Study Group

Transit Routing Options and MARTA Connectivity Assessments

Atlanta BeltLine West

Westside Study Group: September 22, 2014 Southwest Study Group: September 25, 2014

10/6/2014 BeltLine // © 2014 Page 1 Study Group

• Project Team Introductions • Today’s Agenda: . Schedule . Project Background . Environmental Review Process . Screening Process . Preference Exercise • Adjourn

10/6/2014 Atlanta BeltLine // © 2014 Page 2

Community Engagement Schedule Summer and Fall 2014

Study Group Study Group SAC Kickoff Citywide SAC/TAC Citywide Meetings Meetings Meeting Conversation Meetings Conversation Round #1 Round #2

Sept 22 & 25, Oct 6 & 9, Sept 9, 2014 Sept 15, 2014 Oct 14, 2014 2014 2014 Oct 30, 2014

Stakeholder Advisory Committee (SAC): Advisory committee for Study Groups: Residents and business owners with an each project corridor representing business and property interest in the project within each geographical area. owners, adjacent neighborhoods, and community groups. Citywide Conversations: Citywide public meetings are Technical Advisory Committee (TAC): Advisory committee forums to educate the public at large with upcoming plans, comprised of representatives with technical and/or policies, and studies. environmental expertise.

10/6/2014 Atlanta BeltLine // © 2014 Page 3 Milestone Schedule

Transit Routing Technical Studies Complete Draft Public/Agency Finding of No Project Options/MARTA and Evaluation Environmental Review and Significant Development Connectivity Assessment (EA) Public Hearing Impact (FONSI) (PD) Entry Assessments Request

June 2014 to September 2014 November 2014 to March 2015 March 2015 April 2015 May 2015 Summer 2015

10/6/2014 Atlanta BeltLine // © 2014 Page 4 Study Group

Project Background Atlanta BeltLine West

10/6/2014 Atlanta BeltLine // © 2014 Page 5 Project Background Transit Plans/Studies/Initiatives

Connect Atlanta Plan

November 2008

Draft Atlanta BeltLine/ System Plan (SSP) March 2014

Atlanta Streetcar Finding of No Record of Decision (ROD) for Tier 1 Significant Impact (FONSI) EIS April 2011 August 2012

10/6/2014 Atlanta BeltLine // © 2014 Page 6 Project Background Atlanta BeltLine/Atlanta Streetcar System Plan

A Supplement to the Connect Atlanta Plan and the ABI Strategic Implementation Plan (SIP) Phasing of transit in SIP based on this strategy Includes all streetcar lines in the Connect Atlanta Plan including Atlanta BeltLine Project evaluation based on Equity, Readiness, Value Capture, Finance, Ridership Significant stakeholder and public input garnered to date Integrates Atlanta Streetcar lines and Atlanta BeltLine into a unified system

10/6/2014 Atlanta BeltLine // © 2014 Page 7 Project Background Atlanta BeltLine/Atlanta Streetcar System Plan

Streetcar is the transit technology for the Atlanta BeltLine corridor

Comprehensive system network

Complements existing and future MARTA bus and rail services

10/6/2014 Atlanta BeltLine // © 2014 Page 8 Study Group

Environmental Review Process Atlanta BeltLine West

10/6/2014 Atlanta BeltLine // © 2014 Page 9 Environmental Review Process What is it?

• National Environmental Policy Act (NEPA) of 1969 • All federal projects must consider impacts to the environment

Social Natural

Built

10/6/2014 Atlanta BeltLine // © 2014 Page 10 Environmental Review Process What are the steps?

Review Previous Planning Work

Routing Selection / MARTA Connectivity

Technical Studies and Detailed Evaluation

Complete Documentation

Finding of No Significant Impact (FONSI)

10/6/2014 Atlanta BeltLine // © 2014 Page 11 Environmental Review Process Which corridors are involved?

Atlanta BeltLine East -Alignment Options

Midtown/Crosstown Corridor -Alignment Options

Atlanta BeltLine West -Alignment Options

Atlanta Streetcar*

MARTA Red/Gold Line*

MARTA Blue/Green Line*

* Shown for Reference

10/6/2014 Atlanta BeltLine // © 2014 Page 12 Study Group

Screening Process Atlanta BeltLine West

10/6/2014 Atlanta BeltLine // © 2014 Page 13 Screening Process Preliminary Evaluation Criteria

• Five Guiding Principles . Project Readiness . Practicality / Ridership . Equity . Financial Options . Development Impact • Shaped from community input during previous transit planning efforts

10/6/2014 Atlanta BeltLine // © 2014 Page 14 Screening Process

ALT ALT ALT ALT ALT ALT ALT ALT ALT

ALT ALT ALT ALT ALT ALT

10/6/2014 Atlanta BeltLine // © 2014 Page 15 Study Group

Transit Routing Options Atlanta BeltLine West

10/6/2014 Atlanta BeltLine // © 2014 Page 16

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

DL Hollowell Pky

JE Lowery Lowery JE Blvd

JE Boone Blvd

MLK Jr. Drive

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue

Metropolitan

Pky

Dill Avenue Preference Exercise Transit Routing Options / MARTA Connectivity

• Four boards are for indicating your preferred routing, by Boone Infill MARTA station connection Station

• Two boards are for indicating Ashby Bankhead your preferred MARTA station Station MARTA Green Line Station connection, by focus area Connections • Please indicate your preferences with green dots (like most) and orange dots (like least) Oakland City MARTA Red/Gold Line West End Station Connections Station • Please label your dots with the route option number (GL1, NL3) Murphy • Explanatory comments should Infill Station be on sticky-notes

10/6/2014 Atlanta BeltLine // © 2014 Page 48 Contact Information

Jonathan Lewis, AICP Document confirmed transit Interim Assistant Director of Planning - routes and environmental Transportation resources City of Atlanta, Department of Planning [email protected]

Shaun Green, PE Senior Transit Engineer Continue to engage Atlanta BeltLine, Inc. communities and coordinate [email protected] with resource agencies

Nathan Soldat Community Engagement Advocate Atlanta BeltLine, Inc. Proceed with technical work [email protected] based on documented transit routes

10/6/2014 Atlanta BeltLine // © 2014 Page 49