Task Force on Kai Tak Harbourfront Development Kai Tak Development

Total Page:16

File Type:pdf, Size:1020Kb

Task Force on Kai Tak Harbourfront Development Kai Tak Development Task Force on Kai Tak Harbourfront Development For information TFKT/05/2012 on 27 November 2012 Kai Tak Development Progress Report as of November 2012 PURPOSE This paper provides an overview of the latest progress of Kai Tak Development (KTD). BACKGROUND 2. The KTD is a huge and highly complex development project spanning a total planning area of over 320 hectares and covering the ex-airport site together with the adjoining hinterland districts of Kowloon City, Wong Tai Sin and Kwun Tong. It is our vision to develop the KTD into “a distinguished, vibrant, attractive and people-oriented community by the Victoria Harbour”. CURRENT SITUATION 3. The updated programme chart is at Annex A. The following are highlights of the latest progress - Projects Planned for Completion in 2013 4. Construction of all key projects to be completed in 2013 is progressing well. They include the cruise terminal building cum the first berth at the former runway, the early phase of district cooling system, the public rental housing development and the advance supporting infrastructure works. A location plan of all these projects is at Annex B. Urban Design Enhancement Proposal Page 1 Task Force on Kai Tak Harbourfront Development For information TFKT/05/2012 on 27 November 2012 5. Kai Tak Outline Zoning Plan (OZP) No. S/K22/4, which includes the relocation of roads away from the waterfront and the provision of a 30-metre-wide Preservation Corridor for preservation of the remnants of Lung Tsun Stone Bridge, was approved in September 2012. Environmentally Friendly Linkage System (EFLS) 6. We conducted the first stage of a two-stage public engagement (PE) exercise on the EFLS and consulted the Task Force, Districts Councils, Panel on Development, professional bodies, operators and various stakeholders to solicit views on the implementation of EFLS. The second stage PE is scheduled to commence in early 2013 with a view to building a consensus reflecting the majority of public views on the way forward for EFLS. Trade and Industry Tower (TI Tower) (previously known as the Kai Tak Government Offices) 7. TI Tower will provide Government services to both the existing population in the hinterland areas, such as San Po Kong and Kowloon City, and the new population in KTD at an early stage. The construction commenced on 16 January 2012 for substantial completion in 2014. Kwun Tong Waterfront Promenade 8. Stage 1 of the project, providing a 200-metre-long promenade, was opened for public enjoyment in January 2010. Stage 2 of the project will involve the footprint of the Kwun Tong Public Cargo Working Area, which was closed down in August 2011. The project design has been completed and the construction is scheduled to commence in early 2013 with a view to completing the project in end 2014. Civil Engineering and Development Department November 2012 Page 2 Task Force on Kai Tak Harbourfront Development Annex A Kai Tak Development - Programme Chart (as of November 2012) Major Items 2009 20102011 2012 2013 2014 2015 2016 2017 20182019 2020 2021 Planning Kai Tak Outline Zoning Plan amendment to incorporate urban design refinements including consultations 1 Lung Tsun Stone Bridge and realignment of roads at waterfront on proposals consultations 2 Study on Environmentally Friendly Linkage System on proposals Infrastructure 3 District Cooling System Phase I 4 Interception facilities at Jordan Valley Box Culvert 5 Bio-remediation of Kai Tak Approach Channel and Kwun Tong Typhoon Shelter 6 Central Kowloon Route 7 Reconstruction and Upgrading of Kai Tak Nullah (within Kai Tak Development) 8 Shatin-to-Central Link (Tai Wai to Hung Hom section) 9 Opening at runway to enhance water circulation at Kai Tak Approach Channel Building / Open Space 10 Public Rental Housing Development 11 Sub-divisional fire station with ambulance facility at Cheung Yip Street 12 Runway Park Phase 1 commissioning of Cruise Terminal building and first berth 13 Cruise Terminal 14 Trade and Industry Tower (previously known as Kai Tak Government Offices) 15 Kwun Tong Promenade stage 1 stage 2 16 Centre of Excellence in Paediatrics Note: Programmes indicated are tentative and subject to approval, funding and further planning. Legend Waterfront Projects Planning Activities Design and Tender Construction / E&M Task Force on Kai Tak Harbourfront Development Annex B Projects Planned for Completion in 2013 (Item Nos. 3, 4, 9, 10, 12 & 14 of Programme Chart) Page 5 .
Recommended publications
  • Rail Construction Commences
    Kowloon City Section Newsletter June 2012 Rail construction commences The Shatin to Central Link (SCL) project was first gazetted under the "Railways Ordinance" on 26 November 2010, followed with the first and second amendment schemes gazetted on 15 July and 11 November 2011 respectively. The Legislative Council’s Finance Committee approved funding for the SCL project in May 2012. Following the funding approval, the construction of the project commences. The Tai Wai to Hung Hom Section is expected to be completed in 2018 followed by the Hung Hom to Admiralty Section in 2020. Benefits Upon its completion, the SCL will provide a fast, reliable and convenient rail service to Kai Tak, To Kwa Wan, Ma Tau Wai and Ho Man Tin areas, which are not yet served by the network. Passengers from the Kowloon City district will be able to travel directly to destinations in New Territories East and West through the "East West Corridor" formed by the Ma On Shan Line, the Tai Wai to Hung Hom Section and the West Rail Line; while the Hung Hom to Admiralty Section will further link up the existing railway network. The Tai Wai new service will give passengers more options to Che Kung Temple reach their destinations and with more convenient interchanges, making it easier to travel around Hong Hin Kong Island, Kowloon and the New Territories. Keng Diamond Alignment 圭⨑戍 Hill Lai Chi Kok Kowloon Tong Wong Tai Sin ⶾᛚ The Kowloon City Section of the SCL will have four stations - Kai Tak, Lok Fu Cheung Sha Wan 䏹䒔ល To Kwa Wan, Ma Tau Wai and Ho Man Tin Stations.
    [Show full text]
  • South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review
    THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION PLANNING DEPARTMENT Agreement No. CE4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review Technical Report No.4H Preliminary Sustainability Assessment (February 2007) CITY PLANNING – MAUNSELL JOINT VENTURE in association with Atkins China Ltd. Edaw Urban Design Ltd. ADI Ltd. Agreement No: CE 4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review (Feasibility Study) Preliminary Sustainability Assessment Table of Contents Abbreviation and Acronyms 1. INTRODUCTION 1-1 1.1 Purpose 1-1 1.2 Report Structure 1-1 2. REVISED PRELIMINARY OUTLINE DEVELOPMENT PLAN 2-1 2.1 Study Area and Major Proposals 2-1 2.2 Land Use Budget and Key Development Parameters 2-2 3. ASSESSMENT APPROACH 3-1 3.1 Sustainability Development 3-1 3.2 Purpose of Sustainability Assessment 3-1 3.3 Approach of the Present PSA 3-1 4. PRELIMINARY SUSTAINABILITY ASSESSMENT 4-1 4.1 Economy 4-1 4.2 Natural Resources 4-4 4.3 Society and Social Infrastructure 4-7 4.4 Leisure and Cultural Vibrancy 4-8 4.5 Environmental Quality 4-9 4.6 Mobility 4-11 4.7 Other Major Considerations: Non-quantifiable Indicators 4-11 4.8 Other Major Considerations: Non-quantifiable Issues 4-17 5. SUMMARY AND CONCLUSION 5-1 5.1 Summary 5-1 5.2 Conclusion 5-5 List of Tables Table 2.2.1 Land Use Budget for the Study Area Table 2.2.2 Key Development Parameters Table 3.3.1 CASET Indicators Not Relevant to the Present Study Table 3.3.2
    [Show full text]
  • Hong Kong Government's Policy Address 2020
    Hong Kong Government’s Policy Address 2020 Key Takeaways primarily relevant to the Real Estate and Infrastructure sector November 25, 2020 Summary Authors/Presenters This year’s Policy Address was delivered today (25th November 2020) amidst the backdrop of a changing and dynamic environment. The Chief Executive (“CE”) has set out a variety of key initiatives to address the city’s land Andrew MacGeoch and housing supply, infrastructure, the environment, Co-Author collaboration with the Greater Bay Area (“GBA”), and HK’s Partner and Regional Practice Group Leader - Real Estate ongoing role as an international financial center. We set Asia out a list of key takeaways below highlighting primarily Hong Kong [email protected] those aspects involving real estate and infrastructure. OPENING This year’s Policy Address was delivered today (25th November 2020) amidst the backdrop of a changing and dynamic environment. The Chief Executive (“CE”) has set out a variety of key initiatives to address the city’s land and housing supply, infrastructure, the environment, collaboration with the Greater Bay Area (“GBA”), and HK’s ongoing role as an international financial center. We set Page 1 of 11 out a list of key takeaways below highlighting primarily those aspects involving real estate and infrastructure. LAND SUPPLY Increasing land supply is a top priority of the Government. Glenn Haley At present, the Government has identified new land supply Co-Author with a total area of 90 hectares along the Northern Link, Partner Hong Kong including the San Tin / Lok Ma Chau Development Node. [email protected] Further initiatives to support the increase of land supply include: Development of Siu Ho Wan Depot Site.
    [Show full text]
  • LC Paper No. PWSC81/20-21(01) - 2
    LC Paper No. PWSC81/20-21(01) - 2 - Encl. c.c.(w/e) Antiquities and Monuments Office (Attn: Ms. Susanna SIU) Architectural Services Department (Attn: Ms. Jackie LEE) Leisure and Cultural Services Department (Attn: Mr. Horman CHAN) Civil Engineering and Development Department (Attn: Mr. Ricky CHAN) Enclosure Legislative Council Public Works Subcommittee PWP Item 470RO – Lung Tsun Stone Bridge Preservation Corridor at Kai Tak Follow-up Actions arising from the Meeting held on 27 January 2021 The Public Works Subcommittee discussed the LegCo Paper No. PWSC(2020-21)31. In response to the request from the Chairman and Hon Junius HO Kwan-yiu, the Administration hereby provide the following supplementary information to elaborate the heritage and historic value of remnants of Lung Tsun Stone Bridge (LTSB), and how the proposed item of LTSB preservation corridor can effectively preserve and interprete its heritage and historical values. The relevant supplementary information is as follows: History of LTSB 2. Built between 1873 and 1875, Lung Tsun Stone Bridge (LTSB) was was originally about 210 meters in length and 2.6 to 4 meters in width (Photo 1). In 1892, a wooden extension of 80 metres was added by the local charity organisation Lok Sin Tong (樂善堂) after fund raising (Photo 2). In 1910, the timber extension of LTSB was replaced by a concrete structure, which was later modified to become the Kowloon City Pier. Part of LTSB was buried by the Kai Tack Bund reclamation carried out by the Government between 1916 and 1924 at the west shore of Kowloon Bay for property development.
    [Show full text]
  • Tfkt-04-2017
    Task Force on Kai Tak Harbourfront Development Kai Tak Development Progress Report as of February 2017 (Paper No. TFKT/04/2017) Planning Vision/ Themes/ Initiatives Planning Vision A distinguished, vibrant, attractive and people-oriented community by the Victoria Harbour Planning Themes/ Initiatives Heritage, green, sports and tourism hub of Hong Kong Green web for sustainable development Quality living environment Help regenerate adjacent old districts under Energizing Kowloon East initiatives 2 Kai Tak Outline Zoning Plan San Po Kong Basic information: Site Area : ~ 320 ha Kowloon City Open Space : ~ 100 ha Waterfront : ~ 11 km Infrastructure works Kowloon Bay Total cost : more than HK$100B Gross Floor Area - Non-domestic : ~ 2.3M sqm - Domestic : ~ 2.2M sqm Kwun Tong Legend : Kai Tak Land Use Zoning Kwun Tong Typhoon Shelter Commercial Comprehensive Development Area Residential (Group A) Residential (Group B) Residential (Group C) Government, Institution or Community Open Space Other Specified Uses Other Specified Uses (Amenity Area) 3 Major Supporting Infrastructure and Related Works Project Stage 3B Infrastructure Works at North Apron 新蒲崗 CEDD (2020) Reconstruction and San Po Kong Upgrading of Kai Tak Nullah CEDD (2018) Stage 3A Infrastructure Works at North Apron 九龍城 CEDD (2017) Stage 5A InfrastructureKowloon Works City at North Apron CEDD (2020) Stage 1 & 2 Infrastructure Works at North Apron CEDD (2013 & 2015) Shatin to Central Link HyD (2019) 啟德發展區 Kai Tak Development 九龍灣 Stage 4 Infrastructure Kowloon Bay Works at North
    [Show full text]
  • TFKT/01/2021 on 14 April 2021
    Task Force on Kai Tak Harbourfront Development For discussion TFKT/01/2021 on 14 April 2021 Progress Update on Kai Tak Sports Park and Adjoining Public Open Space PURPOSE This paper provides update to Members on the latest progress and detailed design of the Kai Tak Sports Park (the Sports Park) and the adjoining Public Open Space (POS), and our responses to Members’ suggestions and comments raised at the meeting on 15 January 2019. BACKGROUND 2. We have provided regular updates to the Task Force on Kai Tak Harbourfront Development (the Task Force) since the early planning stage of the Sports Park project. We last briefed the Task Force on 15 January 2019 after the award of the Sports Park contract in end-December 2018. The latest design development and detailed design of the Sports Park are set out in the ensuing paragraph(s). Our responses to the comments and suggestions raised by Members at the last meeting (extract of the minutes of meeting at Annex A) are highlighted in the bracket after each item for easy reference – (a) Design (i) coherent design of the pedestrian walkways and POS (para. 8). (b) Water-land interface (i) design elements to promote or activate the waterbody nearby (paras. 12 to 16); Task Force on Kai Tak Harbourfront Development TFKT/01/2021 (c) Vibrancy (i) provision for pre-event and post-event food and beverage concessions and ad-hoc retail (paras. 12 to 16); (d) Accessibility (i) 24-hour pedestrian access for pedestrians to go to harbourfront promenade from the hinterland freely (para.
    [Show full text]
  • Ten Principles for a Sustainable Approach to New Development Towards Sustainable and Integrated Large-Scale Developments for a More Livable Hong Kong
    Ten Principles for a Sustainable Approach to New Development Towards Sustainable and Integrated Large-Scale Developments for a More Livable Hong Kong North Asia Ten Principles for a Sustainable Approach to New Development Towards Sustainable and Integrated Large-Scale Developments for a More Livable Hong Kong North Asia About ULI About ULI Asia Pacific and Japan (ULI APJ) The Urban Land Institute is a 501(c) (3) nonprofit research Across Asia Pacific and Japan, the Institute has nearly 1,000 and education organization supported by its members. members, with a particularly strong presence in Japan, Founded in 1936, the Institute now has nearly 30,000 mem- Greater China, Southeast Asia, and Australia. The regional bers worldwide representing the entire spectrum of land use office is headquartered in Hong Kong, with satellite offices and real estate development disciplines, working in private in Tokyo and Singapore. ULI APJ brings together industry enterprise and public service. As the preeminent, multidisci- leaders with a common commitment to improving profes- plinary real estate forum, ULI facilitates the open exchange of sional standards, seeking the best use of land, and follow- ideas, information, and experience among local, national, and ing excellent practices. By engaging experts from various international industry leaders and policy makers dedicated to disciplines, the Institute can arrive at responsible answers to creating better places. problems that would be difficult to achieve independently. ULI APJ shares its knowledge through various discussion forums, The mission of the Urban Land Institute is to provide leader- research, publications, and electronic media. ULI’s activities ship in the responsible use of land and in creating and sus- in the region are aimed at providing information that is practi- taining thriving communities worldwide.
    [Show full text]
  • Designing Victoria Harbour: Integrating, Improving, and Facilitating Marine Activities
    Designing Victoria Harbour: Integrating, Improving, and Facilitating Marine Activities By: Brian Berard, Jarrad Fallon, Santiago Lora, Alexander Muir, Eric Rosendahl, Lucas Scotta, Alexander Wong, Becky Yang CXP-1006 Designing Victoria Harbour: Integrating, Improving, and Facilitating Marine Activities An Interactive Qualifying Project Report Submitted to the Faculty of WORCESTER POLYTECHNIC INSTITUTE in partial fulfilment of the requirements for the Degree of Bachelor of Science In cooperation with Designing Hong Kong, Ltd., Hong Kong Submitted on March 5, 2010 Sponsoring Agencies: Designing Hong Kong, Ltd. Harbour Business Forum On-Site Liaison: Paul Zimmerman, Convener of Designing Hong Kong Harbour District Submitted by: Brian Berard Eric Rosendahl Jarrad Fallon Lucas Scotta Santiago Lora Alexander Wong Alexander Muir Becky Yang Submitted to: Project Advisor: Creighton Peet, WPI Professor Project Co-advisor: Andrew Klein, WPI Assistant Professor Project Co-advisor: Kent Rissmiller, WPI Professor Abstract Victoria Harbour is one of Hong Kong‟s greatest assets; however, the balance between recreational and commercial uses of the harbour favours commercial uses. Our report, prepared for Designing Hong Kong Ltd., examines this imbalance from the marine perspective. We audited the 50km of waterfront twice and conducted interviews with major stakeholders to assess necessary improvements to land/water interfaces and to provide recommendations on improvements to the land/water interfaces with the goal of making Victoria Harbour a truly “living” harbour. ii Acknowledgements Our team would like to thank the many people that helped us over the course of this project. First, we would like to thank our sponsor, Paul Zimmerman, for his help and dedication throughout our project and for providing all of the resources and contacts that we required.
    [Show full text]
  • Kai Tak Development Project Profile Civil Engineering and Development Department
    Kai Tak Development Project Profile Civil Engineering and Development Department Kai Tak Development Project Profile July 2006 Civil Engineering and Development Department i July 2006 Kai Tak Development Project Profile Civil Engineering and Development Department TABLE OF CONTENTS Pages 1. BASIC INFORMATION..............................................................................................1 1.1 Project Title.........................................................................................................1 1.2 Purpose and Nature of the Project ......................................................................1 1.3 Name of Project Proponent.................................................................................1 1.4 Location and Scale of Project and History of Site..............................................2 1.5 Number and Types of Designated Projects to be Covered by the Project Profile .............................................................................................................................4 1.6 Name and Telephone Number of Contact Person...............................................4 2. OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAMME............5 2.1 Project Implementation Time Table ...................................................................5 2.2 Interactions with Other Projects..........................................................................5 3. MAJOR ELEMENTS OF THE SURROUNDING ENVIRONMENT....................6 4. POSSIBLE IMPACT ON THE ENVIRONMENT....................................................7
    [Show full text]
  • For Discussion on 27 June 2006 LEGISLATIVE COUNCIL PANEL on PLANNING, LANDS and WORKS Kai Tak Planning Review Stage 3 Public Pa
    CB(1)1834/05-06(04) For discussion on 27 June 2006 LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS Kai Tak Planning Review Stage 3 Public Participation – Preliminary Outline Development Plan Purpose This paper seeks Members’ comments on the draft Preliminary Outline Development Plan (PODP) for Kai Tak Development prepared under the Kai Tak Planning Review. Background 2. The Kai Tak Planning Review was commissioned in July 2004. Progress of the Planning Review and the results of the Stage 1 Public Participation: Community’s Vision for Kai Tak were submitted to this Panel in October 2004, February 2005 and June 2005 respectively. Under the Stage 2 Public Participation, three Outline Concept Plans (OCPs), with emphasis on residential, commercial and sports themes, were presented to this Panel on 20 December 2005. A special meeting of the Panel was also organized on 25 January 2006 to hear the representations from the concerned groups. The results of the Stage 2 Public Participation are summarized in Annex 1. Preliminary Outline Development Plan 3. After completion of the OCPs, the study has proceeded to the final stage of the Planning Review, i.e. the preparation of the PODP. The study team has, as far as possible, taken into account the comments and proposals received in the previous rounds of public participation programme in preparing the draft PODP for further discussion with the community. The Stage 3 Public Participation programme aims to facilitate early feedback from the community on the draft PODP before it is finalized. The proposals presented are subject to the findings of the on-going Preliminary - 2 - Technical Assessments.
    [Show full text]
  • The Urban Renewal Plan for Kowloon City 3
    People First 以人為先 District-based 地區為本 District-based Public Participatory 與民共議 Participatory Public �龍城市區更新地區諮詢平市區更新地區諮詢平台台 Kowloon City DURF Table of Contents Background 1. Introduction 1 2. Objectives 1 3. Overview of the Kowloon City District 2 4. Formulation of the Urban Renewal Plan for Kowloon City 3 Recommendations 5. Vision 13 6. Recommendations of the Urban Renewal Plan 13 Basic Framework 13 Urban Renewal Proposals 18 Shaping District Character “5 Streets” and “13 Streets” Area, To Kwa Wan 19 Nga Tsin Wai Road Area, Lung Tong 24 To Kwa Wan Central 37 Wuhu Street / Winslow Street / Gillies Avenue South Area, 42 Hung Hom Revitalising Heritage and Designation of Themed Walking Trail 52 Enhancing Waterfront and District Connectivity 64 Optimising Land Resources for Urban Renewal 75 7. Social Impact Mitigation Measures 78 8. Conclusion 82 Appendix I Composition and Terms of Reference of Kowloon City District Urban Renewal Forum Appendix II Summary of Kowloon City Urban Renewal Proposals Background 1. Introduction 1.1 The Government promulgated the “Urban Renewal Strategy” (URS) in February 2011 adopting the “People First, District-based and Public Participatory” approach in undertaking urban renewal, and embracing the new proposal of setting up District Urban Renewal Forum (DURF) in old urban districts to strengthen the urban renewal planning at district level. In June 2011, the first pilot DURF was established in Kowloon City. The DURF is chaired by a professional who is familiar with urban renewal issues and its members are drawn from different professions and local organizations, including District Council / Area Committee Members, representatives from local non-government organisations, and representatives of relevant government bureau / departments and the Urban Renewal Authority (URA).
    [Show full text]
  • The District Cooling System (Dcs) at the Kai Tak Development
    THE DISTRICT COOLING SYSTEM (DCS) AT THE KAI TAK DEVELOPMENT Mr LAM Kwok Yin Engineer Electrical and Mechanical Services Department CONTENTS The Kai Tak DCS Benefits of the DCS Current Status of District Cooling Services DCS Services Charges Conclusion THE KAI TAK DCS THE KAI TAK DCS First-of-its-kind district cooling system (DCS) in Hong Kong Total area of over 320 hectares that covers the ex- airport and nearby areas Total air-conditioned floor area 1.73 million m2 Air-conditioning demand of about 284 megawatt of refrigeration (MWr) THE KAI TAK DCS North Plant Seawater Pump Room & South Plant THE DCS PLANTS The South Plant located at The North Plant located at underground of former- Shing Kai Road runway of Kai Tak Airport BANK OF CHILLERS IN DCS PLANTS The installed 1.4MWr and The installed 17.5MWr 4.3MWr Chillers at the Chiller at the Basement Basement Floor of North Floor of South Plant Plant CHILLED WATER PIPING NETWORK 3-Pipe System of DCS Pipes Laying inside the Underground Chilled Water Underground Tunnel Piping in Open Trench DCS PIPES PROTECTION 65mm Factory-prefabricated polyurethane insulation with 65mm thick polyurethane and external jacket with high density polyethylene (HDPE) HDPE CONSUMER SUBSTATION At the primary chilled water side At the secondary chilled water of the heat exchanger, i.e. DCS side of the heat exchanger, i.e. side: consumer side: • Supply Temperature = 5℃ • Supply Temperature = 6℃ • Return Temperature = 13℃ • Return Temperature = 14℃ The Heat Exchangers in DCS Substation The Energy Meter in
    [Show full text]