Atlanta Beltline/Atlanta Streetcar West Transit Route Options and MARTA
Total Page:16
File Type:pdf, Size:1020Kb
Study Group Transit Routing Options and MARTA Connectivity Assessments Atlanta BeltLine West Westside Study Group: September 22, 2014 Southwest Study Group: September 25, 2014 10/6/2014 Atlanta BeltLine // © 2014 Page 1 Study Group • Project Team Introductions • Today’s Agenda: . Schedule . Project Background . Environmental Review Process . Screening Process . Preference Exercise • Adjourn 10/6/2014 Atlanta BeltLine // © 2014 Page 2 Community Engagement Schedule Summer and Fall 2014 Study Group Study Group SAC Kickoff Citywide SAC/TAC Citywide Meetings Meetings Meeting Conversation Meetings Conversation Round #1 Round #2 Sept 22 & 25, Oct 6 & 9, Sept 9, 2014 Sept 15, 2014 Oct 14, 2014 2014 2014 Oct 30, 2014 Stakeholder Advisory Committee (SAC): Advisory committee for Study Groups: Residents and business owners with an each project corridor representing business and property interest in the project within each geographical area. owners, adjacent neighborhoods, and community groups. Citywide Conversations: Citywide public meetings are Technical Advisory Committee (TAC): Advisory committee forums to educate the public at large with upcoming plans, comprised of representatives with technical and/or policies, and studies. environmental expertise. 10/6/2014 Atlanta BeltLine // © 2014 Page 3 Milestone Schedule Transit Routing Technical Studies Complete Draft Public/Agency Finding of No Project Options/MARTA and Evaluation Environmental Review and Significant Development Connectivity Assessment (EA) Public Hearing Impact (FONSI) (PD) Entry Assessments Request June 2014 to September 2014 November 2014 to March 2015 March 2015 April 2015 May 2015 Summer 2015 10/6/2014 Atlanta BeltLine // © 2014 Page 4 Study Group Project Background Atlanta BeltLine West 10/6/2014 Atlanta BeltLine // © 2014 Page 5 Project Background Transit Plans/Studies/Initiatives Connect Atlanta Plan November 2008 Draft Atlanta BeltLine/Atlanta Streetcar System Plan (SSP) March 2014 Atlanta Streetcar Finding of No Record of Decision (ROD) for Tier 1 Significant Impact (FONSI) EIS April 2011 August 2012 10/6/2014 Atlanta BeltLine // © 2014 Page 6 Project Background Atlanta BeltLine/Atlanta Streetcar System Plan A Supplement to the Connect Atlanta Plan and the ABI Strategic Implementation Plan (SIP) Phasing of transit in SIP based on this strategy Includes all streetcar lines in the Connect Atlanta Plan including Atlanta BeltLine Project evaluation based on Equity, Readiness, Value Capture, Finance, Ridership Significant stakeholder and public input garnered to date Integrates Atlanta Streetcar lines and Atlanta BeltLine into a unified system 10/6/2014 Atlanta BeltLine // © 2014 Page 7 Project Background Atlanta BeltLine/Atlanta Streetcar System Plan Streetcar is the transit technology for the Atlanta BeltLine corridor Comprehensive system network Complements existing and future MARTA bus and rail services 10/6/2014 Atlanta BeltLine // © 2014 Page 8 Study Group Environmental Review Process Atlanta BeltLine West 10/6/2014 Atlanta BeltLine // © 2014 Page 9 Environmental Review Process What is it? • National Environmental Policy Act (NEPA) of 1969 • All federal projects must consider impacts to the environment Social Natural Built 10/6/2014 Atlanta BeltLine // © 2014 Page 10 Environmental Review Process What are the steps? Review Previous Planning Work Routing Selection / MARTA Connectivity Technical Studies and Detailed Evaluation Complete Documentation Finding of No Significant Impact (FONSI) 10/6/2014 Atlanta BeltLine // © 2014 Page 11 Environmental Review Process Which corridors are involved? Atlanta BeltLine East -Alignment Options Midtown/Crosstown Corridor -Alignment Options Atlanta BeltLine West -Alignment Options Atlanta Streetcar* MARTA Red/Gold Line* MARTA Blue/Green Line* * Shown for Reference 10/6/2014 Atlanta BeltLine // © 2014 Page 12 Study Group Screening Process Atlanta BeltLine West 10/6/2014 Atlanta BeltLine // © 2014 Page 13 Screening Process Preliminary Evaluation Criteria • Five Guiding Principles . Project Readiness . Practicality / Ridership . Equity . Financial Options . Development Impact • Shaped from community input during previous transit planning efforts 10/6/2014 Atlanta BeltLine // © 2014 Page 14 Screening Process ALT ALT ALT ALT ALT ALT ALT ALT ALT ALT ALT ALT ALT ALT ALT 10/6/2014 Atlanta BeltLine // © 2014 Page 15 Study Group Transit Routing Options Atlanta BeltLine West 10/6/2014 Atlanta BeltLine // © 2014 Page 16 DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive DL Hollowell Pky JE Lowery Blvd JE Lowery JE Boone Blvd MLK Jr. Drive Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Metropolitan Pky Dill Avenue Dill Preference Exercise Transit Routing Options / MARTA Connectivity • Four boards are for indicating your preferred routing, by Boone Infill MARTA station connection Station • Two boards are for indicating Ashby Bankhead your preferred MARTA station Station MARTA Green Line Station connection, by focus area Connections • Please indicate your preferences with green dots (like most) and orange dots (like least) Oakland City MARTA Red/Gold Line West End Station Connections Station • Please label your dots with the route option number (GL1, NL3) Murphy • Explanatory comments should Infill Station be on sticky-notes 10/6/2014 Atlanta BeltLine // © 2014 Page 48 Contact Information Jonathan Lewis, AICP Document confirmed transit Interim Assistant Director of Planning - routes and environmental Transportation resources City of Atlanta, Department of Planning [email protected] Shaun Green, PE Senior Transit Engineer Continue to engage Atlanta BeltLine, Inc. communities and coordinate [email protected] with resource agencies Nathan Soldat Community Engagement Advocate Atlanta BeltLine, Inc. Proceed with technical work [email protected] based on documented transit routes 10/6/2014 Atlanta BeltLine // © 2014 Page 49 .