CB(1)525/05-06(05) for Discussion on 20 December 2005
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Rail Construction Commences
Kowloon City Section Newsletter June 2012 Rail construction commences The Shatin to Central Link (SCL) project was first gazetted under the "Railways Ordinance" on 26 November 2010, followed with the first and second amendment schemes gazetted on 15 July and 11 November 2011 respectively. The Legislative Council’s Finance Committee approved funding for the SCL project in May 2012. Following the funding approval, the construction of the project commences. The Tai Wai to Hung Hom Section is expected to be completed in 2018 followed by the Hung Hom to Admiralty Section in 2020. Benefits Upon its completion, the SCL will provide a fast, reliable and convenient rail service to Kai Tak, To Kwa Wan, Ma Tau Wai and Ho Man Tin areas, which are not yet served by the network. Passengers from the Kowloon City district will be able to travel directly to destinations in New Territories East and West through the "East West Corridor" formed by the Ma On Shan Line, the Tai Wai to Hung Hom Section and the West Rail Line; while the Hung Hom to Admiralty Section will further link up the existing railway network. The Tai Wai new service will give passengers more options to Che Kung Temple reach their destinations and with more convenient interchanges, making it easier to travel around Hong Hin Kong Island, Kowloon and the New Territories. Keng Diamond Alignment 圭⨑戍 Hill Lai Chi Kok Kowloon Tong Wong Tai Sin ⶾᛚ The Kowloon City Section of the SCL will have four stations - Kai Tak, Lok Fu Cheung Sha Wan 䏹䒔ល To Kwa Wan, Ma Tau Wai and Ho Man Tin Stations. -
3 PROJECT DESCRIPTION 3.1 Scope of the Project 3.2 South Apron
3 PROJECT DESCRIPTION 3.1 Scope of the Project 3.1.1.1 Further to the recommendations of the Option Assessment and subsequent alignment developments detailed in Section 2 of this report, the preferred Trunk Road T2 is shown in Figure 3.1 and will comprise: • a dual two-lane trunk road of approximately 3.0km long with about 2.7km of the trunk road in form of tunnel; • ventilation and administration buildings and a traffic control and surveillance system; and • associated civil, electrical, mechanical, landscaping and environmental protection and mitigation works. 3.1.1.2 The works for the Trunk Road T2 project are grouped under the following major geographical headings: a) The South Apron Section – all works for the Trunk Road T2 Project located at the South Apron of the former Kai Tak Airport, including a ventilation building, a section of at-grade road, a section of depressed road, a section of cut and cover tunnel, a vertical launching shaft for the tunnel boring machines (TBM), a section of twin TBM tunnel and ancillary works. b) The Subsea Tunnel Section – all works for the Trunk Road T2 project in the sea between the South Apron and Cha Kwo Ling, including twin subsea TBM tunnels. c) The Cha Kwo Ling Section – all works for the Trunk Road T2 project located at the former Cha Kwo Ling Public Cargo Works Area (PCWA), including a section of cut and cover tunnel, a vertical receiving shaft for the TBMs, a section of twin TBM tunnels, a ventilation building and an administration building located inside the Lam Tin Interchange. -
1. the Meeting Was Resumed at 9:30 A.M. on 1.3.2017. 2. the Following
1. The meeting was resumed at 9:30 a.m. on 1.3.2017. 2. The following Members and the Secretary were present in the morning session of the resumed meeting: Permanent Secretary for Development Chairman (Planning and Lands) Mr Michael W.L. Wong Professor S.C. Wong Vice-Chairman Mr Lincoln L.H. Huang Mr Ivan C.S. Fu Mr Dominic K.K. Lam Mr Stephen H.B. Yau Dr F.C. Chan Mr Philip S.L. Kan Mr K.K. Cheung Mr Wilson Y.W. Fung Mr Alex T.H. Lai Dr Lawrence K.C. Li Ms Sandy H.Y. Wong Mr Franklin Yu Deputy Director of Environmental Protection Mr C.W. Tse Assistant Director of Lands/Regional 3 Mr Edwin W.K. Chan - 2 - Agenda Item 1 [Open Meeting] Consideration of Representations and Comments in respect of Draft Kennedy Town & Mount Davis Outline Zoning Plan No. S/H1/20 (TPB Paper No. 10244) [The item was conducted in Cantonese and English.] 3. The Chairman said that it was the fifth and last day of the hearing of the representations and comments in respect of the draft Kennedy Town & Mount Davis Outline Zoning Plan (OZP) No. S/H1/20 (the draft OZP). 4. The Secretary said that Members’ declaration of interests was recorded in the minutes of 7.2.201 and 15.2.2017. In addition, Dr Lawrence K.C. Li declared interest on the item as R4113 was submitted by the Democratic Alliance for the Betterment and Progress of Hong Kong (DAB) and his relative was a DAB member. -
2011 Annual River Water Quality Reports
Environmental Protection Department The Government of the Hong Kong Special Administrative Region Mission To conduct an effective and scientifically sound water monitoring programme that helps achieve and maintain the Water Quality Objectives and protect the health of Hong Kong’s rivers and streams. Disclaimer Whilst the Government of the Hong Kong Special Administrative Region ("the Government") endeavours to ensure the accuracy of the information in this report, the Government (including its officers and employees) makes no warranty, statement or representation, expressed or implied, with respect to accuracy, completeness, or usefulness of the information contained herein, and in so far as permitted by law, shall not have any legal liability or responsibility (including liability for negligence) for any loss, damage, injury and death which may result, whether directly or indirectly, from the supply or use of such information. Users are responsible for making their own assessments of all information contained in this publication before acting on it. Copyright Notice The information contained in this publication can be used freely for study, research and training purposes subject to acknowledgement of the source. Use of the information for purposes other than those stated above requires prior written permission of the Director of Environmental Protection. Acknowledgement We acknowledge the Government Laboratory for undertaking chemical analyses of the water samples. River Water Quality in Hong Kong in 2011 2 Content 1. An overview of Hong -
Executive Summary
EXECUTIVE SUMMARY Introduction 1. This is the 26th Environmental Monitoring and Audit (EM&A) Report prepared by Cinotech Consultants Limited for the “Contract No. KLN/2010/04 - Environmental Monitoring Works for Kai Tak Development” (hereinafter called “the Project”). This report documents the findings of EM&A Works conducted in February 2013. 2. During the reporting month, the following works contracts were undertaken within Kai Tak Site: KL/2009/01 - Site Formation for Kai Tak Cruise Terminal KL/2008/09 - Stage 1 Infrastructure works at North Apron KL/2008/07 - Stage 1 Advance Infrastructure Works DC/2008/12 - Sewage Interception Scheme in Kowloon City DC/2010/03 - Kai Tak Nullah Improvement Works at Prince Edward Road East DC/2009/21 - Provision of Interception Facilities at Jordan Valley Box Culvert 20090097 - Public Rental Housing Development at Kai Tak Site 1A 20090006 - Public Rental Housing Development at Kai Tak Site 1B 3/WSD/08, 6/WSD/08, 7/WSD/08 & 8/WSD/08 - Replacement and Rehabilitation of Water Mains Stages 2 & 3 SS W 303 - Kai Tak Cruise Terminal Building and Ancillary Facilities CKL-KCT circuit 1&2 - CLPP (132kV cable installation) 1016EM10 - Chilled Water Pipe Laying Works at North Apron Area for District Cooling System at Kai Tak Development 1017EM10 - Design-Build-Operate a District Cooling System (Phase II Works) at Kai Tak Development KL/2010/02 - Kai Tak Development – Kai Tak Approach Channel and Kwun Tong Typhoon Shelter Improvement Works (Phase 1) KL/2010/03 - Kai Tak Development – Stage 2 Infrastructure -
Final Report
Transport and Housing Bureau The Government of the Hong Kong SAR FINAL REPORT Consultancy Services for Providing Expert Advice on Rationalising the Utilization of Road Harbour Crossings In Association with September 2010 CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT September 2010 WILBUR SMITH ASSOCIATES LIMITED CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT TABLE OF CONTENTS Chapter Title Page 1 BACKGROUND AND INTRODUCTION .......................................................................... 1-1 1.1 Background .................................................................................................................... 1-1 1.2 Introduction .................................................................................................................... 1-1 1.3 Report Structure ............................................................................................................. 1-3 2 STUDY METHODOLOGY .................................................................................................. 2-1 2.1 Overview of methodology ............................................................................................. 2-1 2.2 7-stage Study Methodology ........................................................................................... 2-2 3 IDENTIFICATION OF EXISTING PROBLEMS ............................................................. 3-1 3.1 Existing Problems -
South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review
THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION PLANNING DEPARTMENT Agreement No. CE4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review Technical Report No.4H Preliminary Sustainability Assessment (February 2007) CITY PLANNING – MAUNSELL JOINT VENTURE in association with Atkins China Ltd. Edaw Urban Design Ltd. ADI Ltd. Agreement No: CE 4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review (Feasibility Study) Preliminary Sustainability Assessment Table of Contents Abbreviation and Acronyms 1. INTRODUCTION 1-1 1.1 Purpose 1-1 1.2 Report Structure 1-1 2. REVISED PRELIMINARY OUTLINE DEVELOPMENT PLAN 2-1 2.1 Study Area and Major Proposals 2-1 2.2 Land Use Budget and Key Development Parameters 2-2 3. ASSESSMENT APPROACH 3-1 3.1 Sustainability Development 3-1 3.2 Purpose of Sustainability Assessment 3-1 3.3 Approach of the Present PSA 3-1 4. PRELIMINARY SUSTAINABILITY ASSESSMENT 4-1 4.1 Economy 4-1 4.2 Natural Resources 4-4 4.3 Society and Social Infrastructure 4-7 4.4 Leisure and Cultural Vibrancy 4-8 4.5 Environmental Quality 4-9 4.6 Mobility 4-11 4.7 Other Major Considerations: Non-quantifiable Indicators 4-11 4.8 Other Major Considerations: Non-quantifiable Issues 4-17 5. SUMMARY AND CONCLUSION 5-1 5.1 Summary 5-1 5.2 Conclusion 5-5 List of Tables Table 2.2.1 Land Use Budget for the Study Area Table 2.2.2 Key Development Parameters Table 3.3.1 CASET Indicators Not Relevant to the Present Study Table 3.3.2 -
Transport Infrastructure and Traffic Review
Transport Infrastructure and Traffic Review Planning Department October 2016 Hong Kong 2030+ 1 TABLE OF CONTENTS 1 PREFACE ........................................................... 1 5 POSSIBLE TRAFFIC AND TRANSPORT 2 CHALLENGES ................................................... 2 ARRANGEMENTS FOR THE STRATEGIC Changing Demographic Profile .............................................2 GROWTH AREAS ............................................. 27 Unbalanced Spatial Distribution of Population and Synopsis of Strategic Growth Areas ................................. 27 Employment ........................................................................3 Strategic Traffic and Transport Directions ........................ 30 Increasing Growth in Private Vehicles .................................6 Possible Traffic and Transport Arrangements ................. 32 Increasing Cross-boundary Travel with Pearl River Delta Region .......................................................................7 3 FUTURE TRANSPORT NETWORK ................... 9 Railways as Backbone ...........................................................9 Future Highway Network at a Glance ................................11 Connecting with Neighbouring Areas in the Region ........12 Transport System Performance ..........................................15 4 STRATEGIC DEVELOPMENT DIRECTIONS FROM TRAFFIC AND TRANSPORT PERSPECTIVE ................................................. 19 Transport and Land Use Optimisation ...............................19 Railways Continue to be -
Tseung Kwan O - 及 Lam Tin Tunnel Cross Bay Link
Tseung Kwan O - 及 Lam Tin Tunnel Cross Bay Link Proposed Scheme – Consultation Digest Kwun Tong Tseung Kwan O Lam Tin Tiu Keng Leng TKO Town Centre South Yau Tong Junk Bay Lam Tin Interchange TKO Area 86 January 2012 Project Information Legends: Benefits Proposed Interchange • Upon completion of Route 6, the new road • The existing Tseung Kwan O Tunnel is operating Kai Tak Tseung Kwan O - Lam Tin Tunnel network will relieve the existing heavily near its maximum capacity at peak hours. The trafficked road network in the central and TKO-LT Tunnel and CBL will relieve the existing Kowloon Bay Cross Bay Link eastern Kowloon areas, and hence reduce travel traffic congestion and cater for the anticipated Kwun Tong Trunk Road T2 time for vehicles across these areas and related traffic generated from the planned development Yau Ma Tei Central Kowloon Route environmental impacts. of Tseung Kwan O. To Kwa Wan Lam Tin Tseung Kwan O Table 1: Traffic Improvement - Kwun Tong District Yau Tong From Yau Tong to Journey Time West Kowloon Area (Peak Hour) Current (2012) 22 min. Schematic Alignment of Route 6 and Cross Bay Link Via Route 6 8 min. Traffic Congestion at TKO Tunnel The Tseung Kwan O - Lam Tin Tunnel (TKO-LT Tunnel) At present, the existing Tseung Kwan O Tunnel is towards Kowloon in the morning is a dual-two lane highway of approximately 4.2km the main connection between Tseung Kwan O and Table 2: Traffic Improvement - Tseung Kwan O long, connecting Tseung Kwan O (TKO) and East urban areas of Kowloon. -
Minutes of the 1125 Meeting of The
Minutes of the 1125th Meeting of the Town Planning Board held on 24.10.2016 Present Permanent Secretary for Development Chairman (Planning and Lands) Mr Michael W.L. Wong Professor S.C. Wong Vice-chairman Mr Lincoln L.H. Huang Mr Ivan C.S. Fu Mr Sunny L.K. Ho Ms Janice W.M Lai Mr Dominic K.K. Lam Mr Patrick H.T. Lau Mr Stephen H.B. Yau Dr F.C. Chan Mr David Y.T. Lui Mr Peter K.T. Yuen Mr Philip S.L. Kan Dr Lawrence W.C. Poon - 2 - Mr Wilson Y.W. Fung Mr Stephen L.H. Liu Professor T.S. Liu Miss Winnie W.M. Ng Miss Sandy H.Y. Wong Mr Franklin Yu Director of Planning Mr K.K. Ling Principal Assistant Secretary (Transport) 3 Transport and Housing Bureau Mr Andy S.H. Lam Chief Engineer (Works), Home Affairs Department Mr Martin W.C. Kwan Deputy Director of Environmental Protection (1) Mr C.W. Tse Director of Lands Ms Bernadette H.H. Linn Deputy Director of Planning/District Secretary Mr Raymond K.W. Lee Absent with Apologies Mr H.W. Cheung Professor K.C. Chau Dr Wilton W.T. Fok Ms Christina M. Lee Mr H.F. Leung Dr Frankie W.C. Yeung Mr K.K. Cheung Dr C.H. Hau - 3 - Mr Thomas O.S. Ho Mr T.Y. Ip Mr Alex T.H. Lai Dr Lawrence K.C. Li In Attendance Assistant Director of Planning/Board Miss Fiona S.Y. Lung Chief Town Planner/Town Planning Board Ms Doris S.Y. -
2021 LIMITED ACCESS STATE NUMBERED HIGHWAYS As of December 31, 2020
2021 LIMITED ACCESS STATE NUMBERED HIGHWAYS As of December 31, 2020 CONNECTICUT DEPARTMENT OF Transportation BUREAU OF POLICY AND PLANNING Office of Roadway Information Systems Roadway INVENTORY SECTION INTRODUCTION Each year, the Roadway Inventory Section within the Office of Roadway Information Systems produces this document entitled "Limited Access - State Numbered Highways," which lists all the limited access state highways in Connecticut. Limited access highways are defined as those that the Commissioner, with the advice and consent of the Governor and the Attorney General, designates as limited access highways to allow access only at highway intersections or designated points. This is provided by Section 13b-27 of the Connecticut General Statutes. This document is distributed within the Department of Transportation and the Division Office of the Federal Highway Administration for information and use. The primary purpose to produce this document is to provide a certified copy to the Office of the State Traffic Administration (OSTA). The OSTA utilizes this annual listing to comply with Section 14-298 of the Connecticut General Statutes. This statute, among other directives, requires the OSTA to publish annually a list of limited access highways. In compliance with this statute, each year the OSTA publishes the listing on the Department of Transportation’s website (http://www.ct.gov/dot/osta). The following is a complete listing of all state numbered limited access highways in Connecticut and includes copies of Connecticut General Statute Section 13b-27 (Limited Access Highways) and Section 14-298 (Office of the State Traffic Administration). It should be noted that only those highways having a State Route Number, State Road Number, Interstate Route Number or United States Route Number are listed. -
Hong Kong Government's Policy Address 2020
Hong Kong Government’s Policy Address 2020 Key Takeaways primarily relevant to the Real Estate and Infrastructure sector November 25, 2020 Summary Authors/Presenters This year’s Policy Address was delivered today (25th November 2020) amidst the backdrop of a changing and dynamic environment. The Chief Executive (“CE”) has set out a variety of key initiatives to address the city’s land Andrew MacGeoch and housing supply, infrastructure, the environment, Co-Author collaboration with the Greater Bay Area (“GBA”), and HK’s Partner and Regional Practice Group Leader - Real Estate ongoing role as an international financial center. We set Asia out a list of key takeaways below highlighting primarily Hong Kong [email protected] those aspects involving real estate and infrastructure. OPENING This year’s Policy Address was delivered today (25th November 2020) amidst the backdrop of a changing and dynamic environment. The Chief Executive (“CE”) has set out a variety of key initiatives to address the city’s land and housing supply, infrastructure, the environment, collaboration with the Greater Bay Area (“GBA”), and HK’s ongoing role as an international financial center. We set Page 1 of 11 out a list of key takeaways below highlighting primarily those aspects involving real estate and infrastructure. LAND SUPPLY Increasing land supply is a top priority of the Government. Glenn Haley At present, the Government has identified new land supply Co-Author with a total area of 90 hectares along the Northern Link, Partner Hong Kong including the San Tin / Lok Ma Chau Development Node. [email protected] Further initiatives to support the increase of land supply include: Development of Siu Ho Wan Depot Site.