Rolling Stock Danish market forThe By Lasse Lasse By Toylsbjerg 2014 September SWERIG –
Focus Denmark Focus
-
Petersen
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. Agenda 2
5 4 3 2 1
FREIGHT OTHERPASSENGER SERVICES THE “TRAINFUND.DK”TIMETABLES THE CURRENT FLEET OF THE
RAILWAY
TRAFFIC
BUSINESS IS
DSB BOOMING
IN DENMARK
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. General General 3 Planned
electrification market
information . . .
Key Deregulation - High growth factors 2008
Denmark Alstom Alstom Lint) Arriva operates Regional lines on Jutland (with DSB has monopoly on all IC lines Partly delayed deregulation Comprehensive electrification program on Passenger Railway size: 2667 km, 640 km electrified lines nowrecovering E Nominal GDP2010: 217 Population: 5,5 Mio. . . . ffected data: achieved 300% expected 70% achieved from 2008 100%
of of the general economical down growth growth growth status: : – ~
2008 2008 2008
7000 Mio of procured by to
in
2030
in in
- - - number 2013) 2013 2030 (10% Freight number
– -
more
2030 B EUR
passenger Trafikstyrelsen of
Traffic
of
passengertrains
than passengers growth (
311 B USD expected
10% -
km 2008 growth
turn turn but
-
going expected -
2013) (40% )
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. Passengertraffic Expected Increase of passengers from 2012 to 2022 and 2027 ( 2022 2012 to frompassengers of Increase Expected ” Whenever by purchasing
is growing andis growing growing investing
possible
doubledecker
in new
the the growth infrastructure
must must Banedanmark
instead be ”
handled
of of
mio )
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. in 2009as a To handlethe three more traveltimes allowing infrastructure optimal work was Trafikstyrelsen Even Infrastructure * strategy Conceptual
steps steps to to
though towards capacity lead rail
shorter coordinated
TS, BDK TS, and DSB
and
the the thoughts
– taken the the
, from from result without
–
growth so various needs infrastructure (to infrastructure the optimal timetable the optimal work would Banedanmark later Conceptual Timetable
avoid ” complicating
are meetings meetings inthe Danish of of
) descisions
lead
of ”a green transport policy” transport ”a green of making
seperated
further -
using
the the rail a
” the proces
stepwise of of
, the marketopenings idea Rail Rolling optimal optimal needed traintype the optimal DSB Strategy
Sector was would
to to have the Stock
timetable to to run the (s)
could approach
find find
be
Marketopening workshops new maintenance supplier letting intention of trains purchase aprove would settlements New Maintenance build political
– then the the
the the was
with the do the
of of new
–
in
introduced in the future to determine would settlements New Tendered be Possible
political tendered
traffic lines lines
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. been agreed and financed beenagreed Since then heavyinvestments has infrastructure in rail
• • • • • • • • • • Agreedandfundedpolitical settlements being In total across across Vejle and Fjord Hovedgaard New lines 250 (maybe 300) km/h Odense Aalborg Holbaek Upgrading 120 160 from to the km/h of lines km/h Struer Kalundborg, Fredericia ”Togfonden.dk”: Electrification the of lines Roskilde 160 for km/h (2018) Upgrade and of electrification the Line Aalborg and ”Ring in 3” Copenhagen Lightrail Electrification to Esbjerg Aalborg 200 Ringsted km/h (2018) New line Copenhagen double track of the line Ringsted Fixed Link across Femern Belt (2021) including upgrade entire State ”The Signalling
invested
approx – solutions solutions Odder –
Frederikshavn Kalundborg, Langaa -
owned network (2018
Programme
130 BDKK (18 BEUR) in Danish –
–
Odense Odense and 160 Hobro km/h Femern Femern 200 to (250) and km/h – –
Koege
– Frederikshavn and Vejle
Aarhus Aarhus ” –
Rail ERTMS Level on 2 the
– –
Struer, Vejle Ringsted Ringsted - – 2022)
- infrastructure Grenaa
Aarhus Koege
– –
, Odense, Middelfart, Middelfart,
250 250 km/h
– are –
Naestved Struer, –
–
-
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. Agenda 7
5 4 3 2 1
FREIGHT OTHERPASSENGER SERVICES THE “TRAINFUND.DK”TIMETABLES THE CURRENT FLEET OF THE
INFRASTRUCTURE
TRAFFIC
PROJECTS DSB
IN
DENMARK
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. Bombardier has introduced new trains to Denmark since 1861 to Denmark new trains hasintroduced Bombardier 8
• • • “Scandia” in 1876 name to changes the “HvideMølle” Mølle” at the ”Hvide wagonsare build opens. All and Randers between Aarhus The railway Mølle”opens Randers ”Hvide The factory in
1861
-
Bombardier has been involved in almost everyintroduction
of of new ”standard trains” in Denmark since 1861 . . made in Randers the “Lyntog” are interior work of Carbodies and isborn traffic revolution “Lillebælt” the bridge across the “Lyntog” and introducesDSB 1935
- 1972 –
a
. . . . weldedcarbody distance cars with 1950: Long woodenbogies service cars on 1940: Local riveted carbody distance cars with 1932: Long from Scandia: passenger cars” the new “standard introducesDSB 1932 - 1989 -
. . . 2009 in service until The 600+ cars are 1974 introduced in concept is The Intercity builtby Scandia of UIC type “Y” passenger cars” the new “standard introducesDSB 1964
- 2009
. . introduced OTU train are EMUand the Later the IR4 the IC3 DMU introduced with & de smooth coupling designed for “Flexliner” train The Scandia 1988 - coupling is
-
-
built –
. . 2002 companies from leasing are introduced via decker coaches builtdouble A total of 113 BT 2001 Tranz acquires AD Bombardier 2001
(Scandia -
) ) in
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. And today 9
1985 uerdingen/Scandia 1978 delivered195by DMUs MR 2012 delivered2000 belongs to DSB) 111 (34 EMUs ET (OTU) 1984 byHenschel/ Scandia 22 delivered left) (6 locos EA
- 1992
– -
most of the DSB fleet is built by us most of
- 2002 leasing companies 113 deliveredviacars Doubledeckers 1980 Henschel Kassel 37 deliveredfrom locos ME bySiemens delivered20 DMUs Desiro - - 2009 1983
Bombardier/Siemens consortia 13) deliveredby has (DSB 20 DMUs ICE 1998 Scandiafrom 1989 delivered96 DMUs IC3 byAnsaldobreda 105 IC2 &IC4 -
TD
DMUs delivered DMUs
-
production at BT, Randers Assembly of series Alstom/Siemens. 136 bydeliveredEMUs S 1993 Scandiafrom delivered44 EMUs IR4 - train
- 1997 Builtothersby BuiltBombardier by
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. The The shortstory The Ansaldobreda Ansaldobreda The 0 1 • • • •
As the As the the the 19 ” depreciation the The performance day are to the former regime) 58 ended the 82 Of IC2 i in september 2013 and the last DSB expected was contract in 2003 delivery Ansaldobreda in 2000 with the DSB
accounts normally
circulation trains signed October took signed
in result - trains
2006 of of 83 4 of 23 of 2
Libya
delivery delivered
delivery represent
in 2002 in 2002 with
a
have used the 1998 tender,
of of – in service”in 2013 contract
with a as a gift from as gift from a - - an 4 car car car DMUcar (IC2) ,4 ,4 DKK, but B
2004 only to to run a 19 of of the last IC4 additional
IC4 IC4 ( DMUs
a poor
value with started - 2005
one trains
(IC4)
in Italy
of of
DMU From the Medias
• • • • • • leaving Almost accounts 7 IC4 down Maximum speed noise Public mileage There 400 BC ” to
and and bogies DMUs are known
every spareparts
are of of to IC4 , and ” avoid
no
working
are /
limited originally problems with TCMS,
damaging can
being
currently climb
as as a
be
on
milestones in
activated used
sparesparts improvement ” highly soon
the the
reduced
as as ” gearboxes
critical spareparts
when sight
to 169 169 to km/h, supplier brakes
of of the IC4 issue
needed
–
so so
however
– ,
accelleration
does couplings but but ”
trains engines are
not not
DSB DSB
still
exist , doors expect listed
are is over Denmark at seen trains Ansaldobreda Most of the
any poor
sidings , A/C, ” tuned
in the in the
longer, standing
the the can
all be
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. The The 11
Number lack
of
of rolling rolling of overcrowded stock
trains
in leads peakhours
to overcrowded
on various
lines
trains
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. fleet will be missing 20.000 seatsuntil 2027 the DSB terminated, are all trains Ansaldobreda …and if 12 Train Train of the Other IC2 og IC4 identified Missing seats Future
trains
Official Official
numbers Capacity 56.745 59.000
from 2011 from TRM 2.255 2012
need
as as ”seats of the rolling
48.531 17.997 69.900 3.372 2017
TS stock growth 47.703 17.997 74.300 ” 1.900 6.700 2020
scenarios scenarios
added
on TRMon 20.435 45.168 17.997 83.600 2022 number
the the volume of seats needed in the fleet to Note: Note: These numbers are calculations of
80.350 87.400 7.050 provide the needed capacity. 2027
2027 implemented in Future” is fully “Train of the seats until the appox a seat capacity of rolling stock with willbe missing terminated, DSB and IC4 are Ansaldobreda IC2 If the
20.000
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. needs”hasbeen made for a newprocess “trafical After story the Ansaldobreda DSB Forligskreds Finance Ministry of transport Ministry of politicians themselves Trafikstyrelsen ,suppliers, * The The ”need” could be triggered by DSB,
Agree on need need *
lobbyists or the
opportunities Order Order DSB to to look at
Quality Recommend Recommend
consultants solution
check check by
Quality Some opportunitiesSome need to be approved again consultants
solution check check by Check Check solution Check Check
solution Accept Accept
Tell to DSB go/no go/no go
Run Run process for purchase for
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. Agenda 14
5 4 3 2 1
FREIGHT OTHERPASSENGER SERVICES THE “TRAINFUND.DK”TIMETABLES THE CURRENT FLEET OF THE
INFRASTRUCTURE
TRAFFIC
PROJECTS DSB
IN
DENMARK
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. ” To 5 1 optimized the new from the ” The ”
harvest maximum infrastructure Signalling
the timetable
capacity benefits
Programme”with
added ” approach” ” led to the”One
of the new of timetable …ledto the ”One infratructure - Hour
- Model” - Hour
an
Model”
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. hour”between the major cities in Denmark the “One Hour Model” travelWith totime is “one reduced • • sets for couplingor decouplingof train The timetabledoesnotallow time km/h Speedtrains runningup to 250 Esbjerg/Aarhus, AalborgHighwith Copenhagen,Odense, betweenHour”the citiesof Travel timeto reducedbeto ”One
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. ”Superlyntog” ( ”Superlyntog” One The 7 1
Hour
model high
speed)lines consists
of of
three • • • stops inOdenseandKolding CopenhagenandEsbjergwith Line3 runs Fredericia,Vejle and Horsens withsOdense,stops in Copenhagenand AarhusH Line2 runs Randers stops inOdense, AarhusH and Copenhagenand withAalborg Line1 runs
different • • • • • Traveltime Odense Copenhagen Aarhus Odense Copenhagen
– – – between between between
Aalborg: 60 min
Aarhus H: 55 min Esbjerg: Esbjerg: 60 min
– –
Aalborg 180 min Odense: 58 min
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. is As a 8 1
introduced result Copenhagen Example
of of existing
– of the ”One of
reduction
with and new
of of up to 2 traveltimes significant hours
from from
is - possible Hour
plan” aDanish ”Takt
reductions other to same time, in By both other having
trains
directions
lines
in the ”One
attractive and minute on ”the at ”hub” stations model” The ”One can traveltimes busses
meetingat the be Hour ” 00 or30 ”
made to trains attractive connections fahrplan
Hour
Trains”
meet
”
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. look of the needfortypes canmade be train different look of By looking at thein timetables the “One • into newtrain types lines characteristic can be interpreted lines can be made ”One investments, growth scenarios and the Based on the infrastructure All - colours Traintypes Hour plan” a generic - Hour Plan” a set to to be
for future future for NetworkDSB explained –
160 ” Regional West. High Regional East. 200 km/h Intercity 230 Highspeed
160 and the specific lower - on the up of different - - - 180 km/h 250 km/h 180 km/h capacity ”
capacity next
slide
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. at Danish the 8 In total 20 • • • • • • • • •
(Berlin) Hamburg – (Oslo) To expected traffic 200 meter EMU Highspeed 250 km/h hour trains” To run the “One 150 meter EMU 230 Highspeed
København Eurocity - 250 km/h
-
Göteborg different
–
–
- state EMU: Electric EMU: Electric Not the part of ”Fremtidens DSB Tog”
RegionalDiesel train
• • • • owned • • • EMU trains IR4 and IC4 existing IC3, To replace the “High capacity” 200 km/h Jütland upgrated tendered ( service passenger To run DMU 160 km/h currently train Intercity
types types
set
Rail ) on
lines lines in -
DMU: Diesel
can
network
be project RegionalDiesel • • • RegionalEast train • • • hauled EMUor loco capacity raise seat decker train to Might be double 160
lines on trains Alstom Currently DMU 120 km/t expected
set - tendered 180 km/h
running
Lint
for
passenger • • • • RegionalWest • • • Öresundståg current possible solutions Wide of these Replacement Existing EMUs 180 km/h EMU Single 160 any - 180 km/h
car
is is not part projects
deckers lines
on the -
body
of of
service service
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. Agenda 21
5 4 3 2 1
FREIGHT OTHERPASSENGER SERVICES THE “TRAINFUND.DK”TIMETABLES THE CURRENT FLEET OF THE
INFRASTRUCTURE
TRAFFIC
PROJECTS DSB
IN
DENMARK
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. is just not DSB and Arriva in Denmark Passengerservices 22
Aalborg – LRV projects in Odense, Copenhagen and Aalborg to be tendered 2015 Odense
Aarhus -
2019
• • • Nordjyske Jernbaner • • Aarhus Letbane • • Lokalbanen • • • Regionstog • • Vestbanen • • Midtjyske Jernbaner Will run additional onWill theservices Frederikshavn lineto BDKfrom theRuns traffic on ownwith linesTrains 8Siemens Desiro Frederikshavn Infrastructure manager of the lines Hjørring New StadlerNew belongs Jernbaner to Midtjyske Aarhus. The lineto Grenå belongs to andBDK, the lineto Odder Infrastructure manager of the newbuildlinesthe withinof city LintAlstom 41 Operate on 4 Duewagown withnetwork Regiospinter and 25 and Jægersborg Frederiksværk Helsingør Infrastructure manager of the lines Snekkersten Roskilde and Holbæk Are expected to run Operate traffic 13with BT andbuild IC2 16Lint Alstom 41 (Vest) F – Infrastructure manager of the lines Holbæk Traffic is tendered with2 Alstom LintArrivaby 41 Infrastructure manager of the lineVarde 1984 aon 1965 design) theRuns traffic on ownwithlines Thyborøn Infrastructure manager of the lines Vemb Aalborg (and later
Slagelse, Køge
–
– Nakskov
Gilleleje tramtrains
–
Skagen – Hobro
Hårlev additional additional services –
–
Hillerød, TisvildelejeHillerød,
to be in Service from to be in2017 Servicefrom Tølløse
) – -
12 additional DMUs needed 12 additional DMUs Faxe Ladeplads/RødvigFaxe and Nykøbing
–
4 ”Lynette” trains (build 1983 trains4 ”Lynette” (build Nærum -
on the BDK linesKøge Nørre Nebel Nørre –
Lemvig Lemvig and Lemvig – – –
Nykøbing S, Tølløse NykøbingTølløse S, Kagerup, Hillerød Hirtshals and Hirtshals –
Helsingør,
- –
–
-
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. 2015 Aalborg international high international the With 23
Hamburg
Aarhus
Odense opening
1 5 departure - 7 departures Copenhagen
Gothenburg a day
a of the Femern of Berlin -
day speed
Malmö Stockholm train
system is - belt • • • •
the the German The ”Public Service” part of Denmark (Odense & Aalborg) The 3rd and 4th IC3 service” Copenhagen services Jointly operation” Copenhagen with byX2K SJ in ” Malmö Today tunnel, a new fixed DMUs
traffic
any withDB with X55 and Stockholm expected traffic traffic link link Arhus
international
is is run accross –
withDBICE TDor DSB
expires
Hamburg as ”public Fernverkehr – biggest
Berlin and between act
Femern
by the
train cities for for the Danish (I)
Gothenburg DSB runs DSBruns
system opening
Belt in are – free
not not
of of – -
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. 2021 international high international the With 24 Aalborg
Hamburg Aarhus
Odense 5 1 opening - departure 7 departures
pr Copenhagen hour a day Gothenburg
of the Femern of -
speed Berlin
Malmö Stockholm train
system is - belt • • •
Model” voltage and longer than the “One expected. These trains would be dual and new The current DMUs willbe terminated, as well lines with possible ad Hamburg and Aarhus basis between Gothenburg and system is expected to run on an hourly service act” a new ”free operation” With the withdrawing of the ”public timetables to Stockholm withconnection to the current SJ service from Copenhagen to opens up for an hourly ”Interregional” The timetables in the ”One Hour Model” tunnel, a new
expected Highspeed Highspeed
trains
EMUs are - – ons ons to other cities
Hamburg. Both
(II) Odense
- Hour -
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. Agenda 25
5 4 3 2 1
FREIGHT OTHERPASSENGER SERVICES THE “TRAINFUND.DK”TIMETABLES THE CURRENT FLEET OF THE
INFRASTRUCTURE
TRAFFIC
PROJECTS DSB
IN
DENMARK
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. 26
- Denmark State of
The The freight play
in
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. domestic services they run with old traction they run domestic services 5 Freight only RUIn Denmark 27
*: Ownedby ” Midtjyske
Jernbaner” runs the service from FMS:In SE and DE transit traffic for Captrain. for other request. sevices byRun Operate transit traffic and loco/driver In SEFMS: and DE establishment DK2007in Padborg. growthMajor since import/export to the of terminal Operate transit traffic as as well DE). maintenance corrective of CargoCFL for maintenance of fleet their (also rented workshopa small in Padborg Operate import/export trains. Has / ServiceCargo RailCFL FMS: import/export staff of Captrain After severalyears hiringother Siemens andFMS: DSB Taastrup and Taulov the Runs Denmark. at Høje terminals import/export and national freight in leader.Market Operate transit,
Railcare
purchased purchased the
in 2013. Operate Herning
licence
´ to
s are Rønland
Rus and , as subcontractoras active + locos DElocos to+ 12 Traxx AC2 DElocos to+ 2 Traxx AC2 2 Traxx AC2 (MRCE) 1 Traxx AC2 (GC) DElocos to+ Padborg 2 CFL18xx diesel 2 MXdiesel diesel1 MY 2 Mydiesel 18 Traxx AC2 13 EG 3100 diesel*1 MY 5 MZ diesel
Padborg Padborg –
and for
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. perspective into an import/export perspective perspectiveinto import/export an Freight is moving in Denmark a DE from 28 2012
Terminals Requested but not realized 1 to10 trains a day 1 to 4 trains a week More than 10 trains a day Source: Banedanmark
–
trains per direction
capacity 2025 Terminals 1 to 10 trains a day More than 20 trains a day More than 20 trains a day 10 to 20 trains a day More than 30 trains a day -
– – - 650 meter
SE SE transit 600 – – – - 835 meter 750 meter 835 meter 1000 meter
by traffic to ensure freight are made to new terminals ERTMS and electrification, Denmark in investments in traffic, transit freight focus on From a strong 2025
trippel
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. l Mob. +45 2440 0664 Region Central Eastern / Europe and CIS Salgsdirektør Danmark Sales / Manager Denmark Lasse Toylsbjerg asse.toylsbjerg - [email protected] - Petersen
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved.