Industrial and Office Units for Sale/To Let

Total Page:16

File Type:pdf, Size:1020Kb

Industrial and Office Units for Sale/To Let Hilton Cross Business Park Junction 1 M54 Industrial and office units For sale/to let Built for business For sale/to let • Junction 1, M54 Well connected industrial and office units within a carefully considered environment Mercury is a premier new business park opportunity. It has recently benefited from a comprehensive highways and utilities project to provide a flexible range of development plots. Product Mercury offers a rare combination of uncon- strained land to deliver floorspace to occupiers’ requirements, in a rich natural setting, and yet located on a motorway junc- tion at the heart of the regional road network. Further land is available for development as indicated overleaf. Key Features • Infrastructure completed • High specification contemporary floorspace • Adjoins motorway junction • Good labour catchment • Secured, managed site • Woodland environment • 12 acres (4.86 ha) of developable land available www.mercurym54.co.uk Glasgow Edinburgh Leeds Manchester Liverpool Location Nottingham Mercury is at the confluence of the region’s motorway net- Wolverhampton work. Located at the northern fringe of the Wolverhampton Birmingham and Black Country conurbation, Cardiff Mercury has direct site access from the A460 Cannock London Road on to the M54 Motorway (Junction 1) which Bristol connects to the M6 (Junction 10A). The M6 Toll is approxi- mately 4 miles north at Junction 11A of the M6. The A460 is a primary bus route between Wolverhampton and Cannock. Intercity and regional rail services are avail- able from Wolverhampton and Birmingham New Street. Manchester Cannock & M56 T7 M6 T6 A38 A449 11 M6 Toll T8 A5 T5 M54 2 1 Tamworth M6 Toll 10A T4 A461 A460 A452 A460 M6 A454 M6 Toll 10 Walsall T3 M1 North M54 Wolverhampton JUNCTION 1 9 Sutton T2 M54 M42 A463 8 M54 M6 8 7 Coldfield A41 A38 A4123 18 T1 19 MANN+HUMMELL M6 1 15 18 Dudley 16 12 West Bromwich A460 17 M5 Birmingham 13 M42 Postcode: WV10 7QZ Bristol & Birmingham South West Airport & M40 Terms City Miles Freehold or Leasehold packages available on application to the joint agents: Birmingham 15 London 129 Manchester 71 Wolverhampton 5 Brought to you by: Working with: PROJECT PART-FINANCED BY THE EUROPEAN UNION www.mercurym54.co.uk These particulars do not constitute, nor constitute any part of, an offer or a contract. None of the statements contained in these particulars are to be relied on as statements or representations of fact. Any intending lessees must satisfy themselves by inspection or otherwise as to the correctness of each of the statements contained in these particulars. The vendors, lessors or assignees do not make or give any representation or warranty in relation to the property. The photographic images are indicative only. Please refer to agents for further details. Designed and produced by Switch Design Consultancy.Tel: 0121 233 2727. November 2007. (12615) Hilton Cross Business Park Junction 1 M54 Phase II • Design & Build opportunity available Unit 4 • 20,930 sq ft (1,944.5 sq m) • For sale/to let Unit specification • Fully fitted offices with • 8 metres clear internal height capacity for extension to underside of steel haunch • Two 4m x 5m electrically operated • CCTV monitored main site entrance barrier loading doors • Secure service yard with 25m turning circle • Floor loading to 50 KN m2 • Provision for future lift installation Artist’s impression, for guidance only Artist’s impression, for guidance only www.mercurym54.co.uk Accommodation Production Office Total Car space space space spaces sq ft sq m sq ft sq m sq ft sq m Unit 4 19,353 1,798 1,576 146.50 20,930 1,944.5 30 A460 (M54 – JUNCTION 1) A460 MANN+HUMMEL UNIT 2 FUTURE DEVELOPMENT SITE HENRY SQUIRE & SONS UNIT 1 BMI(UK)Ltd MERCURY COURT UNIT 4 UNIT 3 ARTHUR HOUGH & SONS UNIT 5 FUTURE DEVELOPMENT SITE KEY: PHASE 2 Postcode: WV10 7QZ A development by Joint agents These particulars do not constitute, nor constitute any part of, an offer or a contract. None of the statements contained in these particulars are to be relied on as statements or representations of fact. Any intending lessees must satisfy themselves by inspection or otherwise as to the correctness of each of the statements contained in these particulars. The vendors, lessors or assignees do not make or give any representation or warranty in relation to the property. The photographic images are indicative only. Please refer to agents for further details. Designed and produced by Switch Design Consultancy. Tel: 0121 233 2727. November 2007. (12615) Hilton Cross Business Park Junction 1 M54 Phase II • Design & Build opportunity available Unit 5 • 32,227 sq ft (2,994 sq m) • For sale/to let Unit specification • Fully fitted offices with • 8 metres clear internal height capacity for extension to underside of steel haunch • Two 4m x 5m electrically • CCTV monitored main site entrance barrier operated loading doors • Secure service yard with 25m turning circle 2 • Floor loading to 50 KN m • Designed to allow up to 2 dock levellers • Provision for future lift installation to be retrofitted Artist’s impression, for guidance only www.mercurym54.co.uk Accommodation Production Office Total Car space space space spaces sq ft sq m sq ft Sq m sq ft sq m Unit 5 30,757 2,857.5 1,468 136.5 32,227 2,994 62 A460 (M54 – JUNCTION 1) A460 MANN+HUMMEL UNIT 2 FUTURE DEVELOPMENT SITE HENRY SQUIRE & SONS UNIT 1 BMI(UK)Ltd MERCURY COURT UNIT 4 UNIT 3 ARTHUR HOUGH & SONS UNIT 5 FUTURE DEVELOPMENT SITE KEY: PHASE 2 Postcode: WV10 7QZ A development by Joint agents These particulars do not constitute, nor constitute any part of, an offer or a contract. None of the statements contained in these particulars are to be relied on as statements or representations of fact. Any intending lessees must satisfy themselves by inspection or otherwise as to the correctness of each of the statements contained in these particulars. The vendors, lessors or assignees do not make or give any representation or warranty in relation to the property. The photographic images are indicative only. Please refer to agents for further details. Designed and produced by Switch Design Consultancy. Tel: 0121 233 2727. November 2007. (12615).
Recommended publications
  • Catalogue.Pdf
    Barnett Ross WEDNESDAY 25TH OCTOBER 2017 At The Radisson Blu Portman Hotel 22 Portman Square London W1H 7BG Commencing at 12.00 p.m. AUCTION 25 TH OCTOBER 2017 Auctioneers J. Barnett FRICS J. L. G. Ross MRICS Tel: 020 8492 9449 Fax: 020 8492 7373 Notice to all Bidders 1. Please note the General Conditions of Sale which are included with this catalogue and the Special Conditions of Sale which are available on request. An Addendum will be made available on the Auction Day and the bidder should check whether the lot which he/she is interested in bidding for is included. 2. Prospective purchasers are assumed to have inspected the properties in which they are interested and to have made all usual pre-contract searches and enquiries. 3. The successful Bidder is Bound under Contract as soon as the Auctioneer’s gavel falls on his/her final bid. Immediately thereafter the successful Bidder will be handed a Form to fill out supplying details of his/her name and address together with (if different) the name and address of the purchaser and those of his/her solicitors. He/she must also supply a cheque for the deposit, which we will hold at our office. The bidder will be given our bank account details and must arrange to transfer the deposit monies to our client bank account the following day by way of a ‘same day CHAPS payment.’ Once these funds are received we will return the bidder’s cheque by post. 4. The information from the Form will be used to complete a memorandum of contract similar to the one at the back of this catalogue which the purchaser must sign and hand to the Auctioneer’s staff prior to leaving the room.
    [Show full text]
  • Road Investment Strategy: Overview
    Road Investment Strategy: Overview December 2014 Road Investment Strategy: Overview December 2014 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website www.gov.uk/dft General enquiries https://forms.dft.gov.uk ISBN: 978-1-84864-148-8 © Crown copyright 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed on paper containing 75% recycled fibre content minimum. Photographic acknowledgements Alamy: Cover Contents 3 Contents Foreword 5 The Strategic Road Network 8 The challenges 9 The vision 10 The Investment Plan 13 The Performance Specification 22 Transforming our roads 26 Appendices: regional profiles 27 The Road Investment Strategy suite of documents (Strategic Vision, Investment Plan, Performance Specification, and this Overview) are intended to fulfil the requirements of Clause 3 of the Infrastructure Bill 2015 for the 2015/16 – 2019/20 Road Period.
    [Show full text]
  • Practical AUGUST1996£2.20 U) U) Es Zi 0 Et
    U) practical AUGUST1996£2.20 U) U) eS zI 0 et W ct 5 0 IL ores N et e Power - Ridden ley.carrying 0 The S 1 Way (A IA 4Ova o Compact Dual Band MobileFT -8000R p "So easy to operate, I didn't 'Advancedperformance, and Features simple to use. I knew Yaesu even need the manual!" Frequency Coverage would be first with RX: 110-550 MHz "High-tech features, too, 750-1300 MHz* like the enhanced TX: 144-146 MHz 430-450 MHz Smart -Search'," 3 Power Output Levels 2m 50/10/5 Watt 70c Frl35/10/5 Watt one-touchliome"channels)that store 110 Memory Channels Continuing Yaesu's leading edge engi- 155 per band,including neering philosophy, the FT -8000R Compact - repeater shift. CTCSS encode tone, and packet "Home" channels) Dual Band Mobile introduces industry -first baud rate. Other essential features include Enhanced Smart Searchrm features and no-nonsense operation for today's a Time Chit Timer and an all -new S -Meter CTCSS Encode demanding Amateur. No puzzling key combina- Squelch that opens based on the S -meter reading. Time -Out Timer (TOT) Other options include a DTMF backlit S -Meter Squelch tions on the FT -8000R; eight clearly marked microphone (another Yaesu first) and for Dual Receive (V+V,U+U,V+U) keys and Yaesu's exclusive Omni -Glow' display a progrannning alternative, the ADMS-2C Crossband Repeat make operation a snap. Want to change bands? (bidirectional or one-way) Personal Computer Programming Kit simplifies PC Programmable w/optional Just push the VHF or UHF Volume control! operation even more.
    [Show full text]
  • Impact of Sustainable Transport Measures on Town Centres
    Local Sustainable Transport Fund Case Study Evaluation – Impact of Sustainable Transport Measures on Town Centres SUPPORTING TECHNICAL APPENDICES Department for Transport July 2017 LSTF Case Study Evaluation - Impact of Sustainable Transport Measures on Town Centres Supporting Technical Appendices Notice This document and its contents have been prepared and are intended solely for Department for Transport’s information and use in relation to the LSTF Case Study Evaluation Study. Atkins assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document history Job number: 5127520 Revision Purpose description Originated Checked Reviewed Authorised Date Rev 1.0 Initial draft for DfT review AL, EH, KQ, JR JR - 26/08/16 Accent Rev 2.0 Version 2 addressing AL, Accent JR JR JR 13/12/16 comments from DfT and Peer Reviewer Rev 3.0 Updated draft responding JR - - - 03/03/17 to final comments from DfT (FINAL VERSION) Atkins LSTF Case Study Evaluation - Impact of Sustainable Transport Measures on Town Centres Supporting Technical Appendices Table of contents Chapter Pages Part A - Introduction and Methodology 1. Introduction 7 1.1. Introduction 7 1.2. Study purpose and context 7 1.3. Evaluation aims and research questions 7 1.4. High level programme and study timescales 8 2. Methodology 9 2.1. Introduction 9 2.2. Overall approach 9 2.3. Overview of evidence base 11 2.4. Data issues and limitations 19 Part B – Telford Case Study 3. Introduction 22 3.1. Introduction 22 4. Rationale for LSTF bid 23 4.1.
    [Show full text]
  • Element Court
    Modern self-contained offices TO LET from 1,780 to 4,120 sq ft Hilton Cross Business Park Wolverhampton WV10 7QZ Element Court Element Court The Details The Location offers 8 modern Key features of the site are: Element Court is at the two storey self- confluence of the region’s Excellent car parking ratio motorway network. Located contained office (90 in total with 8 disabled) buildings ranging at the northern fringe of the in size from 1,780 Raised access floors and Wolverhampton and Black suspended ceilings Country conurbation, Element to 4,120 sq ft within Court has direct site access from a landscaped Fitted fire alarms and the A460 Cannock Road on to environment. security systems the M54 Motorway (Junction Passenger lifts 1) which connects to the M6 (offices 1, 4 & 5 only) (Junction 10A). The M6 Toll is approximately 4 miles north at VRF heating and cooling systems Junction 11A of the M6. External steel security shutters to The A460 is a primary bus route ground floor doors and windows between Wolverhampton and LG7 compliant internal lighting Cannock. Intercity and regional rail services are available from Double glazed windows Wolverhampton and Birmingham New Street. CCTV monitored main site entrance barrier Courtyard lighting and landscaping Sat Nav: WV10 7QZ Manchester Cannock & M56 4 4 Office 1 2 3 T7 st nd M6 (1 floor) (2 floor) T6 A38 A449 11 M6 Toll T8 A5 T5 sq ft 4,120 1,780 1,780 1,700 1,600 A460 M54 2 1 Tamworth 10A T4 A461 Office 5 6 7 8 Element A452 Court sq ft 3,300 1,780 1,780 1,780 M6 A454 M6 Toll 10 Walsall T3 Wolverhampton M1 North 9 Sutton T2 A463 M42 1 8 8 7 Coldfield A41 A38 8 A4123 18 T1 19 M6 7 2 1 15 18 6 Dudley 61 3 West Bromwich 12 17 5 M5 Birmingham 13 M42 4 Bristol & Birmingham South West Aiport & M40 For enquiries contact: www.langtreegroupplc.co.uk/property/element-court The Agents for themselves and for the Sellor/Lessor of this property who agents they are give notice that: 1.
    [Show full text]
  • |FREE| M54 Motorway
    M54 MOTORWAY EBOOK Author: Timoteus Elmo Number of Pages: 80 pages Published Date: 22 Oct 2011 Publisher: Loc Publishing Publication Country: United States Language: English ISBN: 9786137757413 Download Link: CLICK HERE M54 Motorway Online Read Business 3 hours ago. M54 to M6 link road. Contact me at jamie. Navigation menu Personal tools Log in. By continuing to browse our site, you agree to the use of these cookies. Between junction 4 and junction 5, the road passes across the Wolverhampton M54 Motorway Shrewsbury railway lineand through the centre of Telford. Wikimedia Commons. This prompted the Department of Transport to consider that site. Sincedevelopers have been solely M54 Motorway for coming up with their own proposals for new motorway services. All rights reserved. This aesthetic improvement M54 Motorway took two and a half years to complete and employed over people. Viral news 21 hours ago. Shropshire County Council. Shrewsbury 23 hours ago. Reviews M54 Motorway Shrewsbury 1 hour ago. Construction timeline. Latest updates 24 August The Department for Transport DfT is currently investigating the possibility of extending the M54 westward to Shrewsburythereby placing the county town on the M54 Motorway motorway map for the first time. Close Privacy Overview This website uses cookies to M54 Motorway your experience while you navigate through the website. We would like your views on these proposed changes. Start date UK News Less than an hour ago. Other nearby roads. Connects to. It then passes to the north of Shifnal. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic M54 Motorway of the website.
    [Show full text]
  • Tackling High Risk Regional Roads Safer Roads Fund Full
    Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION The Royal Automobile Club Foundation for Motoring Ltd is a transport policy and research organisation which explores the economic, mobility, safety and environmental issues relating to roads and their users. The Foundation publishes independent and authoritative research with which it promotes informed debate and advocates policy in the interest of the responsible motorist. RAC Foundation 89–91 Pall Mall London SW1Y 5HS Tel no: 020 7747 3445 www.racfoundation.org Registered Charity No. 1002705 October 2018 © Copyright Royal Automobile Club Foundation for Motoring Ltd Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION About the Road Safety Foundation The Road Safety Foundation is a UK charity advocating road casualty reduction through simultaneous action on all three components of the safe road system: roads, vehicles and behaviour. The charity has enabled work across each of these components and has published several reports which have provided the basis of new legislation, government policy or practice. For the last decade, the charity has focused on developing the Safe Systems approach, and in particular leading the establishment of the European Road Assessment Programme (EuroRAP) in the UK and, through EuroRAP, the global UK-based charity International Road Assessment Programme (iRAP). Since the inception of EuroRAP in 1999, the Foundation has been the UK member responsible for managing the programme in the UK (and, more recently, Ireland), ensuring that these countries provide a global model of what can be achieved.
    [Show full text]
  • For Sale Junction 1 M54 Hilton Cross
    3 NEW LOGISTICS/ JUNCTION 1 M54 MANUFACTURING / UNITS HILTON CROSS BUSINESS PARK TO LET/ FOR SALE WOLVERHAMPTON UNIT 1 – 47,750 SQ FT WV10 7QZ UNIT 2 – 62,000 SQ FT UNIT 3 – 113,000 SQ FT WOLFPACK-J1M54.COM SUSTAINABILITY Our buildings at Wolf Pack, Hilton Cross Business Park, Wolverhampton will be constructed to a market leading specification that will benefit the occupiers using them, by reducing occupational A PRIME costs and fulfilling many of the environmental, social and corporate governance ratings in measuring the sustainability and social impact of buildings. Our buildings acknowledges the key requirements of the Mid – Box industrial and logistics market and indeed exceeds them in many areas. MANUFACTURING Barberry have worked hard to use the latest environmentally friendly technology to minimise the dependency on fossil fuels, help reduce CO2 emissions and the costs of occupation for occupiers who have the opportunity to procure a renewable electrical energy tariff and AND LOGISTICS drive towards a zero carbon operation. Optimum performance EPC A rating insulated cladding DEVELOPMENT and roof materials Target BREEAM High efficiency air ‘Excellent’ source heat pump Unit 2 Wolf Pack, Hilton Cross Business Park, Wolverhampton, is a high profile speculative development of 3 self-contained detached Reduce cooling, 10% PV Cells lighting and buildings built to a market leading specification with planning heating demand. permission for manufacturing, warehousing and distribution uses. Buildings will be available to lease or purchase
    [Show full text]
  • A Choice of Entry and Exit Points Fair Pricing
    M6 Toll Junction Information A choice of entry Entry points Exit points Toll stations Northbound from A4097 Northbound and exit points T1 Southbound from M42 to M42 Southbound None T2 only You can join the M6 Toll at various junctions along the road. You just T3 Northbound and Northbound and On Entry (S) either pay at a junction, or at one of two main Toll Plaza stations which Southbound Southbound On Exit (N) Northbound and Northbound and On Exit stretch across the whole motorway at Great Wyrley on the northbound T4 Southbound Southbound carriageway and Weeford Park on the southbound carriageway. Northbound Southbound Pull out all On Exit T5 only only the stops. Southbound and Southbound and On Exit Fair pricing T6 Northbound Northbound Southbound Northbound T7 only only The toll system automatically classifies vehicles and charges separate Southbound Northbound rates for each category, depending on the size of the vehicle. Each T8 only only time you pass through a Toll Lane our sensors tell us how many axles Welcome to the M6 Toll – the most your vehicle has and how high it is from the point of the first axle. This tells us which class your vehicle falls into. exciting development in British What class is my vehicle? www.m6toll.co.uk transport history for many years. As a Vehicle Class Number Number Height at free-flowing alternative to the M6, the of Wheels of Axles 1st Axle* M6 Toll offers reliably shorter journey Z-CARD™ (trademarks used by Z industries Ltd under license). Class One Under 4 Any This product is a doubly-folded sheet card.
    [Show full text]
  • Park Design & Build
    FOR SALE/ TO LET DESIGN & BUILD OPPORTUNITIES UP TO 120,000 SQ FT 4.9 ACRE SITE WITH 2 ACRES STORAGE/EXPANSION PLANNING CONSENT FOR B2/B8 USES FULLY SERVICED SITE READY FOR DEVELOPMENT A460 • JUNCTION 1 • M54 • WV10 7HP VERNON DESIGN PARK & BUILD JOIN THE SUCCESS... WWW.VERNONPARK.CO.UK UP TO 120,000 SQ FT DESIGN & BUILD WWW.VERNONPARK.CO.UK 01 JOIN THE SUCCESS... WWW.VERNONPARK.CO.UK 02 DESCRIPTION WOLVERHAMPTON & STAFFORDSHIRE Vernon Park comprises a 4.9 acre development site benefitting from detailed Vernon Park is a highly prominent development planning consent for a high specification, at Junction 1 of the M54 motorway. The 120,000 sq ft B2/B8 building. Adjacent to the Jaguar Land Rover Engine Facility lies only 5 development site lies a further 2 acre plot for minutes drive time away demonstrating the additional storage or expansion. attractiveness of this location. Vernon Park has succeeded in attracting Situated within the Wolverhampton & a number of major businesses and Staffordshire region where manufacturing household names including Joseph Joseph, is twice as prominent as it is nationally. The Mann + Hummel and J Banks. development enjoys excellent access to the local and national road network. The site is fully serviced and ready for immediate development. Other occupiers nearby include, TRW, Moog, EWS and BSL. JOIN THE SUCCESS... WWW.VERNONPARK.CO.UK 03 ACCOMODATION Industrial Warehouse design & build up to 120,000 sq ft. Designed to occupier specification NOTE: Computer generated images used TYPICAL BUILDING SpEC 10 m eaves height 10 dock level and 2 level access loading doors High quality offices Gated and fenced secured yard Car parking to suit occupier and additional areas if required 50 KN/m2 floor loading capacity JOIN THE SUCCESS..
    [Show full text]
  • Post Opening Project Evaluation M6 Toll Five Years After Study
    Post Opening Project Evaluation M6 Toll Five Years After Study Post Opening Project Evaluation M6 Toll Five Years After Study October 2009 Document History JOB NUMBER: 5081587/905 DOCUMENT REF: M6T_FYA_Final.doc Revision Purpose Description Originated Checked Reviewed Authorised Date 1 Draft for client review SB PW NM PR Sep ‘09 2 2nd Draft with HA (POPE) SB PW NM PR Sep ‘09 revisions 3 Final Draft SB PW NM PR Oct ‘09 5081587/POPE _ M6T FYA report _ Final Post Opening Project Evaluation M6 Toll Five Years After Study Contents Section Page Glossary of Terms iv Executive Summary vii Traffic vii Safety viii Environment viii 1. Introduction 1 Post Opening Project Evaluation (POPE) 1 Aims of this Study 1 Background to the M6 Toll 1 Scheme Description 5 Scheme Objectives 5 Scheme History 5 Midland Expressway Limited (MEL) 6 Current Economic Climate 6 Fuel Prices 6 Roadworks 7 Contents of this Report 7 2. Long Term Trends in Traffic Volumes 8 Major Roadworks affecting Midlands Motorways 8 Other Important Nearby Schemes 9 Variation in Numbers of M6 Toll Users 9 Annual Change in Average Number of M6 Toll Users 10 Changes in the Number of Electronic Tag Users 11 M6 Parallel to M6 Toll 12 M6 North and South of M6 Toll 13 Key Findings: Long Term Trends in Traffic 16 3. Daily Traffic Volumes 17 Factoring Methodology 17 Locations of Automatic Traffic Count (ATC) Sites on M6 Toll 17 Changes in 24hr Traffic Flows on the M6 Toll since 2004 18 Changes in Directional Flows on M6 Toll 24 Traffic Flows on the M6 and other Motorways and Strategic Routes 25 Key Findings: Daily Traffic Volumes 36 4.
    [Show full text]
  • Si 2010/2424
    STATUTORY INSTRUMENTS 2010 No. 2424 ROAD TRAFFIC The M5, M6 and M54 Motorways (Temporary Restriction of Traffic) Order 2010 Made - - - - 24 September 2010 Coming into force - - 01 October 2010 WHEREAS the Secretary of State for Transport, being the traffic authority for the M5 Motorway (“the M5”), the M6 Motorway (“the M6”), the M54 Motorway (“the M54”) and connecting roads, is satisfied that traffic on lengths of those motorways and some of those connecting roads in the Metropolitan Boroughs of Sandwell and Walsall and the County of Staffordshire should be restricted because of the likelihood of danger to the public: NOW, THEREFORE, the Secretary of State, in exercise of the powers conferred by section 14(1)(b) of the Road Traffic Regulation Act 1984(a), and of all other powers enabling him in that behalf, hereby makes the following Order:- 1. This Order may be cited as the M5, M6 and M54 Motorways (Temporary Restriction of Traffic) Order 2010 and shall come into force on 1 October 2010. 2. In this Order – “the motorway” means – (a) the northbound and southbound carriageways of the M6 between a point 250 metres south of the centreline of the Rushall canal underbridge at Junction 8 and a point 750 metres north of the centreline of the B4156 Hobnock Road overbridge at Junction 10a; (b) the eastbound carriageway of the M54 from the centreline of the western overbridge at Junction 1 to its junction with the southbound carriageway of the M6 (Junction 10a); and (c) the westbound carriageway of the M54 from its junction with the northbound
    [Show full text]