Atlanta Region's Plan RTP (2020) PROJECT FACT SHEET AR-411

Atlanta Region's Plan RTP (2020) PROJECT FACT SHEET AR-411

AR-411 Atlanta Region's Plan RTP (2020) PROJECT FACT SHEET Short Title CLIFTON CORRIDOR LIGHT RAIL TRANSIT - PHASE 1 FROM LINDBERGH MARTA STATION TO EMORY UNIVERSITY GDOT Project No. N/A Federal ID No. N/A Status Long Range Service Type Transit / Rail Capital Sponsor MARTA Jurisdiction Regional - Central Analysis Level In the Region's Air Quality Conformity Analysis Existing Thru Lane N/A LCI Network Year 2040 Planned Thru Lane N/A Flex Corridor Length 6 miles Detailed Description and Justification This project will construct light rail service along the Clifton Corridor from the Lindbergh MARTA station to the Emory University/CDC campus along existing rail corridors. This includes provisions for both heavy rail and light rail service to meet the complex travel patterns and needs within the service corridor as identified within the Clifton Corridor Transit Initiative - Alternatives Analysis (AA). The project includes construction of 6, possibly 7, light rail stations and 4.24 miles of bi-directional trackage and auxiliary infrastructure, as well as the provision of feeder and circulator bus service. This provides high capacity transit mobility options for residents and commuters traveling between Lindbergh Center, the Emory University Main Campus and Clairmont Campus and the Centers for Disease Control Roybal Campus. Further, the project will provide long distance travelers approaching the Clifton Corridor from points along the Gold line or Red line with rail service into the Emory/CDC complex, which serves the travel demand patterns as revealed by extensive ridership analysis. This project is currently under Environmental Review. Phase Status & Funding Status FISCAL TOTAL PHASE BREAKDOWN OF TOTAL PHASE COST BY FUNDING SOURCE Information YEAR COST FEDERAL STATE BONDS LOCAL/PRIVATE PE 5307 Discretionary AUTH 2006 $7,294,589 $2,999,539 $0,000 $0,000 $4,295,050 PE STP - Urban (>200K) (ARC) AUTH 2012 $4,000,000 $1,266,666 $0,000 $0,000 $2,733,334 ALL New Starts LR 2031- $1,750,000,000 $612,500,000 $0,000 $0,000 $1,137,500,000 2040 $1,761,294,589 $616,766,205 $0,000 $0,000 $1,144,528,384 SCP: Scoping PE: Preliminary engineering / engineering / design / planning PE-OV: GDOT oversight services for engineering ROW: Right-of-way Acquistion UTL: Utility relocation CST: Construction / Implementation ALL: Total estimated cost, inclusive of all phases ? For additional information about this project, please call (404) 463-3100 or email [email protected]. Report Generated: 8/25/2021.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us