Third Small Towns Water Supply and Sanitation Sector Project —Parsa (Chitwan District)

Third Small Towns Water Supply and Sanitation Sector Project —Parsa (Chitwan District)

Updated Initial Environmental Examination Project number: 35173-013 July 2015 NEP: Third Small Towns Water Supply and Sanitation Sector Project —Parsa (Chitwan District) Prepared by ITECO Nepal (P) Ltd., SILT Consultants (P) Ltd., and Unique Engineering Consultancy (P) Ltd. for the Government of Nepal and the Asian Development Bank. This revised initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Government of Nepal Ministry of Urban Development Department of Water Supply and Sewerage Small Towns Water Supply and Sanitation Sector Project (STWSSSP) Project Management Office (PMO) Panipokhari, Maharajgunj, Kathmandu, Nepal Enhance Functionality in Small Towns Water Supply and Sanitation Sector Project (STWSSSP) UPDATED INITIAL ENVIRONMENTAL EXAMINATION REPORT (IEE) for Parsa Small Towns Water Supply and Sanitation Sector Project Chitwan District Kathmandu, July 2015 Submitted by: Joint Venture in Between ITECO Nepal (P) Ltd. SILT Consultants (P) Ltd. Unique Engineering P. O. Box 2147 P.O. Box 2724 Consultancy (P) Ltd. Min Bhawan, Kathmandu, Nepal Ratopul, Gaushala, Kathmandu, Nepal P. O. Box 3522, Jwagal-10, Lalitpur, Nepal Tel: ++977-1- 46 21 764 (Hunting Line), Tel: ++977-1-44 87 598, 44 75139 Tel: ++977-1-55 49 332, 55 29 896 Fax : ++ 977-1- 46 22 298 Fax: ++977-1-44 73 573 Fax: ++977-1-55 49 332 E-mail: [email protected] E-mail: [email protected], [email protected] E-mail: [email protected] Website: www.iteconepal.com Website: www.silt.com.np Website:www.unecnepal.com.np UPDATED IEE OF SMALL TOWN WATER SUPPLY REHABILITATION SUB-PROJECT PARSA, CHITWAN Table of Contents EXECUTIVE SUMMARY ..................................................................................................................... VII 1. INTRODUCTION ........................................................................................................................... 4 1.1 Background ........................................................................................................................... 4 1.2 Objectives of IEE ................................................................................................................... 4 1.3 Rational of IEE Requirement ................................................................................................. 4 1.4 Methodology Used in Preparing IEE ...................................................................................... 4 2. POLICY, LEGAL & ADMINISTRATIVE FRAMEWORK ................................................................ 5 2.1 ADB Policy ............................................................................................................................ 5 2.2 ADB Safeguards policy ......................................................................................................... 5 2.3 Nepal‟s Environmental Policy and Legal Framework ............................................................. 7 3. ANALYSIS OF ALTERNATIVES ................................................................................................. 13 3.1 Alternatives considered in the approved IEE report 2006 .................................................... 13 3.1.1 No Project Alternative .............................................................................................. 13 3.1.2 With project Alternative ............................................................................................ 13 3.1.3 Alternative Sources of Water ................................................................................... 13 3.1.4 Design Alternative .................................................................................................... 13 3.1.5 Route Alternative ..................................................................................................... 13 3.1.6 Construction Schedule Alternative ........................................................................... 13 3.1.7 Consideration of environmental Issues .................................................................... 14 3.2 Alternatives for the Updated IEE ......................................................................................... 14 4. DESCRIPTION OF SUBPROJECT ............................................................................................. 15 4.1 Location and Accessibility: .................................................................................................. 15 4.2 Climate ................................................................................................................................ 15 4.3 Service Area and Settlement Pattern................................................................................... 15 4.4 Existing Condition and Need for the Subproject .................................................................. 17 4.4.1 General Information ................................................................................................. 17 4.4.2 TECHNICAL INFORMATION ................................................................................... 17 4.4.3 SOCIO- ECONOMIC INFORMATION ...................................................................... 17 4.4.4 FINANCIAL INFORMATION .................................................................................... 18 4.5 Sub Project Construction schedule ...................................................................................... 18 5. DESCRIPTION OF THE ENVIRONMENT ................................................................................... 20 5.1 Physical Profile .................................................................................................................... 20 5.1.1 Topography ............................................................................................................. 20 5.1.2 Geology and Soils .................................................................................................... 20 5.1.3 Climate .................................................................................................................... 20 5.1.4 Surface and Groundwater ........................................................................................ 20 5.1.5 Water Quality Analysis ............................................................................................. 20 5.2 Ecological Profile ................................................................................................................. 21 5.2.1 Flora ........................................................................................................................ 21 5.2.2 Fauna ...................................................................................................................... 21 5.3 Socio economic condition .................................................................................................... 21 5.3.1 Population, Communities and Occupation ............................................................... 21 5.3.2 Health and Sanitation .............................................................................................. 21 5.3.3 Economic Characteristics ........................................................................................ 22 5.3.4 Infrastructure Facilities ............................................................................................. 22 5.3.5 Land Use Planning .................................................................................................. 22 ITECO-SILT-UNEC JV II | PAGE UPDATED IEE OF SMALL TOWN WATER SUPPLY REHABILITATION SUB-PROJECT PARSA, CHITWAN 5.3.6 Quality of Life Values ............................................................................................... 22 5.4 Resettlement, Relocation and Compensation Issue ............................................................ 22 6. DESCRIPTION OF IMPACT ASSESSMENT ............................................................................... 23 6.1 Physical Environment .......................................................................................................... 23 6.1.1 Impact on land use pattern ...................................................................................... 23 6.1.2 Landslide, erosion and soil instability ....................................................................... 23 6.1.3 Impact on water/land quality .................................................................................... 23 6.1.4 Impacts of sediments and Disinfecting Chemicals ................................................... 23 6.1.5 Water Volume/Quality .............................................................................................. 23 6.1.6 Impacts on Air Quality .............................................................................................. 23 6.1.7 Impacts on Acoustic Environment ............................................................................ 23 6.1.8 Impacts on Traffic and Temporary disturbance ........................................................ 24 6.2 Biological Environment .......................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    78 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us