Task Force on Kai Tak Harbourfront Development

Kai Tak Development Progress Report as of February 2017

(Paper No. TFKT/04/2017) Planning Vision/ Themes/ Initiatives

Planning Vision A distinguished, vibrant, attractive and people-oriented community by the

Planning Themes/ Initiatives Heritage, green, sports and tourism hub of Hong Kong Green web for sustainable development Quality living environment Help regenerate adjacent old districts under Energizing East initiatives

2 Kai Tak Outline Zoning Plan

San Po Kong Basic information:

 Site Area : ~ 320 ha

Kowloon City  Open Space : ~ 100 ha

 Waterfront : ~ 11 km

 Infrastructure works Total cost : more than HK$100B

 Gross Floor Area - Non-domestic : ~ 2.3M sqm - Domestic : ~ 2.2M sqm

Kwun Tong Legend : Kai Tak Land Use Zoning Typhoon Shelter Commercial Comprehensive Development Area Residential (Group A) Residential (Group B) Residential (Group C) Government, Institution or Community Open Space Other Specified Uses Other Specified Uses (Amenity Area) 3 Major Supporting Infrastructure and Related Works Project

Stage 3B Infrastructure Works at North Apron 新蒲崗 CEDD (2020) Reconstruction and Upgrading of CEDD (2018) Stage 3A Infrastructure Works at North Apron 九龍城 CEDD (2017) Stage 5A InfrastructureKowloon Works City at North Apron CEDD (2020) Stage 1 & 2 Infrastructure Works at North Apron CEDD (2013 & 2015) Shatin to Central Link HyD (2019) 啟德發展區 九龍灣 Stage 4 Infrastructure Kowloon Bay Works at North Apron 馬頭角 Stage 3 Infrastructure Works For Developments CEDD (2017) at Southern Part of Former Runway CEDD (2019)

Advanced Infrastructure Works for KTCT CEDD (2013)

觀塘 觀塘避風塘 Kwun Tong Kwun Tong Typhoon Shelter Kai Tak Approach Channel and Kwun Tong Stage 2 Infrastructure Works For Developments Typhoon Shelter Improvement Works (Phase 1) at Southern Part of Former Runway CEDD (2014) CEDD (2019)

Legend:

Remaining Dredging Works for 2nd berth Completed CEDD (2015) Under Construction Responsible Works Department (Completion/Anticipated Completion Year) 4 Major Supporting Infrastructure and Related Works Project

新蒲崗 San Po Kong

九龍城

Stage 5B Infrastructure Works at North Apron CEDD (Design in Progress) 啟德發展區 Kai Tak Approach Channel and Kwun Tong Typhoon Kai Tak Development Shelter Improvement Works (Phase 2) 九龍灣 CEDD (Design in Progress) Kowloon Bay 馬頭角 Ma Tau Kok

Local Roads at South Apron CEDD (Design in Progress) (Central Kowloon Route) HyD (Design in Progress)

觀塘 Kwun Tong Route 6 (Trunk Road T2) Road D3 (Metro Park Section) CEDD (Design in Progress) CEDD (Design in Progress) 觀塘避風塘 Kwun Tong Typhoon Shelter

Legend:

Projects under Active Planning Responsible Works Department (Project Status) 5 Major G/IC Buildings / Facilities and Development Sites

Trade and Industry Tower ArchSD (2015) 新蒲崗 San Po Kong 2 Primary Schools ArchSD (2015)

九龍城 Kowloon City

九龍灣 District Cooling Plant Kowloon Bay Public Rental Housing EMSD (2013 & 2014) HD (2013 & 2014)

馬頭角 Ma Tau Kok Kai Tak Fire Station cum Ambulance Depot ArchSD (2013)

觀塘 Kwun Tong

觀塘避風塘 Kwun Tong Typhoon Shelter

Kai Tak Cruise Terminal ArchSD/CEDD (2013 & 2014) Legend:

Completed Under Construction Projects under Active Planning Responsible Works Department (Completion Year) 6 Major G/IC Buildings / Facilities and Development Sites

Kowloon East Regional Headquarters & 新蒲崗 Operational Base cum Ngau Tau Kok Divisional San Po Kong Police Station ArchSD (2019)

Secondary School ArchSD (2019) Trade and Industry Tower 2 Primary Schools ArchSD (2015) 九龍城 Kowloon City ArchSD (2015)

Public Rental Housing HD (2013)

九龍灣 Residential Development sites Kowloon Bay

Hong Kong Children’s Hospital ArchSD (2017)

觀塘 Kai Tak Fire Depot Kwun Tong ArchSD (2013) 觀塘避風塘 Kwun Tong Typhoon Shelter ArchSD (2013)

Hong Kong Children’s Hospital

Artist’s Impression Legend:

Completed Under Construction Responsible Works Department (Anticipated Completion Year)

7 Major G/IC Buildings / Facilities and Development Sites

新蒲崗 San Po Kong

Inland ArchSD (Tender Stage)

九龍城 Kowloon City

九龍灣 Kowloon Bay

Kai Tak Sports Park Kai Tak New Acute Hospital HAB (Formal S.16 Application HA (Under planning) submitted to TPB)

觀塘 Kwun Tong

觀塘避風塘 (KTSP) Kwun Tong Typhoon Shelter Artist’s Impression

Legend:

Projects under Active Planning Responsible Works Department (Project Status)

8 Major Open Space and Recreational Projects

Station Square Avenue Park ArchSD (Design in Progress) ArchSD (Design in Progress)

LTSB Preservation Corridor ArchSD (Design in Progress) Waterfront Promenade adjacent to HKCH ArchSD (Design in Progress)

Sung Wong Toi Park ArchSD (Design in Progress) Improvement to Hoi Bun Road Park and Adjacent Area Project ArchSD (Design in Progress)

Kwun Tong Promenade Stages 1 and 2 ArchSD (2010 & 2015)

Hoi Sham Park Extension ArchSD (Design in Progress) KTCT Park Legend: ArchSD (2013)

Completed Under Design Stage (TF consulted) Projects under Active Planning Responsible Works Department (Project Status) Runway Park Phase 1 ArchSD (2013 & 2014) (Completion Year) 9 Other Projects Kai Tak Fantasy • Planning and Urban Design Review for Developments at Runway Tip (to be completed in 2017) • Planning and Engineering Study on Kwun Tong Action Area (KTAA) (to be completed in early 2018) • Consultation on the design of the Runway Tip and preliminary proposals for KTAA in 2017

Environmental Friendly Linkage System (EFLS) • Detailed feasibility study (DFS) commenced in October 2015 • Evaluate and select most suitable and cost‐effective green public transport mode(s) • Target for staged completion in about end 2017

Cycle Track Network in KTD • Feasibility study to review network and extension to pulbic open spaces • Develop schematic design with ancillary facilities including rental & parking provision • Examine implementation approach and management options • To be substantially completed in first half of 2017 10 Thank You