Shatin to Central Link Brochure
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Coin Cart Schedule (From 2014 to 2020) Service Hours: 10 A.M
Coin Cart Schedule (From 2014 to 2020) Service hours: 10 a.m. to 7 p.m. (* denotes LCSD mobile library service locations) Date Coin Cart No. 1 Coin Cart No. 2 2014 6 Oct (Mon) to Kwun Tong District Kwun Tong District 12 Oct (Sun) Upper Ngau Tau Kok Estate Piazza Upper Ngau Tau Kok Estate Piazza 13 Oct (Mon) to Yuen Long District Tuen Mun District 19 Oct (Sun) Ching Yuet House, Tin Ching Estate, Tin Yin Tai House, Fu Tai Estate Shui Wai * 20 Oct (Mon) to North District Tai Po District 26 Oct (Sun) Wah Min House, Wah Sum Estate, Kwong Yau House, Kwong Fuk Estate * Fanling * (Service suspended on Tuesday 21 October) 27 Oct (Mon) to Wong Tai Sin District Sham Shui Po District 2 Nov (Sun) Ngan Fung House, Fung Tak Estate, Fu Wong House, Fu Cheong Estate * Diamond Hill * (Service suspended on Friday 31 October) (Service suspended on Saturday 1 November) 3 Nov (Mon) to Eastern District Wan Chai District 9 Nov (Sun) Oi Yuk House, Oi Tung Estate, Shau Kei Lay-by outside Causeway Centre, Harbour Wan * Drive (Service suspended on Thursday 6 (opposite to Sun Hung Kai Centre) November) 10 Nov (Mon) to Kwai Tsing District Islands District 16 Nov (Sun) Ching Wai House, Cheung Ching Estate, Ying Yat House, Yat Tung Estate, Tung Tsing Yi * Chung * (Service suspended on Monday 10 November and Wednesday 12 November) 17 Nov (Mon) to Kwun Tong District Sai Kung District 23 Nov (Sun) Tsui Ying House, Tak Chak House, Tsui Ping (South) Estate * Hau Tak Estate, Tseung Kwan O * (Service suspended on Tuesday 18 November) 24 Nov (Mon) to Sha Tin District Tsuen Wan -
China / Hong Kong Monthly Chart Book
China / Hong Kong Monthly Chart Book HK Property Refer to important disclosures at the end of this report DBS Group Research . Equity 14 January 2019 Local developers dominated the land HSI: 26,667 market • Kai Tak is the key source of land supply ANALYST Jeff YAU CFA, +852 3668 4180 • MTRC stepping up project launches [email protected] • Local developers dominated the land market Ian CHUI +852 3668 4174 Kai Tak is the key source of land supply. In 2018, the government sold [email protected] 11 residential or residential/commercial sites via public tender for HK$70.6bn. Upon completion, these projects are expected to provide Jason LAM +852 3668 4179 >5,500 residential units, of which about 74% will come from the Kai [email protected] Tak area. After SHKP (16.HK) paid a record price for the sizeable residential/retail lot adjacent to Kai Tak MTR Station, the government released three waterfront residential sites along the runway of the old airport onto the market for tender during Nov-Dec 18. A consortium equally owned by Henderson Land (12.HK), Wheelock (20.HK), New World Development (17.HK), and Empire Group won the tender for one of the sites. The joint venture arrangement allows the consortium members to diversify their investment risk. The other two went to Chinese companies, China Overseas Land (688.HK) and Goldin Financial (530.HK). MTRC stepping up project launches. In 2H18, MTRC (66.HK) offered two projects for tender. Cheung Kong Asset Holdings (1113.HK) defeated four other developers to secure the development rights of Wong Chuk Hang Station Package 3 in Aug-18. -
Rail Construction Commences
Kowloon City Section Newsletter June 2012 Rail construction commences The Shatin to Central Link (SCL) project was first gazetted under the "Railways Ordinance" on 26 November 2010, followed with the first and second amendment schemes gazetted on 15 July and 11 November 2011 respectively. The Legislative Council’s Finance Committee approved funding for the SCL project in May 2012. Following the funding approval, the construction of the project commences. The Tai Wai to Hung Hom Section is expected to be completed in 2018 followed by the Hung Hom to Admiralty Section in 2020. Benefits Upon its completion, the SCL will provide a fast, reliable and convenient rail service to Kai Tak, To Kwa Wan, Ma Tau Wai and Ho Man Tin areas, which are not yet served by the network. Passengers from the Kowloon City district will be able to travel directly to destinations in New Territories East and West through the "East West Corridor" formed by the Ma On Shan Line, the Tai Wai to Hung Hom Section and the West Rail Line; while the Hung Hom to Admiralty Section will further link up the existing railway network. The Tai Wai new service will give passengers more options to Che Kung Temple reach their destinations and with more convenient interchanges, making it easier to travel around Hong Hin Kong Island, Kowloon and the New Territories. Keng Diamond Alignment 圭⨑戍 Hill Lai Chi Kok Kowloon Tong Wong Tai Sin ⶾᛚ The Kowloon City Section of the SCL will have four stations - Kai Tak, Lok Fu Cheung Sha Wan 䏹䒔ល To Kwa Wan, Ma Tau Wai and Ho Man Tin Stations. -
Press Release on Modification Works for the MTR Diamond Hill Station In
CB(1)786/12-13(01) PR021/13 25 March 2013 Enhanced facilities to make MTR Diamond Hill Station the future East Kowloon railway hub MTR Diamond Hill Station will be transformed into a major new railway hub for East Kowloon when the first phase of the Shatin to Central Link (SCL) commences service in 2018. Modification works will begin in mid-April to upgrade and enlarge Diamond Hill Station to serve as the future interchange station between SCL and the Kwun Tong Line. A new SCL concourse and platforms will be built and a wide array of enhanced facilities will be added there including the installation of 3 new lifts, 12 escalators, additional Ticket Issuing Machines, Automatic Teller Machines, shops, and new public toilet facilities. “We take on the feedback from the community on barrier-free facilities. By reorganising the station layout and exploring ways to overcome technical challenges, we have been able to maximize the number of lifts and escalators we can put into the station, “said Mr Jay Walder, Chief Executive Officer of MTR Corporation. “Passengers will enjoy the convenience brought by the new facilities at the Kwun Tong Line of Diamond Hill Station from the end of 2015, while the facilities at the new extension will be unveiled with the completion of the SCL in 2018,”said Mr Philco Wong, General Manager – Shatin to Central Link of MTR Corporation. In the intervening period, a number of temporary arrangements will be implemented at the station to facilitate construction works. “In planning the modification works, we will do our best to minimize the inconvenience caused to the passengers. -
Legislative Council Panel on Transport
CB(4)1318/15-16(01) Legislative Council Panel on Transport Fares of MTR Kwun Tong Line Extension This paper briefs Members on the fares of MTR Kwun Tong Line Extension (“KTE”). Background 2. KTE will commence passenger service on 23 October 20161. It is approximately 2.6-kilometre long, extending the existing Kwun Tong Line from Yau Ma Tei Station to the new Ho Man Tin Station and Whampoa Station (“KTE stations”). Ho Man Tin Station will be an interchange station connecting Kwun Tong Line and the future Shatin to Central Link. Fares of KTE 3. In accordance with the Operating Agreement signed between the Government and the MTR Corporation Limited (“MTRCL”), MTRCL shall brief the Legislative Council Panel on Transport and the Transport Advisory Committee on fares of new railway extensions. 4. Being an extension of the Kwun Tong Line, the same “distance based” fare structure of the existing MTR heavy rail system will be applied to determining fares of the two new KTE stations. Examples on fares between KTE stations and some stations of other railway lines are as follows : 1 For the works progress of the South Island Line (East) and KTE (as at 30 June 2016), please refer to the paper submitted by the Transport and Housing Bureau to the Subcommittee on Matters Relating to Railways of the Legislative Council Panel on Transport in September 2016. 1 Octopus Single Journey Ticket To / From Whampoa Elderly / Eligible Student Station Adult Child Persons with (Promotional Adult Concessionary Disabilities# Fare)* Hung Hom $4.5 $2.9 $2.0 $2.9 $4.5 -
Temporary Service Arrangement in Relation to the Peak Tramway's
Information Paper C&WDC T&TC Paper No. 43/2019 Central & Western District Council – Traffic & Transport Committee Temporary Service Arrangement in Relation to the Peak Tramway’s Upgrading Plan On 2 October 2018, the Chief Executive in Council (“ExCo”) has approved, under the Peak Tramway Ordinance (Cap. 265), the grant of the second 10-year (2026 - 2035) operating right of the peak tramway to the Peak Tramways Company Limited (“PTC”) for maintaining the peak tramway as an important tourism and recreational facility. Since early 2019, PTC has embarked on works related to the upgrading plan. At present, the progress of the upgrading plan is on schedule, and the Government will continue to closely monitor the progress of the upgrading plan carried out by PTC. To enable District Council members to have an understanding of the latest progress of the upgrading plan and the temporary service arrangement in respect of service suspension starting from 23 April 2019 for around two to three months, the information paper prepared by PTC is attached for members’ reference. Tourism Commission Commerce and Economic Development Bureau 4 April 2019 Information Paper The Peak Tram Upgrading Plan Following consultation with Central & Western District Council (“C&WDC”) - Traffic & Transport Committee (“T&TC”) on 12 April 2018, the Peak Tramways Company Limited’s (“PTC”) application for the second ten-year operating right, together with the upgrading plan and the proposed legislative amendments arising from the upgrading plan, was also submitted to the Legislative Council (“LegCo”) Panel of Economic Development on 25 June 2018, and the proposal gained the support of Panel members. -
Progress of Admiralty Station Expansion Works Under the Shatin to Central Link Project
For Circulation C&W DC Paper No. 109/2017 Central and Western District Council Progress of Admiralty Station Expansion Works under the Shatin to Central Link Project Introduction 1. This paper aims to update members of the Central and Western District Council on the progress of the expansion works of Admiralty Station under the Shatin to Central Link (“SCL”) project. Background 2. The 17-kilometre SCL is a territory-wide strategic railway project linked with a number of existing and future railways to form two strategic railway corridors, namely the “East West Corridor” and the “North South Corridor”. The “East West Corridor” will be formed by extending the Ma On Shan Line from Tai Wai Station to Hung Hom Station where it will connect with the West Rail Line. The “North South Corridor” will extend the existing East Rail Line from Hung Hom Station across the Victoria Harbour to Admiralty Station via Exhibition Station. The “East West Corridor” and “North South Corridor” are expected to commission in mid-2019 and the 2021 respectively. 3. Admiralty Station will become the railway transport hub on Hong Kong Island that serves as the interchange for Island Line, Tsuen Wan Line, South Island Line (“SIL”) and the SCL. As part of the facilities are integrated for both the SCL and the South Island Line (East) (SIL(E)) project, part of the major works including platforms and interchange concourse were carried out under the SIL(E) project to shorten the overall construction time and minimise disturbance to the environment, road traffic and community. As SIL has been in operation since December 2016, SCL has taken over the works site from SIL(E) in Admiralty to continue the remaining railway construction works. -
Branch List English
Telephone Name of Branch Address Fax No. No. Central District Branch 2A Des Voeux Road Central, Hong Kong 2160 8888 2545 0950 Des Voeux Road West Branch 111-119 Des Voeux Road West, Hong Kong 2546 1134 2549 5068 Shek Tong Tsui Branch 534 Queen's Road West, Shek Tong Tsui, Hong Kong 2819 7277 2855 0240 Happy Valley Branch 11 King Kwong Street, Happy Valley, Hong Kong 2838 6668 2573 3662 Connaught Road Central Branch 13-14 Connaught Road Central, Hong Kong 2841 0410 2525 8756 409 Hennessy Road Branch 409-415 Hennessy Road, Wan Chai, Hong Kong 2835 6118 2591 6168 Sheung Wan Branch 252 Des Voeux Road Central, Hong Kong 2541 1601 2545 4896 Wan Chai (China Overseas Building) Branch 139 Hennessy Road, Wan Chai, Hong Kong 2529 0866 2866 1550 Johnston Road Branch 152-158 Johnston Road, Wan Chai, Hong Kong 2574 8257 2838 4039 Gilman Street Branch 136 Des Voeux Road Central, Hong Kong 2135 1123 2544 8013 Wyndham Street Branch 1-3 Wyndham Street, Central, Hong Kong 2843 2888 2521 1339 Queen’s Road Central Branch 81-83 Queen’s Road Central, Hong Kong 2588 1288 2598 1081 First Street Branch 55A First Street, Sai Ying Pun, Hong Kong 2517 3399 2517 3366 United Centre Branch Shop 1021, United Centre, 95 Queensway, Hong Kong 2861 1889 2861 0828 Shun Tak Centre Branch Shop 225, 2/F, Shun Tak Centre, 200 Connaught Road Central, Hong Kong 2291 6081 2291 6306 Causeway Bay Branch 18 Percival Street, Causeway Bay, Hong Kong 2572 4273 2573 1233 Bank of China Tower Branch 1 Garden Road, Hong Kong 2826 6888 2804 6370 Harbour Road Branch Shop 4, G/F, Causeway Centre, -
Online Brochure 01
123 Bulkeley Street, Hung Hom, Kowloon PRIME LOCATION The Grand Blossom Business and Entertainment Visiting Mainland China Ultimate Lifestyle Occupies a prime location in proximity to the Ho Man Tin Just minutes away from the vibrancy of the commercial and To pay a visit to the Mainland China, get onto the East Rail For ultimate retail, dining and entertainment indulgence, the and Hung Hom MTR Station, where guests can avail of the entertainment hub of Tsim Sha Tsui, the 33-storey apartment Line MTR from Hung Hom Station to Lo Wu / Lok Ma Chau. nearby Whampoa Garden is only a five-minute walk away. services of both the East Rail Line and West Rail Line. block lies in a bustling neighborhood. A journey to the core The all-inclusive community center features a comprehensive commercial district of Central is also only 30 minutes via shopping complex which spans over 1.4 million sq.ft. cross-harbor bus 115. N ACCESS Ho Man Tin Station 何文田站 To Ho Man Tin MTR Station To Whampoa Gardens (3 mins) (8 - 12 mins) 6, 6A (5 mins) To Hung Hom MTR Station (10 mins) To Hong Kong International Airport 5C, 8 (6 mins) E23 (70 mins) To Central Station To Kai Tak Cruise Terminal 115 (30 mins) 219X (50 mins) To Tsim Sha Tsui Station To Hung Hom Ferry Pier (Ferry to North Point) 6, 6A, 8, 8A (10 mins) 15 (15 mins) To Mong Kok Station 6C, 6F, 212 (15 mins) On Foot Bus Route Hung Hom Pier 紅磡碼頭 Minibus Route Hung Hom Station 紅磡站 A3 2 Bathrooms with Shower Booths Covered Car Parking Spaces APARTMENTS Twice-a-week Housekeeping and Laundry Services 24 Hours Round-the-clock Professional Management and Security Services Full Kitchen Facilities Kitchenware Electronic Hotel Lock and RFID Keycard Electronic In-room Safe Unlimited Utilities Package Unlimited High-speed Wi-Fi Package FEATURES Television Set Wall-mounted Room Air Conditioning 24-hr House Key Reading Furniture TV Set Security Keeping Card Lounge Bathroom Kitchenware Laundry High Speed Utilities Fitness Amenities Wifi Package Area Gross Size: 700 - 763 sq. -
A Brief Highlight of Stations Along the Alignment
A brief highlight of stations along the alignment Diamond Hill Station and Depot New Diamond Station and depot facility located at previous Tai Hom Village Existing MTR Kwun Tong Line Approx. location of Kai Tak Station Hung Hom To Kwa Wan Kowloon City Approximate run of Shatin-Central Link Location of the Kai Tak Station of SCL Advance works for Kai Tak Development nearby the Kai Tak Station of SCL The urban environment of the nearby district Toward Ho Man Tin Station Kwun Tong Line Extension as a sub-network to the Shatin Central Link serving the Whampoa District The urban environment of the nearby district Satellite map showing the original layout of the site Homantin Station, which is an interchanging station for the SCL and KTE lines The land reserved for the Ho Man Tin Station (previous Valley Road Estate) before site formation Site formation for the Ho Man Tin Station Advance work for the Whampoa Station in early 2012 Phasing arrangement to convert Hung Hom Station into an interchanging station The International Mail Centre – to be relocated to Kowloon Bay due to part of the building foundations will be infringed by the SCL harbour crossing tunnel Future seawall of WC Reclamation zone Storing of explosive for drill-and-blast tunnel works The Tuen Mun Western Bypass and Tuen Mun-Chek Lap Kok Link To meet future traffic demand for the Northwest New Territories and Lantau, a plan to develop the Tuen Mun Western Bypass (9 km) and the Tuen Mun-Chek Lap Kok Link (4 km in immersed-tube) at a cost of over $20 billion is proposed. -
Administration's Paper on the Progress Update of the Construction of The
LC Paper No. CB(4)610/15-16(05) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Progress Update of the Construction of the Shatin to Central Link (As at 31 December 2015) Introduction This paper reports to Members on the progress of the main construction works of the Shatin to Central Link (“SCL”) as at 31 December 2015. Background 2. SCL, with a total length of 17 kilometres, consists of the following two sections – (a) Tai Wai to Hung Hom section: this is an extension of the Ma On Shan Line from Tai Wai via Southeast Kowloon to Hung Hom where it will join the West Rail Line; and (b) Hung Hom to Admiralty section: this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. 3. SCL will have ten stations. Apart from bringing improvements to the existing Tai Wai Station, the SCL project will involve construction of new stations or extension of existing stations at Hin Keng, Diamond Hill, Kai Tak, To Kwa Wan, Ma Tau Wai, Ho Man Tin, Hung Hom, the Hong Kong Convention and Exhibition Centre, and Admiralty. It is a territory-wide strategic railway project (alignment layout at Annex 1). Admiralty Station and Ho Man Tin Station will become integrated stations providing interchange service to passengers of SCL and South Island Line (East)(“SIL(E)”), as well as passengers of SCL and Kwun Tong Line Extension (“KTE”) respectively. 4. The Approved Project Estimate for the entire SCL project is $79,800 million (in money-of-the-day prices) and the project is funded by the Government under the “concession approach”. -
South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review
THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION PLANNING DEPARTMENT Agreement No. CE4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review Technical Report No.4H Preliminary Sustainability Assessment (February 2007) CITY PLANNING – MAUNSELL JOINT VENTURE in association with Atkins China Ltd. Edaw Urban Design Ltd. ADI Ltd. Agreement No: CE 4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review (Feasibility Study) Preliminary Sustainability Assessment Table of Contents Abbreviation and Acronyms 1. INTRODUCTION 1-1 1.1 Purpose 1-1 1.2 Report Structure 1-1 2. REVISED PRELIMINARY OUTLINE DEVELOPMENT PLAN 2-1 2.1 Study Area and Major Proposals 2-1 2.2 Land Use Budget and Key Development Parameters 2-2 3. ASSESSMENT APPROACH 3-1 3.1 Sustainability Development 3-1 3.2 Purpose of Sustainability Assessment 3-1 3.3 Approach of the Present PSA 3-1 4. PRELIMINARY SUSTAINABILITY ASSESSMENT 4-1 4.1 Economy 4-1 4.2 Natural Resources 4-4 4.3 Society and Social Infrastructure 4-7 4.4 Leisure and Cultural Vibrancy 4-8 4.5 Environmental Quality 4-9 4.6 Mobility 4-11 4.7 Other Major Considerations: Non-quantifiable Indicators 4-11 4.8 Other Major Considerations: Non-quantifiable Issues 4-17 5. SUMMARY AND CONCLUSION 5-1 5.1 Summary 5-1 5.2 Conclusion 5-5 List of Tables Table 2.2.1 Land Use Budget for the Study Area Table 2.2.2 Key Development Parameters Table 3.3.1 CASET Indicators Not Relevant to the Present Study Table 3.3.2