1000 Abernathy Road Northpark 400, Suite 100 Atlanta, GA 30328 (770) 671-0006

Total Page:16

File Type:pdf, Size:1020Kb

1000 Abernathy Road Northpark 400, Suite 100 Atlanta, GA 30328 (770) 671-0006 1000 Abernathy Road Northpark 400, Suite 100 Atlanta, GA 30328 (770) 671-0006 www.lhh.com Directions to Lee Hecht Harrison: From Interstate 75 Interstate 75 to 285 East. Travel approximately 7 miles to Exit 27 Georgia 400 Toll Road North to Exit 5A Abernathy Road. Turn left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left. From 75/85 Downtown 85 North to Georgia 400 Toll Road. Exit 5A Abernathy Road. Turn left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left. From Interstate 85 Interstate 85 to 285 West. Travel approximately 7 miles to Exit 27 Georgia 400 Toll Road North. Exit 5A Abernathy Road. Turn left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left and Northpark 500 and 600 are on the right. From Georgia 400 traveling South Take Georgia 400 Toll Road to exit 5 Sandy Springs / Abernathy Road. Turn left, under freeway bridge, make left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left. From 285 285 East or West to Exit 27 Georgia 400 Toll Road North. Exit 5A Abernathy Road. Turn left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left. From Interstate 20 East of 285 Take Interstate 20 West to 285 North to Exit 27 Georgia 400 Toll Road North. Exit 5A Abernathy Road. Turn left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left. From Interstate 20 West of 285 Take Interstate 20 East to 285 North to Exit 27 Georgia 400 Toll Road North. Exit 5A Abernathy Road. Turn left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left. From MARTA Northpark Town Center features public transit access unmatched by any office space in suburban Atlanta. The Sandy Springs MARTA station opened in December 2000, giving Northpark tenants, clients and visitors easy access to the station via a pedestrian tunnel that allows convenient, safe covered access. Access to Northpark via MARTA when traveling northbound: At the stop, exit the train to the left (heading west). Follow signs to Abernathy Road and Mt. Vernon Highway. Take the elevator or stairs to the mezzanine level that has an escalator leading to the tunnel level. A sign will indicate the need to turn right for the "Pedestrian Tunnel under Abernathy Road." After the turn, an additional sign reads "Pedestrian Tunnel to Northpark Town Center.“ Upon exiting the tunnel, pedestrians will reach the sidewalk via a series of steps or via elevator. For southbound travelers (from the North Springs Station): The directions are identical, other than the need to turn right when exiting the train. Parking Northpark offers ample parking for tenants and visitors. Northpark 400 features a stand-alone garage immediately behind the tower. Convenient visitor parking spaces are provided for those who stay one hour or less on level B of Northpark 400. Visitors who have plans to stay longer than one hour are asked to park in unmarked spaces. 1000 Abernathy Road • Northpark 400, Suite 100 Atlanta, GA 30328 • (770) 671-0006 .
Recommended publications
  • Metropolitan Transportation Plan (MTP) 2040
    Metropolitan Transportation Plan (MTP) 2040 4.1 Roads and Highways Element The largest part of the transportation system is a roadway network of more than 7,000 lane miles and is comprised of NCDOT maintained roads, locally maintained roads, and private roads. In late 2013 the metropolitan area boundary for the High Point MPO increased in size to include the remaining portion of Davidson County not already included in an MPO. This substantially expanded the roadway network for the MPO. Radial movements that are strongest in the MPO are: • Towards Greensboro and Jamestown to the northeast, • Towards Winston-Salem from High Point to the northwest via Interstate 74, • Towards the Piedmont Triad International Airport to the north via NC 68, • Towards Lexington from High Point to the southwest via Interstate 85 and US 29/70, and • Towards Winston-Salem from Lexington via US 52. • There is some radial demand between High Point, Thomasville, Archdale, Trinity, and Wallburg. Heavily traveled routes include: • Eastchester Drive (NC 68), towards Piedmont Triad International Airport • Westchester Drive and National Highway (NC 68), towards Thomasville • NC 109 • Main Street in High Point, • Main Street in Archdale, • US 311 Bypass, • Interstate 85, • US 29-70, • Wendover Avenue, • Main Street and NC 8 in and around Lexington, • High Point - Greensboro Road, and 4.1 Roads and Highways Element • Surrett Drive. Chapter: 1 Metropolitan Transportation Plan (MTP) 2040 The projects in the Roadway Element of the Transportation Plan come from the Comprehensive Transportation Plan (CTP) for the High Point Urbanized Area. The differences between the Roadway Element of the MTP and the CTP include: • The MTP is required by Federal Law, CTP is mandated by the North Carolina Department of Transportation.
    [Show full text]
  • Interstate 85 Widening and Improvements Spartanburg And
    Interstate 85 Widening and Improvements Mile Marker 80 – 96 Spartanburg and Cherokee Counties Environmental Assessment SCDOT NEPA ENVIRONMENTAL COMMITMENTS Date: 10/12/2015 FORM Project ID : 027114 County : Cherokee District : District 4 Doc Type: EA Total # of 12 Commitments: Project Name: I‐85 Widening (MM80‐96) The Environmental Commitment Contractor Responsible measures listed below are to be included in the contract and must be implemented. It is the responsibility of the Program Manager to make sure the Environmental Commitment SCDOT Responsible measures are adhered to. If there are questions regarding the commitments listed please contact: CONTACT NAME: Mr. Brad Reynolds PHONE #: (803)‐737‐1440 ENVIRONMENTAL COMMITMENTS FOR THE PROJECT Water Quality Responsibility: CONTRACTOR The contractor will be required to minimize possible water quality impacts through implementation of construction BMPs, reflecting policies contained in 23 CFR 650B and the Department's Supplemental Specifications on Seeding and Erosion Control Measures (Latest Edition). Other measures including seeding, silt fences, sediment basins, etc. as appropriate will be implemented during construction to minimize impacts to Water Quality. Non‐Standard Commitment Responsibility: CONTRACTOR Floodplains The selected contractor will send a set of final plans and request for floodplain management compliance to the local County Floodplain Administrator. A hydraulic analysis will be performed for each encroachment of a FEMA‐regulated floodplain and a detailed hydraulic analysis
    [Show full text]
  • NORTH I-75 MASTER PLAN Summary Report
    NORTH I-75 MASTER PLAN Summary Report Interstate 75 (SR 93) From the Florida’s Turnpike Interchange to the I-10 Interchange Alachua, Bradford, Clay, Citrus, Columbia, Duval, Levy, Marion, and Sumter Counties, Florida Financial Project ID: 191985-2-12-01 June 2017 Updated August 2017 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY ............................................................................................................................................. 1 2 PROJECT BACKGROUND & PURPOSE .................................................................................................................... 2 2.1 Background ................................................................................................................................................................................................ 2 2.2 I-75 Relief Task Force Recommendations ...................................................................................................................................... 2 3 STUDY AREA CORRIDORS ........................................................................................................................................ 4 3.1 Study Area .................................................................................................................................................................................................. 4 4 STUDY METHODOLOGY & PUBLIC INVOLVEMENT ............................................................................................. 6 5 EXISTING AND FUTURE I-75 TRANSPORTATION ...............................................................................................
    [Show full text]
  • Transportation Element
    CHAPTER 3 CITY OF NORTH PORT COMPREHENSIVE PLAN _________________________________ TRANSPORTATION Transportation Element Table of Contents Chapter 3 Transportation Page Introduction 3-3 Transportation Issues Identified in the EAR 3-4 Functional Classification of Roads 3-6 Strategic Intermodal System 3-8 Roadway Jurisdiction and Maintenance 3-8 Parking Facilities 3-8 Traffic Generators 3-9 Traffic Counts 3-10 Intersection Deficiencies 3-10 Roadway Level of Service 3-10 State Highway System Levels of Service 3-11 Existing Level of Service Standards 3-12 Concurrency Management 3-14 Proportionate Fair Share 3-14 Access Management Strategies 3-15 U.S. 41 Corridor Master Plan 3-15 Transportation and Disaster Management 3-16 Future Growth and Transportation Improvements 3-17 Alternative Modes of Transportation 3-20 Intergovernmental Coordination 3-21 List of Illustrations TABLES 3-1 Existing Roadway Classification 3-7 3-2 Existing Roadway Lanes 3-8 3-3 Existing Roadway Jurisdiction 3-8 3-4 Backlogged and Constrained Facilities 3-14 3-5 Time to Clear Landfalling Storm for Evacuation Zones 3-17 Attachment 2007 Existing Traffic Counts Goals, Objectives, & Policies 3-22 Maps follow GOP’s 3-1 Existing & Future Transit Generators 3-5 Existing Roadway Lane Classification 3-2 Existing Roadway Jurisdictional 3-5a Future Roadway Lane Classification 3-2a Future Roadway Jurisdictional 3-6 Future Transportation 3-3 Level of Service 3-3b LOS C Congestion Levels 3-4 Existing Roadway Classification 3-2 Transportation Element TRANSPORTATION ELEMENT INTRODUCTION The goal of the transportation element is to develop an effective multi-modal transportation system which optimizes safety, convenience, cost, and pollution reduction practices by establishing internal and external transportation linkages between residential neighborhoods and activity centers.
    [Show full text]
  • Driving Directions to Ccc League Games
    DRIVING DIRECTIONS TO CCC LEAGUE GAMES TO: ANSONIA High School…Ansonia, Ohio Take State Route 503 North to and right (North) on State Route 127 to and left (West) on State Route 47. The School is located approximately 3-4 miles from Route 127 on the North side of the road. TO: ARCANUM High School…Arcanum, Ohio Take State Route 503 North and right (East) on State Route 722 (in Ithaca) to and left (North) at the stop sign. Stay on this road as it winds through the edge of Ithaca and eventually continues North into Arcanum. The high school is located past the second traffic signal on the left (West) side of the street in Arcanum. TO: BETHEL High School…Tipp City, Ohio Take State Route 503 North to and right (East) on Interstate 70 to the second exit past Interstate 75 which is State Route 201. Take State Route 201 left (North). The High School is located approximately 3-4 miles from I70 on the left (West) side of the road. TO: BRADFORD High School…Bradford, Ohio Take State Route 503 North to and right (East) on Interstate 70 to the State Route 49 North Exit. Take Route 49 Northwest through Phillipsburg to and right (North) on State Route 721 and continue into Bradford. The High School is located at the North edge of Bradford on the left (West) side of Route 721. TO: COVINGTON High School…Covington, Ohio Take State Route 503 North to and right (East) on Interstate 70 to and left (North) on State Route 48 at the Englewood exit.
    [Show full text]
  • The Interstate Highway System: 50 Years of Perspective Jerome Hall and Loretta Hall
    The Interstate Highway System: 50 Years of Perspective Jerome Hall and Loretta Hall On June 29, 1956, President Dwight Eisenhower signed historic legislation that authorized construction of the Interstate Highway System and created a pay-as-you-go Highway Trust Fund to generate the federal government’s 90+ percent share of the system’s cost. Although Eisenhower is justifiably credited with making it a reality, the Interstate System is actually the result of a series of concepts that were refined over several prior decades within the engineering and political arenas. Developing the system required a visionary financing strategy that would satisfy diverse philosophical and economic view points. Designing the system presented unprecedented challenges for standardizing elements that would improve safety and be appropriate for a truly national highway system. The current 46,700-mile Interstate System generated transportation efficiencies and enabled societal mobility to unanticipated degrees. This paper traces the system’s conceptual development; describes its major political, societal, financial, and technical challenges; and evaluates its influences on the American way of life. Conceptual Development The federal government undertook its first interstate road building project in 1806, when it authorized federally funded construction of the National Road (now US 40). President Thomas Jefferson approved legislation to build the 20-foot-wide highway on 60-foot-wide right-of-way. The War of 1812 slowed construction of the first section from Cumberland, Maryland, to the Ohio River. After spirited debate about federal versus state powers, the federal government transferred ownership of the road to the states about 1835. The National Road was a macadam highway traversed by herded livestock and covered wagons.
    [Show full text]
  • Federal Register/Vol. 65, No. 233/Monday, December 4, 2000
    Federal Register / Vol. 65, No. 233 / Monday, December 4, 2000 / Notices 75771 2 departures. No more than one slot DEPARTMENT OF TRANSPORTATION In notice document 00±29918 exemption time may be selected in any appearing in the issue of Wednesday, hour. In this round each carrier may Federal Aviation Administration November 22, 2000, under select one slot exemption time in each SUPPLEMENTARY INFORMATION, in the first RTCA Future Flight Data Collection hour without regard to whether a slot is column, in the fifteenth line, the date Committee available in that hour. the FAA will approve or disapprove the application, in whole or part, no later d. In the second and third rounds, Pursuant to section 10(a)(2) of the than should read ``March 15, 2001''. only carriers providing service to small Federal Advisory Committee Act (Pub. hub and nonhub airports may L. 92±463, 5 U.S.C., Appendix 2), notice FOR FURTHER INFORMATION CONTACT: participate. Each carrier may select up is hereby given for the Future Flight Patrick Vaught, Program Manager, FAA/ to 2 slot exemption times, one arrival Data Collection Committee meeting to Airports District Office, 100 West Cross and one departure in each round. No be held January 11, 2000, starting at 9 Street, Suite B, Jackson, MS 39208± carrier may select more than 4 a.m. This meeting will be held at RTCA, 2307, 601±664±9885. exemption slot times in rounds 2 and 3. 1140 Connecticut Avenue, NW., Suite Issued in Jackson, Mississippi on 1020, Washington, DC, 20036. November 24, 2000. e. Beginning with the fourth round, The agenda will include: (1) Welcome all eligible carriers may participate.
    [Show full text]
  • US23 Route Is That You Avoid Congested Detroit and of Course Have Less Exposure to Accident Traffic Incidents with Resulting Backups
    Direct southbound route from Flint, Michigan to Perrysburg, Ohio (I-75 exit 192) From Flint, Michigan, Interstate-75 takes a significant turn to the southeast as it runs towards downtown Detroit ... and onwards to Toledo in Ohio. For those driving from the UP, Sault Ste Marie and other points in Michigan north of Flint, here is a route which avoids Detroit and the extra southeast I-75 miles; it is a direct southbound path which rejoins I-75 just below Toledo. Parts of the route are through rural country on a two-lane open highway while others are on a two lane limited access route similar to an interstate. The advantage of the US23 route is that you avoid congested Detroit and of course have less exposure to accident traffic incidents with resulting backups. Comparison Via I-75: time/dist. from Flint to Toledo/I-75 exit 192 = 147 miles (237km) 2:55 hours. Via US23 route: time/dist from Flint to Toledo/I-75 exit 192 = 130 miles (209km) 3:00 hours. Alternative US23 Route 1. On I-75 just south of Flint, Michigan, move to the two right lanes and take exit 115 - US23 to Ann Arbor. 2. Continue of US23 through Fenton, Brighton and Whitmore Lake to Ann Arbor. 3. Just north of Ann Arbor, move to left two lanes and continue following US23South - Toldeo (do not take exit 45, or follow US23 Business or signs to Ann Arbor). The road bends to the east (left) for 2.5 miles (4kms). 4. Stay in right two lanes.
    [Show full text]
  • Roadside Flowers by Josh Shaffer Photography by Joey and Jessica Seawell
    Roadside Flowers By Josh Shaffer Photography by Joey and Jessica Seawell The Department of Transportation’s wildflower program brings back-road scenery to North Carolina’s busiest highways. Little of beauty shows up on the side of a highway. It’s where cars break down. It’s where hitchhikers stand. It’s where litterbugs toss drink cans and cigarette butts. There’s nothing much to see but a gas station sign on a pole, a shredded tire from a tractor- Multicolored wildflowers catch the eyes of motorists traveling down U.S. Highways trailer, or the remains of an 52 near Rural Hall unlucky deer. Nobody fusses much about these places, places we pass in a hurry on the way to somewhere prettier. But for 27 years, North Carolina has persisted with the stubborn idea that those humdrum strips of road should offer some reward beyond six lanes and reflective highway markers. A driver crossing the state on Interstate 40 should see more than asphalt and weeds between Wilmington and Asheville. The hot, flat ribbons linking Raleigh and Charlotte ought to show off scenery more often found in meadows — the catchflies, the toadflax, the oxeye daisies. As a driver, the sudden flash of red from an acre of corn poppies ought to make you pull off on the roadside, stop the car, step over the bits of gravel and broken glass, and walk knee-deep into the blooms. Even in this budget-slashing era, the North Carolina Department of Transportation still treats 1,500 acres of lowly roadside as the state’s flower garden.
    [Show full text]
  • Hotel Directions
    HOTEL INFORMATION The Westin Buckhead Atlanta 3391 Peachtree Road, N.E. Atlanta, Georgia 30326 866-716-8108 The Westin Buckhead Atlanta is 19-miles or 30 minutes from Hartsfield-Jackson International Airport and 8-miles or 10 minutes from Peachtree DeKalb Airport. If traveling to the hotel by car please follow the following directions. From North Take Georgia State Route 400 South and Exit at Lenox Road (Exit 2). Turn left and follow the signs for Peachtree Road South. Turn right on Peachtree Road. Turn left at the second traffic light. The hotel is on the right. From South (Hartsfield-Jackson International Airport) Domestic Terminal: Take Interstate 85 North. Exit Georgia State Route 400 North. Take the first exit (Lenox Road). Turn right and follow the signs for Peachtree Road South. Turn right on Peachtree Road. Turn left at the second traffic light. The hotel is on the right. International Terminal: Take Interstate 75 North Exit Interstate 85 North Exit Georgia State Route 400 North Take the first exit (Lenox Road) Turn right and follow the signs for Peachtree Road South Turn right on Peachtree Road Turn left at the second traffic light The hotel is on the right From East From East Take Interstate 20 West to Downtown and proceed to Interstate 85 North. Take I-85 and exit at GA400 North. Take the Lenox Road Exit and turn right. Follow the signs for Peachtree Road South. Turn right onto Peachtree Road, then turn left at the second traffic light. The hotel is on the right. From West Take Interstate 285 East to Georgia State Route 400 South.
    [Show full text]
  • The Interstate Highway System Turns 60
    The Interstate Highway System turns 60: Challenges to Its Ability to Continue to Save Lives, Time and Money JUNE 27, 2016 202-466-6706 tripnet.org Founded in 1971, TRIP ® of Washington, DC, is a nonprofit organization that researches, evaluates and distributes economic and technical data on surface transportation issues. TRIP is sponsored by insurance companies, equipment manufacturers, distributors and suppliers; businesses involved in highway and transit engineering and construction; labor unions; and organizations concerned with efficient and safe surface transportation. Executive Summary Sixty years ago the nation embarked on its greatest public works project, the construction of the Interstate Highway System. President Dwight D. Eisenhower provided strong support for the building of an Interstate Highway System that would improve traffic safety, reduce travel times and improve the nation’s economic productivity. Serving as the most critical transportation link in the nation’s economy, the Interstate Highway System has significantly improved the lives of U.S. residents and visitors. Throughout the nation, the Interstate system allows for high levels of mobility by greatly reducing travel times and providing a significantly higher level of traffic safety than other routes. But 60 years after President Eisenhower articulated a vision for the nation’s transportation system, the U. S. again faces a challenge in modernizing its aging and increasingly congested Interstate highway system. If Americans are to continue to enjoy their current level of personal and commercial mobility on Interstate highways and bridges, the nation will need to make a commitment to identifying a long-term funding source to support a well-maintained Interstate Highway System able to meet the nation’s need for additional mobility.
    [Show full text]
  • Eastern Bypass of Southwest Ohio and Greater Cincinnati
    EASTERN BYPASS OF SOUTHWEST OHIO AND GREATER CINCINNATI Submitted to Ohio General Assembly December 2019 Prepared by The Ohio Department of Transportation, District 8 Eastern Bypass of Southwest Ohio and Greater Cincinnati – December 2019 ABSTRACT This document fulfills requirements of Section 755.60 (A) of the Ohio Department of Transportation (ODOT) budget. This report covers the following required topics: 1. Commentary on the study conducted by the State of Kentucky’s Transportation Cabinet pertaining to the Eastern Bypass titled Brent Spence Strategic Corridor Study. 2. Details on the extent the Ohio Department of transportation assisted and coordinated with the Kentucky Transportation Cabinet in conducting the study, including information that was provide by the Ohio Department of Transportation. 3. Details on the next steps the Ohio Department of Transportation is taking or needs to take to coordinate with the Kentucky Transportation Cabinet to plan and construct the Eastern Bypass. 2 Eastern Bypass of Southwest Ohio and Greater Cincinnati – December 2019 Contents Brent Spence Strategic Corridor Study - Commentary ............................................. 4 ODOT Assistance with Study............................................................................ 6 ODOT Coordination During Study ...................................................................... 6 Eastern Bypass of Cincinnati Next Steps.............................................................. 6 Attachments .............................................................................................
    [Show full text]