JEC Strategic Partnership Taps Growth of Data Centres in Hong Kong

Total Page:16

File Type:pdf, Size:1020Kb

JEC Strategic Partnership Taps Growth of Data Centres in Hong Kong FEB 2014 ISSUE 28 JECJEC StrategicStrategic PartnershipPartnership TapsTaps GrowthGrowth ofof DataData CentresCentres inin HongHong KongKong JEC Provides Upgrades for Yuen Long Sewage Treatment Works JEC Philippines Awarded Data Centre Contract for City of Dreams, Manila Bay First Commercial Active Chilled Beam Project in Hong Kong Jardine Engineering Corporation www.jec.com 目錄 CONTENTS FEB 2014 ISSUE 28 JEC Philippines Awarded Data Centre 03 Contract for City of Dreams, Manila Bay 16 CEO’s Message 行行政總裁的話政總裁的話 菲律賓怡和機器獲馬尼拉灣City of Dreams Around Asia 亞亞洲概覽洲概覽 的數據中心合約 Thailand 泰國 JEC Provides Upgrades for Yuen Long JEC Thailand Promotes the 04 Apprenticeship Programme in 2013 News 簡簡訊訊 Sewage Treatment Works 怡和機器為元朗污水處理廠的輸送管及壓 泰國怡和機器推廣2013年見習生計劃 JEC Enters into Strategic Partnership 縮機升級 Philippines with Chung Hing Engineers 菲律賓 JEC Philippines Participated in the 怡和機器與中興工程建立策略性夥伴關係 JEC Singapore Awarded the Certifi cate of Excellence by RQAM First Water Challenge Forum JEC Speaker Luncheon on the 新加坡怡和機器獲萊佛士碼頭房地資產管 菲律賓怡和機器參加首個食水挑戰論壇 Environment 理頒發卓越獎狀 Jardine Distribution Inc. Launched 怡和機器有關環境專題客戶及業務夥伴午 ‘Rise Up, Partner!’ 餐會 JEC Thailand Conducted a Solar PV Rooftop Seminar JDI展開「夥伴站起來!」計劃 泰國怡和機器屋頂光伏太陽能電池板研 JEC Philippines Participated in The 討會 HVAC/R National Convention JEC Singapore Moves to New Offi ce 菲律賓怡和機器參與HVAC/R國家會議 新加坡怡和機器辦事處遷址 Singapore 新加坡 JEC Singapore Rises to The Mindset 10 Challenge 2013 Feature Story 特特寫寫 JEC Philippines Achieves Two Million 新加坡怡和機器參與The Mindset Challenge 2013 Safe Man-Hours JEC Strategic Partnership Taps on 菲律賓怡和機器達200萬安全工時 Growth of Data Centres in Hong Kong Mainland China 中國內地 怡和機器的策略性夥伴關係把握香港數據 JEC Awarded ACMV Contract for Newly Promoting Green Energy at Guangzhou 中心增長機遇 Built Offi ce Building Event 怡和機器獲得新建辦公大樓的機械通風及 怡和機器於廣州活動中推廣綠色能源 空調系統合約 14 Product Solutions 產產品品 Macau 澳門 JEC 90th Anniversary Customer Cocktail JEC Macau Wins LV Switch Panel Party Piller APOSTAR AP Premium Maintenance Service Contract for 怡和機器九十周年客戶酒會 Uninterruptible Power Supply System Several Major Hotels and Casinos Piller APOSTAR AP Premium不間斷供電 澳門怡和機器贏得數間主要酒店及娛樂 JEC Awarded the Contract for Supplying 系統 場的低壓電制櫃維修保養合約 Granular Activated Carbon to Tai Po Water Treatment Works 怡和機器取得為大埔濾水廠提供顆粒活性 20 碳的合約 Projects 項項目探討目探討 Welcome to the New JEC Showroom Engineering a Better Asia with Another First 歡迎來到怡和機器全新陳列室 再次開創先河,建設更美好亞洲 15 Personality 人人物物 Chat with Eric Fung JEC MAGAZINE ISSUE 28 與馮智衍對話 02 行政總裁的話 CEO’S MESSAGE 22 Environmental, Health & Safety I am very excited to share with you that JEC has entered into 環環境、健康與安全境、健康與安全 a partnership with Chung Hing Engineers Limited, a leading engineering contractor specialising in the critical facilities Data Centre Sustainability sector in Hong Kong, Macau and Mainland China. As a turnkey 數據中心的持續性 solution provider, Chung Hing Engineers offers services ranging from project design and implementation to ongoing facilities 24 maintenance. Training & Development 培培訓及發展訓及發展 The partnership, effective from 30th November 2013, offers strong synergies to JEC and will add great depth to our existing JEC Combines Creativity and Competence in Developing a business, enhancing our capabilities in the critical facilities sector Formidable Workforce and allowing us to offer an expanded range of services for our 怡和機器結合創意與技能以建立強大的 customers. You can read all the details in our Feature Story. 工作團隊 The Projects section of this issue showcases another fi rst for JEC. We pioneered the installation of an Active Chilled Beam system for a fully functioning commercial offi ce in Hong Kong under a very tight timeline. The successful implementation demonstrated our capabilities to innovate, execute, as well as our drive and commitment to customers. In the region, last November saw the passage of Super Typhoon Haiyan that devastated the Philippines and has deeply affected our colleagues at Jardine Distribution Inc. (JDI), but thankfully there was no loss of life. JDI, with the help of JEC colleagues, 26 took immediate action to provide aid and support to the community. Community Care 關關懷社區懷社區 There is a full report inside. JEC Caring Team Visit to Lamma Island I hope you enjoy reading this issue of the JEC Magazine. 怡和機器義工隊遊覽南丫島 我很高興能與各位分享,怡和機器已與香港、澳門及中國關鍵設施行業 JEC Caring Team Organised Campus 的領先工程承辦商 ─ 中興工程建立夥伴關係。作為一個全面性方案供應 Orientation for Children 商,中興工程提供的服務包括項目設計與執行,及對現有設施進行維修。 怡和機器義工隊安排兒童參觀港大校園 Central Rat Race 2013 夥伴關係已於2013年11月30日展開,並為怡和機器帶來強大的協同效 2013鼠戰中環 益,有助增強及擴大現有業務發展,提升我們在關鍵設施行業的實力, 從而為客戶提供更廣泛的服務。大家稍後可於「特寫」專欄了解更多。 MINDSET Fun Day 2013 2013思健同樂日 本期的「項目探討」展述了怡和機器另一項新的創舉。在緊迫的時限下, 我們成功地為香港一個全面運作的寫字樓安裝了主動式冷樑柱系統。該 項目得以順利完成,突顯了我們具備創新及實踐的能力,以及我們的動 力和對客戶的承擔。 此外,超級颱風海燕在11月席捲菲律賓,對Jardine Distribution Inc. ( JDI)的員工深受影響,幸而沒有任何人員傷亡。在怡和機器同事的協助 JEC MAGAZINE JDI 下, 即時為社區提供援助及支援。詳情請參閱內文。 ISSUE 28 28 希望您喜歡今期的內容。 Major Contracts Listing 工工程合約程合約 Wilson Kwong 鄺永銓 03 簡訊 NEWS JEC Enters into Strategic Partnership with Chung Hing Engineers 怡和機器與中興工程建立策略性夥伴關係 JEC has invested in a signifi cant strategic stake in Chung Hing 怡和機器已與中興工程建立夥伴關係,成為 Engineers Ltd. (Chung Hing), a leading engineering specialist 中興工程的策略性投資者。中興工程為香 contractor in the critical facilities sector in Hong Kong, Macau and 港、澳門及中國內地關鍵設施行業的領先工 Mainland China. Chung Hing Engineers offers installation contracting 程專業承辦商。中興工程提供安裝承包及維 and provides operating and maintenance services. They became a 修保養服務,於2013年11月30日成為怡和機 member of JEC as of 30th November 2013. 器的成員公司。 JEC Speaker Luncheon on the Environment 怡和機器有關環境專題客戶及業務夥伴午餐會 On 3rd December 2013, the JEC Speaker Luncheon was held at 2013年12月3日,怡和機器客戶及業務夥伴 The Excelsior Hong Kong. Mr. Kam-Sing Wong, Secretary for the 午餐聚會假香港怡東酒店舉行。香港特區政 Environment, Hong Kong SAR Government, was the distinguished 府環境局局長黃錦星先生為午餐會的演講 speaker at the event. He shared his perspectives and insights on 嘉賓。他透過講題「不再浪費:垃圾按量收 environmental concerns through the topic of “Waste No More: Pay- 費、科技與時間」分享了他對環境問題的觀 as-you-Throw, Technology and Time”. It was well received by the 點及見解,觀眾的反應十分理想。 audience. JEC MAGAZINE ISSUE 28 04 JEC Philippines Achieves Two Million Safe Man-Hours 菲律賓怡和機器達200萬安全工時 The LNMB Sewage Treatment Plant Project was recently recognised LNMB污水處理廠項目最近就其超卓的安全 by the Safety Organisation of the Philippines Inc (SOPI) for its 工時紀錄獲菲律賓安全協會嘉許。 exceptional project safety records. 於2011年3月至2013年9月期間,菲律賓怡和 JEC Philippines received the Award of Merit for achieving 2,311,224 機器達到2,311,224安全工時及沒有發生損失 Safe Man-Hours without Lost Time Accident from March 2011 to 工作日事故,因而取得優異獎。獎項於11月 30th September 2013. The award was presented last 13th to 13日至15日在卡加延-德奧羅市舉行的組織年 15th November during the Annual Convention of the organisation in 度會議頒發,並由菲律賓怡和機器安全團隊 Cagayan de Oro City and was received by the JEC Philippines safety 領取。 team. 團隊認為能達致此成就,全賴所制訂的安全 The team attributes this achievement to the Safety Awareness 意識計劃及就不同方面舉行的定期安全會 Programmes which have been put in place and the regular safety 議。此獎項亦有賴高級管理層的支持及整隊 sessions with the different trades. Also the award would not have 項目團隊的積極參與。 been achieved without the support of the top management and the active participation of the whole project team. JEC Awarded ACMV Contract for Newly Built Offi ce Building 怡和機器獲得新建辦公大樓的機械通風及空調系統合約 JEC was awarded the contract to supply and install the ACMV 怡和機器獲得27層新建辦公室發展項目的 equipment and system for the newly built 27-storey offi ce 機械通風及空調設備與系統的供應和安裝合 development. The building is located in 17 Cheung Shun Street, 約。該大樓位於九龍長沙灣長順街17號,並 Cheung Sha Wan, Kowloon, and owned by Luk Yeung Restaurant. 由綠楊坊擁有。 To meet the industry benchmark, the project team aims to achieve the 為達致業界標準,項目團隊以取得BEAM Platinum grade of the BEAM Plus, the leading initiative in assessing, Plus白金級認證為目標,BEAM Plus為評 improving, certifying and labelling the environmental performance 估、改善、證明及標示樓宇環保表現的領先 JEC MAGAZINE of buildings. Platinum grade is the highest rating in the BEAM Plus 制度。白金級為BEAM Plus評估制度的最高 ISSUE 28 assessment recognised by the Hong Kong Green Building Council 等級,並獲香港綠色建築議會認可。 (HKGBC). 項目於2013年10月獲得,並預期於2015年 The project was awarded in October 2013 and it is expected to be 3月前竣工。 completed by March 2015. 05 JEC 90th Anniversary Customer Cocktail Party 怡和機器九十周年客戶酒會 On 17th October 2013, JEC held a Customer Cocktail Party at the Hong Kong Convention and Exhibition Centre to mark its 90th anniversary. Over 300 guests and JEC staff attended and all enjoyed a fabulous evening. Each guest was given a commemorative book entitled “JEC 90 Years – Together we engineer a better Asia”. 2013年10月17日,怡和機器於香港會議展覽中心舉行客戶酒會,以慶祝其創立九十周年。超過300位嘉賓及怡和機器員 工出席酒會,各人度過了一個愉快的晚上。每名嘉賓均獲贈名為「怡和機器 ─ 創建亞洲九十年」的紀念冊。 JEC MAGAZINE ISSUE 28 06 JEC Awarded the Contract for Supplying Granular Activated Carbon to Tai Po Water Treatment Works 怡和機器取得為大埔污水處理廠提供顆粒活性碳的合約 JEC has been awarded the contract for the supply of granular 怡和機器取得為大埔污水處理廠及附屬原水 activated carbon for the expansion of Tai Po Water Treatment Works, 和食水輸送設施的擴展工程(15/WSD/10) as well as its ancillary raw water and fresh water transfer facilities (15/ 提供顆粒活性碳的合約。 WSD/10). 在Black & Veatch為項目顧問及安樂 - 中建 With Black & Veatch as the consultant and ATAL - China State Joint 聯營為主承建商下,怡和機器將透過向水務 Venture as the main contractor, JEC will participate in this project 署提供顆粒活性碳參與此項目。活性碳將用 by supplying granular activated carbon to the client, Water Services 於大埔污水處理廠二號新流水道的第二快速 Department. The activated carbon will be used on the secondary rapid 重力過濾器。 gravity fi lters of the New Stream II at Tai Po Water Treatment Works. 第二快速重力過濾是水通過第一次生物過濾 The secondary rapid gravity fi ltration is for fi nal fi ltration of water that 及臭氧處理後的最後過濾。 has gone through primary biological fi ltration
Recommended publications
  • Typhoon Haiyan
    Emergency appeal Philippines: Typhoon Haiyan Emergency appeal n° MDRPH014 GLIDE n° TC-2013-000139-PHL 12 November 2013 This emergency appeal is launched on a preliminary basis for CHF 72,323,259 (about USD 78,600,372 or EUR 58,649,153) seeking cash, kind or services to cover the immediate needs of the people affected and support the Philippine Red Cross in delivering humanitarian assistance to 100,000 families (500,000 people) within 18 months. This includes CHF 761,688 to support its role in shelter cluster coordination. The IFRC is also soliciting support from National Societies in the deployment of emergency response units (ERUs) at an estimated value of CHF 3.5 million. The operation will be completed by the end of June 2015 and a final report will be made available by 30 September 2015, three months after the end Red Cross staff and volunteers were deployed as soon as safety conditions allowed, of the operation. to assess conditions and ensure that those affected by Typhoon Haiyan receive much-needed aid. Photo: Philippine Red Cross CHF 475,495 was allocated from the International Federation of Red Cross and Red Crescent Societies (IFRC) Disaster Relief Emergency Fund (DREF) on 8 November 2013 to support the National Society in undertaking delivering immediate assistance to affected people and undertaking needs assessments. Un-earmarked funds to replenish DREF are encouraged. Summary Typhoon Haiyan (locally known as Yolanda) made landfall on 8 November 2013 with maximum sustained winds of 235 kph and gusts of up to 275 kph. The typhoon and subsequent storm surges have resulted in extensive damage to infrastructure, making access a challenge.
    [Show full text]
  • Appendix 8: Damages Caused by Natural Disasters
    Building Disaster and Climate Resilient Cities in ASEAN Draft Finnal Report APPENDIX 8: DAMAGES CAUSED BY NATURAL DISASTERS A8.1 Flood & Typhoon Table A8.1.1 Record of Flood & Typhoon (Cambodia) Place Date Damage Cambodia Flood Aug 1999 The flash floods, triggered by torrential rains during the first week of August, caused significant damage in the provinces of Sihanoukville, Koh Kong and Kam Pot. As of 10 August, four people were killed, some 8,000 people were left homeless, and 200 meters of railroads were washed away. More than 12,000 hectares of rice paddies were flooded in Kam Pot province alone. Floods Nov 1999 Continued torrential rains during October and early November caused flash floods and affected five southern provinces: Takeo, Kandal, Kampong Speu, Phnom Penh Municipality and Pursat. The report indicates that the floods affected 21,334 families and around 9,900 ha of rice field. IFRC's situation report dated 9 November stated that 3,561 houses are damaged/destroyed. So far, there has been no report of casualties. Flood Aug 2000 The second floods has caused serious damages on provinces in the North, the East and the South, especially in Takeo Province. Three provinces along Mekong River (Stung Treng, Kratie and Kompong Cham) and Municipality of Phnom Penh have declared the state of emergency. 121,000 families have been affected, more than 170 people were killed, and some $10 million in rice crops has been destroyed. Immediate needs include food, shelter, and the repair or replacement of homes, household items, and sanitation facilities as water levels in the Delta continue to fall.
    [Show full text]
  • 2013 Major Water-Related Disasters in the World (Pt.1)
    2013 Major Water-Related Disasters in the World (Pt.1) India. Nepal (Jun. 2013) Bangladesh (May. 2013) China (May. 2013) China (Aug. 2013) China (Aug. 2013) The Torrential rain by early Landed tropical cyclone Continuous heavy Continuous heavy rain caused The torrential rain by coming monsoon caused MAHASEN brought rain caused floods over-flow the river of border Typhoon Utor, hit China on floods, flash floods and torrential rain and storms. and landslide in area between China and Russia, Aug. 14, caused floods in landslides in northern India and The death toll was 17., and south China. and floods in Northeast China southern China. More than 8 Nepal. The Death toll was about 1.5 million people 55 were killed. and Far East Russia. The death million were affected and 88 6,054 across India, 76 in Nepal were affected. toll was 118 in China. were killed. India (Oct. 2013) The Tropical Cyclone PHAILIN China, Taiwan (Jul. 2013) landed at east coast of India, China (Jan. 2013) Torrential rain caused and killed 47 people. About 1.3 A landslide caused floods and landslides in million people were affected. by the continuous China. And Typhoon heavy rains buried SOULIK lashed Taiwan 16 families, killing India (Oct. 2013) and coastal area of China 46.* th The Flash floods in Odisha on 13 Jul. These killed and Andhra Pradesh, east 233. coast of India, killed 72 people. China, Viet Nam (Sep.2013) The rainstorm by Typhoon Saudi Arabia (Apr.2013) WUTIP caused floods and Continuous heavy rain for 2 Viet Nam (Nov.2013) killed 16 in Viet Nam and 74 weeks caused floods and The torrential rain by Tropical in China.
    [Show full text]
  • Typhoon Haiyan
    Information Bulletin Philippines: Typhoon Haiyan Information bulletin n° 1 7 November 2013 This bulletin is being issued for information only and reflects the current situation and details available at Text box for brief photo caption. Example: In February 2007, the this time. The Philippine Red Cross has placed its disaster response teams on standby for rapid Colombian Red Cross Society distributed urgently needed deployment and preparedness stocks ready for dispatch, if required. materials after the floods and slides in Cochabamba. IFRC (Arial 8/black colour) Summary: Typhoon Haiyan is currently making its way across the Pacific and has intensified into a category 5 typhoon (super typhoon). Forecasts indicate Typhoon Haiyan will make landfall in the Philippines on Friday, 8 November 2013. Known locally as Typhoon Yolanda, Haiyan is expected to track across Samar and Leyte provinces in Eastern Visayas region, packing maximum sustained winds of 240 kph (150 mph). It is expected to bring widespread torrential rain and damaging winds, and trigger life- threatening flash floods, as well as mudslides on higher terrain. The Philippine Red Cross (PRC) has been on highest alert since the Preparedness stocks – which include standard relief items – are being transferred typhoon was sighted. The PRC is from the Philippine Red Cross central warehouse in Manila to a regional maintaining close coordination with warehouse in Cebu for immediate dispatch to areas where they will be needed. disaster authorities and has alerted Photo: Joe Cropp/IFRC all its chapters in Visayas (Central, Eastern and Western Visayas) as well as in Bicol, Mindoro, and Caraga regions for immediate response, if required.
    [Show full text]
  • Risks of Climate Change on the Singapore-Malaysia High Speed Rail System
    Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 5 August 2016 doi:10.20944/preprints201608.0045.v1 Peer-reviewed version available at Climate 2016, 4, 65; doi:10.3390/cli4040065 Review Risks of Climate Change on the Singapore-Malaysia High Speed Rail System Sazrul Leena Binti Sa’adin 1, Sakdirat Kaewunruen 2,* and David Jaroszweski 3 1 Malaysia Land Public Transport Commission (SPAD), Ministry of Transport, Kuala Lumpur, Malaysia; [email protected] 2 Department of Civil Engineering, School of Engineering, The University of Birmingham, Birmingham B15 2TT, UK 3 Birmingham Centre for Railway Research and Education, The University of Birmingham, Birmingham B15 2TT, UK; [email protected] * Correspondence: [email protected]; Tel.: +44-1214-142-670 Abstract: Warming of the climate system is unequivocal, and many of the observed changes are unprecedented over five decades to millennia. Globally the atmosphere and ocean is increasingly getting warmer, the amount of ice on the earth is decreasing over the oceans, and the sea level has risen. According to Intergovernmental Panel on Climate Change, the total increasing temperature globally averaged combined land and surface between the average of the 1850-1900 period and the 2003 to 2012 period is 0.78°C (0.72 to 0.85). But should we prepare for such the relatively small change? The importance is not the mean of the warming but the considerable likelihood of climate change that could trigger extreme natural hazards. The impact and the risk of climate change associated with railway infrastructure have not been fully addressed in the literature due to the difference in local environmental parameters.
    [Show full text]
  • A Review of the Philippines Typhoons Shelter Working Group
    A Review of the Philippines Typhoons Shelter Working Group December 2006 – March 2007 Raj Rana, Consultant (report author/Shelter Working Group Coordinator) The views expressed in this review are those of the consultant, and not necessarily those of the IFRC 2 Table of Contents Table of Contents ........................................................................................... 3 Summary and Recommendations ...................................................................... 4 Acronyms Used .................................................................................................... 9 I Introduction ........................................................................................... 10 II Chronology of Events ........................................................................ 12 III Findings................................................................................................ 17 IV Survey Results ..................................................................................... 28 V Conclusions and Recommendations................................................... 30 Annex 1- Methodology ................................................................................... 34 Annex 2- Bibliography................................................................................. 35 Annex 3- List of Interviewees ............................................................... 36 Annex 4- TOR .................................................................................................... 37 Annex
    [Show full text]
  • Emergency Appeal Philippines: Typhoons and Floods 2013
    Emergency appeal Philippines: Typhoons and floods 2013 Emergency appeal n° MDRPH012 GLIDE n° FL-2013-000092-PHL and FL-2013-000095-PHL 19 September 2013 This emergency appeal seeks CHF 1,856,354 in cash, kind, or services to support the Philippine Red Cross in delivering humanitarian assistance to 15,000 families (75,000 people) within eight months. The operation will be completed by the end of April 2014 and a final report will be made available by 31 July 2014, three months after the end of the operation. Appeal history: A preliminary emergency appeal seeking CHF 1.68 million to support the Philippine Red Cross in assisting 15,000 families (75,000 people) for eight months was issued on 26 August 2013 CHF 319,766 was allocated from the International Federation of A staff member of the PRC interviews a person whose home was damaged by Red Cross and Red Crescent Typhoon Utor in the municipality of Casiguran, Aurora Province. This operation aims Societies (IFRC) Disaster Relief to provide shelter repair assistance to 500 affected families. Emergency Fund (DREF) on 16 Photo: Kozu Tsuda/Philippine Red Cross August 2013 to support the National Society in undertaking needs assessments and delivering immediate assistance to people affected by Typhoon Utor. Unearmarked funds to replenish DREF are encouraged. Summary Since mid-August 2013, Philippine Red Cross (PRC) has been responding to humanitarian needs wrought by two severe weather events: Typhoon Utor, which slammed into the provinces of Aurora and Quirino with a severe impact, and flooding brought by Tropical Storm Trami-induced monsoon rains, which affected Metro Manila, its four neighbouring provinces, and parts of Central Luzon.
    [Show full text]
  • My Retrospective on ASEAN
    My Retrospective on ASEAN Gloria Macapagal-Arroyo The Philippines hosted the ASEAN Summit in Cebu, Phi lippines, in January 2007, when I was President of the country. At that Summit, we declared our strong commitment to accelerate the establishment of an ASEAN community by 2015. It was a pivotal period in ASEAN’s development. Maphilindo I would like to think that ASEAN had a forerunner in the brief Maphilindo union founded in a Manila summit in 1963 among Malaysia, the Philippines, and Indonesia, when my father, Diosdado Macapagal, was President of the Philippines. He was then reviving the dream of a united Malay race which went back much earlier, to Filipino heroes like Wenceslao Vinzons in our 1935–1940 Commonwealth period under American tutelage, and the father of Filipino nationalism himself, ‘The Great Malay’ Jose Rizal. 55 My father believed that after centuries of colonial rule, the three Malay countries should work together on ‘Asian solutions for Asian problems’, following the Musyawarah principle of mutual consultation. Indonesian President Sukarno helped flesh out this vision during frequent trips to Manila, and Malaya’s Prime Minister Tunku Abdul Rahman later came on board. At the Manila summit, the three declared that initial steps should be taken towards the establishment of Maphilindo by holding frequent and regular consultations at all levels, to be known as Musyawarah Maphilindo. The summit statement also enunciated what might well have been ASEAN’s own tenets: ‘This Conference ... has greatly strengthened the fraternal ties which bind their three countries and extended the scope of their cooperation and understanding, with renewed confidence that their governments and peoples will together make a significant contribution to the attainment of just and enduring peace, stability and prosperity in the region.’ Though Maphilindo was short-lived, the dream lived on.
    [Show full text]
  • Appendix 3 Selection of Candidate Cities for Demonstration Project
    Building Disaster and Climate Resilient Cities in ASEAN Final Report APPENDIX 3 SELECTION OF CANDIDATE CITIES FOR DEMONSTRATION PROJECT Table A3-1 Long List Cities (No.1-No.62: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP. EIGHT-JAPAN ENGINEERING CONSULTANTS INC. A3-1 Building Disaster and Climate Resilient Cities in ASEAN Final Report Table A3-2 Long List Cities (No.63-No.124: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP. EIGHT-JAPAN ENGINEERING CONSULTANTS INC. A3-2 Building Disaster and Climate Resilient Cities in ASEAN Final Report Table A3-3 Long List Cities (No.125-No.186: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP. EIGHT-JAPAN ENGINEERING CONSULTANTS INC. A3-3 Building Disaster and Climate Resilient Cities in ASEAN Final Report Table A3-4 Long List Cities (No.187-No.248: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP. EIGHT-JAPAN ENGINEERING CONSULTANTS INC. A3-4 Building Disaster and Climate Resilient Cities in ASEAN Final Report Table A3-5 Long List Cities (No.249-No.310: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP. EIGHT-JAPAN ENGINEERING CONSULTANTS INC. A3-5 Building Disaster and Climate Resilient Cities in ASEAN Final Report Table A3-6 Long List Cities (No.311-No.372: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP.
    [Show full text]
  • Preliminary Emergency Appeal Philippines: Typhoons and Floods 2013
    Preliminary emergency appeal Philippines: Typhoons and floods 2013 Emergency appeal n° MDRPH012 GLIDE n° FL-2013-000092-PHL and FL-2013-000095-PHL 26 August 2013 This preliminary emergency appeal seeks CHF 1,681,554 in cash, kind, or services to support the Philippine Red Cross to assist 15,000 families (75,000 people) for eight months. The operation will be completed by the end of April 2014 and a final report will be made available by 31 July 2014, three months after the end of the operation. Appeal history: CHF 319,766 was allocated from the International Federation of Red Cross and Red Crescent Societies (IFRC) Disaster Relief Emergency Fund (DREF) to support the National Society in needs A section of flooded road in Manila (EDSA – Taft Avenue). The impact of assessments and initiate flooding has been most felt in several cities of Metro Manila, including delivery assistance to people Valenzuela, and the provinces of Cavite, Laguna and Rizal. Photo: IFRC affected by Typhoon Utor. This DREF allocation is being included as start-up funding for this appeal and therefore unearmarked funds to replenish DREF are encouraged. Summary Starting Sunday, 18 August 2013, incessant monsoon rains fuelled by Tropical Storm Trami (local name: Maring) have fallen over the Philippine capital, Manila, and surrounding provinces, bringing widespread flooding that has had devastating effect. By 24 August, the National Disaster Risk Reduction and Management Committee (NDRRMC) reported that 21 lives have been lost, 179,000 families or more than 800,000 people have been displaced. Overall, the flooding has had an impact on the lives and livelihood of 2.5 million people across five regions.
    [Show full text]
  • Risks of Climate Change with Respect to the Singapore-Malaysia High Speed Rail System
    climate Review Risks of Climate Change with Respect to the Singapore-Malaysia High Speed Rail System Sazrul Leena Binti Sa’adin 1, Sakdirat Kaewunruen 2,* and David Jaroszweski 3 1 Malaysia Department of Public Work, Ministry of Transport, Kuala Lumpur 50582, Malaysia; [email protected] 2 Department of Civil Engineering, School of Engineering, The University of Birmingham, Birmingham B15 2TT, UK 3 Birmingham Centre for Railway Research and Education, The University of Birmingham, Birmingham B15 2TT, UK; [email protected] * Correspondence: [email protected] or [email protected]; Tel.: +44-01214-142-670 Academic Editor: Yang Zhang Received: 4 August 2016; Accepted: 9 December 2016; Published: 20 December 2016 Abstract: Warming of the climate system is unequivocal, and many of the observed changes are unprecedented over the past five decades. Globally, the atmosphere and the ocean are becoming increasingly warmer, the amount of ice on the earth is decreasing over the oceans, and the sea level has risen. According to the Intergovernmental Panel on Climate Change, the average increase in global temperature (combined land and surface) between the 1850–1900 period and the 2003–2012 period was 0.78 ◦C (0.72 to 0.85). But should we prepare for such a relatively small change? The importance is not the means of the warming but the considerable likelihood of climate change that could trigger extreme natural hazards. The impact and the risk of climate change associated with railway infrastructure have not been fully addressed in the literature due to the differences in local environmental parameters.
    [Show full text]
  • Planning and Engineering of Coastal Flooding Mitigation Works of an Airport Runway in a Storm-Tracked Island
    Planning and Engineering of Coastal Flooding Mitigation Works of an Airport Runway in a Storm-tracked Island Eric C. Cruz1,2 Edgardo P. Kasilag II2 1Professor, Institute of Civil Engineering, University of the Philippines Diliman, Quezon City 1101, Philippines; Email: [email protected] 2 Principal, AMH Philippines Inc., Bahay ng Alumni Bldg, U.P. Diliman Campus, Quezon City 1101 ABSTRACT: An existing airport requires a length extension of its runway to meet increased air traffic demand. The extension places the runway termini to be along the coasts. This paper discusses the methodology applied to address the likely coastal flooding at both termini, which are tracked by typhoons. The approach hinges on the quantification of storm tide levels and local wave effects induced by historical typhoons. Aviation clearance requirement and sediment stability around the seawall toe are also addressed. It is found that the required minimum non-overtopping seawall elevation is highly influenced by historical storm and by local seabed features. Keywords: coastal flooding, runway, seawall, overtopping, typhoons, engineering INTRODUCTION With a growing demand for inter-island trade, commerce and tourism, the Philippines is building new or upgrading existing transport infrastructures in major islands. One of the existing airports needs an extension of its runway length to meet the growing domestic and international demand for air travel to Boracay Island, which is famous for its tropical beaches and marine recreation, and as a popular “sun and beaches” destination of Philippine tourism. The airport is in the northern tip of Aklan Province, which hosts the nearest seaport gateway to Boracay. The existing runway has a length of 950 m and runs southwest-northeast (Figure 1) is designed to serve only small-capacity propeller airplanes from major cities such as Manila and Cebu.
    [Show full text]