CH-RF-ENG-Erosion Control at the Dzhubga-Sochi Road-Sept18
Total Page:16
File Type:pdf, Size:1020Kb
CASE HISTORY Rev 03, Sept 07, 2018 EROSION CONTROL AT THE DZHUBGA-SOCHI ROAD BORDER WITH ABKHAZIA AT THE SECTION OF 4+500 – 18+007 KM EROSION CONTROL Production: Geomat MacMat R1 6822 GN green Description of the site XXII Olympic Winter Games were held in Russia in the city of Sochi from February 7 to February 23, 2014. By the beginning of the event, a large number of sports and infrastructure facilities were built, which continue to function successfully after the Olympic Games. The mild climate of the coast of the Krasnodar Territory and the developed infrastructure attract a large number of tourists throughout the year. The A-147 Dzhubga-Sochi highway is one of the main highway of present-day Sochi, is a part of the European route E97, and is a kind of landmark of the region. The length of the road is 183 km, and it runs along the coastline of the Black Sea along a mountainous territory. The complex geology of the area causes a special approach to the arrangement of transport infrastructure facilities. Condition of the slope before protective measures Problem With the arrangement of the A-147 Dzhubga-Sochi road, a need arose for the greening of steep slopes of the road, which were subjected to soil erosion processes. Initially, a 3D geogrid was installed on the slopes along the automobile road. This material did not live up to its purpose, since most of it collapsed and sagged under the influence of soil erosion and other external factors. The poorly reinforced slope lost its aesthetic appearance, the vegetation could not grow on it. Solution The customer was faced with the task of choosing a technical solution capable of providing a stable herbaceous soil- covering on this site within the shortest possible time. The variable slope from 1: 1 to 1: 1.5 was the peculiarity of the Dismantling the 3D geogrid site. In addition, the site itself is a slope of semi-rocky soils. © COPYRIGHT Customer: DSD CHERNOMORYE OJSC Designer: CENTRPROJECT LLC MACCAFERRI General Contractor: NPO GEOSTROY LLC Products used: © Any 2018 copying materials of is prohibited.All rights are reserved MACMAT R1 6822 GN GREEN - 6 564 M2 Construction period: JANUARY 11- MARCH 15, 2016 Start of construction works The Maccaferri company, together with the contractor, developed a solution that allows to retain a nutrient-rich layer of soil on the slope within a minimum time by laying the MacMatTM R. Due to the highly elastic layer of high porosity, MacMatTM R fixes soil particles and promotes growth of vegetation through it, which provides the reinforced slope with its natural appearance. Taking into account the steepness of the slope, it was suggested to use a geomat, reinforced with a double twist wire mesh with an additional zinc coating - MacMatTM R 6822 GN. The green color of the geomat made it possible to provide the slope with an attractive appearance even in the Geomat MacMatTM R mounting process process of construction. Completion of construction works Slope, reinforced with Geomat MacMatTM R © COPYRIGHT MACCAFERRI Rapid natural greening of the slope due to the installation of Geomat MacMatTM R 6822 GN © Any 2018 copying materials of is prohibited.All rights are reserved MACCAFERRI GABIONS CIS 115088, Moscow, Sharikopodshipnikovskaya, 13, building 1 tel.: +7(495) 108-58-84 E-mail: [email protected] www.maccaferri.ru .