AR-411 Region's Plan RTP (2020) PROJECT FACT SHEET

Short Title CLIFTON CORRIDOR LIGHT RAIL TRANSIT - PHASE 1 FROM LINDBERGH MARTA STATION TO

GDOT Project No. N/A

Federal ID No. N/A

Status Long Range

Service Type Transit / Rail Capital

Sponsor MARTA

Jurisdiction Regional - Central

Analysis Level In the Region's Air Quality Conformity Analysis

Existing Thru Lane N/A LCI Network Year 2040 Planned Thru Lane N/A Flex Corridor Length 6 miles Detailed Description and Justification

This project will construct light rail service along the Clifton Corridor from the Lindbergh MARTA station to the Emory University/CDC campus along existing rail corridors. This includes provisions for both heavy rail and light rail service to meet the complex travel patterns and needs within the service corridor as identified within the Clifton Corridor Transit Initiative - Alternatives Analysis (AA). The project includes construction of 6, possibly 7, light rail stations and 4.24 miles of bi-directional trackage and auxiliary infrastructure, as well as the provision of feeder and circulator bus service. This provides high capacity transit mobility options for residents and commuters traveling between Lindbergh Center, the Emory University Main Campus and Clairmont Campus and the Centers for Disease Control Roybal Campus. Further, the project will provide long distance travelers approaching the Clifton Corridor from points along the Gold line or Red line with rail service into the Emory/CDC complex, which serves the travel demand patterns as revealed by extensive ridership analysis. This project is currently under Environmental Review.

Phase Status & Funding Status FISCAL TOTAL PHASE BREAKDOWN OF TOTAL PHASE COST BY FUNDING SOURCE Information YEAR COST FEDERAL STATE BONDS LOCAL/PRIVATE PE 5307 Discretionary AUTH 2006 $7,294,589 $2,999,539 $0,000 $0,000 $4,295,050

PE STP - Urban (>200K) (ARC) AUTH 2012 $4,000,000 $1,266,666 $0,000 $0,000 $2,733,334

ALL New Starts LR 2031- $1,750,000,000 $612,500,000 $0,000 $0,000 $1,137,500,000 2040 $1,761,294,589 $616,766,205 $0,000 $0,000 $1,144,528,384

SCP: Scoping PE: Preliminary engineering / engineering / design / planning PE-OV: GDOT oversight services for engineering ROW: Right-of-way Acquistion UTL: Utility relocation CST: Construction / Implementation ALL: Total estimated cost, inclusive of all phases