Roadside Flowers by Josh Shaffer Photography by Joey and Jessica Seawell
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Metropolitan Transportation Plan (MTP) 2040
Metropolitan Transportation Plan (MTP) 2040 4.1 Roads and Highways Element The largest part of the transportation system is a roadway network of more than 7,000 lane miles and is comprised of NCDOT maintained roads, locally maintained roads, and private roads. In late 2013 the metropolitan area boundary for the High Point MPO increased in size to include the remaining portion of Davidson County not already included in an MPO. This substantially expanded the roadway network for the MPO. Radial movements that are strongest in the MPO are: • Towards Greensboro and Jamestown to the northeast, • Towards Winston-Salem from High Point to the northwest via Interstate 74, • Towards the Piedmont Triad International Airport to the north via NC 68, • Towards Lexington from High Point to the southwest via Interstate 85 and US 29/70, and • Towards Winston-Salem from Lexington via US 52. • There is some radial demand between High Point, Thomasville, Archdale, Trinity, and Wallburg. Heavily traveled routes include: • Eastchester Drive (NC 68), towards Piedmont Triad International Airport • Westchester Drive and National Highway (NC 68), towards Thomasville • NC 109 • Main Street in High Point, • Main Street in Archdale, • US 311 Bypass, • Interstate 85, • US 29-70, • Wendover Avenue, • Main Street and NC 8 in and around Lexington, • High Point - Greensboro Road, and 4.1 Roads and Highways Element • Surrett Drive. Chapter: 1 Metropolitan Transportation Plan (MTP) 2040 The projects in the Roadway Element of the Transportation Plan come from the Comprehensive Transportation Plan (CTP) for the High Point Urbanized Area. The differences between the Roadway Element of the MTP and the CTP include: • The MTP is required by Federal Law, CTP is mandated by the North Carolina Department of Transportation. -
Ultimate RV Dump Station Guide
Ultimate RV Dump Station Guide A Complete Compendium Of RV Dump Stations Across The USA Publiished By: Covenant Publishing LLC 1201 N Orange St. Suite 7003 Wilmington, DE 19801 Copyrighted Material Copyright 2010 Covenant Publishing. All rights reserved worldwide. Ultimate RV Dump Station Guide Page 2 Contents New Mexico ............................................................... 87 New York .................................................................... 89 Introduction ................................................................. 3 North Carolina ........................................................... 91 Alabama ........................................................................ 5 North Dakota ............................................................. 93 Alaska ............................................................................ 8 Ohio ............................................................................ 95 Arizona ......................................................................... 9 Oklahoma ................................................................... 98 Arkansas ..................................................................... 13 Oregon ...................................................................... 100 California .................................................................... 15 Pennsylvania ............................................................ 104 Colorado ..................................................................... 23 Rhode Island ........................................................... -
Interstate 85 Widening and Improvements Spartanburg And
Interstate 85 Widening and Improvements Mile Marker 80 – 96 Spartanburg and Cherokee Counties Environmental Assessment SCDOT NEPA ENVIRONMENTAL COMMITMENTS Date: 10/12/2015 FORM Project ID : 027114 County : Cherokee District : District 4 Doc Type: EA Total # of 12 Commitments: Project Name: I‐85 Widening (MM80‐96) The Environmental Commitment Contractor Responsible measures listed below are to be included in the contract and must be implemented. It is the responsibility of the Program Manager to make sure the Environmental Commitment SCDOT Responsible measures are adhered to. If there are questions regarding the commitments listed please contact: CONTACT NAME: Mr. Brad Reynolds PHONE #: (803)‐737‐1440 ENVIRONMENTAL COMMITMENTS FOR THE PROJECT Water Quality Responsibility: CONTRACTOR The contractor will be required to minimize possible water quality impacts through implementation of construction BMPs, reflecting policies contained in 23 CFR 650B and the Department's Supplemental Specifications on Seeding and Erosion Control Measures (Latest Edition). Other measures including seeding, silt fences, sediment basins, etc. as appropriate will be implemented during construction to minimize impacts to Water Quality. Non‐Standard Commitment Responsibility: CONTRACTOR Floodplains The selected contractor will send a set of final plans and request for floodplain management compliance to the local County Floodplain Administrator. A hydraulic analysis will be performed for each encroachment of a FEMA‐regulated floodplain and a detailed hydraulic analysis -
Interchange Modification Report
I-26 / Naval Base Terminal Access Road Interchange INTERCHANGE MODIFICATION REPORT CHARLESTON COUNTY, SOUTH CAROLINA Prepared for: South Carolina Department of Transportation Prepared by: Parsons Brinckerhoff, Inc. May 2012 I-26ȀPortAccessRoadInterchangeModificationReport TABLEOFCONTENTS EXECUTIVE SUMMARY ............................................................................................................................................ 1 1. INTRODUCTION .............................................................................................................................................. 3 Project Location.................................................................................................................................................. 3 Project History.................................................................................................................................................... 3 Project Description ............................................................................................................................................. 7 Project Purpose and Need .................................................................................................................................. 9 Project Conceptual Design ................................................................................................................................ 11 Interchange Modification Report (IMR) Scope.................................................................................................. -
Directions to Cleveland Operations
Directions to Cleveland Works 1600 Harvard Avenue Cleveland, OH 44105 Please note that there are no sleeping areas at this facility. You must stop at a rest area or truck stop. From Interstate 71 th North bound: Take 1-71 North to Exit 247A, W. 14 St. and Clark Ave. Make a right at the end of the exit ramp. nd Then take route 176 south, approx. ¼ mile on your left. Harvard Ave. will be your 2 exit. At the end of the rd ramp take a left. Gate 6 will be at the 3 traffic light on your right. ¾ Closest Rest Area Exit 209, Lodi From Interstate 77 North bound: Take 1-77 North to exit 159A (Harvard Ave). At the end of the ramp take a left. Gate 6 will be about 1 mile on your left. ¾ Closest Rest Area Exit 111, North Canton From Interstate 80 East East or West bound: Exit 11 / 173 to I-77 North. Take I-77 North to exit 159A (Harvard Ave). At the end of the ramp take a left. Gate 6 will be about 1 mile on your left. ¾ Closest Rest Area East Bound between exits 10 / 161 and 11 / 173 West Bound between exits 14 / 209 and 13A / 193 From Interstate 480 East bound: Exit 17 onto Route 176 North. Exit onto Harvard Ave. Take a right onto Harvard Ave. Gate 6 will rd be at the 3 traffic light on your right. ¾ Closest Rest Area None West bound: Exit 20B onto I-77 North. Take 1-77 North to exit 159A (Harvard Ave). -
West Virginia Turnpike 2018 Revenue Bond Study
tĞƐƚsŝƌŐŝŶŝĂdƵƌŶƉŝŬĞ ϮϬϭϴZĞǀĞŶƵĞŽŶĚ^ƚƵĚLJ :ƵůLJϭϯ͕ϮϬϭϴ WƌĞƉĂƌĞĚĨŽƌ tĞƐƚsŝƌŐŝŶŝĂ WĂƌŬǁĂLJƐƵƚŚŽƌŝƚLJ Table of Contents Executive Summary ......................................................................................................................................... ES‐1 ES.1 Study Objectives and Approach ...................................................................................................... ES‐1 ES.2 Background ............................................................................................................................................. ES‐3 ES.3 Existing Conditions .............................................................................................................................. ES‐3 ES.4 Stated Preference Survey .................................................................................................................. ES‐8 ES.5 Economic Growth Analysis ............................................................................................................... ES‐9 ES.6 Toll Modeling Approach .................................................................................................................. ES‐10 ES.7 Traffic and Revenue Forecast ........................................................................................................ ES‐11 ES.8 Sensitivity Tests .................................................................................................................................. ES‐16 Chapter 1 Introduction .................................................................................................................................... -
Federal Register/Vol. 65, No. 233/Monday, December 4, 2000
Federal Register / Vol. 65, No. 233 / Monday, December 4, 2000 / Notices 75771 2 departures. No more than one slot DEPARTMENT OF TRANSPORTATION In notice document 00±29918 exemption time may be selected in any appearing in the issue of Wednesday, hour. In this round each carrier may Federal Aviation Administration November 22, 2000, under select one slot exemption time in each SUPPLEMENTARY INFORMATION, in the first RTCA Future Flight Data Collection hour without regard to whether a slot is column, in the fifteenth line, the date Committee available in that hour. the FAA will approve or disapprove the application, in whole or part, no later d. In the second and third rounds, Pursuant to section 10(a)(2) of the than should read ``March 15, 2001''. only carriers providing service to small Federal Advisory Committee Act (Pub. hub and nonhub airports may L. 92±463, 5 U.S.C., Appendix 2), notice FOR FURTHER INFORMATION CONTACT: participate. Each carrier may select up is hereby given for the Future Flight Patrick Vaught, Program Manager, FAA/ to 2 slot exemption times, one arrival Data Collection Committee meeting to Airports District Office, 100 West Cross and one departure in each round. No be held January 11, 2000, starting at 9 Street, Suite B, Jackson, MS 39208± carrier may select more than 4 a.m. This meeting will be held at RTCA, 2307, 601±664±9885. exemption slot times in rounds 2 and 3. 1140 Connecticut Avenue, NW., Suite Issued in Jackson, Mississippi on 1020, Washington, DC, 20036. November 24, 2000. e. Beginning with the fourth round, The agenda will include: (1) Welcome all eligible carriers may participate. -
1000 Abernathy Road Northpark 400, Suite 100 Atlanta, GA 30328 (770) 671-0006
1000 Abernathy Road Northpark 400, Suite 100 Atlanta, GA 30328 (770) 671-0006 www.lhh.com Directions to Lee Hecht Harrison: From Interstate 75 Interstate 75 to 285 East. Travel approximately 7 miles to Exit 27 Georgia 400 Toll Road North to Exit 5A Abernathy Road. Turn left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left. From 75/85 Downtown 85 North to Georgia 400 Toll Road. Exit 5A Abernathy Road. Turn left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left. From Interstate 85 Interstate 85 to 285 West. Travel approximately 7 miles to Exit 27 Georgia 400 Toll Road North. Exit 5A Abernathy Road. Turn left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left and Northpark 500 and 600 are on the right. From Georgia 400 traveling South Take Georgia 400 Toll Road to exit 5 Sandy Springs / Abernathy Road. Turn left, under freeway bridge, make left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left. From 285 285 East or West to Exit 27 Georgia 400 Toll Road North. Exit 5A Abernathy Road. Turn left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left. From Interstate 20 East of 285 Take Interstate 20 West to 285 North to Exit 27 Georgia 400 Toll Road North. Exit 5A Abernathy Road. Turn left at 2nd light onto Peachtree Dunwoody Road. Northpark 400 is on the left. From Interstate 20 West of 285 Take Interstate 20 East to 285 North to Exit 27 Georgia 400 Toll Road North. -
Best Practices for Road Weather Management
Best Practices for Road Weather Management Version 3.0 June 2012 Acknowledgments While many individuals deserve recognition, the authors want to particularly acknowledge all the staff at the participating state departments of transportation who provided materials and were generous with their time and expertise. Any opinions, findings, and conclusions or recommendations expressed in this publication are those of the authors and do not necessarily reflect the views of the Federal Highway Administration. Notice This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in this document. The U.S. Government does not endorse products or manufacturers. Trademarks or manufacturers’ names appear in this report only because they are considered essential to the objective of the document. Quality Assurance Statement The Federal Highway Administration (FHWA) provides high-quality information to serve Government, industry, and the public in a manner that promotes public understanding. Standards and policies are used to ensure and maximize the quality, objectivity, utility, and integrity of its information. FHWA periodically reviews quality issues and adjusts its programs and processes to ensure continuous quality improvement. ii Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. FHWA-HOP-12-046 4. Title and Subtitle 5. Report Date June 2012 Best Practices for Road Weather Management, Version 3.0 6. Performing Organization Code 7. Co-Author(s) 8. Performing Organization Report No. Ray Murphy, FHWA; Ryan Swick, Booz Allen Hamilton; Gabe Guevara, FHWA 9. -
Division 13 Guide
DIVISION 1 2019 NCDOTANNUAL Highway REPORT Division 13 | Division 1 Contacts55 Orange Street Asheville, N.C. 28801 828-250-3000 Division 13 2021 Guide Alleghany Gr Curritu a N Ashe Vance Camde Person nville orthampto Surry Gates Stokes Rockingham Pasquotan c k Caswell Warren Hertford P n n erquiman Halifax Watauga C Wilkes Yadkin howan k Mitchell Forsyth Durha Alamance s Avery Orange Guilford Bertie Yancey Franklin Caldwell Davie m Madison DIVISION Nash Alexander Iredell Davidson Edgecombe Martin Tyrrell Burke Washington Dare 13 Randolph Chatham Wake Haywood Rowan Wilson Buncombe McDowell Catawba Pitt Swain Beaufort Hyde Lincoln Johnston Graham Rutherford Mecklenburg Lee Greene Henderson Cabarrus Stanly Cleveland Harnett Jackson Polk Wayne Gaston Montgomery Moore Cherokee Macon Lenoir Craven Clay Transylvania Cumberland Richmond Hoke Sampson Pamlico Anson Jones Union d Duplin Carteret Scotlan Onslow DIVISION 1 2020 GUIDE | 3 Robeson Bladen Pender Columbus New Hanover Brunswick NCDOT Highway Division 13 Mark T. Gibbs, PE William “Billy” Clarke 55 Orange St. Division Engineer Board of Transportation Member Asheville, N.C. 28801 828-250-3000 828-252-6600 828-250-3000 [email protected] [email protected] DIVISION EMPLOYEES 435 3 438 As of July 2020 Permanent Temporary Total DIVISION 13 COUNTIES BUNCOMBE RUTHERFORD BURKE YANCEY MADISON MCDOWELL MITCHELL ROAD MILES LANE MILES 5,116 10,875 AIRPORTS Asheville Regional Foothills Regional, Morganton Rutherford County 2 | DIVISION 13 2021 GUIDE Our Work in Division 13 MAJOR PROJECTS COMPLETED IN 2020 MAJOR PROJECTS UNDERWAY IN 2021 U.S. 19E (YANCEY, MITCHELL COUNTIES) LEICESTER HIGHWAY (BUNCOMBE COUNTY) $64.9 million, 8-mile project adds one lane each way $34.9 million project, to widen Leicester Highway between Micaville and Spruce Pine with a median, turn (N.C. -
Summary of State Speed Laws
DOT HS 810 826 August 2007 Summary of State Speed Laws Tenth Edition Current as of January 1, 2007 This document is available to the public from the National Technical Information Service, Springfield, Virginia 22161 This publication is distributed by the U.S. Department of Transportation, National Highway Traffic Safety Administration, in the interest of information exchange. The opinions, findings, and conclusions expressed in this publication are those of the author(s) and not necessarily those of the Department of Transportation or the National Highway Traffic Safety Administration. The United States Government assumes no liability for its contents or use thereof. If trade or manufacturers' names or products are mentioned, it is because they are considered essential to the object of the publication and should not be construed as an endorsement. The United States Government does not endorse products or manufacturers. TABLE OF CONTENTS Introduction ...................................................iii Missouri ......................................................138 Alabama..........................................................1 Montana ......................................................143 Alaska.............................................................5 Nebraska .....................................................150 Arizona ...........................................................9 Nevada ........................................................157 Arkansas .......................................................15 New -
I-85 MM 96-106 Hazardous Materials Draft
I-85 Widening Project Cherokee County, South Carolina Phase I Environmental Site Assessment September 14, 2015 ARM Project #16-314-15 Prepared For: HDR | ICA 501 Huger Street Columbia, SC 29201 1210 1st STREET SOUTH EXTENSION / COLUMBIA, SC 29209 / phone 803-783-3314 fax 803-783-2587 TABLE OF CONTENTS 1.0 - Summary Page 1 2.0 - Introduction Page 4 3.0 - Site Description Page 6 4.0 – User Provided Information Page 7 5.0 – Records Review Page 8 6.0 – Site Reconnaissance Page 19 7.0 – Interviews Page 20 8.0 – Findings Page 21 9.0 – Opinion Page 21 10.0 – Conclusions Page 22 11.0 – Deviations Page 25 12.0 – Additional Services Page 25 13.0 – References Page 25 14.0 – Signature(s) of Environmental Professional(s) Page 26 15.0 – Qualifications of Environmental Professional(s) Page 26 16.0 – Warranty Page 26 17.0 – Appendices 17.1 Site (Vicinity) Map – Figure 1 17.2 Site Plan – Figure 2 17.3 Site Photographs 17.4 Historical Research Documentation 17.5 Regulatory Records Documentation 17.6 Interview Documentation 17.7 Special Contractual Conditions Between User and Environmental Professional 17.8 Qualifications of the Environmental Professional I-85 Widening Project, Cherokee Co. SC ARM Project No. 12-314-15 Phase I ESA September 14, 2015 1.0 Summary ARM Environmental Services, Inc. (ARM) has completed a Phase I Environmental Site Assessment (ESA) of a corridor study area along Interstate 85 (I-85), from a point approximately 1 mile northeast of SC 18 to the South Carolina / North Carolina border, located in Cherokee County, South Carolina.