@atlantabeltline PROGRAM ELEMENTS

Vision: To be the catalyst for making a global beacon for equitable, inclusive, and sustainable city life. Northeast Trail

Tonight’s Band

https://en.wikipedia.org/wiki/Dr._Teeth_and_The_Electric_Mayhem#/media/File:The_Electric_Mayhem.jpg We are here… Northeast Trail: Project Overview

Limits: • Monroe Drive to MARTA Lindbergh

Tasks: • Alternatives Analysis • Concept Validation • Locally Preferred Alt • Engineering and Design Still Here! • Construction Documents Northeast Trail: GPC Hairpin Line

Limits: • to

Tasks: • Pole Work Complete • Line Work Complete • Grading, Storm Water, Walls, Paving, and Grassing forthcoming • Access Point at Montgomery Ferry Road Northeast Trail: ABI Follow-On

Limits: • Mayson Street to Westminster Drive

Tasks: • Lighting • Landscaping • Connections – Westminster Dr – Piedmont Ave – Mayson St

Results: • Full BeltLine Trail Implementation Northeast Trail – Tonight’s Focal Area

Future System Interactions… • Northeast Trail • Northeast Transit • Northside Trail • Northside Transit • MARTA Armour Station • LRT

These are all “defined by placeholders.” Northeast Trail

Systems Interactions… • Northeast Trail cannot preclude any viable alternatives along any potential Northside BeltLine Corridor Northeast Trail

Connect with Existing System • MARTA Red/Gold Lines • PATH400 • • Confluence Trail

Consider Future Network Connections Northeast Trail

Physical Constraints… • I-85/Buford Hwy • MARTA Red/Gold Line • MARTA • Norfolk Southern Rail • CSX Rail • • Brookwood Hills Conservation Easement • Armour Drive – Under Buford Hwy – Under MARTA/NSR Northeast Trail

How Did We Move This Forward? 1. Identified Alternatives 2. Developed Performance Measures 3. Analyzed Alternatives 4. Considered Existing Systems Impacts 5. Considered Possible Future Infrastructure 6. Simplified… Northeast Trail

Alternatives… 1. Segment Identification 2. Chained Segments 3. How Can We Simplify? 4. Transit Governs 5. If…Then… 6. Simplified. Northeast Trail

Alternatives… 1. Segment Identification 2. Chained Segments 3. How Can We Simplify? 4. Transit Governs 5. If…Then… 6. Simplified. Northeast Trail

Decision Point 1. Wye Bridges over Buford Highway 2. If Transit on one, then Trail on the other Northeast Trail

Decision Point 1. Wye Bridges over Buford Highway 2. If Transit on one, then Trail on the other Northeast Trail

Results:

Universe

42 Alternatives

5 Alternatives 3 on south Wye 2 on north Wye Alt 1 Alt 2 Alt 3 Alt 4 Alt 5 Northeast Trail

Open House… • Ask Questions and Provide Feedback on the Alignments Carried Forward Thank you!