Ft1 . 17Og5z5aor C-Rs @
Total Page:16
File Type:pdf, Size:1020Kb
18. Copy of colour coded all bathymetry sheet/survey done for M/s AKBTPL in last three years for pocket berths, turning circle, approach channel, disposal ground etc. 1.9. Facilities/machinery/equipment available with M/s AKBTPL, Adani Group for existing and proposed dredging. 20. At a rate of proposed capital and maintenance dredging volume after expansion, disposal ground will fill after how many years? 21. Who is Port Authority and what is the role will be of Port Authority as per Table - 6 - 2. 22. List of technical staff of Port Authority in field of environment with details of educational qualification to look after the assigned role as per Table - 6 - 2. 23. Map showing mangroves cover around the 10 Km radius of M/s AKBTPL. 24. Please refer page 05 of 10 of Annexure-01. Copy of bifurcation made by GCMA regarding Active or Inactive mudflat. If not done, who will be the authority to ascertain the same and signification thereof in classification/preparation of CRZ Map. 25. Copy of Ietter forwarded to GCMA to ascertain Mudflat (active or inactive) by CRZ mapping a u t h o rity/P roject Proponent. 26. Copy of report prepared by M/s Central Water and Power Research Station, Pune for the studies related to dredging. 21. Copy of action plan to comply with lacuna mentioned in summery note (lmplementation status of conditions) by Dr. H. V. C. Chary Guntupalli of RO, MoEF, Bhopal attached as An nexu re-04. 28. Details of presence of flora and fauna having conservation status of as per IUCN Red data. 29. Proposed plan for utilization of Solar Power by setting up of solar cell at M/s AKBTPL. 30. Proposed plan for skill development of local affected villagers by M/s AKBTPL. 31. Proposed plan to provide safe drinking water in schools of nearby vlllages by M/s AKBTPL. SSn, 1</ ltv 6>Jt 22eA 7^V6l \, n/252 -f.A.( 9)t a' \ Y Ytrna/ )t t2,4V)h 1221 ft1 . 17og5z5aor C-rs @ Date - 06.01.2018 TO THE COLLECTOR & CHAIRMAN, PUBLIC HEARING BHUJ KUTCH THE MEMBER SECRETARY& CONVENOR, PUBLIC HEARING GUJARAT POLLUTION CONTROL BOARD GANDHINAGAR COMMENTS/QUESTIONS FOR THE PULIC HEARING SCHEDULED ON 09-01.2018 OF M/S AKETPL, TUNA, KUTCH, GUJARAT. With reference to scheduled public hearing, please submit a certified copy of.. 1. Last five year data of cargo handled (import/export of each cargo per year) 2. Last five year data of capital and maintenance dredging carried out for M/s AKBTPL with disposal details of dredged material. 3 what will be the change in volume of totar cargo handring after proposed dredging? 4. Details of present cargo dispatch capacity and existing road and rail network. 5. ls there any augmentation in cargo dispatch capacity by strengthenin g road/rair network? 6. Present status of CRZ Clearance for proposed expansion. 7. Copy of CRZ application if done before GCZMA. 8. copy of complaints received against M/s AKBTpL for non-compliance of conditions laid down in EC/CRZ Clearance/GpCB CTE CCA Clearance. 9. Copy of site inspection carried out individually/jointly by MoEF&CCICPCB I3CZMA/ GPCB/any govt. agency in last three years. 10. Legal actions taken against the M/s AKBTPL by M o EF&cclcpcB/G czMA/G pcB/a ny govt. agency in last three years. 11. Point wise compliance report of existing EC/CRZ Clearance L2. Point wise compliance report of CTE CCA Clearance given by GpCB 13. Point wise compliance report of coar handring guiderine pubrished by GpCB/CpcB 14. Application made to EAC/SErAA for ch a nge/mod ificatio n/amend ment/correction in existing EC/CRZ Cleara nce. 15. Minutes of Oil Spill Management Drill done by M/s AKBTpL as per the NOSDCP guideline 16. Minutes of state/District Level committee Kutch as per as per the NosDCp guideline for last th ree years. 17. Facilities/m ach in ery/eq u ipm ent ava ira bre with M/s AKBTpL for oir spiI contror as per the gu idelin e of NOSDCP. 18. Copy of colour coded all bathymetry sheet/survey done for M/s AKBTPL in last three years for pocket berths, turning circle, approach channel, disposalground etc. 19. Facilities/machinery/eq uipm ent available with M/s AKBTPL, Adani Group for existing and proposed dredging. 20. At a rate of proposed capital and maintenance dredging volume after expansion, disposal ground will fill after how many years? 21. Who is Port Authority and what is the role will be of Port Authority as per Table - 6 - 2. 22. List of technical staff of Port Authority in field of environment with details of educational qualification to look after the assigned role as per Table - 6 - 2. 23. Map showing mangroves cover around the 10 Km radius of M/s AKBTPL. 24. Please refer page 05 of 10 of Annexure-01. Copy of bifurcation made by GCMA regarding Active or lnactive mudflat. lf not done, who will be the authority to ascertain the same and signification thereof in classification/preparation of CRZ M ap. 25. Copy of letter forwarded to GCMA to ascertain Mudflat (active or inactive) by CRZ mapping authority/Project Proponent. 26. Copy of report prepared by M/s Central Water and Power Research Station, Pune for the studies related to dredging. 27. Copy of action plan to comply with lacuna mentioned in summery note (lmplementation status of conditions) by Dr. H. V. C. Chary Guntupalli of RO, MoEF, Bhop a I attached as Annexure-04. 28. Details of presence of flora and fauna having conservation status of as per IUCN Red data. 29. Proposed plan for utilization of Solar Power by setting up of solar cell at M/s AKBIPL. 30. Proposed plan for skill development of local affected villagers by M/s AKBTpL. 31. Proposed plan to provide safe drinking water in schools of nearby villages by M/s AKBTPL. )iun jtt,t /tttntfiz- !y- m l(25/ hT ttK .3) 1z-0sn dt.d.efir- (.. atiqyre-seo. o! \Ut!vt 4r "rtu: .idl, v). gelr, <1. ortie (s.s) cJqr?td. xA, cralu: l?1,1<- gut ulLne?-il| gat uit, oar dpu dt.2ittQ_tw. tqo*ad ad wn*! ], ue,, clv dt?t gxt ui!./l qqnqnl aaat ztdl ac? 0. ql *.) wqsdla) dlz). dtl qu zt4lrl tild ] ttt 4r criti.r 'tir'tt ziwuilti qe*i q€r. deirouz eiti.r zindr4 ge,{l ari qqa. arr apil@t rqtqedr.u ourt ar iu./r eRt cu.tri ldtnq titi ttqn[ duqti ai ou rairlt aiol dt,tl titciei,t4l. 40ue e/d, qn--QSl o.rf,.'h tl,,,"r.rxtc. !gi irr"qt >-- .:l,n Jrrrr,{) 4rtl6>kilr6-. .J)rttll,- "1,( )-.II4Z t rr.r g€'.16 g$a crgl ta-09u dl.q.dld at. otst?-8Al atlr.cidl, O. gut, urrr I .|. (.u) !r.xr s -' - '-t- '-:-' C - 29 (Free translation of representation received in Gujarati) Shri Gadh Noor mamad Hussain Haji, 18, Tuna, Taluka Panchayat Seat Taluka Anjar Kutch Village: Vandi: Po-Tuna Taluka Anjar, Kutch To Chief Officer, Tuna Port, Tuna Taluka- Anjar Kutch Sub: To increase the handling capacity of Tuna Port Jai Bharat, it is to be informed that, Adani Group is increasing the handling capacity of Tuna Port. We heartily welcome this project. We are expecting that from this project, employment opportunity of the local will improve. Unemployed people may get employment. As part Social responsibility, we are expecting the company will contribute for the welfare of the village, in this circumstances we do not have any objection for this project. Thanking you, Note: We are expecting employment especially for three villages, VIZ. Vandi, Tuna and Rampar. Shri Gadh Noor mamad Hussain Haji , 18,Tuna, Taluka Panchayat Seat Taluka Anjar Kutch Village : Wandi, Po-Tuna Taluka Anjar , Kutch C -3o @ C,@R 3.ci$1, .l1. gRu, at. rrirytf s?8. a1. e'l,t f,t( tR, {izr4l, gv,t rr)J, ottt g€tr (tt.Ur?r? _*9. lQtr<: +1619{ raal g.;r z.a?na sqr?qr rr) dzrte c0c g-u<u? +rc)... rugq4l, ?r.rou?d arQ. zvtce.t3 qetetl r'tltt?t ], etG_f,rt-r srrt ou.}t}tr Rtaet, :,tr r)oq_0 gRqr qi ort{q.l.s)-{l 'urrrr,rl{l|t gtRqr.t li5r. tte ctro0a't stqtttt r'tt{<t e). * rD q{ r,tere{l ,u*o"t a*dr crrn?qr .,,,* .**J]*l'l'll"1l tuQ til* ;:::ilTl d Fr.t.{l O } srrt * * [Qstrt{t stqi erq tr?ctr..r. r,trQet d o *^o"** "t*t i.tu r,**qr?r-tr JITH' ;:*.i,X;i:: rt"t'lQ t4d. ")ar >,'t4 a'l,r,t <jJ1tF -r 9rj r\rr) \ic'd'l lrrnur .:,,,r,r97 o' Gr.Q @ C - 30 (Free translation of representation received in Gujarati) Vadher Sunni Muslim Jamaat At: Vandi, Po Tuna Taluka Anjar Kutch Xx/01/2018 To Manager, Tuna Port, Village Tuna, Taluka Anjar, Kutch Subject: Public hearing conducted to increase the capacity of Tuna Port Adani Tuna Port Dear Sir, Jai Bharat, It is to inform you that, Adani Foundation is implementing Welfare activities in the field of Education, Health and rural infrastructure development in our village. We are thankful to Adani Group for this. We hereby welcome this project for increasing the handling capacity of Tuna Port. We are also anticipating that, the company will continue these welfare activities in future also. We are expecting that after the implementation of this project, there will be development of Vandi Village and nearby areas.