Designated 7-11 Convenience Stores
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Historical Appraisal
Serial No.: N86 Historic Building Appraisal Old Quarry Site Structures Lei Yue Mun, Kwun Tong, Kowloon Hong Kong has been well favoured with its building stones. The high quality, Historical fine-grained granite was commonly used in construction by the time the island of Interest Hong Kong was taken over by the British in 1841. This situation continued after the British arrival, with quarries stretching along the northern coastline of the Island, ranging from Shek Tong Tsui (䞛⠀) in the western part to Quarry Bay (殪欂㴴) and A Kung Ngan (旧℔ⱑ) in the east. There were many new colonial buildings and structures which, at this date, were rich in local granite. Surviving examples include Flagstaff House and St John’s Cathedral. The general topography of the villages of Lei Yue Mun (歱欂攨), Ngau Tau Kok (䈃柕奺), Sai Cho Wan (勄勱䀋) and Cha Kwo Ling (勞㝄ⵢ) in Kowloon was quite hilly, offering little arable land for crop growing, but they were rich in granite. They were well known for the production of stones, and thus got the name of ‘Si Shan’ (⚃Ⱉ, ‘Four Hills’). The Qing government appointed a ‘Tau Yan’ (柕Ṣ) (headman) in each of the ‘Four Hills’ to manage the quarries. There was a ‘Sze Shan Kung So’ (⚃Ⱉ℔, Communal Hall of Four Hills) to discuss matters relating to stone business. The famous Canton Cathedral (⺋ⶆ䞛⭌) was built with granite cut in the “Four Hills”. The British takeover of Kowloon and the New Territories led to a greater demand of stone for construction. At the time, the more prominent stone-cutting stores in Lei Yue Mun included Tung Li Tong (⎴⇑➪) owned by Ip Wa-shing (叱厗⊅) (1844-1914), Tung Tai Tong (⎴㲘➪) owned by Tsang Lam-on (㚦㜿 ⬱) and Tung Fuk Tong (⎴䤷➪) owned by Ip Fuk (叱䤷). -
LC Paper No. CB(1)531/20-21(05)
LC Paper No. CB(1)531/20-21(05) For discussion on 23 February 2021 Legislative Council Panel on Development Progress of Work by the Sustainable Lantau Office (SLO), and Staffing Proposals of SLO, Planning Department and Railway Development Office of Highways Department for Taking Forward and Implementation of Development and Conservation Projects related to Lantau PURPOSE The paper aims to brief members on: (a) the proposal of the Sustainable Lantau Office (SLO) of the Civil Engineering and Development Department (CEDD) to retain four supernumerary directorate posts, and create two supernumerary directorate posts up to 31 March 2025 to provide directorate support for the implementation of new and on-going development and conservation initiatives in Lantau (details at Enclosure 1); (b) the proposal of the Planning Department to create one supernumerary directorate post of Chief Town Planner up to 31 March 2025 to provide high-level steer for various strategic planning tasks for the sustainable development of Lantau (details at Enclosure 2); (c) the proposal of the Railway Development Office of the Highways Department to create one supernumerary directorate post of Chief Engineer up to 31 March 2025 to provide technical support for the planning and implementation of the proposed priority rail links and the possible rail links for the longer term under the “Studies related to Artificial Islands in the Central Waters” (details at Enclosure 3); and (d) the progress of work made by SLO of CEDD (details at Enclosure 4). ADVICE SOUGHT 2. Members are invited to comment on the above staffing proposals1. After soliciting Members’ comments, we intend to submit the proposals to the Establishment Subcommittee for consideration and to the Finance Committee for approval at the soonest opportunity. -
List of Buildings with Confirmed / Probable Cases of COVID-19
List of Buildings With Confirmed / Probable Cases of COVID-19 List of Residential Buildings in Which Confirmed / Probable Cases Have Resided (Note: The buildings will remain on the list for 14 days since the reported date.) Related Confirmed / District Building Name Probable Case(s) Islands Hong Kong Skycity Marriott Hotel 5482 Islands Hong Kong Skycity Marriott Hotel 5483 Yau Tsim Mong Block 2, The Long Beach 5484 Kwun Tong Dorsett Kwun Tong, Hong Kong 5486 Wan Chai Victoria Heights, 43A Stubbs Road 5487 Islands Tower 3, The Visionary 5488 Sha Tin Yue Chak House, Yue Tin Court 5492 Islands Hong Kong Skycity Marriott Hotel 5496 Tuen Mun King On House, Shan King Estate 5497 Tuen Mun King On House, Shan King Estate 5498 Kowloon City Sik Man House, Ho Man Tin Estate 5499 Wan Chai 168 Tung Lo Wan Road 5500 Sha Tin Block F, Garden Rivera 5501 Sai Kung Clear Water Bay Apartments 5502 Southern Red Hill Park 5503 Sai Kung Po Lam Estate, Po Tai House 5504 Sha Tin Block F, Garden Rivera 5505 Islands Ying Yat House, Yat Tung Estate 5506 Kwun Tong Block 17, Laguna City 5507 Crowne Plaza Hong Kong Kowloon East Sai Kung 5509 Hotel Eastern Tower 2, Pacific Palisades 5510 Kowloon City Billion Court 5511 Yau Tsim Mong Lee Man Building 5512 Central & Western Tai Fat Building 5513 Wan Chai Malibu Garden 5514 Sai Kung Alto Residences 5515 Wan Chai Chee On Building 5516 Sai Kung Block 2, Hillview Court 5517 Tsuen Wan Hoi Pa San Tsuen 5518 Central & Western Flourish Court 5520 1 Related Confirmed / District Building Name Probable Case(s) Wong Tai Sin Fu Tung House, Tung Tau Estate 5521 Yau Tsim Mong Tai Chuen Building, Cosmopolitan Estates 5523 Yau Tsim Mong Yan Hong Building 5524 Sha Tin Block 5, Royal Ascot 5525 Sha Tin Yiu Ping House, Yiu On Estate 5526 Sha Tin Block 5, Royal Ascot 5529 Wan Chai Block E, Beverly Hill 5530 Yau Tsim Mong Tower 1, The Harbourside 5531 Yuen Long Wah Choi House, Tin Wah Estate 5532 Yau Tsim Mong Lee Man Building 5533 Yau Tsim Mong Paradise Square 5534 Kowloon City Tower 3, K. -
Membership List
MEMBERSHIP LIST Hotel Address Tel.No. Fax.No. 99 Bonham 99 Bonham Strand, Sheung Wan, Hong Kong 3940 1111 3940 1100 Hotel Alexandra 32 City Garden Road, North Point, Hong Kong 3893 2888 3893 2999 (opening in 2020) ALVA HOTEL BY ROYAL 1 Yuen Hong Street, Shatin, New Territories 3653 1111 3653 1122 Auberge Discovery Bay Hong Kong 88 Siena Avenue Discovery Bay Lantau Island, Hong Kong 2295 8288 2295 8188 BEST WESTERN Hotel Causeway Bay Cheung Woo Lane, Canal Road West, Causeway Bay, Hong Kong 2496 6666 2836 6162 BEST WESTERN PLUS Hotel Hong Kong 308 Des Voeux Road West, Hong Kong 3410 3333 2559 8499 Best Western PLUS Hotel Kowloon 73-75 Chatham Road South, Tsimshatsui, Kowloon 2311 1100 2311 6000 Bishop Lei International House 4 Robinson Road, Mid Levels, Hong Kong 2868 0828 2868 1551 Butterfly on Prat 21 Prat Avenue, Tsim Sha Tsui, Kowloon 3962 8888 3962 8889 The Charterhouse Causeway Bay 209-219 Wanchai Road, Hong Kong 2833 5566 2833 5888 City Garden Hotel 9 City Garden Road, North Point, Hong Kong 2887 2888 2887 1111 The Cityview 23 Waterloo Road, Yaumatei, Kowloon 2783 3888 2783 3899 Conrad Hong Kong Pacific Place, 88 Queensway, Hong Kong 2521 3838 2521 3888 Cordis Hong Kong 555 Shanghai Street, Mongkok, Kowloon 3552 3388 3552 3322 Cosmo Hotel Hong Kong 375-377 Queen’s Road East, Wanchai, Hong Kong 3552 8388 3552 8399 Courtyard by Marriott Hong Kong 167 Connaught Road West, Hong Kong 3717 8888 3717 8228 Courtyard by Marriott Hong Kong Sha Tin 1 On Ping Street, Shatin, New Territories 3940 8888 3940 8828 Crowne Plaza Hong Kong Kowloon East 3 Tong Tak Street, Tseung Kwan O, Kowloon 3983 0388 3983 0399 Disney Explorers Lodge Hong Kong Disneyland Resort, Lantau Island, Hong Kong 3510 2000 3510 2333 Hong Kong Disneyland Hotel Hong Kong Disneyland Resort, Lantau Island, Hong Kong 3510 6000 3510 6333 Disney’s Hollywood Hotel Hong Kong Disneyland Resort, Lantau Island, Hong Kong 3510 5000 3510 5333 Dorsett Kwun Tong, Hong Kong 84 Hung To Road, Kwun Tong, Kowloon 3989 6888 3989 6868 Dorsett Mongkok, Hong Kong No. -
Contents • the Last Month in Brief, Shipping Companies
GURKHA INTERNATIONAL GROUP Apr 2017 Issue 236 Newsletter Contents • The Last Month in Brief, Shipping Companies ...........................................1 • GI (HK) Business, World Security: Economics, Nuclear, Europe ...........2 • The Arab World, Afghanistan & Pakistan, Palestine, Asia ...................3 • Thailand and Malaysia, The Malacca Straits, Somalia, Africa, The Americas, Myanmar, India ...............4 • Nepal News .....................................5 - 7 • Hong Kong News ........................8 - 9 • Conclusion .........................................10 We publish this month a photograph of Thomson Discovery of Columbia Cruise Services Ltd. If you have pictures or postcards of your ship, please send them in to us for future Newsletters. We Welcome Norwegian Cruise Lines I shall be in Myanmar at the start of next month re- Dev Bahadur Gurung Kusum Thapa cruiting for NCL. It is good to see that that Company Man Prasad Roka Magar Bishal Gurung has decided to resume recruiting after a gap of about Uda Ram Vishnoi a year. Carnival UK Bimala Gurung Raju Kalpit Gurung Raju Chhetri Culumbia Ship Management Bhuwan Moktan SHIPPING COMPANIES AND SHIPS LINKED TO US We are working with 21 shipping companies, and have 734 men and 170 women on ships, a total of 904 crew and staff under management. Gurkha International Group Newsletter 1 World Security World Security Economics The world’s economy seems to be on a slight upturn at the moment. There are no major worries this month. GI (HK) Business Nuclear Tension has risen markedly in and around Korea, as North Ko- We are providing security ser- vices for 28 Hong Kong Clients rea has continue to test missiles and threatened to conduct and have 104 security staff em- underground nuclear tests. -
G.N. 4891 Travel Agents Registry REVOCATION of TRAVEL
G.N. 4891 Travel Agents Registry REVOCATION OF TRAVEL AGENTS LICENCE Notice is hereby given under section 30(1)(a)(i) of the Travel Agents Ordinance (Chapter 218) that the following Travel Agents Licences were revoked on 29 July 2021 under section 19(2) of the said Ordinance:— Licence Number Name of Licensee Name of Travel Agent and Address 240540 LU KUO KAO & PARTNER ELEGANT TRAVEL SERVICES CO. Room 803, 8/F, Century Square, 1–13 D’aguilar Street, Central, Hong Kong. 350031 BO ING HOLIDAY SERVICES BO ING HOLIDAY SERVICES LIMITED LIMITED Room 1202, 12/F, Hung Kei Mansion, 5–8 Queen Victoria Street, Central, Hong Kong. 350461 JARDINE TRAVEL LIMITED JTL Room 2509–2510A, 25/F, Skyline Tower, 39 Wang Kwong Road, Kowloon Bay, Kowloon. 350721 HONG KONG FOUR SEASONS UNITED TRAVEL SERVICES TRAVEL SERVICE LIMITED Room M101, M1/F, Haleson Building, 1 Jubilee Street, Central, Hong Kong. 350880 CHILDWISE INTERNATIONAL CHILDWISE INTERNATIONAL TRAVEL SERVICE CO. TRAVEL SERVICE CO. LIMITED LIMITED Room 1218, 12/F, Beverley Commercial Centre, 87–105 Chatham Road South, Tsim Sha Tsui, Kowloon. 350980 LION INTERNATIONAL LION INTERNATIONAL TRAVEL TRAVEL SERVICE COMPANY SERVICE COMPANY LIMITED LIMITED Room 1106, 11/F, Beverly House, 93–107 Lockhart Road, Wan Chai, Hong Kong. 351195 FORCETEN LIMITED FORCETEN LIMITED Room 153, 1/F, Palm Springs Commercial Centre, Wo Shang Wai, Yuen Long, New Territories. 351938 HOUSELINK LIMITED NETWORK TRAVEL SERVICE CO. Room 308, 3/F, Universal Commercial Building, 69 Peking Road, Tsim Sha Tsui, Kowloon. 352529 HOTELBEDS HONG KONG 百事活公司 LIMITED Unit No. 29–32, 10/F, Star House, 3 Salisbury Road, Tsim Sha Tsui, Kowloon. -
Press Release on Modification Works for the MTR Diamond Hill Station In
CB(1)786/12-13(01) PR021/13 25 March 2013 Enhanced facilities to make MTR Diamond Hill Station the future East Kowloon railway hub MTR Diamond Hill Station will be transformed into a major new railway hub for East Kowloon when the first phase of the Shatin to Central Link (SCL) commences service in 2018. Modification works will begin in mid-April to upgrade and enlarge Diamond Hill Station to serve as the future interchange station between SCL and the Kwun Tong Line. A new SCL concourse and platforms will be built and a wide array of enhanced facilities will be added there including the installation of 3 new lifts, 12 escalators, additional Ticket Issuing Machines, Automatic Teller Machines, shops, and new public toilet facilities. “We take on the feedback from the community on barrier-free facilities. By reorganising the station layout and exploring ways to overcome technical challenges, we have been able to maximize the number of lifts and escalators we can put into the station, “said Mr Jay Walder, Chief Executive Officer of MTR Corporation. “Passengers will enjoy the convenience brought by the new facilities at the Kwun Tong Line of Diamond Hill Station from the end of 2015, while the facilities at the new extension will be unveiled with the completion of the SCL in 2018,”said Mr Philco Wong, General Manager – Shatin to Central Link of MTR Corporation. In the intervening period, a number of temporary arrangements will be implemented at the station to facilitate construction works. “In planning the modification works, we will do our best to minimize the inconvenience caused to the passengers. -
Proposed Road Improvement Works in West Kowloon Reclamation Development Phase I
Proposed Road Improvement Works in West Kowloon Reclamation Development Phase I Project Profile (Report No. 276799/11.01/B) August 2011 Highways Department, HKSAR Government Proposed Road Improvement Works in West Kowloon276799 ReclamationTNI Development BRI 096/03 B P:\Hong Kong\ENL\PROJECTS\276799(BRI) West Kowloon Road Phase I Impr\reports\PP\Project Profile RevA doc 01 December 2009 Schemes H, I, J, Q (Interim Option) and Improvement Works at the Junction of Canton Road/ Ferry Street/ Jordan Road Project Profile August 2011 Highways Department 6/F., Homantin Government Offices, 88 Chung Hau Street, Homantin, Kowloon Mott MacDonald, 20/F, Two Landmark East, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong T +852 2828 5757 F +852 2827 1823 W www.mottmac.com.hk Phase I Project Profile Issue and revision record Revision Date Originator Checker Approver Description A June 2011 Various Eric Ching H. T. Cheng First Issue B August 2011 Various Eric Ching H. T. Cheng Second Issue This document is issued for the party which commissioned it We accept no responsibility for the consequences of this and for specific purposes connected with the above-captioned document being relied upon by any other party, or being used project only. It should not be relied upon by any other party or for any other purpose, or containing any error or omission used for any other purpose. which is due to an error or omission in data supplied to us by other parties This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it. -
3 PROJECT DESCRIPTION 3.1 Scope of the Project 3.2 South Apron
3 PROJECT DESCRIPTION 3.1 Scope of the Project 3.1.1.1 Further to the recommendations of the Option Assessment and subsequent alignment developments detailed in Section 2 of this report, the preferred Trunk Road T2 is shown in Figure 3.1 and will comprise: • a dual two-lane trunk road of approximately 3.0km long with about 2.7km of the trunk road in form of tunnel; • ventilation and administration buildings and a traffic control and surveillance system; and • associated civil, electrical, mechanical, landscaping and environmental protection and mitigation works. 3.1.1.2 The works for the Trunk Road T2 project are grouped under the following major geographical headings: a) The South Apron Section – all works for the Trunk Road T2 Project located at the South Apron of the former Kai Tak Airport, including a ventilation building, a section of at-grade road, a section of depressed road, a section of cut and cover tunnel, a vertical launching shaft for the tunnel boring machines (TBM), a section of twin TBM tunnel and ancillary works. b) The Subsea Tunnel Section – all works for the Trunk Road T2 project in the sea between the South Apron and Cha Kwo Ling, including twin subsea TBM tunnels. c) The Cha Kwo Ling Section – all works for the Trunk Road T2 project located at the former Cha Kwo Ling Public Cargo Works Area (PCWA), including a section of cut and cover tunnel, a vertical receiving shaft for the TBMs, a section of twin TBM tunnels, a ventilation building and an administration building located inside the Lam Tin Interchange. -
Temporary Service Arrangement in Relation to the Peak Tramway's
Information Paper C&WDC T&TC Paper No. 43/2019 Central & Western District Council – Traffic & Transport Committee Temporary Service Arrangement in Relation to the Peak Tramway’s Upgrading Plan On 2 October 2018, the Chief Executive in Council (“ExCo”) has approved, under the Peak Tramway Ordinance (Cap. 265), the grant of the second 10-year (2026 - 2035) operating right of the peak tramway to the Peak Tramways Company Limited (“PTC”) for maintaining the peak tramway as an important tourism and recreational facility. Since early 2019, PTC has embarked on works related to the upgrading plan. At present, the progress of the upgrading plan is on schedule, and the Government will continue to closely monitor the progress of the upgrading plan carried out by PTC. To enable District Council members to have an understanding of the latest progress of the upgrading plan and the temporary service arrangement in respect of service suspension starting from 23 April 2019 for around two to three months, the information paper prepared by PTC is attached for members’ reference. Tourism Commission Commerce and Economic Development Bureau 4 April 2019 Information Paper The Peak Tram Upgrading Plan Following consultation with Central & Western District Council (“C&WDC”) - Traffic & Transport Committee (“T&TC”) on 12 April 2018, the Peak Tramways Company Limited’s (“PTC”) application for the second ten-year operating right, together with the upgrading plan and the proposed legislative amendments arising from the upgrading plan, was also submitted to the Legislative Council (“LegCo”) Panel of Economic Development on 25 June 2018, and the proposal gained the support of Panel members. -
Progress of Admiralty Station Expansion Works Under the Shatin to Central Link Project
For Circulation C&W DC Paper No. 109/2017 Central and Western District Council Progress of Admiralty Station Expansion Works under the Shatin to Central Link Project Introduction 1. This paper aims to update members of the Central and Western District Council on the progress of the expansion works of Admiralty Station under the Shatin to Central Link (“SCL”) project. Background 2. The 17-kilometre SCL is a territory-wide strategic railway project linked with a number of existing and future railways to form two strategic railway corridors, namely the “East West Corridor” and the “North South Corridor”. The “East West Corridor” will be formed by extending the Ma On Shan Line from Tai Wai Station to Hung Hom Station where it will connect with the West Rail Line. The “North South Corridor” will extend the existing East Rail Line from Hung Hom Station across the Victoria Harbour to Admiralty Station via Exhibition Station. The “East West Corridor” and “North South Corridor” are expected to commission in mid-2019 and the 2021 respectively. 3. Admiralty Station will become the railway transport hub on Hong Kong Island that serves as the interchange for Island Line, Tsuen Wan Line, South Island Line (“SIL”) and the SCL. As part of the facilities are integrated for both the SCL and the South Island Line (East) (SIL(E)) project, part of the major works including platforms and interchange concourse were carried out under the SIL(E) project to shorten the overall construction time and minimise disturbance to the environment, road traffic and community. As SIL has been in operation since December 2016, SCL has taken over the works site from SIL(E) in Admiralty to continue the remaining railway construction works. -
Branch List English
Telephone Name of Branch Address Fax No. No. Central District Branch 2A Des Voeux Road Central, Hong Kong 2160 8888 2545 0950 Des Voeux Road West Branch 111-119 Des Voeux Road West, Hong Kong 2546 1134 2549 5068 Shek Tong Tsui Branch 534 Queen's Road West, Shek Tong Tsui, Hong Kong 2819 7277 2855 0240 Happy Valley Branch 11 King Kwong Street, Happy Valley, Hong Kong 2838 6668 2573 3662 Connaught Road Central Branch 13-14 Connaught Road Central, Hong Kong 2841 0410 2525 8756 409 Hennessy Road Branch 409-415 Hennessy Road, Wan Chai, Hong Kong 2835 6118 2591 6168 Sheung Wan Branch 252 Des Voeux Road Central, Hong Kong 2541 1601 2545 4896 Wan Chai (China Overseas Building) Branch 139 Hennessy Road, Wan Chai, Hong Kong 2529 0866 2866 1550 Johnston Road Branch 152-158 Johnston Road, Wan Chai, Hong Kong 2574 8257 2838 4039 Gilman Street Branch 136 Des Voeux Road Central, Hong Kong 2135 1123 2544 8013 Wyndham Street Branch 1-3 Wyndham Street, Central, Hong Kong 2843 2888 2521 1339 Queen’s Road Central Branch 81-83 Queen’s Road Central, Hong Kong 2588 1288 2598 1081 First Street Branch 55A First Street, Sai Ying Pun, Hong Kong 2517 3399 2517 3366 United Centre Branch Shop 1021, United Centre, 95 Queensway, Hong Kong 2861 1889 2861 0828 Shun Tak Centre Branch Shop 225, 2/F, Shun Tak Centre, 200 Connaught Road Central, Hong Kong 2291 6081 2291 6306 Causeway Bay Branch 18 Percival Street, Causeway Bay, Hong Kong 2572 4273 2573 1233 Bank of China Tower Branch 1 Garden Road, Hong Kong 2826 6888 2804 6370 Harbour Road Branch Shop 4, G/F, Causeway Centre,