River Water Quality — Global Environmental Monitoring System (GEMS)

Total Page:16

File Type:pdf, Size:1020Kb

River Water Quality — Global Environmental Monitoring System (GEMS) Classification of Water Quality under National Water Quality Monitoring Programme from April - 2021 to June-2021 River Water Quality — Global Environmental Monitoring System (GEMS) Sl. Stn Regional Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Monitoring Location River code No Office Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI 1 29 At Ullanur Bridge Tungabhadra Raichur C S C S C S 2 33 At Balamuri Kshetra Cauvery C S C S C S Mysruru 3 34 At Satyagala Bridge Cauvery C S C S C S 4 38 At Honnali Bridge Tungabhadra Davangere B S B S B S 5 41 At Cause way Suttur Kabini Mysuru C S C S C S River Water Qaulity — Monitoring of Indian National Aquatic Resource System (MINARS) Sl. Stn Regional Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Monitoring Station River code No Office Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI 6 1028 At Tintini Bridge Krishna Raichur C S C S C S 7 1029 At Haralahalli Bridge Tungabhadra Davangere B S B S B S 8 1091 D/S of KIOCL, Malleshwar Bhadra Hassan B S B S B S 9 1163 W.A. Point to Gokak Town Ghataprabha C S C S C S Belgavi 10 1164 W.A. Point to Hubli- Malaprabha C S C S * Dharwad 11 1165 At D/S of Kanakapura Arkavathi Ramanaga D US * D US r 12 1166 At D/S of Bridge Halagur Shimsha Mysuru * D US D US 13 1167 At D/S of Bridge near Yadgir Bhima Raichur * * C S 14 1168 At D/S of Shimoga Tunga Davangere D US D US B S 15 1169 Near Holehonnur Bhadra Davangere B S B S B S 16 1170 At D/S of Devasagar Bridge Krishna Raichur C S C S C S At D/S of Road Bridge at 17 1171 Cauvery Mysuru D US D US C S Shrirangapatna 18 1181 At D/S of Narayana pura Krishna C S C S C S Dam Belgavi 19 1182 At D/S of Ugarkhurd Krishna C S C S C S AtBarrage D/S of Road Bridge 20 1183 Bhima C S C S C S Ghanagapur Village Kalaburagi 21 1184 At Ferozabad Bhima C S C S C S At D/S of Mudhol Road 22 1185 Ghataprabha * C S C S Cross Bridge Belgavi 23 1186 At D/S of Aihole Town Malaprabha C S C S C S 24 1187 At D/S of Khanapur Village Malaprabha C S C S * 25 1195 At Kushalnagar Cauvery C S B S B S Lakshman 26 1196 D/S of Hunsur Town * D US D US Tirtha Mysuru 27 1197 At Saragur Village Kabini C S C S C S 28 1198 at Napoklu Bridge Cauvery B S B S B S Sl. Stn Regional Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Monitoring Location River code No Office Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI 29 1199 At D/S of Holenarasipura Hemavathi Hassan C S C S C S Town 30 1200 Near Yediyur on NH-47 Shimsha Tumakuru D US D US D US 31 1386 D/S of Karekura Village Cauvery Mysuru C S C S C S 32 1387 D/S of Bhadravathi City Bhadra Davangere D US D US B S At D/S of West Coast Paper 33 1444 Kali Dharwad C S C S * Mills Kabini, W.A. Point at 34 1445 Kabini C S C S C S KIADB, Nanjangud Mysuru 35 1446 Hebbala Valley near Mandya Hebbala D US D US D US Bhima River Confluence of 36 1888 Jewagri Town Sewage Bhima Kalaburagi C S C S C S Disposal Point Ankali Bridge Along 37 1889 Krishna Belgavi C S C S C S Chikkodi Kagwad Road Karanja river near byalahalli 38 1891 Karanja river Bidar * * * village Netravathi U/S of Dharma 39 1892 Stala at Water Supply Netravathi Mangaluru C S B S C S Intake point Yagachi River Near Pumping 40 1893 Yagachi Hassan C S C S C S Stations Hassan City U/S Uppinagady Town 41 1894 Before Confluence with Kumara Dhara Mangaluru B S B S C S river Nethravathi Kagina D/S of Sewage 42 1895 Kagina Kalaburagi C S E US C S disposal point Confluence point of Tunga 43 1896 Tunga-Bhadra Davangere B S B S B S and Bhadra at Kudli 44 2763 Asangi Village Asangi nalla C S C S C S Belgavi 45 2764 At Badami Bridge Malaprabha C S C S C S 46 2765 U/S of MPM Bhadra B S B S B S 47 2766 At New Bridge Tungabhadra B S B S B S 48 2767 U/S of HPF Old Bridge Tungabhadra B S B S B S 49 2768 D/S of HPF Tungabhadra Davangere D US D US D US 50 2769 At Jack Well Point Tungabhadra B S D US B S At Harihar Water Supply 51 2770 Tungabhadra D US D US D US Intake 52 2771 U/S of KIOCL Bhadra Hassan B S B S B S Lakshman 53 2772 D/S of Kattemalavadi Mysuru * D US D US Tirtha Sl. Stn Regional Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Monitoring Location River code No Office Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI 54 2773 At Bannur Bridge Cauvery C S C S C S 55 2774 At Ranganathittu Cauvery Mysuru C S C S C S At Bathing Ghat, 56 2775 Kabini D US C S C S Nanjanagud 57 2776 D/S of Gangawathi Tungabhadra Raichur C S C S C S 58 2777 At Shahabad Bridge C S C S C S Benniothora dam Kagina Kalaburagi 59 4499 C S C S C S Kurkota village, Kagina river at D/S of 60 4500 bridge cum barrage, Kagina Kalaburagi C S C S C S Sadem Tq. 61 2780 U/S of WCPM, Dandeli Kali Dharwad C S C S * 62 2781 D/S of Alamatti Dam Krishna Belgavi C S C S C S Dodesugur bridge gaugung 63 3558 Tungabhadra Raichur * * C S Station Thumbe water supply 64 3562 Nethravathi B S B S C S station to Mangalore city Mangaluru 65 3563 U/s of Uppinangady town Nethravathi C S C S C S 66 3566 KRS Dam Mandya Cauvery C S C S C S 67 3567 D/s Shimsha near Madduar Shimsha * D US C S Watertown supply intakepoint to 68 3568 Cauvery C S C S C S Srirangapatna town Water supply intake point to 69 3569 Cauvery C S C S C S Mandya town 70 3570 D/s of KR Nagar bridge Cauvery C S C S C S 71 3571 U/s of KR Nagar Cauvery C S C S C S Water supply intake point to Lakshman 72 3572 * D US D US Hunsur town Thirtha 73 3573 D/s of Kushalanagar town Cauvery B S B S B S Water supply intake point to Mysuru 74 3574 Cauvery B S B S C S Madikeri town (Kootehole) U/s Intake point to 75 3575 Nanjanagud & Gundlupet Kabini C S C S C S at Debur Water supply intake point to 76 3576 Cauvery C S C S C S Mysore pump house Water supply intake point to 77 3577 Kabini C S C S C S T. Narasipura D/s of Cauvery Maddur 78 3578 water supply treatment plant Cauvery C S C S C S at @ Bachalli Sl. Stn Regional Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Monitoring Location River code No Office Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Class WQI Water supply intake point at 79 3579 Cauvery C S C S C S Kollegala, Dasanapura Water supply intake point 80 3580 Cauvery Mysuru C S C S C S to Malavalli Water supply intake point at 81 3581 Cauvery C S C S C S Torekadanahalli 82 4087 NR Bridge, Ankola Gangavali C S C S C S 83 4088 Aghanashini River Aghanashini C S C S C S 84 4089 Hadinabal Bridge Gundabai C S C S C S 85 4090 NR Bridge, at Honnavara Sharavathi Karwar C S C S C S 86 4091 NR Kadivinakatte Dam Venkatpur C S C S C S Aghanashini River 87 4496 Aghanashini C S C S C S Marigadde(Sirsi) 88 4497 Kengre hole (Sirsi) C S C S C S Aghanashini Karwar 89 4498 Sanavalli Dam , Mungod C S C S C S Rakkasakoppa Reservoir Rakkasakopp 90 4098 Belgavi C S C S * Rakkasakoppa Vill Belagavi Reservor D/S Barachuki Falls 91 4099 Cauvery C S C S C S Sathegala Attigullipura Suvaranvathi 92 4100 C S C S B S Chamarajanagar Reservoir Mysuru Gundal Kollegala Tq & Gundal 93 4101 B S B S B S Chamarajanagar Dist Reservoir D/S of cauvery at 94 4102 Cauvery B S B S B S Bhagamandala Bridge D/S of Cauvery at Kanive 95 4103 Ramaligeswara Tempale Cauvery Mysuru B S B S B S Bridge Kushalnagar Ghatprabha River, 96 4104 Davalshwar Braaga Jackwell Ghatprabha Belagavi * C S C S for Drinking Water Supply Bhadra River D/S MPM, Bhadra 97 4105 B S B S B S Bhadrawati Tunga River U/S Tunga 98 4106 B S B S B S Shivamogga Davangere 99 4494 Tungabhadra river at Mylara Tunga D US B S B S 100 4495 Tungabhadra river at Aravi Tunga B S B S B S Dakshina Pinakini River Dakshina 101 4107 Sarjapura E US * D US Near Mugalur Bridge, Pinakini 102 4108 Akravathir River Before Arkavathi D US * D US Ramanagar 103 4109 Cauvery River Before Cauvery D US * D US Confluence At Sangam Sl.
Recommended publications
  • Bidar District “Disaster Management Plan 2015-16” ©Ãzàgà F¯Áè
    BIDAR DISTRICT DISASTER MANAGEMENT PLAN-2015-16 Government of Karnataka Bidar District “Disaster Management Plan 2015-16” ©ÃzÀgÀ f¯Áè “““«¥ÀvÀÄÛ“«¥ÀvÀÄÛ ¤ªÀðºÀuÁ AiÉÆÃd£É 20152015----16161616”””” fĒÁè¢üPÁjUÀ¼À PÁAiÀiÁð®AiÀÄ ©ÃzÀgÀ fĒÉè BIDAR DEPUTY COMMISSIONER OFFICE, BIDAR. BIDAR DISTRICT DISASTER MANAGEMENT PLAN-2015-16 CONTENTS SL NO TOPIC PAGE NO 1 Preface 03 2 Glossary 04 3 Chapter-1 :Introduction 05-13 4 Chapter-2 : Bidar District Profile 14-25 5 Chapter-3 : Hazard Risk Vulnerability and Capacity (HRVC) 26-41 Analyses 6 Chapter-4 : Institution Mechanism 42-57 7 Chapter-5: Mitigation Plan 58-73 8 Chapter-6: Response Plan 74-80 9 Chapter-7: Recovery and Reconstruction Plan 81-96 10 Chapter-8 : Resources and Contact Numbers 97-117 11 Chapter-9 : Standard Operating Processor (SOPs) 118-125 12 Chapter-10 : Maps 126-137 13 Conclusion 138 14 Bibliography 139 BIDAR DEPUTY COMMISSIONER OFFICE, BIDAR. Bidar District Disaster Management Pla n 2015-16 Office of the Deputy Commissioner Bidar District, Bidar Shri. Anurag Tewari I. A.S Chairman of Disaster Management & Deputy Commissioner Phone: 08482-225409 (O), 225262(Fax) Bidar District E-mail: [email protected] PREFACE “Disaster” means unforeseen and serious threat to public life with suddenness in terms of time. Declaration of disaster depends on gravity or magnitude of situ ation, number of victims involved, time factor i.e. suddenness of an event, non- availability of medical care in terms of space, equipment’s medical and pa ramedical staff, medicines and other basic human needs like food, shelter and clothing, weather conditions in the locali ty of incident etc., thus enhancing human sufferings and create human needs that the victim cann ot alleviate without assistance.
    [Show full text]
  • Water Quality Analysis of River Tungabhadra Near Harihar
    Vol-3 Issue-2 2017 IJARIIE-ISSN(O)-2395-4396 WATER QUALITY ANALYSIS OF RIVER TUNGABHADRA NEAR HARIHAR T M VINAY1 1 Assistant professor, CIVIL department, MCET, Telangana, India ABSTRACT River Tungabhadra flowing near Harihar taluk in Karnataka (India), receives waste water discharges from villages located on the bank of River and waste water discharged from industries located in Harihar. The present study involves the implementation of QUAL2KW model to determine the water quality status of this polluted our selected stretch of River. The River samples are collected for pre monsoon and lab results are used for calibrating the model. We observed that predicted values of the model are approximately in match with the observed values. Model results for pre-monsoon indicate decreasing quality of water from upstream to downstream for the selected segment. This is because of discharge of domestic waste water from Rajanahalli, Halasabalu and Nalawagal into River and due to release of waste water from industries located on banks of River in Harihar. Since many of the selected water quality parameters are exceeding their limits, water in the selected segment is not fit for drinking or it is not portable. Keyword: - Water quality, QUAL2KW, River pollution, River Tungabhadra. 1. INTRODUCTION Water pollution caused by increased industrialization and urbanization is considered to be the major problem which is faced by the mankind in India. The increase of water pollution in rivers results in decrease of DO concentration and increase of toxic chemicals concentration which ends up in death of aquatic animals like fishes which are further consumed by humans, affects their health [8].
    [Show full text]
  • Limnological Investigation and Zooplankton Diversity of Karanja River, Karnataka
    International Journal of Science and Research (IJSR), India Online ISSN: 2319-7064 Limnological Investigation and Zooplankton Diversity of Karanja River, Karnataka Umadevi .T1 1Associate Professor Department of Zoology Karnatak College, Bidar, Karnataka, India [email protected] Abstract: The abundance, composition and distribution of zooplankton in relation to water quality parameters such as temperature, pH, dissolved oxygen, alkalinity, total dissolved salts total hardness and biochemical oxygen demand, were studied at monthly intervals from June 2011 to may2012 in Karanja river; Bidar at five locations selected. 36 species of zooplankton were identified as a total., which included 14species of rotifera 11 species of cladocera 8 species of copepoda and 3species of ostracoda...Dominant, rare and pollution indicators were studied. The affect of several physico-chemical parameters on the abundance and distribution of zooplankton is discussed. The investigation reveals that zooplankton better thrive in alkaline water and the water of Karanja river is fit for fish production and human use. Keywords: Physico-chemical parameters, zooplankton bioindicators, seasonal fluctuation, Karanja River 1. Introduction 3. Problem definition The aquatic ecosystem presents a great contrast to Studying the relation of different physico-chemical terrestrial ecosystem and aquatic organisms display wide parameters with zooplankton. range of adaptation. Major constituent of aquatic Zooplankton abundance species diversity and seasonal organisms is the plankton- the Zooplankton and fluctuation. phytoplankton. Zooplankton are minute drifting Evaluating the quality of water for economically important invertebrates either marine or fresh water column. They fauna and human use. are indispensable members of the aquatic food chain, connecting primary producers to higher trophic levels 4.
    [Show full text]
  • GRMB Annual Report 2018-19 | 59
    Government of India Ministry of Jal Shakti Department of Water Resources, River Development & Ganga Rejuvenation Godavari River Management Board GODAVARI RIVER Origin Brahmagiri near Trimbakeshwar, Nashik Dist., Maharashtra Geographical Area 9.50 % of Total Geographical Area of India Location Latitude – 16°19’ to 22°34’ North Longitude – 73°24’ to 83° 40’ East Boundaries West: Western Ghats North: Satmala hills, Ajanta range and the Mahadeo hills East: Eastern Ghats & Bay of Bengal South: Balaghat & Mahadeo ranges, stretching from eastern flank of Western Ghats & Anantgiri and other ranges of the hills. Ridges separate the Godavari basin from Krishna basin. Catchment Area 3,12,812 Sq.km. Length of the River 1465 km States Maharashtra, Madhya Pradesh, Chhattisgarh, Odisha, Karnataka, Telangana, Andhra Pradesh and Puducherry (Yanam). Length in AP & TS 772 km Major Tributaries Pravara, Manjira, Manair – Right side of River Purna, Pranhita, Indravati, Sabari – Left side of River Sub- basins Twelve (G1- G12) Select Dams/ Head works Gangapur Dam, Jayakwadi Dam, Srirama Sagar, Sripada across Main Godavari Yellampally, Kaleshwaram Projects (Medigadda, Annaram & Sundilla barrages), Dummugudem Anicut, Polavaram Dam (under construction), Dowleswaram Barrage. Hydro power stations Upper Indravati 600 MW Machkund 120 MW Balimela 510 MW Upper Sileru 240 MW Lower Sileru 460 MW Upper Kolab 320 MW Pench 160 MW Ghatghar pumped storage 250 MW Polavaram (under 960 MW construction) ANNUAL REPORT 2018-19 GODAVARI RIVER MANAGEMENT BOARD 5th Floor, Jalasoudha,
    [Show full text]
  • Government of Karnataka Performance Budget
    GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT (MAJOR AND MEDIUM) PERFORMANCE BUDGET 2008-09 JULY 2009 1 INDEX SL. PAGE PROJ ECT NO NO. A CADA 5 B PROJECTS UNDER KRISHNA BHAGYA J ALA NIGAM 14 1 UPPER KRISHNA PROJ ECT 15 1.1 DAM ZONE ALMATTI 17 1.2 CANAL, ZONE NO.1, BHEEMARAYANAGUDI 23 1.3 CANAL ZONE NO.2, KEMBHAVI 27 1.4 O & M ZONE, NARAYANAPUR 32 1.5 BAGALKOT TOWN DEVELOPMENT AUTHORITY, 35 BAGALKOT C KARNATAKA NEERAVARI NIGAM LIMITED 42 1 MALAPRABHA PROJ ECT 43 2 GHATAPRABHA PROJ ECT 46 3 HIPPARAGI IRRIGATION PROJ ECT 50 4 MARKANDEYA RESERVOIR PROJ ECT 53 5 HARINALA IRRIGATION PROJ ECT 56 6 UPPER TUNGA PROJ ECT 59 7 SINGTALUR LIFT IRRIGATION SCHEME 62 8 BHIMA LIFT IRRIGATION SCHEME 66 9 GANDORINALA PROJ ECT 72 10 TUNGA LIFT IRRIGATION SCHEME 75 11 KALASA – BHANDURNALA DIVERSION SCHEME S 77 12 DUDHGANGA IRRIGATION PROJ ECT 79 13 BASAPURA LIFT IRRIGATION SCHEME 82 14 ITAGI SASALWAD LIFT IRRIGATION SCHEME 84 15 SANYASIKOPPA LIS 87 16 KALLUVADDAHALLA NEW TANK 89 17 TILUVALLI LIS 90 18 NAMMURA BANDARAS 92 19 DANDAVATHY RESERVOIR PROJECT 93 20 BENNITHORA PROJ ECT 94 21 LOWER MULLAMARI PROJ ECT 97 22 VARAHI PROJ ECT 100 23 UBRANI – AMRUTHAPURA LIFT IRRIGATION SCHEME 102 24 GUDDADAMALLAPURA LIFT IRRIGATION SCHEME 104 25 AMARJ A PROJ ECT 106 2 SL. PAGE PROJ ECT NO NO. 26 SRI RAMESHWARA LIFT IRRIGATION SCHEME 109 27 BELLARYNALA LIFT IRRIGATION SCHEME 111 28 HIRANYAKESHI LIFT IRRIGATION SCHEME 114 29 KINIYE PROJECT 116 30 J AVALAHALLA LIFT IRRIGATION SCHEME 117 31 BENNIHALLA LIFT IRRIGATION SCHEME 118 32 KONNUR LIFT IRRIGATION SCHEME 119 33
    [Show full text]
  • Government of Karnataka Watershed Development Department Public Disclosure Authorized
    Government of Karnataka Watershed Development Department Public Disclosure Authorized Sujala-II Watershed Project The World Bank Assisted Public Disclosure Authorized Environmental Management Framework Public Disclosure Authorized Final Report December 2011 Public Disclosure Authorized Samaj Vikas Development Support Organisation Hyderabad www.samajvikas.org Government of Karnataka – Watershed Development Department – The World Bank Assisted Sujala-II Environmental Management Framework – Final Report – December 2011 Table of Contents Executive Summary ............................................................................................................. 6 1. Introduction ................................................................................................................. 13 1.1 Background ............................................................................................................ 13 1.2 Sujala-II Project ...................................................................................................... 14 1.2.1 Project Development Objective ................................................................. 14 1.2.2 Project Location and Beneficiaries ............................................................ 14 1.2.3 Project Phasing ............................................................................................. 15 1.3 Project Design and Brief Description of Sujala-II ............................................. 15 1.3.1 Component 1: Support for Improved Program Integration in Rainfed
    [Show full text]
  • International Journal for Scientific Research & Development| Vol. 5, Issue 02, 2017 | ISSN (Online): 2321-0613
    IJSRD - International Journal for Scientific Research & Development| Vol. 5, Issue 02, 2017 | ISSN (online): 2321-0613 Water Quality Modeling of River Tungabhadra near Harihar T.M. Vinay1 C.G. Hiremath2 S. Ranjith3 1,2Assistant Professor 3Reasearch Scholar 1Department of Civil Engineering 2,3Department of Water and Land Management 1Medak College of Engineering Kondapak, Siddipet, Telangana 2,3Visvesvaraya Technological University, Belagavi, Karnataka, India Abstract— River Tungabhadra flowing near Harihar taluk in River and Bhadra River which flows down the eastern slope Karnataka (India), receives waste water discharges from of the Western Ghats in Karnataka [12]. River Tungabadra villages on the bank of River and also waste water flows through Harihara, its elevation from sea level is 525 m discharges from industries located in Harihar. The present and the coordinates are 75.75 degree longitude and 14.51 study involves the implementation of QUAL2KW model to degree latitude [12]. determine the water quality status of this polluted stretch of B. Data and Sampling Sites River. The River samples are collected for post monsoon and lab results are used for calibrating the model. Predicted The present study area is 16km stretch of River values of the model are approximately in match with the Tungabhadra near Harihar. In the entire stretch 9 sampling observed values. Model results for post-monsoons indicate points are selected on the basis of point source of pollution decreasing quality of water from upstream to downstream which mainly includes
    [Show full text]
  • Performance Budget
    GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT (MAJOR & MEDIUM IRRIGATION) PERFORMANCE BUDGET 2006-07 2 INDEX SL. PROJECT PAGE NOS. NO A CADA 1 – 8 B KRISHNA BHAGYA JALA NIGAM 1 UPPER KRISHNA PROJECT 9 – 26 1.1 DAM ZONE ALMATTI 1.2 CANAL, ZONE NO.1, BHEEMARAYANAGUDI 1.3 CANAL ZONE - 2, KEMBHAVI 1.4 O & M ZONE, NARAYANAPUR 1.5 BAGALKOT TOWN DEVELOPMENT AUTHORITY, BAGALKOT C KARNATAKA NEERAVARI NIGAM LIMITED 1 MALAPRABHA PROJECT 27 – 30 2 GHATAPRABHA PROJECT 31 – 33 3 HIPPARAGI IRRIGATION PROJECT 34 – 35 4 MARKANDEYA RESERVOIR PROJECT 36 – 37 5 HARINALA IRRIGATION PROJECT 38 – 39 6 UPPER TUNGA PROJECT 40 – 41 7 SINGTALUR LIFT IRRIGATION SCHEME 42 – 44 8 BHIMA LIFT IRRIGATION SCHEME 45 – 47 9 GANDORINALA PROJECT 48 – 49 10 TUNGA LIFT IRRIGATION SCHEME 50 – 51 11 KALASA – BHANDURNALA DIVERSION SCHEME 52 12 DUDHGANGA IRRIGATION PROJECT 53 – 54 13 BASAPURA LIFT IRRIGATION SCHEME 55 – 56 14 ITAGI SASALWAD LIFT IRRIGATION SCHEME 57 – 58 15 BENNITHORA PROJECT 59 – 61 16 LOWER MULLAMARI PROJECT 62 – 63 17 VARAHI PROJECT 64 – 66 18 UBRANI – AMRUTHAPURA LIFT IRRIGATION SCHEME 67 – 68 19 GUDDADAMALLAPURA LIFT IRRIGATION SCHEME 69 – 70 20 AMARJA PROJECT 71 – 72 21 SRI RAMESHWARA LIFT IRRIGATION SCHEME 73 22 BELLARYNALA LIFT IRRIGATION SCHEME 73 23 HIRANYAKESHI LIFT IRRIGATION SCHEME 74 24 JAVALAHALLA LIFT IRRIGATION SCHEME 74 25 BENNIHALLA LIFT IRRIGATION SCHEME 74 26 KONNUR LIFT IRRIGATION SCHEME 75 27 KOLACHI LIFT IRRIGATION SCHEME 75 28 SANYASIKOPPA LIFT IRRIGATION SCHEME 75 – 76 29 UPPER BHADRA STAGE - 1 77 3 SL. PROJECT PAGE NOS. NO D CAUVERY
    [Show full text]
  • Bidar District, Karnataka
    GOVERNMENT OF INDIA MINISTRY OF WATER RESOURCES CENTRAL GROUND WATER BOARD GROUND WATER INFORMATION BOOKLET BIDAR DISTRICT, KARNATAKA SOUTH WESTERN REGION BANGALORE JULY 2008 FOREWORD Ground water contributes to about eighty percent of the drinking water requirements in the rural areas, fifty percent of the urban water requirements and more than fifty percent of the irrigation requirements of the nation. Central Ground Water B oard has decided to bring out district level ground water information booklets highlighting the ground water scenario, its resource potential, quality aspects, recharge – discharge relationship, etc., for all the districts of the country. As part of this, Central Ground Water Board, South Western Region, Bangalore, is preparing such booklets for all the 27 districts of Karnataka state, of which six of the districts fall under farmers’ distress category. The Bidar district Ground Water Information Booklet ha s been prepared based on the information available and data collected from various state and central government organisations by several hydro-scientists of Central Ground Water Board with utmost care and dedication. Dr.J.Davithuraj, Assistant Hydrogeologi st, has prepared this booklet under the guidance of Dr.K.Md. Najeeb, Superintending Hydrogeologist, Central Ground Water Board, South Western Region, Bangalore. The figures were prepared by S/Sri. H.P.Jayaprakash, Scientist-C and K.Rajarajan, Assistant Hydrogeologist. The efforts of Report processing section in finalising and bringing out the report in this format are commendable. I take this opportunity to congratulate them for the diligent and careful compilation and observation in the form of this book let, which will certainly serve as a guiding document for further work and help the planners, administrators, hydrogeologists and engineers to plan the water resources management in a better way in the district.
    [Show full text]
  • Central Water Commission Daily Flood Situation Report Cum Advisories 20-07-2021 1.0 IMD Information
    Central Water Commission Daily Flood Situation Report cum Advisories 20-07-2021 1.0 IMD information 1.1 Chief amount of rainfall recorded at 0830 hours IST of today (15 cm or more) as per IMD Name of Place (State) Rainfall (in cm) Kalyan (Maharashtra) 37 Bhiwandi (Maharashtra) 30 Ulhasnagar (Maharashtra) 29 Maheran (Maharashtra) 26 Ambone & Tamini (Maharashtra) 27 Ambernath (Maharashtra) 25 Pataudi & Farukhnagar (Haryana), Dungerwadi (Maharashtra), Etah & Sikandra(UP) 24 Dapoli & Bhira (Maharashtra) 23 Haldwani (Uttarakhand), Sudhagad Pali (Maharashtra) 22 Bahadurgarh (Haryana) 20 Assandh (Haryana),Pen(Maharashtra) 19 1.2 Rainfall forecast for next 5 days issued on 20thJuly 2021 (Midday) by IMD Heavy to very heavy/ Extremely heavy rainfall over Konkan & Goa and Ghat Areas of Madhya Maharashtra during 20th-24th; Himachal Pradesh, Uttarakhand, Punjab, Haryana, Uttar Pradesh and Andaman & Nicobar Islands on 20th; Odisha and Coastal Andhra Pradesh & Yanam on 21st & 22nd; Madhya Pradesh, Chhattisgarh, Vidarbha, Telangana and Coastal & South Interior Karnataka on 22nd & 23rd July, 2021 2.0 Flood Situation and Advisories 2.1 Summary of Flood Situation as per CWC Flood Forecasting Network On 20thJuly, 2021, 14 Stations (13 in Bihar and 1 in Assam) are flowing in Severe Flood Situation and 17 stations (7 in Bihar, 5 in Uttar Pradesh, 4 in Assam and 1 in Tamilnadu) are flowing in Above Normal Flood Situation. Inflow Forecast has been issued for 20 Barrages & Dams (9 in Karnataka, 5 in Jharkhand, 2 in Uttar Pradesh and 1 each in Andhra Pradesh, Maharashtra, Telangana and West Bengal) Details are given at link: http://www.cwc.gov.in/sites/default/files/dfbcwc20072021_5.pdf 2.1.1 Flood Situation Map 2.2 CWC Advisories 2.2.1 West Flowing Rivers between Tapi and Tadri - Mumbai, Konkan and Goa, Coastal Karnataka IMD has predicted Heavy to Very Heavy Rainfall over Mumbai, Konkan & Goa and heavy rainfall over Coastal Karnataka.
    [Show full text]
  • Karanja Dam January 2020
    O&M Manual for Karanja Dam January 2020 GOVERNMENT OF KARNATAKA Karanja Project Operation and Maintenance Manual for Karanja Dam State of Karnataka Doc. No. CDSO_O&M_KA06MH0181_karanja_DAM KAWRD_01_v2.0 January 2020 Central Water Commission Ministry of Water Resources, River Development & Ganga Rejuvenation Government of India 1 O&M Manual for Karanja Dam January 2020 Front Cover Photograph: Downstream view of Karanja Dam during rehabilitation works carried out under the Dam Rehabilitation & Improvement Project (DRIP). The Scope of Work entailed Reaming of porous holes of drainage gallery, Re- construction of dry sone rock toe and improvement to v notch, fixing rain water drain and scour filling on downstream right and left side, security aspects/ lighting/ barbed fencing, strengthening and arresting of leakage of right bank and left bank sluice gate, improvement to existing road adjacent to bund left and right of downstream and strengthening and improvements of gates and other electromechanical components of Karanja Dam. 2 O&M Manual for Karanja Dam January 2020 Operation and Maintenance Manual for Karanja Dam Prepared by the Dam Safety Rehabilitation Directorate with Assistance from KARNATKA NEERAVRI NIGAM LIMITED (A Government of Karnataka undertaking) State of Karnataka 3 O&M Manual for Karanja Dam January 2020 KARANATAKA NEERAVARI NIGAMA LIMITED (A Government of Karnataka Enterprises) This operation and maintenance Manual for Karanja Dam in no way restricts the dam owner in digressing from her/ this responsibilities. This state Dam safety Organization or the central water commission cannot be held responsible for the efficacy of this manual developed based on documents provided by the dam owner.
    [Show full text]
  • ANNUAL REPORT on IMPLEMENTATION of ACCELERATED IRRIGATION BENEFIT PROGRAMME As on March, 2011
    ANNUAL REPORT ON IMPLEMENTATION OF ACCELERATED IRRIGATION BENEFIT PROGRAMME As on March, 2011 SRIRAMASAGAR PROJECT(STAGE-II), ANDHRA PRADESH Government of India Ministry of Statistics and Programme Implementation Infrastructure and Project Monitoring Division Sardar Patel Bhavan, Sansad Marg New Delhi-110001 ANNUAL REPORT ON IMPLEMENTATION OF ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP) AS ON MARCH, 2011 Government of India Ministry of Statistics and Programme Implementation Infrastructure and Project Monitoring Division Sardar Patel Bhavan, Sansad Marg New Delhi-110001 ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP) HIGHLIGHTS AS ON MARCH, 2011 1. CLA/Grant released (1.4.1996-31.3.2011) : Rs.48566.5756 crore 2. No. of Projects covered under AIBP : 287 since 1996-97 3. No. of projects completed between : 136 (1.4.1996-31.3.2011) 4. Target Irrigation Potential of AIBP : 11929.2611Thousand projects hectare 5. Cumulative Irrigation Potential under : 6426.712 Thousand AIBP created up to 2011 hectare 6. Irrigation Potential created under AIBP : 1587.804 Thousand up to March 2011(Based on 85 projects hectare reviewed by CWC) 1 CONTENTS Sl.No. Items Page PART – I 1. Background and Policy Framework 3 2. Central Loan Assistance 3 3. Overview of the AIBP implementation since inception 5 4. State-wise Summary of CLA/Grant released 6 5. Irrigation Potential Created 7 6. Status of AIBP Implementation in 2010-11 7 7. Reasons for time and cost overruns 8 8. Benefits of the AIBP Scheme 8 PART – II 9. Central Loan Assistance/Grant released from 1996-97 Annexure-1 to 2010-11. 10. State wise Summary of CLA/Grant released.
    [Show full text]