Tfkt-04-2017 Task Force on Kai Tak Harbourfront Development Kai Tak Development Progress Report as of February 2017 (Paper No. TFKT/04/2017) Planning Vision/ Themes/ Initiatives Planning Vision A distinguished, vibrant, attractive and people-oriented community by the Victoria Harbour Planning Themes/ Initiatives Heritage, green, sports and tourism hub of Hong Kong Green web for sustainable development Quality living environment Help regenerate adjacent old districts under Energizing Kowloon East initiatives 2 Kai Tak Outline Zoning Plan San Po Kong Basic information: Site Area : ~ 320 ha Kowloon City Open Space : ~ 100 ha Waterfront : ~ 11 km Infrastructure works Kowloon Bay Total cost : more than HK$100B Gross Floor Area - Non-domestic : ~ 2.3M sqm - Domestic : ~ 2.2M sqm Kwun Tong Legend : Kai Tak Land Use Zoning Kwun Tong Typhoon Shelter Commercial Comprehensive Development Area Residential (Group A) Residential (Group B) Residential (Group C) Government, Institution or Community Open Space Other Specified Uses Other Specified Uses (Amenity Area) 3 Major Supporting Infrastructure and Related Works Project Stage 3B Infrastructure Works at North Apron 新蒲崗 CEDD (2020) Reconstruction and San Po Kong Upgrading of Kai Tak Nullah CEDD (2018) Stage 3A Infrastructure Works at North Apron 九龍城 CEDD (2017) Stage 5A InfrastructureKowloon Works City at North Apron CEDD (2020) Stage 1 & 2 Infrastructure Works at North Apron CEDD (2013 & 2015) Shatin to Central Link HyD (2019) 啟德發展區 Kai Tak Development 九龍灣 Stage 4 Infrastructure Kowloon Bay Works at North Apron 馬頭角 Ma Tau Kok Stage 3 Infrastructure Works For Developments CEDD (2017) at Southern Part of Former Runway CEDD (2019) Advanced Infrastructure Works for KTCT CEDD (2013) 觀塘 觀塘避風塘 Kwun Tong Kwun Tong Typhoon Shelter Kai Tak Approach Channel and Kwun Tong Stage 2 Infrastructure Works For Developments Typhoon Shelter Improvement Works (Phase 1) at Southern Part of Former Runway CEDD (2014) CEDD (2019) Legend: Remaining Dredging Works for 2nd berth Completed CEDD (2015) Under Construction Responsible Works Department (Completion/Anticipated Completion Year) 4 Major Supporting Infrastructure and Related Works Project 新蒲崗 San Po Kong 九龍城 Kowloon City Stage 5B Infrastructure Works at North Apron CEDD (Design in Progress) 啟德發展區 Kai Tak Approach Channel and Kwun Tong Typhoon Kai Tak Development Shelter Improvement Works (Phase 2) 九龍灣 CEDD (Design in Progress) Kowloon Bay 馬頭角 Ma Tau Kok Local Roads at South Apron CEDD (Design in Progress) Route 6 (Central Kowloon Route) HyD (Design in Progress) 觀塘 Kwun Tong Route 6 (Trunk Road T2) Road D3 (Metro Park Section) CEDD (Design in Progress) CEDD (Design in Progress) 觀塘避風塘 Kwun Tong Typhoon Shelter Legend: Projects under Active Planning Responsible Works Department (Project Status) 5 Major G/IC Buildings / Facilities and Development Sites Trade and Industry Tower ArchSD (2015) 新蒲崗 San Po Kong 2 Primary Schools ArchSD (2015) 九龍城 Kowloon City 九龍灣 District Cooling Plant Kowloon Bay Public Rental Housing EMSD (2013 & 2014) HD (2013 & 2014) 馬頭角 Ma Tau Kok Kai Tak Fire Station cum Ambulance Depot ArchSD (2013) 觀塘 Kwun Tong 觀塘避風塘 Kwun Tong Typhoon Shelter Kai Tak Cruise Terminal ArchSD/CEDD (2013 & 2014) Legend: Completed Under Construction Projects under Active Planning Responsible Works Department (Completion Year) 6 Major G/IC Buildings / Facilities and Development Sites Kowloon East Regional Headquarters & 新蒲崗 Operational Base cum Ngau Tau Kok Divisional San Po Kong Police Station ArchSD (2019) Secondary School ArchSD (2019) Trade and Industry Tower 2 Primary Schools ArchSD (2015) 九龍城 Kowloon City ArchSD (2015) Public Rental Housing HD (2013) 九龍灣 Residential Development sites Kowloon Bay Hong Kong Children’s Hospital ArchSD (2017) 觀塘 Kai Tak Fire Depot Kwun Tong ArchSD (2013) 觀塘避風塘 Kwun Tong Typhoon Shelter Kai Tak Cruise Terminal ArchSD (2013) Hong Kong Children’s Hospital Artist’s Impression Legend: Completed Under Construction Responsible Works Department (Anticipated Completion Year) 7 Major G/IC Buildings / Facilities and Development Sites 新蒲崗 San Po Kong Inland Revenue Tower ArchSD (Tender Stage) 九龍城 Kowloon City 九龍灣 Kowloon Bay Kai Tak Sports Park Kai Tak New Acute Hospital HAB (Formal S.16 Application HA (Under planning) submitted to TPB) 觀塘 Kwun Tong 觀塘避風塘 Kai Tak Sports Park (KTSP) Kwun Tong Typhoon Shelter Artist’s Impression Legend: Projects under Active Planning Responsible Works Department (Project Status) 8 Major Open Space and Recreational Projects Station Square Avenue Park ArchSD (Design in Progress) ArchSD (Design in Progress) LTSB Preservation Corridor ArchSD (Design in Progress) Waterfront Promenade adjacent to HKCH ArchSD (Design in Progress) Sung Wong Toi Park ArchSD (Design in Progress) Improvement to Hoi Bun Road Park and Adjacent Area Project ArchSD (Design in Progress) Kwun Tong Promenade Stages 1 and 2 ArchSD (2010 & 2015) Hoi Sham Park Extension ArchSD (Design in Progress) KTCT Park Legend: ArchSD (2013) Completed Under Design Stage (TF consulted) Projects under Active Planning Responsible Works Department (Project Status) Runway Park Phase 1 ArchSD (2013 & 2014) (Completion Year) 9 Other Projects Kai Tak Fantasy • Planning and Urban Design Review for Developments at Runway Tip (to be completed in 2017) • Planning and Engineering Study on Kwun Tong Action Area (KTAA) (to be completed in early 2018) • Consultation on the design of the Runway Tip and preliminary proposals for KTAA in 2017 Environmental Friendly Linkage System (EFLS) • Detailed feasibility study (DFS) commenced in October 2015 • Evaluate and select most suitable and cost‐effective green public transport mode(s) • Target for staged completion in about end 2017 Cycle Track Network in KTD • Feasibility study to review network and extension to pulbic open spaces • Develop schematic design with ancillary facilities including rental & parking provision • Examine implementation approach and management options • To be substantially completed in first half of 2017 10 Thank You.
Recommended publications
  • Rail Construction Commences
    Kowloon City Section Newsletter June 2012 Rail construction commences The Shatin to Central Link (SCL) project was first gazetted under the "Railways Ordinance" on 26 November 2010, followed with the first and second amendment schemes gazetted on 15 July and 11 November 2011 respectively. The Legislative Council’s Finance Committee approved funding for the SCL project in May 2012. Following the funding approval, the construction of the project commences. The Tai Wai to Hung Hom Section is expected to be completed in 2018 followed by the Hung Hom to Admiralty Section in 2020. Benefits Upon its completion, the SCL will provide a fast, reliable and convenient rail service to Kai Tak, To Kwa Wan, Ma Tau Wai and Ho Man Tin areas, which are not yet served by the network. Passengers from the Kowloon City district will be able to travel directly to destinations in New Territories East and West through the "East West Corridor" formed by the Ma On Shan Line, the Tai Wai to Hung Hom Section and the West Rail Line; while the Hung Hom to Admiralty Section will further link up the existing railway network. The Tai Wai new service will give passengers more options to Che Kung Temple reach their destinations and with more convenient interchanges, making it easier to travel around Hong Hin Kong Island, Kowloon and the New Territories. Keng Diamond Alignment 圭⨑戍 Hill Lai Chi Kok Kowloon Tong Wong Tai Sin ⶾᛚ The Kowloon City Section of the SCL will have four stations - Kai Tak, Lok Fu Cheung Sha Wan 䏹䒔ល To Kwa Wan, Ma Tau Wai and Ho Man Tin Stations.
    [Show full text]
  • 1. the Meeting Was Resumed at 9:30 A.M. on 1.3.2017. 2. the Following
    1. The meeting was resumed at 9:30 a.m. on 1.3.2017. 2. The following Members and the Secretary were present in the morning session of the resumed meeting: Permanent Secretary for Development Chairman (Planning and Lands) Mr Michael W.L. Wong Professor S.C. Wong Vice-Chairman Mr Lincoln L.H. Huang Mr Ivan C.S. Fu Mr Dominic K.K. Lam Mr Stephen H.B. Yau Dr F.C. Chan Mr Philip S.L. Kan Mr K.K. Cheung Mr Wilson Y.W. Fung Mr Alex T.H. Lai Dr Lawrence K.C. Li Ms Sandy H.Y. Wong Mr Franklin Yu Deputy Director of Environmental Protection Mr C.W. Tse Assistant Director of Lands/Regional 3 Mr Edwin W.K. Chan - 2 - Agenda Item 1 [Open Meeting] Consideration of Representations and Comments in respect of Draft Kennedy Town & Mount Davis Outline Zoning Plan No. S/H1/20 (TPB Paper No. 10244) [The item was conducted in Cantonese and English.] 3. The Chairman said that it was the fifth and last day of the hearing of the representations and comments in respect of the draft Kennedy Town & Mount Davis Outline Zoning Plan (OZP) No. S/H1/20 (the draft OZP). 4. The Secretary said that Members’ declaration of interests was recorded in the minutes of 7.2.201 and 15.2.2017. In addition, Dr Lawrence K.C. Li declared interest on the item as R4113 was submitted by the Democratic Alliance for the Betterment and Progress of Hong Kong (DAB) and his relative was a DAB member.
    [Show full text]
  • 2011 Annual River Water Quality Reports
    Environmental Protection Department The Government of the Hong Kong Special Administrative Region Mission To conduct an effective and scientifically sound water monitoring programme that helps achieve and maintain the Water Quality Objectives and protect the health of Hong Kong’s rivers and streams. Disclaimer Whilst the Government of the Hong Kong Special Administrative Region ("the Government") endeavours to ensure the accuracy of the information in this report, the Government (including its officers and employees) makes no warranty, statement or representation, expressed or implied, with respect to accuracy, completeness, or usefulness of the information contained herein, and in so far as permitted by law, shall not have any legal liability or responsibility (including liability for negligence) for any loss, damage, injury and death which may result, whether directly or indirectly, from the supply or use of such information. Users are responsible for making their own assessments of all information contained in this publication before acting on it. Copyright Notice The information contained in this publication can be used freely for study, research and training purposes subject to acknowledgement of the source. Use of the information for purposes other than those stated above requires prior written permission of the Director of Environmental Protection. Acknowledgement We acknowledge the Government Laboratory for undertaking chemical analyses of the water samples. River Water Quality in Hong Kong in 2011 2 Content 1. An overview of Hong
    [Show full text]
  • Executive Summary
    EXECUTIVE SUMMARY Introduction 1. This is the 26th Environmental Monitoring and Audit (EM&A) Report prepared by Cinotech Consultants Limited for the “Contract No. KLN/2010/04 - Environmental Monitoring Works for Kai Tak Development” (hereinafter called “the Project”). This report documents the findings of EM&A Works conducted in February 2013. 2. During the reporting month, the following works contracts were undertaken within Kai Tak Site: KL/2009/01 - Site Formation for Kai Tak Cruise Terminal KL/2008/09 - Stage 1 Infrastructure works at North Apron KL/2008/07 - Stage 1 Advance Infrastructure Works DC/2008/12 - Sewage Interception Scheme in Kowloon City DC/2010/03 - Kai Tak Nullah Improvement Works at Prince Edward Road East DC/2009/21 - Provision of Interception Facilities at Jordan Valley Box Culvert 20090097 - Public Rental Housing Development at Kai Tak Site 1A 20090006 - Public Rental Housing Development at Kai Tak Site 1B 3/WSD/08, 6/WSD/08, 7/WSD/08 & 8/WSD/08 - Replacement and Rehabilitation of Water Mains Stages 2 & 3 SS W 303 - Kai Tak Cruise Terminal Building and Ancillary Facilities CKL-KCT circuit 1&2 - CLPP (132kV cable installation) 1016EM10 - Chilled Water Pipe Laying Works at North Apron Area for District Cooling System at Kai Tak Development 1017EM10 - Design-Build-Operate a District Cooling System (Phase II Works) at Kai Tak Development KL/2010/02 - Kai Tak Development – Kai Tak Approach Channel and Kwun Tong Typhoon Shelter Improvement Works (Phase 1) KL/2010/03 - Kai Tak Development – Stage 2 Infrastructure
    [Show full text]
  • South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review
    THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION PLANNING DEPARTMENT Agreement No. CE4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review Technical Report No.4H Preliminary Sustainability Assessment (February 2007) CITY PLANNING – MAUNSELL JOINT VENTURE in association with Atkins China Ltd. Edaw Urban Design Ltd. ADI Ltd. Agreement No: CE 4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review (Feasibility Study) Preliminary Sustainability Assessment Table of Contents Abbreviation and Acronyms 1. INTRODUCTION 1-1 1.1 Purpose 1-1 1.2 Report Structure 1-1 2. REVISED PRELIMINARY OUTLINE DEVELOPMENT PLAN 2-1 2.1 Study Area and Major Proposals 2-1 2.2 Land Use Budget and Key Development Parameters 2-2 3. ASSESSMENT APPROACH 3-1 3.1 Sustainability Development 3-1 3.2 Purpose of Sustainability Assessment 3-1 3.3 Approach of the Present PSA 3-1 4. PRELIMINARY SUSTAINABILITY ASSESSMENT 4-1 4.1 Economy 4-1 4.2 Natural Resources 4-4 4.3 Society and Social Infrastructure 4-7 4.4 Leisure and Cultural Vibrancy 4-8 4.5 Environmental Quality 4-9 4.6 Mobility 4-11 4.7 Other Major Considerations: Non-quantifiable Indicators 4-11 4.8 Other Major Considerations: Non-quantifiable Issues 4-17 5. SUMMARY AND CONCLUSION 5-1 5.1 Summary 5-1 5.2 Conclusion 5-5 List of Tables Table 2.2.1 Land Use Budget for the Study Area Table 2.2.2 Key Development Parameters Table 3.3.1 CASET Indicators Not Relevant to the Present Study Table 3.3.2
    [Show full text]
  • Minutes of the 1125 Meeting of The
    Minutes of the 1125th Meeting of the Town Planning Board held on 24.10.2016 Present Permanent Secretary for Development Chairman (Planning and Lands) Mr Michael W.L. Wong Professor S.C. Wong Vice-chairman Mr Lincoln L.H. Huang Mr Ivan C.S. Fu Mr Sunny L.K. Ho Ms Janice W.M Lai Mr Dominic K.K. Lam Mr Patrick H.T. Lau Mr Stephen H.B. Yau Dr F.C. Chan Mr David Y.T. Lui Mr Peter K.T. Yuen Mr Philip S.L. Kan Dr Lawrence W.C. Poon - 2 - Mr Wilson Y.W. Fung Mr Stephen L.H. Liu Professor T.S. Liu Miss Winnie W.M. Ng Miss Sandy H.Y. Wong Mr Franklin Yu Director of Planning Mr K.K. Ling Principal Assistant Secretary (Transport) 3 Transport and Housing Bureau Mr Andy S.H. Lam Chief Engineer (Works), Home Affairs Department Mr Martin W.C. Kwan Deputy Director of Environmental Protection (1) Mr C.W. Tse Director of Lands Ms Bernadette H.H. Linn Deputy Director of Planning/District Secretary Mr Raymond K.W. Lee Absent with Apologies Mr H.W. Cheung Professor K.C. Chau Dr Wilton W.T. Fok Ms Christina M. Lee Mr H.F. Leung Dr Frankie W.C. Yeung Mr K.K. Cheung Dr C.H. Hau - 3 - Mr Thomas O.S. Ho Mr T.Y. Ip Mr Alex T.H. Lai Dr Lawrence K.C. Li In Attendance Assistant Director of Planning/Board Miss Fiona S.Y. Lung Chief Town Planner/Town Planning Board Ms Doris S.Y.
    [Show full text]
  • The Eighth Meeting
    Progress Report of the 8th Meeting of the Kowloon City District Council Purpose This paper aims to report on the major issues discussed at the 8th meeting of the Kowloon City District Council (KCDC) on 22 January 2009. Meeting with the Under Secretary for Home Affairs 2. The Under Secretary for Home Affairs briefed the Members on her three major scopes of work, namely developing culture and the arts, encouraging the establishment of social enterprise and enhancing liaison with different sectors of the community. She also provided the latest information about local affairs which were issues of interest to the Members: (i) Community Hall – Judging from the current progress, the project of Government Offices Building in Bailey Street would be tabled for consideration by the Public Works Subcommittee of the Legislative Council and submitted to the Finance Committee for funding approval in 2010. The works would hopefully begin in the latter half of 2010. As to the community hall inside Kai Tak Government Offices Building, design work and approval procedures would commence upon the deliberation of the master layout plan by the District Council. According to the present schedule, the project was expected to start in 2010 and be completed after three to four years; (ii) Ko Shan Theatre – To support the development of Cantonese Opera, the Government launched a pioneer scheme by according priority to Cantonese Opera troupes to use the new annex of the Ko Shan Theatre. In daily operation, the Leisure and Cultural Services Department would accept applications from all organisations and bodies for using all the halls and rooms in the theatre so as to ensure full use of facilities.
    [Show full text]
  • Hong Kong Government's Policy Address 2020
    Hong Kong Government’s Policy Address 2020 Key Takeaways primarily relevant to the Real Estate and Infrastructure sector November 25, 2020 Summary Authors/Presenters This year’s Policy Address was delivered today (25th November 2020) amidst the backdrop of a changing and dynamic environment. The Chief Executive (“CE”) has set out a variety of key initiatives to address the city’s land Andrew MacGeoch and housing supply, infrastructure, the environment, Co-Author collaboration with the Greater Bay Area (“GBA”), and HK’s Partner and Regional Practice Group Leader - Real Estate ongoing role as an international financial center. We set Asia out a list of key takeaways below highlighting primarily Hong Kong [email protected] those aspects involving real estate and infrastructure. OPENING This year’s Policy Address was delivered today (25th November 2020) amidst the backdrop of a changing and dynamic environment. The Chief Executive (“CE”) has set out a variety of key initiatives to address the city’s land and housing supply, infrastructure, the environment, collaboration with the Greater Bay Area (“GBA”), and HK’s ongoing role as an international financial center. We set Page 1 of 11 out a list of key takeaways below highlighting primarily those aspects involving real estate and infrastructure. LAND SUPPLY Increasing land supply is a top priority of the Government. Glenn Haley At present, the Government has identified new land supply Co-Author with a total area of 90 hectares along the Northern Link, Partner Hong Kong including the San Tin / Lok Ma Chau Development Node. [email protected] Further initiatives to support the increase of land supply include: Development of Siu Ho Wan Depot Site.
    [Show full text]
  • LC Paper No. PWSC81/20-21(01) - 2
    LC Paper No. PWSC81/20-21(01) - 2 - Encl. c.c.(w/e) Antiquities and Monuments Office (Attn: Ms. Susanna SIU) Architectural Services Department (Attn: Ms. Jackie LEE) Leisure and Cultural Services Department (Attn: Mr. Horman CHAN) Civil Engineering and Development Department (Attn: Mr. Ricky CHAN) Enclosure Legislative Council Public Works Subcommittee PWP Item 470RO – Lung Tsun Stone Bridge Preservation Corridor at Kai Tak Follow-up Actions arising from the Meeting held on 27 January 2021 The Public Works Subcommittee discussed the LegCo Paper No. PWSC(2020-21)31. In response to the request from the Chairman and Hon Junius HO Kwan-yiu, the Administration hereby provide the following supplementary information to elaborate the heritage and historic value of remnants of Lung Tsun Stone Bridge (LTSB), and how the proposed item of LTSB preservation corridor can effectively preserve and interprete its heritage and historical values. The relevant supplementary information is as follows: History of LTSB 2. Built between 1873 and 1875, Lung Tsun Stone Bridge (LTSB) was was originally about 210 meters in length and 2.6 to 4 meters in width (Photo 1). In 1892, a wooden extension of 80 metres was added by the local charity organisation Lok Sin Tong (樂善堂) after fund raising (Photo 2). In 1910, the timber extension of LTSB was replaced by a concrete structure, which was later modified to become the Kowloon City Pier. Part of LTSB was buried by the Kai Tack Bund reclamation carried out by the Government between 1916 and 1924 at the west shore of Kowloon Bay for property development.
    [Show full text]
  • Design Smarter and Faster with BIM
    Scott Wilson Limited Design Smarter and Faster with BIM Project: Kai Tak Nullah Improvement Works at Prince Edward Road East Location: Hong Kong Type: Urban Drainage Scheduled Time of Completion: 2012 Construction of the culvert under Prince Edward Road East. The Kai Tai Nullah is a watercourse starts from the south of Diamond Hill, winds through the existing urban districts of Wong Tai Sin, San Po Kong and Kowloon City, and then runs straight through the former Kai Tak Airport before discharging into Kai Tak Approach Channel. The primary role of the nullah is for flood protection purpose in Eastern Kowloon serving Wong Tai Sin, Diamond Hill, Lok Fu, San Po Kong, Kowloon City and part of new Kai Tak Development Area. However, flood events in recent years indicated that the drainage capacity of certain sections of the nullah is not adequate to meet the current flood protection standard. Thus, the flood relief functions of the nullah must be improved. BETTER BY DESIGN AUtodesk HONG KONG BIM Awards 2010 37 Scott Wilson was commissioned by Drainage complexity of the project. To tackle the Services Department to design solutions that problem, Scott Wilson used BIM software to would enhance the nullah’s performance to build a 3D information model to show the minimize flood risk, extend its service life, and complex connections of the above-ground to provide landscape/amenity area for public and underground networks. With BIM, the site use. As part of the assignment, Scott Wilson context was clarified and site constraints were is designing the box culvert below Prince better understood which helped Scott Wilson Edward Road East (PERE).
    [Show full text]
  • TFKT/01/2021 on 14 April 2021
    Task Force on Kai Tak Harbourfront Development For discussion TFKT/01/2021 on 14 April 2021 Progress Update on Kai Tak Sports Park and Adjoining Public Open Space PURPOSE This paper provides update to Members on the latest progress and detailed design of the Kai Tak Sports Park (the Sports Park) and the adjoining Public Open Space (POS), and our responses to Members’ suggestions and comments raised at the meeting on 15 January 2019. BACKGROUND 2. We have provided regular updates to the Task Force on Kai Tak Harbourfront Development (the Task Force) since the early planning stage of the Sports Park project. We last briefed the Task Force on 15 January 2019 after the award of the Sports Park contract in end-December 2018. The latest design development and detailed design of the Sports Park are set out in the ensuing paragraph(s). Our responses to the comments and suggestions raised by Members at the last meeting (extract of the minutes of meeting at Annex A) are highlighted in the bracket after each item for easy reference – (a) Design (i) coherent design of the pedestrian walkways and POS (para. 8). (b) Water-land interface (i) design elements to promote or activate the waterbody nearby (paras. 12 to 16); Task Force on Kai Tak Harbourfront Development TFKT/01/2021 (c) Vibrancy (i) provision for pre-event and post-event food and beverage concessions and ad-hoc retail (paras. 12 to 16); (d) Accessibility (i) 24-hour pedestrian access for pedestrians to go to harbourfront promenade from the hinterland freely (para.
    [Show full text]
  • OFFICIAL RECORD of PROCEEDINGS Thursday, 14 June
    LEGISLATIVE COUNCIL ─ 14 June 2007 8865 OFFICIAL RECORD OF PROCEEDINGS Thursday, 14 June 2007 The Council continued to meet at Nine o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE MRS RITA FAN HSU LAI-TAI, G.B.S., J.P. THE HONOURABLE JAMES TIEN PEI-CHUN, G.B.S., J.P. IR DR THE HONOURABLE RAYMOND HO CHUNG-TAI, S.B.S., S.B.ST.J., J.P. THE HONOURABLE LEE CHEUK-YAN THE HONOURABLE MARTIN LEE CHU-MING, S.C., J.P. THE HONOURABLE FRED LI WAH-MING, J.P. THE HONOURABLE MARGARET NG THE HONOURABLE MRS SELINA CHOW LIANG SHUK-YEE, G.B.S., J.P. THE HONOURABLE JAMES TO KUN-SUN THE HONOURABLE CHEUNG MAN-KWONG THE HONOURABLE CHAN YUEN-HAN, J.P. THE HONOURABLE BERNARD CHAN, G.B.S., J.P. THE HONOURABLE CHAN KAM-LAM, S.B.S., J.P. 8866 LEGISLATIVE COUNCIL ─ 14 June 2007 THE HONOURABLE MRS SOPHIE LEUNG LAU YAU-FUN, S.B.S., J.P. THE HONOURABLE LEUNG YIU-CHUNG THE HONOURABLE SIN CHUNG-KAI, J.P. DR THE HONOURABLE PHILIP WONG YU-HONG, G.B.S. THE HONOURABLE WONG YUNG-KAN, J.P. THE HONOURABLE JASPER TSANG YOK-SING, G.B.S., J.P. THE HONOURABLE HOWARD YOUNG, S.B.S., J.P. DR THE HONOURABLE YEUNG SUM THE HONOURABLE LAU CHIN-SHEK, J.P. THE HONOURABLE LAU KONG-WAH, J.P. THE HONOURABLE LAU WONG-FAT, G.B.M., G.B.S., J.P. THE HONOURABLE MIRIAM LAU KIN-YEE, G.B.S., J.P. THE HONOURABLE EMILY LAU WAI-HING, J.P.
    [Show full text]