ODOT District Two Weekly Construction Update

Total Page:16

File Type:pdf, Size:1020Kb

ODOT District Two Weekly Construction Update Ohio Department of Transportation • Construction Update DISTRICT 2 • TODD M. AUDET, P.E., DEPUTY DIRECTOR 317 East Poe Rd. • Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District Two Weekly Construction Update For Immediate Release Thursday, November 12, 2015 Updates are highlighted in bold and underlined. Lucas/Wood Counties 1. Interstate 75: Widening *LANE RESTRICTIONS THIS WEEKEND* Wood & Hancock Counties (170-14, 199-14, 237-14 & 3000-14): Interstate Restrictions: Effective Friday, November 13 at 8pm, through Saturday, November 14 at 2pm, southbound I- 75, between Dowling Road and Devil’s Hole Road, will be reduced to one lane for ramp widening. Through November 2016, overnight, from 7pm until 6am, single lane restrictions are possible on I- 75 between the I-75/I-475 interchange in Perrysburg and CR 99 in Hancock County. Through 2016, southbound I-75 is reduced to two lanes from US 20 to I-475 in Perrysburg. Through 2016, 11-foot lane width restrictions are in place on I-75 between US 20 in Perrysburg and CR 99 in Hancock County. Ramp Restrictions: Through December, the ramp from southbound I-75 to westbound I-475 is reduced to one lane. Through July 2016, 11-foot lane width restrictions are in place on the ramps from northbound and southbound I-75 to Cygnet Road (Exit 171) and from Cygnet Road to northbound and southbound I-75. Local Routes: Through February 2016, Bays Road at I-75 will be closed for bridge work. Detour: SR 25; SR 281; Solether Road. Through November, Jerry City Road at I-75 is closed for bridge work. Detour: SR 25; SR 281; Solether Road. Through December, Township Road 101 in Hancock County, between CR 220 and TR 142, is closed for bridge work over I-75. Project complete: October 2017. All work is weather permitting. 2. Interstate 75: Widening Lucas County (485-14, 536-14): Through July 2018, overnight, 7pm through 6am, single lane restrictions are possible on I-75, from I-475 in Toledo to I-280 for bridge work. Through fall 2016, one lane of I-75 traffic is maintained in the current northbound lane and one lane of traffic is relocated to southbound I-75 and separated by barrier wall. The following ramps are closed: Through June 2016, the ramp from Phillips Avenue to northbound I-75. Detour: Manhattan Boulevard; Lagrange Street; South Expressway Drive. Through July 2016, the ramp from southbound I-75 to Phillips Avenue (Exit 206). Detour: North Expressway Drive (Exit 207); Stickney Avenue; South Expressway Drive. Through August 2016, the ramp from northbound I-75 to Jeep Parkway (Exit 205A). Detour: Berdan Avenue (Exit 205B); Detroit Avenue. Through October 2016, the ramp from northbound I-75 to Phillips Avenue (Exit 206). Detour: south Expressway Drive (Exit 207); Stickney Avenue; North Expressway Drive. Through July 2018, the ramp from Jeep Parkway to southbound I-75. Detour: Berdan Avenue. Through July 2018, the ramp from Willys Parkway to northbound I-75. Detour: Berdan Avenue; Detroit Avenue; Phillips Avenue. Through July 2018, the ramp from southbound I-75 to Willys Parkway (Exit 205A). Detour: Detroit Avenue (Exit 203B). Local Streets: Through November, expect lane restrictions on Phillips Avenue at I-75, Lagrange Street at I-75, Berdan Avenue at I-75, Detroit Avenue at I-75, and Stickney Avenue at I-75 for bridge work. Through June 2016, South Expressway Drive is restricted to a single lane between Stickney Avenue and Lagrange Street. Through August 2016, Jeep Parkway from Central Avenue to Berdan Avenue is closed. Central Avenue; Detroit Avenue; Berdan Avenue. Through October 2016, the ramp from northbound I-75 to Berdan Avenue is restricted to right turn only movements. Suggested alternate route: Berdan Avenue; Detroit Avenue; Phillips Avenue; Haverhill Drive. Through November 2016, Elm Street and Wersell Avenue at South Expressway Drive, will be closed. Through May 2017, the Polish Village Overpass is closed for bridge work. Detour: North Expressway Drive; Stickney Avenue; South Expressway Drive. Through July 2018, Willys Parkway from Pioneer Lane to Jeep Parkway is closed. Project complete: September 2018. All work is weather permitting. 3. Interstate 75: Pavement Rehabilitation Lucas County (268-14): Through August 2016, I-75, from the I-75/475 split in Toledo to the Anthony Wayne Trail, is reduced to two lanes. Overnight, 10pm through 6am, single lane restrictions are possible in this work zone. • The ramp from northbound I-75 to Bancroft Street is now open. Through August 2016, the following ramps are restricted or closed: The interchange ramp from eastbound I-475 to southbound I-75 is reduced to one lane. The interchange ramp from northbound I-75 to westbound I-475 is reduced to one lane. The ramp from Detroit Avenue to southbound I-75 is closed. Detour: Monroe Street; Michigan Avenue; SR 25. The ramp from Detroit Avenue to northbound I-75 is closed. Detour: Monroe Street; 14th Street. Through May 2016, Oakwood Avenue, between Wells Street and Grove Place, is closed for bridge work. Seek alternate route. Project complete: August 2016. All work is weather permitting. 4. Interstate 75: Rest Area Closure Wood County (170-14): Through July 2016, the northbound and southbound I-75 rest areas are closed as part of the I-75 widening project. Project complete: July 2016. All work is weather permitting. 5. Interstate 475: ProMedica Parkway Ramp Lucas County: Through 2016, the ramp from ProMedica Parkway to eastbound I-475 is closed for traffic control. Detour: westbound I-475; Douglas Road. All work is weather permitting. 6. Interstate 475/U.S. Route 23: Interchange Upgrade *UPDATE* Lucas County (184-14 & 210-15): Effective Monday, November 16 at 9pm, through Tuesday, November 17 at 6am, the ramp from westbound I-475 to southbound I-475/US 23 will be closed for pavement repair. Work was postponed due to weather. Detour: northbound US 23; Monroe Street (Exit 234). Through December, the ramp from southbound US 23 to Central Avenue is closed. Detour: southbound I-475/US23; Airport Highway (Exit 8A). Additionally at this time, southbound US 23 traffic is reduced to one lane from the I-475/US 23 split in Sylvania to Central Avenue. The ramp from westbound I-475 to Central Avenue (Exit 13) is open. Overnight lane restrictions are possible at the interchange of I-475/US 23 from Central Avenue to N. Holland Sylvania Road. Through October, lane restrictions are possible on Blossman Road, between Moffat Road and Plainview Drive for bridge work. Traffic will be maintained by flaggers. Project complete: December. All work is weather permitting. 7. Interstate 475: Bridge Widening Lucas County (251-13 & 235-14): Through December, Angola Road at I-475 is closed for bridge replacement. Detour: Holland Park Boulevard; North Mall Drive; McCord Road; Airport Highway; Holland Sylvania Road. Through May 2016, overnight from 8pm until 6am, lane restrictions are possible on I-475, between Angola Road and Salisbury Road/Dussel Drive. 11-foot lane width restrictions are in place on I-475, between Angola Road and Salisbury Road/Dussel Drive. Project complete: August 2016. All work is weather permitting. 8. Interstate 475: Noise Wall Installation Lucas County (314-14): Through November, intermittent shoulder restrictions are possible on I- 475, between Corey Road and Woodley Road, for finish work. Project complete: October. All work is weather permitting. 9. Interstate Maintenance Work Lucas and Wood Counties: Through December, intermittent overnight lane restrictions are possible on I-75, I-280 and I-475 in Lucas and Wood counties for maintenance work. Project complete: December. All work is weather permitting. 10. U.S. Route 20: Central Avenue Interchange Project Lucas County (210-15): Through September 2017, overnight from 9pm until 6am, lane restrictions are possible on I-475/US 23 between Dorr Street and the I-475/US 23 interchange. 11-foot lane width restrictions are in place within the work zone. Additional restrictions will be announced. Project complete: September 2017. All work is weather permitting. 11. U.S. Route 20: Utility Work *UPDATE* Lucas County: Effective Monday, November 16 at 9pm, through Tuesday, November 17 at 5am, westbound US 20, between Wilford Drive and Plainview Drive, will be reduced to one lane for pavement repair. Through November, overnight from 9pm until 6am, lane restrictions are possible on Central Avenue, between I-475 and Central Park West, for gas line relocation. For more information, contact Columbia Gas at 1-800-344-4077. All work is weather permitting. 12. U.S. Route 20A: Eber Road Roundabout Project Lucas County (184-15): The US 20A at Eber Road roundabout is open. Intermittent lane restrictions are possible on US 20A at Eber Road for finish work. Project complete: November. All work is weather permitting. 13. State Route 2: Anthony Wayne Bridge Project *UPDATE* Lucas County (58-13): All lanes of the Anthony Wayne Bridge are now open. Through November, intermittent lane restrictions are possible and there is no pedestrian access for finish work. Project complete: May 2016. All work is weather permitting. 14. State Route 2: Pavement Repair Lucas County: Through Friday, November 13, SR 2, between Lyon Road and Cousino Road, may be reduced to one lane for pavement repair. Traffic will be maintained by flaggers. All work is weather permitting. 15. State Route 25: Safety Project Lucas County (299-15): Through September 2016, southbound (outbound from downtown Toledo) Anthony Wayne Trail, between Hippo Way and City Park Boulevard, will remain reduced two lanes of traffic for pavement rehabilitation. Project complete: November 2016. All work is weather permitting. 16. McCord Road: Underpass Construction Lucas County (236-14): Through September 2016, McCord Road between North Mall Drive/Hall Road and Spectrum Drive is closed to vehicular and pedestrian traffic.
Recommended publications
  • Ultimate RV Dump Station Guide
    Ultimate RV Dump Station Guide A Complete Compendium Of RV Dump Stations Across The USA Publiished By: Covenant Publishing LLC 1201 N Orange St. Suite 7003 Wilmington, DE 19801 Copyrighted Material Copyright 2010 Covenant Publishing. All rights reserved worldwide. Ultimate RV Dump Station Guide Page 2 Contents New Mexico ............................................................... 87 New York .................................................................... 89 Introduction ................................................................. 3 North Carolina ........................................................... 91 Alabama ........................................................................ 5 North Dakota ............................................................. 93 Alaska ............................................................................ 8 Ohio ............................................................................ 95 Arizona ......................................................................... 9 Oklahoma ................................................................... 98 Arkansas ..................................................................... 13 Oregon ...................................................................... 100 California .................................................................... 15 Pennsylvania ............................................................ 104 Colorado ..................................................................... 23 Rhode Island ...........................................................
    [Show full text]
  • NORTH I-75 MASTER PLAN Summary Report
    NORTH I-75 MASTER PLAN Summary Report Interstate 75 (SR 93) From the Florida’s Turnpike Interchange to the I-10 Interchange Alachua, Bradford, Clay, Citrus, Columbia, Duval, Levy, Marion, and Sumter Counties, Florida Financial Project ID: 191985-2-12-01 June 2017 Updated August 2017 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY ............................................................................................................................................. 1 2 PROJECT BACKGROUND & PURPOSE .................................................................................................................... 2 2.1 Background ................................................................................................................................................................................................ 2 2.2 I-75 Relief Task Force Recommendations ...................................................................................................................................... 2 3 STUDY AREA CORRIDORS ........................................................................................................................................ 4 3.1 Study Area .................................................................................................................................................................................................. 4 4 STUDY METHODOLOGY & PUBLIC INVOLVEMENT ............................................................................................. 6 5 EXISTING AND FUTURE I-75 TRANSPORTATION ...............................................................................................
    [Show full text]
  • Transportation Element
    CHAPTER 3 CITY OF NORTH PORT COMPREHENSIVE PLAN _________________________________ TRANSPORTATION Transportation Element Table of Contents Chapter 3 Transportation Page Introduction 3-3 Transportation Issues Identified in the EAR 3-4 Functional Classification of Roads 3-6 Strategic Intermodal System 3-8 Roadway Jurisdiction and Maintenance 3-8 Parking Facilities 3-8 Traffic Generators 3-9 Traffic Counts 3-10 Intersection Deficiencies 3-10 Roadway Level of Service 3-10 State Highway System Levels of Service 3-11 Existing Level of Service Standards 3-12 Concurrency Management 3-14 Proportionate Fair Share 3-14 Access Management Strategies 3-15 U.S. 41 Corridor Master Plan 3-15 Transportation and Disaster Management 3-16 Future Growth and Transportation Improvements 3-17 Alternative Modes of Transportation 3-20 Intergovernmental Coordination 3-21 List of Illustrations TABLES 3-1 Existing Roadway Classification 3-7 3-2 Existing Roadway Lanes 3-8 3-3 Existing Roadway Jurisdiction 3-8 3-4 Backlogged and Constrained Facilities 3-14 3-5 Time to Clear Landfalling Storm for Evacuation Zones 3-17 Attachment 2007 Existing Traffic Counts Goals, Objectives, & Policies 3-22 Maps follow GOP’s 3-1 Existing & Future Transit Generators 3-5 Existing Roadway Lane Classification 3-2 Existing Roadway Jurisdictional 3-5a Future Roadway Lane Classification 3-2a Future Roadway Jurisdictional 3-6 Future Transportation 3-3 Level of Service 3-3b LOS C Congestion Levels 3-4 Existing Roadway Classification 3-2 Transportation Element TRANSPORTATION ELEMENT INTRODUCTION The goal of the transportation element is to develop an effective multi-modal transportation system which optimizes safety, convenience, cost, and pollution reduction practices by establishing internal and external transportation linkages between residential neighborhoods and activity centers.
    [Show full text]
  • Macon-Bibb County Planning & Zoning Commission
    Macon-Bibb County Planning & Zoning Commission COMPREHENSIVE PLAN Community Assessment Draft – Public Review Phase February 2006 Macon-Bibb County Planning & Zoning Commissioners Theresa T. Watkins, Chariman Joni Woolf, Vice-Chairman James B. Patton Lonnie Miley Damon D. King Administrative Staff Vernon B. Ryle, III, Executive Director James P. Thomas, Director of Urban Planning Jean G. Brown, Zoning Director Dennis B. Brill, GIS/Graphics Director D. Elaine Smith, Human Resources Officer Kathryn B. Sanders, Finance Officer R. Barry Bissonette, Public Information Officers Macon-Bibb County Comprehensive Plan 2030 Prepared By: Macon-Bibb County Planning & Zoning Commission 682 Cherry Street Suite 1000 Macon, Georgia 478-751-7460 www.mbpz.org February 2006 “The opinion, findings, and conclusions in this publication are those of the author(s) and not necessarily those of the Department of Transportation, State of Georgia, or the Federal Highway Administration. Table of Contents Introduction…………………………………………………………Introduction-1 Chapter 1- General Population Overview .................................................................... 1-1 Chapter 2 - Economic Development ............................................................................ 2-1 Chapter 3 - Housing......................................................................................................... 3-1 Chapter 4 - Natural and Cultural Resources................................................................. 4-1 Chapter 5 - Community Facilities and Services...........................................................
    [Show full text]
  • Market Feasibility Analysis
    Market Feasibility Analysis Tenley Commons 600 Lamar Road Macon, Bibb County, Georgia 31210 Prepared For Mr. Denis Blackburne Woda Cooper Companies, Inc. Tenley Commons Limited Partnership (Owner) 127 Abercorn Street, Suite 402 Savannah, Georgia 31401 Effective Date May 15, 2019 Job Reference Number 19-320 JW 155 E. Columbus Street, Suite 220 Pickerington, Ohio 43147 Phone: (614) 833-9300 Bowennational.com Table Of Contents A. Executive Summary B. Project Description C. Site Description and Evaluation D. Primary Market Area Delineation E. Community Demographic Data F. Economic Trends G. Project-Specific Demand Analysis H. Rental Housing Analysis (Supply) I. Absorption & Stabilization Rates J. Interviews K. Conclusions & Recommendations L. Signed Statement M. Market Study Representation N. Qualifications Addendum A – Field Survey of Conventional Rentals Addendum B – Comparable Property Profiles Addendum C – Market Analyst Certification Checklist Addendum D – Methodologies, Disclaimers & Sources Addendum E – Achievable Market Rent Analysis TOC-1 Section A – Executive Summary This report evaluates the market feasibility of the Tenley Commons rental community to be constructed utilizing financing from the Low-Income Housing Tax Credit (LIHTC) program in Macon, Georgia. Based on the findings contained in this report, we believe a market will exist for the subject development, as long as it is constructed and operated as proposed in this report: 1. Project Description: Tenley Commons involves the new construction of 70 apartments on an approximate 11.7-acre site at 600 Lamar Road in Macon. The project will offer 12 one-, 34 two- and 24 three-bedroom garden-style units in three (3) three-story, walk-up residential buildings together with a free-standing, 1,800 square-foot community building.
    [Show full text]
  • Driving Directions to Ccc League Games
    DRIVING DIRECTIONS TO CCC LEAGUE GAMES TO: ANSONIA High School…Ansonia, Ohio Take State Route 503 North to and right (North) on State Route 127 to and left (West) on State Route 47. The School is located approximately 3-4 miles from Route 127 on the North side of the road. TO: ARCANUM High School…Arcanum, Ohio Take State Route 503 North and right (East) on State Route 722 (in Ithaca) to and left (North) at the stop sign. Stay on this road as it winds through the edge of Ithaca and eventually continues North into Arcanum. The high school is located past the second traffic signal on the left (West) side of the street in Arcanum. TO: BETHEL High School…Tipp City, Ohio Take State Route 503 North to and right (East) on Interstate 70 to the second exit past Interstate 75 which is State Route 201. Take State Route 201 left (North). The High School is located approximately 3-4 miles from I70 on the left (West) side of the road. TO: BRADFORD High School…Bradford, Ohio Take State Route 503 North to and right (East) on Interstate 70 to the State Route 49 North Exit. Take Route 49 Northwest through Phillipsburg to and right (North) on State Route 721 and continue into Bradford. The High School is located at the North edge of Bradford on the left (West) side of Route 721. TO: COVINGTON High School…Covington, Ohio Take State Route 503 North to and right (East) on Interstate 70 to and left (North) on State Route 48 at the Englewood exit.
    [Show full text]
  • Franklin Park Mall Toledo, Ohio As the Only Enclosed Super-Regional Center in a 50
    Franklin Park Mall Franklin Park Mall Toledo, Ohio As the only enclosed super-regional center in a 50- mile radius, Franklin Park Mall impresses: 1.3 million MONROE, MI square feet; more than 45,000 trade area households MICHIGAN with incomes of $100,000 and above; retailers with OHIO top regional sales. TOLEDO, OH MAUMEE, OH But numbers don’t tell the whole story about the mall or deceptively affluent Toledo. A low cost of GIBSONBURG, OH 10 MILES living gives residents more money to spend on retail and dining. And the region’s demographics range from tech and medical professionals to the students training to join them. Franklin Park is where they celebrate the lifestyle they’ve earned — or aspire to. Franklin Park Mall Toledo, Ohio • Largest enclosed mall in Northwest Ohio • Enclosed, one-level super-regional mall • Mixes traditional and lifestyle tenants for one-stop shopping • A new Altar’d State and BoxLunch in 2017 Property Description major roads I-475 and Talmadge Road center description Enclosed, one-level center and Monroe Street anchors Macy’s, Dillard’s, JCPenney, Dick’s Sporting total sf 1,293,000 Goods, and Cinemark 16 & XD key tenants Apple Store, Williams-Sonoma, Pottery Barn, # of stores 142 Banana Republic, J Crew Mercantile, Pandora, Pink, Talbot’s, Swarovski, H&M, # of parking 6,100 Bravo Cucina Italiana,Dave & Buster’s, Sephora, Altar’d State, Ulta and BoxLunch THE CENTER THE MARKET STARWOOD Franklin Park Mall “Stop by Franklin Park Mall for the best bargains in fashion, electronics, and more” — DoToledo.org THE CENTER
    [Show full text]
  • The Interstate Highway System: 50 Years of Perspective Jerome Hall and Loretta Hall
    The Interstate Highway System: 50 Years of Perspective Jerome Hall and Loretta Hall On June 29, 1956, President Dwight Eisenhower signed historic legislation that authorized construction of the Interstate Highway System and created a pay-as-you-go Highway Trust Fund to generate the federal government’s 90+ percent share of the system’s cost. Although Eisenhower is justifiably credited with making it a reality, the Interstate System is actually the result of a series of concepts that were refined over several prior decades within the engineering and political arenas. Developing the system required a visionary financing strategy that would satisfy diverse philosophical and economic view points. Designing the system presented unprecedented challenges for standardizing elements that would improve safety and be appropriate for a truly national highway system. The current 46,700-mile Interstate System generated transportation efficiencies and enabled societal mobility to unanticipated degrees. This paper traces the system’s conceptual development; describes its major political, societal, financial, and technical challenges; and evaluates its influences on the American way of life. Conceptual Development The federal government undertook its first interstate road building project in 1806, when it authorized federally funded construction of the National Road (now US 40). President Thomas Jefferson approved legislation to build the 20-foot-wide highway on 60-foot-wide right-of-way. The War of 1812 slowed construction of the first section from Cumberland, Maryland, to the Ohio River. After spirited debate about federal versus state powers, the federal government transferred ownership of the road to the states about 1835. The National Road was a macadam highway traversed by herded livestock and covered wagons.
    [Show full text]
  • CITY of TOLEDO, OHIO 2020 Annual Information Statement
    CITY OF TOLEDO, OHIO 2020 Annual Information Statement in connection with Bonds and Notes of the City of Toledo In addition to providing information on an annual basis, the City of Toledo intends that this Annual Information Statement be used, together with information to be provided by the City specifically for that purpose, in connection with the original offering and issuance by the City of its bonds and notes. Questions regarding information contained in this Annual Information Statement should be directed to: Melanie Campbell Interim Director of Finance One Government Center, Suite 2050 Toledo, Ohio 43604-2293 Telephone (419) 245-1647 E-Mail: [email protected] The date of this Annual Information Statement is September 15, 2020. (This Page Intentionally Left Blank) REGARDING THIS ANNUAL INFORMATION STATEMENT The information and expressions of opinion in this Annual Information Statement are subject to change without notice. Neither the delivery of this Annual Information Statement nor any sale made under an Official Statement or other offering document of which it is a part shall, under any circumstances, give rise to any implication that there has been no change in the affairs of the City since its date. TABLE OF CONTENTS Page INTRODUCTORY STATEMENT .............................................................................................................. 1 STATEMENT RELATED TO THE CORONAVIRUS (COVID-19) PANDEMIC ................................... 2 THE CITY ...................................................................................................................................................
    [Show full text]
  • US23 Route Is That You Avoid Congested Detroit and of Course Have Less Exposure to Accident Traffic Incidents with Resulting Backups
    Direct southbound route from Flint, Michigan to Perrysburg, Ohio (I-75 exit 192) From Flint, Michigan, Interstate-75 takes a significant turn to the southeast as it runs towards downtown Detroit ... and onwards to Toledo in Ohio. For those driving from the UP, Sault Ste Marie and other points in Michigan north of Flint, here is a route which avoids Detroit and the extra southeast I-75 miles; it is a direct southbound path which rejoins I-75 just below Toledo. Parts of the route are through rural country on a two-lane open highway while others are on a two lane limited access route similar to an interstate. The advantage of the US23 route is that you avoid congested Detroit and of course have less exposure to accident traffic incidents with resulting backups. Comparison Via I-75: time/dist. from Flint to Toledo/I-75 exit 192 = 147 miles (237km) 2:55 hours. Via US23 route: time/dist from Flint to Toledo/I-75 exit 192 = 130 miles (209km) 3:00 hours. Alternative US23 Route 1. On I-75 just south of Flint, Michigan, move to the two right lanes and take exit 115 - US23 to Ann Arbor. 2. Continue of US23 through Fenton, Brighton and Whitmore Lake to Ann Arbor. 3. Just north of Ann Arbor, move to left two lanes and continue following US23South - Toldeo (do not take exit 45, or follow US23 Business or signs to Ann Arbor). The road bends to the east (left) for 2.5 miles (4kms). 4. Stay in right two lanes.
    [Show full text]
  • Hotel Directions
    HOTEL INFORMATION The Westin Buckhead Atlanta 3391 Peachtree Road, N.E. Atlanta, Georgia 30326 866-716-8108 The Westin Buckhead Atlanta is 19-miles or 30 minutes from Hartsfield-Jackson International Airport and 8-miles or 10 minutes from Peachtree DeKalb Airport. If traveling to the hotel by car please follow the following directions. From North Take Georgia State Route 400 South and Exit at Lenox Road (Exit 2). Turn left and follow the signs for Peachtree Road South. Turn right on Peachtree Road. Turn left at the second traffic light. The hotel is on the right. From South (Hartsfield-Jackson International Airport) Domestic Terminal: Take Interstate 85 North. Exit Georgia State Route 400 North. Take the first exit (Lenox Road). Turn right and follow the signs for Peachtree Road South. Turn right on Peachtree Road. Turn left at the second traffic light. The hotel is on the right. International Terminal: Take Interstate 75 North Exit Interstate 85 North Exit Georgia State Route 400 North Take the first exit (Lenox Road) Turn right and follow the signs for Peachtree Road South Turn right on Peachtree Road Turn left at the second traffic light The hotel is on the right From East From East Take Interstate 20 West to Downtown and proceed to Interstate 85 North. Take I-85 and exit at GA400 North. Take the Lenox Road Exit and turn right. Follow the signs for Peachtree Road South. Turn right onto Peachtree Road, then turn left at the second traffic light. The hotel is on the right. From West Take Interstate 285 East to Georgia State Route 400 South.
    [Show full text]
  • Donohue V. Ohio Dept. of Transp., Dist. 2, 2011-Ohio-5116.]
    [Cite as Donohue v. Ohio Dept. of Transp., Dist. 2, 2011-Ohio-5116.] Court of Claims of Ohio The Ohio Judicial Center 65 South Front Street, Third Floor Columbus, OH 43215 614.387.9800 or 1.800.824.8263 www.cco.state.oh.us WILLIAM A. DONOHUE Plaintiff v. OHIO DEPT. OF TRANSPORTATION, DISTRICT 2 Defendant Case No. 2011-02328-AD Deputy Clerk Daniel R. Borchert MEMORANDUM DECISION {¶1} Plaintiff, William Donohue, filed this action against defendant, Department of Transportation (ODOT), asserting that his 2007 Volkswagon Jetta was damaged as a proximate cause of negligence on the part of ODOT in maintaining a hazardous roadway condition on Interstate 475 in Toledo, Ohio. Plaintiff related that he was traveling east on Interstate 475 on December 13, 2010, at 8:00 p.m. when his vehicle struck a pothole “just past the Upton bridge.” Plaintiff pointed out that the driver’s side tires and rims were destroyed as a result of the impact. Plaintiff requested damages in the amount of $551.34, the total cost of two replacement tires, car rental, and taxi fare to and from the Toledo airport while his car was being repaired. The filing fee was paid. {¶2} Defendant explained that the roadway area where plaintiff’s damage event occurred was within the limits of a working construction project under the control of ODOT contractor E.S. Wagner Company (Wagner). Defendant related that the particular construction project dealt with improvements to a section of roadway “by grading, draining, paving with stone matrix asphalt concrete on an asphalt concrete base.” According to defendant, the construction project limits “are county mileposts 14.18 to 16.20 on I-475 in Lucas County” and plaintiff’s damage incident occurred at milepost 15.38, a location within the construction area limits.
    [Show full text]