Third Small Towns Water Supply and Sanitation Sector Project —Parsa (Chitwan District)

Total Page:16

File Type:pdf, Size:1020Kb

Third Small Towns Water Supply and Sanitation Sector Project —Parsa (Chitwan District) Updated Initial Environmental Examination Project number: 35173-013 July 2015 NEP: Third Small Towns Water Supply and Sanitation Sector Project —Parsa (Chitwan District) Prepared by ITECO Nepal (P) Ltd., SILT Consultants (P) Ltd., and Unique Engineering Consultancy (P) Ltd. for the Government of Nepal and the Asian Development Bank. This revised initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Government of Nepal Ministry of Urban Development Department of Water Supply and Sewerage Small Towns Water Supply and Sanitation Sector Project (STWSSSP) Project Management Office (PMO) Panipokhari, Maharajgunj, Kathmandu, Nepal Enhance Functionality in Small Towns Water Supply and Sanitation Sector Project (STWSSSP) UPDATED INITIAL ENVIRONMENTAL EXAMINATION REPORT (IEE) for Parsa Small Towns Water Supply and Sanitation Sector Project Chitwan District Kathmandu, July 2015 Submitted by: Joint Venture in Between ITECO Nepal (P) Ltd. SILT Consultants (P) Ltd. Unique Engineering P. O. Box 2147 P.O. Box 2724 Consultancy (P) Ltd. Min Bhawan, Kathmandu, Nepal Ratopul, Gaushala, Kathmandu, Nepal P. O. Box 3522, Jwagal-10, Lalitpur, Nepal Tel: ++977-1- 46 21 764 (Hunting Line), Tel: ++977-1-44 87 598, 44 75139 Tel: ++977-1-55 49 332, 55 29 896 Fax : ++ 977-1- 46 22 298 Fax: ++977-1-44 73 573 Fax: ++977-1-55 49 332 E-mail: [email protected] E-mail: [email protected], [email protected] E-mail: [email protected] Website: www.iteconepal.com Website: www.silt.com.np Website:www.unecnepal.com.np UPDATED IEE OF SMALL TOWN WATER SUPPLY REHABILITATION SUB-PROJECT PARSA, CHITWAN Table of Contents EXECUTIVE SUMMARY ..................................................................................................................... VII 1. INTRODUCTION ........................................................................................................................... 4 1.1 Background ........................................................................................................................... 4 1.2 Objectives of IEE ................................................................................................................... 4 1.3 Rational of IEE Requirement ................................................................................................. 4 1.4 Methodology Used in Preparing IEE ...................................................................................... 4 2. POLICY, LEGAL & ADMINISTRATIVE FRAMEWORK ................................................................ 5 2.1 ADB Policy ............................................................................................................................ 5 2.2 ADB Safeguards policy ......................................................................................................... 5 2.3 Nepal‟s Environmental Policy and Legal Framework ............................................................. 7 3. ANALYSIS OF ALTERNATIVES ................................................................................................. 13 3.1 Alternatives considered in the approved IEE report 2006 .................................................... 13 3.1.1 No Project Alternative .............................................................................................. 13 3.1.2 With project Alternative ............................................................................................ 13 3.1.3 Alternative Sources of Water ................................................................................... 13 3.1.4 Design Alternative .................................................................................................... 13 3.1.5 Route Alternative ..................................................................................................... 13 3.1.6 Construction Schedule Alternative ........................................................................... 13 3.1.7 Consideration of environmental Issues .................................................................... 14 3.2 Alternatives for the Updated IEE ......................................................................................... 14 4. DESCRIPTION OF SUBPROJECT ............................................................................................. 15 4.1 Location and Accessibility: .................................................................................................. 15 4.2 Climate ................................................................................................................................ 15 4.3 Service Area and Settlement Pattern................................................................................... 15 4.4 Existing Condition and Need for the Subproject .................................................................. 17 4.4.1 General Information ................................................................................................. 17 4.4.2 TECHNICAL INFORMATION ................................................................................... 17 4.4.3 SOCIO- ECONOMIC INFORMATION ...................................................................... 17 4.4.4 FINANCIAL INFORMATION .................................................................................... 18 4.5 Sub Project Construction schedule ...................................................................................... 18 5. DESCRIPTION OF THE ENVIRONMENT ................................................................................... 20 5.1 Physical Profile .................................................................................................................... 20 5.1.1 Topography ............................................................................................................. 20 5.1.2 Geology and Soils .................................................................................................... 20 5.1.3 Climate .................................................................................................................... 20 5.1.4 Surface and Groundwater ........................................................................................ 20 5.1.5 Water Quality Analysis ............................................................................................. 20 5.2 Ecological Profile ................................................................................................................. 21 5.2.1 Flora ........................................................................................................................ 21 5.2.2 Fauna ...................................................................................................................... 21 5.3 Socio economic condition .................................................................................................... 21 5.3.1 Population, Communities and Occupation ............................................................... 21 5.3.2 Health and Sanitation .............................................................................................. 21 5.3.3 Economic Characteristics ........................................................................................ 22 5.3.4 Infrastructure Facilities ............................................................................................. 22 5.3.5 Land Use Planning .................................................................................................. 22 ITECO-SILT-UNEC JV II | PAGE UPDATED IEE OF SMALL TOWN WATER SUPPLY REHABILITATION SUB-PROJECT PARSA, CHITWAN 5.3.6 Quality of Life Values ............................................................................................... 22 5.4 Resettlement, Relocation and Compensation Issue ............................................................ 22 6. DESCRIPTION OF IMPACT ASSESSMENT ............................................................................... 23 6.1 Physical Environment .......................................................................................................... 23 6.1.1 Impact on land use pattern ...................................................................................... 23 6.1.2 Landslide, erosion and soil instability ....................................................................... 23 6.1.3 Impact on water/land quality .................................................................................... 23 6.1.4 Impacts of sediments and Disinfecting Chemicals ................................................... 23 6.1.5 Water Volume/Quality .............................................................................................. 23 6.1.6 Impacts on Air Quality .............................................................................................. 23 6.1.7 Impacts on Acoustic Environment ............................................................................ 23 6.1.8 Impacts on Traffic and Temporary disturbance ........................................................ 24 6.2 Biological Environment .......................................................................................................
Recommended publications
  • Monthly District Report
    District Report Housing Recovery and Reconstruction Platform, Nepal Housing Recovery and Reconstruction Platform Monthly District Report Makwanpur, Chitwan, Nawalpur, Parasi 14 June - 14 July 2019 Summary of events during this period Districts Name of activity/event Event date Location (District, Contact Person Reference Municipality) Document Makwanpur District Facilitation and 18th June DCC Hall, [email protected] Meeting Coordination Meeting 2019 Makwanpur, Minute Hetauda Sub- click here.. Metropolitan Update Palika Profile data of 7th June 2019 [email protected] Palika Makwanpur Profile Data Chitwan District Coordination Meeting 26th June Chitwan GMaLi [email protected] Meeting 2019 Hall Minute click here... Organized interaction program 24th June, [email protected] in GMALI DLPIU and Building 2019 DLPIU at Chitwan Organized Technical 26th june, Kalika [email protected] Report Coordination Meeting in Plika 2019 Municipality Available level at Kalika Municipality Office Below Nawalpur Organized Technical 27th June Hupsekot Rural [email protected] Report Coordination Meeting in ward 2019 Municipality Available level at Hupsekot Rural Office Below Municipality Field visit Carry out 27th June, Devchuli 2019 Municipality Parasi Update Palika Profile data of 12th June [email protected] Palika Nawalpur 2019 Profile Data Upcoming Events & Meetings Name of activity/event Date, Time, and Organizer Contact Person Location (District, Municipality) District Facilitation and Tentative 19th July, DCC/GMaLI/HRRP [email protected] Coordination Meeting 2019; DCC Hall, Hetauda, Makwanpur Technical Coordination Meeting 24th July to 26th July, Joint Monitoring Team [email protected] in Ward level and Joint Field 2019 Bakaiya Rural Monitoring Visit Municipality, Participants: M&E Specialist, Makwanpur Gadhi DSE, HRRP team, Ward and Hetauda Sub- representatives, local Metropolitan technicians and Beneficiaries.
    [Show full text]
  • Provincial Summary Report Province 3 GOVERNMENT of NEPAL
    National Economic Census 2018 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 Provincial Summary Report Provincial National Planning Commission Province 3 Province Central Bureau of Statistics Kathmandu, Nepal August 2019 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 National Planning Commission Central Bureau of Statistics Kathmandu, Nepal August 2019 Published by: Central Bureau of Statistics Address: Ramshahpath, Thapathali, Kathmandu, Nepal. Phone: +977-1-4100524, 4245947 Fax: +977-1-4227720 P.O. Box No: 11031 E-mail: [email protected] ISBN: 978-9937-0-6360-9 Contents Page Map of Administrative Area in Nepal by Province and District……………….………1 Figures at a Glance......…………………………………….............................................3 Number of Establishments and Persons Engaged by Province and District....................5 Brief Outline of National Economic Census 2018 (NEC2018) of Nepal........................7 Concepts and Definitions of NEC2018...........................................................................11 Map of Administrative Area in Province 3 by District and Municipality…...................17 Table 1. Number of Establishments and Persons Engaged by Sex and Local Unit……19 Table 2. Number of Establishments by Size of Persons Engaged and Local Unit….….27 Table 3. Number of Establishments by Section of Industrial Classification and Local Unit………………………………………………………………...34 Table 4. Number of Person Engaged by Section of Industrial Classification and Local Unit………………………………………………………………...48 Table 5. Number of Establishments and Person Engaged by Whether Registered or not at any Ministries or Agencies and Local Unit……………..………..…62 Table 6. Number of establishments by Working Hours per Day and Local Unit……...69 Table 7. Number of Establishments by Year of Starting the Business and Local Unit………………………………………………………………...77 Table 8.
    [Show full text]
  • Membership Register MBR0009
    LIONS CLUBS INTERNATIONAL CLUB MEMBERSHIP REGISTER SUMMARY THE CLUBS AND MEMBERSHIP FIGURES REFLECT CHANGES AS OF JULY 2020 CLUB CLUB LAST MMR FCL YR MEMBERSHI P CHANGES TOTAL DIST IDENT NBR CLUB NAME COUNTRY STATUS RPT DATE OB NEW RENST TRANS DROPS NETCG MEMBERS 5117 026070 BIRGANJ NEPAL 325B2 4 07-2020 46 0 0 0 0 0 46 5117 029868 HIMALAYAS PATAN NEPAL 325B2 4 05-2020 25 0 0 0 0 0 25 5117 035305 HETAUDA NEPAL 325B2 4 12-2019 34 0 0 0 0 0 34 5117 040820 NARAYANGARH NEPAL 325B2 4 04-2020 32 0 0 0 0 0 32 5117 042916 BIRGANJ ADARSHNAGAR NEPAL 325B2 4 06-2020 42 0 0 0 0 0 42 5117 042917 BUTWAL NEPAL 325B2 4 04-2020 87 0 0 0 0 0 87 5117 044334 PALPA NEPAL 325B2 4 05-2020 49 0 0 0 0 0 49 5117 045854 SIDDHARATHANAGAR NEPAL 325B2 4 06-2020 72 0 0 0 0 0 72 5117 046792 DHANGADHI TOWN NEPAL 325B2 4 04-2020 47 0 0 0 0 0 47 5117 047592 BIRGANJ GREATER NEPAL 325B2 4 07-2020 9 0 0 0 -6 -6 3 5117 047955 KATHMANDU EVEREST NEPAL 325B2 4 01-2020 10 0 0 0 0 0 10 5117 056224 KATHMANDU TRIPURESWOR NEPAL 325B2 4 07-2020 43 1 0 0 -25 -24 19 5117 056487 LALITPUR PAGODA CITY NEPAL 325B2 4 04-2020 22 0 0 0 0 0 22 5117 057111 KATHMANDU VALLEY WEST NEPAL 325B2 4 04-2020 11 0 0 0 0 0 11 5117 058172 DANG NEPAL 325B2 4 07-2020 46 1 0 0 -1 0 46 5117 058240 KRISHNANAGAR NEPAL 325B2 4 07-2020 11 4 0 0 -1 3 14 5117 059380 BIRGANJ GATEWAY NEPAL 325B2 4 06-2020 21 0 0 0 0 0 21 5117 060132 NEPALGANJ NEPAL 325B2 4 06-2020 66 0 0 0 0 0 66 5117 060588 BARDIYA NEPAL 325B2 4 07-2020 19 0 0 0 0 0 19 5117 060698 RATNANAGAR NEPAL 325B2 4 07-2020 16 8 1 0 0 9 25 5117 061182 NARAYANGARH
    [Show full text]
  • 2 Chitwan District: Asset Baseline
    Technical Assistance Consultant’s Report Project Number: 44168-012 Capacity Development Technical Assistance (CDTA) October 2013 Nepal: Mainstreaming Climate Change Risk Management in Development (Financed by the Strategic Climate Fund) District Baseline Reports: Department of Water Supply and Sewerage (DWSS) – Urban Watsan Chitwan, Dolakha, and Kathmandu Districts Prepared by ICEM – International Centre for Environmental Management This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. MOSTE | Mainstreaming climate change risk management in development | WATSAN-Urban district baselines TA – 7984 NEP October, 2013 Mainstreaming Climate Change Risk Management in Development 1 Main Consultancy Package (44768-012) CHITWAN DISTRICT BASELINE: DEPARTMENT OF WATER SUPPLY AND SEWERAGE (DWSS) – URBAN WATSAN Prepared by ICEM – International Centre for Environmental Management METCON Consultants APTEC Consulting Prepared for Ministry of Science, Technology and Environment, Government of Nepal Environment Natural Resources and Agriculture Department, South Asia Department, Asian Development Bank Version B i TABLE OF CONTENTS 1 CHITWAN DISTRICT .......................................................................................................... 1 1.1 Chitwan Sector Master Plan ...........................................................................................
    [Show full text]
  • Modality in Tharu: a Comparative Perspective
    International Journal of Communication and Media Studies (IJCMS) ISSN (P):2250-0014; ISSN (E): Applied Vol. 7, Issue 4, Oct 2017, 1-8 © TJPRC Pvt. Ltd. MODALITY IN THARU: A COMPARATIVE PERSPECTIVE KRISHNA PRASAD PAUDYAL Department of English, Birendra Multiple Campus (TU), Bharatpur , Chitwan , Nepal ABSTRACT This paper examines the morphosyntactic structures characterizing the notion of modality in two different Tharu languages: Dangaura and Chitoniya, from a comparative perspective. Being the members of the same language family, both of these languages share the vector verbs sʌk used to express the notions of possibility, ability and permission, and pʌr expressing that of necessity and obligation, though there are other verbs like chai/cah ĩ to indicate necessity and pa for the notion of permission. However, they exhibit completely different system in the selection and distribution of devices to express the secondhand knowledge about which the speaker is not sure. Besides, they have a distinct agreement system of their own. KEYWORDS: Possibility, Ability, Permission, Obligation, Necessity and Hearsay Original Article Article Original Received: Jul 15, 2017; Accepted: Aug 03, 2017; Published: Aug 28, 2017; Paper Id.: IJCMSOCT20171 INTRODUCTION Tharu, the largest indigenous community of the nation, is one of the components of the multi-ethnicity in Nepal. Although the population of the Tharu in Nepal is reported to be 1, 737, 470, only 1, 529, 875 of them speak this language (CBS 2012:4, 144). The ethnonym ‘Tharu’ stands for the ethnic group and the language they speak. As the habitat of this ethnic group extends from Mechi to Mahakali, a considerable variation is attested in their language and culture.
    [Show full text]
  • ROJ BAHADUR KC DHAPASI 2 Kamalapokhari Branch ABS EN
    S. No. Branch Account Name Address 1 Kamalapokhari Branch MANAHARI K.C/ ROJ BAHADUR K.C DHAPASI 2 Kamalapokhari Branch A.B.S. ENTERPRISES MALIGAON 3 Kamalapokhari Branch A.M.TULADHAR AND SONS P. LTD. GYANESHWAR 4 Kamalapokhari Branch AAA INTERNATIONAL SUNDHARA TAHAGALLI 5 Kamalapokhari Branch AABHASH RAI/ KRISHNA MAYA RAI RAUT TOLE 6 Kamalapokhari Branch AASH BAHADUR GURUNG BAGESHWORI 7 Kamalapokhari Branch ABC PLACEMENTS (P) LTD DHAPASI 8 Kamalapokhari Branch ABHIBRIDDHI INVESTMENT PVT LTD NAXAL 9 Kamalapokhari Branch ABIN SINGH SUWAL/AJAY SINGH SUWAL LAMPATI 10 Kamalapokhari Branch ABINASH BOHARA DEVKOTA CHOWK 11 Kamalapokhari Branch ABINASH UPRETI GOTHATAR 12 Kamalapokhari Branch ABISHEK NEUPANE NANGIN 13 Kamalapokhari Branch ABISHEK SHRESTHA/ BISHNU SHRESTHA BALKHU 14 Kamalapokhari Branch ACHUT RAM KC CHABAHILL 15 Kamalapokhari Branch ACTION FOR POVERTY ALLEVIATION TRUST GAHANA POKHARI 16 Kamalapokhari Branch ACTIV NEW ROAD 17 Kamalapokhari Branch ACTIVE SOFTWARE PVT.LTD. MAHARAJGUNJ 18 Kamalapokhari Branch ADHIRAJ RAI CHISAPANI, KHOTANG 19 Kamalapokhari Branch ADITYA KUMAR KHANAL/RAMESH PANDEY CHABAHIL 20 Kamalapokhari Branch AFJAL GARMENT NAYABAZAR 21 Kamalapokhari Branch AGNI YATAYAT PVT.LTD KALANKI 22 Kamalapokhari Branch AIR NEPAL INTERNATIONAL P. LTD. HATTISAR, KAMALPOKHARI 23 Kamalapokhari Branch AIR SHANGRI-LA LTD. Thamel 24 Kamalapokhari Branch AITA SARKI TERSE, GHYALCHOKA 25 Kamalapokhari Branch AJAY KUMAR GUPTA HOSPITAL ROAD 26 Kamalapokhari Branch AJAYA MAHARJAN/SHIVA RAM MAHARJAN JHOLE TOLE 27 Kamalapokhari Branch AKAL BAHADUR THING HANDIKHOLA 28 Kamalapokhari Branch AKASH YOGI/BIKASH NATH YOGI SARASWATI MARG 29 Kamalapokhari Branch ALISHA SHRESTHA GOPIKRISHNA NAGAR, CHABAHIL 30 Kamalapokhari Branch ALL NEPAL NATIONAL FREE STUDENT'S UNION CENTRAL OFFICE 31 Kamalapokhari Branch ALLIED BUSINESS CENTRE RUDRESHWAR MARGA 32 Kamalapokhari Branch ALLIED INVESTMENT COMPANY PVT.
    [Show full text]
  • BIODIVERSITY, PEOPLE and CLIMATE CHANGE Final Technical Report of the Hariyo Ban Program, First Phase
    BIODIVERSITY, PEOPLE AND CLIMATE CHANGE Final Technical Report of the Hariyo Ban Program, First Phase Volume Two Detailed Annexes HARIYO BAN PROGRAM This final technical report for Hariyo Ban Program Phase One is submitted to the United States Agency for International Development Nepal Mission by World Wildlife Fund Nepal in partnership with CARE, the Federation of Community Forest Users Nepal and the National Trust for Nature Conservation, under Cooperative Agreement Number AID-367-A-11-00003. © WWF Nepal 2017 All rights reserved Citation Please cite this report as: WWF Nepal. 2017. Biodiversity, People and Climate Change: Final Technical Report of the Hariyo Ban Program, First Phase. WWF Nepal, Hariyo Ban Program, Kathmandu, Nepal. Cover photo credit © Karine Aigner/WWF-US Disclaimer: This report is made possible by the generous support of the American people through the United States Agency for International Development (USAID). The contents are the responsibility of WWF and do not necessarily reflect the views of USAID or the United States Government. 7 April, 2017 Table of Contents ANNEX 5: HARIYO BAN PROGRAM WORKING AREAS ......................................................................... 1 ANNEX 6: COMMUNITY BASED ANTI-POACHING UNITS FORMED/REFORMED ................................. 4 ANNEX 7: SUPPORT FOR INTEGRATED SUB-WATERSHED MANAGEMENT PLANS ........................... 11 ANNEX 8: CHARACTERISTICS OF PAYMENTS FOR ECOSYSTEM SERVICES SCHEMES PILOTED ......... 12 ANNEX 9: COMMUNITY ADAPTATION PLANS OF ACTION PREPARED .............................................
    [Show full text]
  • Interest Subsidy Information of Borrower
    1. Loan under Commercial Agriculture and Livestock on Interest Subsidy. S.No Borrower Name Details of the clients. 1 ABHI KRISHI FARM PVT. LTD CHITWAN, Bharatpur MPC, 2 ANNAPURNA POULTRY AGRO FARM PV Chitawan, Chainpur,1 3 ANNAPURNA POULTRY BREEDERS FARM PVT Chitawan, Chainpur,1 4 ANTI POULTRY FARM DANA SUPPLIERS Morang, Belbari Municipality,5 5 ARPANA POULTRY FARM Baglung, Baglung,3 6 BANSHKHOLI BAKHRA PALAN Dang, Gohari,18 7 BASANTAPUR EKIKRIT KRISHI FARM P.L Rupandehi, Omsatiya ,4 8 BHAGAWATI POULTRY FIRM Chitwan, Khairahani,9 9 BHATBHATENI INTERNATIONAL HATCHERY Jhapa, Charpane,2 10 BHATTARAI KRISHI TATHA P.F Nawalparasi( East), Madhyabindu Municipality,15 11 CENTER POINT INTEGRATED KRISHI FIRM Nawalparasi East, Madhyabindu Municipality,8 12 CHHINAKPU LAMA PASUPALAN FIRM Solukhumbu, Solududhkunda Municipality,4 13 CHITRAWAN POULTRY FIRM CHITWAN, BHARATPUR M.P.C,17 14 CHURIYA MAI BHAISI FIRM MAHOTTARI, BARDIBAS,12 15 DANFEY KRISHI FARM Jhapa, Haldibari VDC,7 16 DARSAN BAHUUDDESIYA KRISHI FARM P.L Bhaktapur, Suryabinayak,3 17 DEVCHULI INTEGRATED AGRICULTURE FAR Nawalparasi( East), Devchuli Municipality,14 18 DHAKAL BHAISI PALAN FARM Bardiya, District livestock Service Office,Bardiya,6 19 DHAULAGIRI PASHU TATHA KRISHI FARM Myagdi, Beni Municipality,1 20 DOLARAM CHAUDHARY Nawalparasi( East), Madhyabindu Municipality,4 21 EVEREST KRISHI BYABASAYA FARM Chitwan, Ichhyakamana Rural Municipality,7 22 EVERGREEN PIG FARM Kaski, POKHARA MPC,15 23 FUTURE AGROTECH P. LTD Lalitpur, LALITPUR, KARYABINAYAK,25 24 G.C.GAIN FIRM Nawalparasi East, Madhyabindu,1 25 GAJENDRA YADAV Nawalprasi, Sukrauli,2 26 GREEN FOREST CHILLARA PVT. LTD. Kathmandu, Thapagau,10 27 GREEN FOREST KOHABARA PVT. LTD Kathmandu, Thapagau,10 28 GREEN FOREST MECHI PVT.
    [Show full text]
  • Global Initiative on Out-Of-School Children
    ALL CHILDREN IN SCHOOL Global Initiative on Out-of-School Children NEPAL COUNTRY STUDY JULY 2016 Government of Nepal Ministry of Education, Singh Darbar Kathmandu, Nepal Telephone: +977 1 4200381 www.moe.gov.np United Nations Educational, Scientific and Cultural Organization (UNESCO), Institute for Statistics P.O. Box 6128, Succursale Centre-Ville Montreal Quebec H3C 3J7 Canada Telephone: +1 514 343 6880 Email: [email protected] www.uis.unesco.org United Nations Children´s Fund Nepal Country Office United Nations House Harihar Bhawan, Pulchowk Lalitpur, Nepal Telephone: +977 1 5523200 www.unicef.org.np All rights reserved © United Nations Children’s Fund (UNICEF) 2016 Cover photo: © UNICEF Nepal/2016/ NShrestha Suggested citation: Ministry of Education, United Nations Children’s Fund (UNICEF) and United Nations Educational, Scientific and Cultural Organization (UNESCO), Global Initiative on Out of School Children – Nepal Country Study, July 2016, UNICEF, Kathmandu, Nepal, 2016. ALL CHILDREN IN SCHOOL Global Initiative on Out-of-School Children © UNICEF Nepal/2016/NShrestha NEPAL COUNTRY STUDY JULY 2016 Tel.: Government of Nepal MINISTRY OF EDUCATION Singha Durbar Ref. No.: Kathmandu, Nepal Foreword Nepal has made significant progress in achieving good results in school enrolment by having more children in school over the past decade, in spite of the unstable situation in the country. However, there are still many challenges related to equity when the net enrolment data are disaggregated at the district and school level, which are crucial and cannot be generalized. As per Flash Monitoring Report 2014- 15, the net enrolment rate for girls is high in primary school at 93.6%, it is 59.5% in lower secondary school, 42.5% in secondary school and only 8.1% in higher secondary school, which show that fewer girls complete the full cycle of education.
    [Show full text]
  • Draft Initial Environmental Examination NEP: Third Small Towns Water Supply and Sanitation Sector Project – for Birendranagar
    Draft Initial Environmental Examination Project Number: 35173-013 July 2016 NEP: Third Small Towns Water Supply and Sanitation Sector Project – for Birendranagar, Chitwan District Prepared by Third Small Towns Water Supply and Sanitation Sector Project, Department of Water Supply and Sewerage, Ministry of Water Supply and Sanitation, Government of Nepal for the Asian Development Bank. This draft initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Initial Environmental Examination of Birendranagar Water Supply and Sanitation Project Government of Nepal Ministry of Water Supply and Sanitation Department of Water Supply and Sewerage Third Small Towns Water Supply & Sanitation Sector Project Project Management Office Panipokhari, Maharajgunj, Kathmandu Initial Environmental Examination (IEE) Of Birendranagar Water Supply and Sanitation Project Chitwan District July, 2016 SUBMITTED BY: TAEC Consultant Pvt. Ltd. / Integrated Consultants Nepal Pvt. Ltd. JV SUBMITTED TO: Project Management Office, Third Small Towns Water Supply and Sanitation Sector Project, Department of Water Supply
    [Show full text]
  • Project Fact Sheet-Innovative Project
    Project fact sheet-Innovative project Project Name Lease land intervention for marginalized and poor community Location Khairahani, Kalika, Madi, Ratnanagar municipalities and Bharatpur metropolitan of Chitwan district Project coordinator Subash sharma Duration Manshir to chaitra 2074 (17 Nov 2017 to 13 April 2018) Contact person Telephone:0977-56520457 Detail Mobile: 9841159320 e-mail: [email protected] Project Partner Poverty Alleviation Fund, Nepal Beneficiaries Total 1700 (Dalit 200, Janajati 1200, Women 1450., Others 300) Total Budget (NRs) 633000 for 5 month Objectives Increase in income generation , access in saving & credit facility and Small scale physical infrastructure development Brief Summary Lease Land Intervention for Improved Livelihood of Landless and Disadvantaged People project is led by MADE-Nepal with the financial support of Poverty Alleviation Fund (PAF) for the better living standard of marginalized, disadvantaged and landless communities of Chitwan district. The innovative project aims to improvement in the existing social economic status through various agro-based income generating opportunity particularly vegetables and on-farm resource management for self-sustained community development. Major Activities • Group formation and social mobilization • Direct cash support to community; • Training on off-seasonal, seasonal vegetable farming and goat farming; • Boar (Water pump) support; • Saving and credit activity; • Exposure visit; • Linkage with local government. Approach/Strategy The project aims to increase
    [Show full text]
  • Economics of Fish Production at Chitwan District, Nepal
    Journal of Agriculture and Natural Resources (2018) 1(1): 21-31 ISSN: 2661-6270 (Print), ISSN: 2661-6289 (Online) Research Article Economics of fish production at Chitwan district, Nepal 1Tara Sharma, 2Shiva Chandra Dhakal, 2Rishi Ram Kattel, 2Kamala Gharti and 3Jeevan Lamichhane 1Department of Agriculture, Kathmandu, Nepal 2Agriculture and Forestry University, Rampur, Chitwan, Nepal 3Nepal Agricultural Research Council *Correspondence: [email protected]; ORCID: https://orcid.org/0000-0001-5783-8937 Received: July 26; Accepted: December 01; Published: December 09. © Copyright: Sharma et al. (2018). This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License. ABSTRACT A study was conducted in 2016 to analyze the economics of fish production at Chitwan District of Nepal. Three study sites: East, West and South part of Chitwan were selected purposively. A total of 90 households, 30 from each study site were selected randomly and were interviewed by using pre-tested semi structured questionnaire. Secondary data needed for the study were obtained from DADO, MOAD, NARC and other related organizations working on fisheries and aquaculture sector. Descriptive statistics and extended Cobb Douglas production function was used to accomplish the study objectives for which MS-Excel and SPSS 16 were used. The B/C ratio is obtained dividing the gross return by total variable cost incurred. The total cost of production per ha of the pond area was Rs. 743798 per year with 79 and 21 percent variable and fixed cost components, respectively. Feed cost (28 %) was largest cost item followed by cost for labour (25 %), fingerlings (10 %), maintenance (6 %), manure cum fertilizers (5 %), fuel cum energy (3 %) and limestone and others (2%).
    [Show full text]