2014 plus Plan Components conditions, the additional necessary mitigation measure is to add a third eastbound through lane on Marsh Road and an additional receiving lane on Marsh Road would be necessary as well.

With the mitigation measure, the intersection level of service improves to LOS C during the AM peak hour and LOS B during the PM peak hour, under the 2035 plus Plan Components conditions. Howev- er, the improvements may not be feasible due to right-of-way requirements. In addition, this intersec- tion is under Caltrans jurisdiction and the City cannot guarantee implementation of the mitigation measure. Therefore, this impact remains significant and unavoidable.

4.13-101

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

2. Roadway and Freeway Segments Near-Term 2014 Plus Plan Components Conditions Impact TR-3: Roadway segment impacts under Near-Term 2014 plus Plan Components conditions would exceed City thresholds.

Mitigation Measure TR-3: The mitigation measures for roadway segment impacts under Near-Term 2014 plus Plan Components conditions would require reducing traffic volumes and improving quality of life and could include transportation demand management (TDM) measures. Such measures may in- clude encouraging carpooling and vanpooling, promoting transit and bicycle/pedestrian mode shares, etc. Even though such TDM measures collectively have the potential to reduce added future develop- ment trip totals to less than significant levels, the City cannot guarantee that these measures may be im- plemented and may reduce the impacts to less than significant. Therefore, the impacts remain signifi- cant and unavoidable.

Impact TR-4: Freeway segment impacts under Near-Term 2014 plus Plan Components conditions would exceed City thresholds.

Mitigation Measure TR-4: The mitigation measure for freeway segments under Near-Term 2014 plus Plan Components conditions normally requires adding additional travel lanes and increasing the capaci- ty of the roadway, to accommodate the additional trips generated by the Plan Components. However, widening roadways/adding additional travel lanes would require right-of-way and may not be feasible. In addition, SR 84 is under Caltrans jurisdiction. Therefore, this impact remains significant and una- voidable.

3. Roadway and Freeway Segments 2035 Plus Plan Components Conditions Impact TR-5: Roadway segment impacts under 2035 Plus Plan Components conditions would exceed City thresholds.

Mitigation Measure TR-5: The mitigation measures for roadway segment impacts under 2035 Plus Plan Components conditions would require reducing traffic volumes and improving quality of life and could include TDM measures. Such measures may include encouraging carpooling and vanpooling, promot- ing transit and bicycle/pedestrian mode shares, etc. Even though such TDM measures collectively have the potential to reduce added project trip totals to less than significant levels, the City cannot guarantee that these measures may be implemented and may reduce the impacts to less than significant. There- fore, the impacts remain significant and unavoidable.

4.13-102

CITY OF MENLO PARK HOUSING ELEMENT UPDATE, GENERAL PLAN CONSISTENCY UPDATE, AND ZONING ORDINANCE AMENDMENTS ENVIRONMENTAL ASSESSMENT TRANSPORTATION AND TRAFFIC

Impact TR-6: Freeway segment impacts under 2035 Plus Plan Components conditions would exceed City thresholds.

Mitigation Measure TR-6: The mitigation measure for freeway segments under 2035 Plus Plan Compo- nents conditions normally requires adding additional travel lanes and increasing the capacity of the roadway, to accommodate the additional trips generated by the Plan Components. However, widening roadways/adding additional travel lanes would require right-of-way and may not be feasible. In addi- tion, SR 84 is under Caltrans jurisdiction. Therefore, this impact remains significant and unavoidable.

4.13-103