Appendix 2: Proposed Response to Tfl Tfl Consultation Questionnaire
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Alternative Options Investigated to Address the Issues at Blackwall Tunnel
Alternative options considered to address the issues at the Blackwall Tunnel We have considered a wide range of options for schemes to help address the transport problems of congestion, closures and incidents, and resilience at the Blackwall Tunnel and believe that our proposed Silvertown Tunnel scheme is the best solution. This factsheet examines a number of potential alternative schemes, including some which were suggested by respondents to our previous consultation, and explains why we do not consider them to be feasible solutions to the problems at the Blackwall Tunnel. Further detail on each alternative as well as other alternatives is included in the Preliminary Case for the Scheme, which can be found at www.tfl.gov.uk/Silvertown-tunnel. Building a bridge between Silvertown and the Greenwich Peninsula, rather than a tunnel We have considered building a bridge at Silvertown, instead of a tunnel. However, any new bridge built in east London needs to provide at least 50m of clearance above the water level to allow tall sea-going shipping to pass beneath safely. A bridge with this level of clearance would require long, sloping approach ramps. Such ramps would create a barrier within the local area, as well as dramatically affecting the visual environment and going against local authorities’ development plans. A high-level bridge would also not be feasible in the current location due to it’s proximity to the Emirates Air Line cable car. We also considered the option of a lifting bridge (like Tower Bridge). This could be constructed at a lower level, with less impact on the local area. -
'Ungovernable'? Financialisation and the Governance Of
Governing the ‘ungovernable’? Financialisation and the governance of transport infrastructure in the London ‘global city-region’ February 2018 Peter O’Briena* Andy Pikea and John Tomaneyb aCentre for Urban and Regional Development Studies (CURDS), Newcastle University, Newcastle upon Tyne, UK NE1 7RU. Email: peter.o’[email protected]; [email protected] bBartlett School of Planning, University College London, Bartlett School of Planning, University College London, 620 Central House, 14 Upper Woburn Place, London, UK WC1H 0NN. Email: [email protected] *Corresponding author 1 Abstract The governance of infrastructure funding and financing at the city-region scale is a critical aspect of the continued search for mechanisms to channel investment into the urban landscape. In the context of the global financial crisis, austerity and uneven growth, national, sub-national and local state actors are being compelled to adopt the increasingly speculative activities of urban entrepreneurialism to attract new capital, develop ‘innovative’ financial instruments and models, and establish new or reform existing institutional arrangements for urban infrastructure governance. Amidst concerns about the claimed ‘ungovernability’ of ‘global’ cities and city-regions, governing urban infrastructure funding and financing has become an acute issue. Infrastructure renewal and development are interpreted as integral to urban growth, especially to underpin the size and scale of large cities and their significant contributions within national economies. Yet, oovercoming fragmented local jurisdictions to improve the governance and economic, social and environmental development of major metropolitan areas remains a challenge. The complex, and sometimes conflicting and contested inter-relationships at stake raise important questions about the role of the state in wrestling with entrepreneurial and managerialist governance imperatives. -
Lombard Wall, Charlton, London SE7
COMING SOON – TARGETED OCCUPATION SUMMER 2022 • HIGH SPECIFICATION DETACHED UNIT OF 11,800 SQFT • FULLY FENCED SECURED SITE • MIN 9 M EAVES RISING TO 12M • 24/7/365 ACCESS • ELECTRIC VEHICLE CHARGING POINTS • CENTRAL LONDON – 9 MILES • STRATEGIC LAST MILE LOCATION TO SERVE CENTRAL LONDON • ADJACENT TO THE CHARLTON RIVERSIDE MASTERPLAN • TARGET OCCUPATION Q2 2022 • JUBILEE LINE – 1.2 MILES • CHARLTON STATION – 0.6 MILES HIGH SPEC WAREHOUSE INDUSTRIAL UNIT – 11,800 SQFT - TO LET Grade A Detached Warehouse Industrial Unit - Pre-Let Interest Invited Lombard Wall, Charlton, London SE7 7SH LOCATION Lombard Wall is situated on the northern boundary of the Charlton Riverside Masterplan zone within a protected Strategic Industrial Location. The Masterplan adopted in 2012 will see the transformation of over 100 acres of long established industrial areas with a new mixed use development that will deliver over 8,000 new homes and 5,200 new jobs. The site offers excellent access to both Central London via the A2/A13, and out to the M25 via the A2/A20 as well as benefitting from excellent transport links for staff with the Jubilee Line (Greenwich North Station) 1.2 miles to the west and 18 minutes to Bond Street and Charlton Station to Charing Cross in 35 minutes. The unit is in a perfect location to deliver last mile logistics into the City, North East and South London, from a protected industrial location, and the opportunity to service the future Charlton Masterplan area as it develops out over the next decade. OPPORTUNITY This Grade A unit on Lombard Wall at the heart of Charlton in South East London offers a rare opportunity to secure a long term location with exemplar connectivity, excellent local staff amenities and access to a growing labour pool. -
Thames Barrier, Charlton Riverside, SE7 8NQ
For Sale Development Opportunity Sites B and C, Land South of the Thames Barrier, Charlton Riverside, SE7 8NQ Centrally located within the Thames Barrier Industrial Estate Development opportunity with potential to form part of a wider scheme (subject to gaining the necessary planning consent) Total area of approximately 0.67 ha (1.65 acres): Site B is 0.45 ha (1.11 acres) and Site C is 0.22 ha (0.54 acres) Freehold for sale by informal tender Unconditional offers invited Bid deadline 12 noon Tuesday 26th February Indicative Boundary 08449 02 03 04 gva.co.uk/14803 Location Other local amenities in close proximity to include the Stone Lake Retail Park, a short 10 minute walk away, Sites B and C are located in south east London in which contains a number of national retailers such as Charlton Riverside, which lies circa 0.6 miles to the Halfords, Currys PC World and Harveys. north of Charlton, circa 1.6 miles to the west of Woolwich and approximately 3 miles to the east of The nearby Maryon Park, less than a 10 minute walk Greenwich. away, provides green space for leisure pursuits, two tennis courts, a basketball court and a playground. The sites are centrally located within the Thames Barrier Industrial Estate, which lies adjacent to the Description Thames Barrier site operated by the Environment Agency. The surrounding area predominantly The total area of the two sites measures approximately comprises light industrial buildings, workshops, 1.65 acres (0.67 hectares). Site B is 1.11 acres (0.45 ha) scrapyards, warehouses and waste facilities. -
Read the Summary Report
THAMES ESTUARY PRODUCTION CORRIDOR FROM VISION TO ACTION 1 THAMES ESTUARY PRODUCTION CORRIDOR FROM VISION TO ACTION This report provides a summary of the strategy to unlock and maximise the potential of the Thames Estuary Production Corridor. It marks the culmination of a year-long programme of activity in 2018-2019 which included consultation with over 200 partners and stakeholders and granular research into baseline conditions across the Estuary. This research was undertaken before the COVID-19 pandemic hit the UK and the world, and recognises projected impacts on the South East. Despite the devastating impacts of the pandemic, the cultural and creative industries will be integral to accelerating the UK’s economic and social recovery. Researched and written by Hatch Regeneris, We Made That and In partnership with: Tom Fleming Creative Consultancy. Design by Maddison Graphic. Commissioned by the Greater London Authority and the South East LEP, in partnership with the Royal Docks team and the London Boroughs of Bexley and Lewisham. Published June 2019 Updated July 2020 2 VISION Page 1 WHAT IS THE THAMES ESTUARY PRODUCTION CORRIDOR? Page 5 FOUNDATIONS AND MOMENTUM Page 7 THE OPPORTUNITY FOR GROWTH Page 9 FROM VISION TO ACTION Page 15 WHAT’S NEXT Page 19 3 Royal Opera House, Bob and Tamar Manoukian Production Workshop at High House Production Park, Thurrock Nicholas Hare Architects © Hufton & Crow Photography 4 5 Lewisham: Globally Significant Knowledge, Talent and Research – Goldsmiths, University of London has long anchored creative activity in London, supporting the development of some of the world’s great creative talent. Today, alongside Trinity Laban, the University supports a thriving graduate community as well as high quality research in augmented reality and digital art. -
Charlton Riverside SPD
Charlton Riverside SPD Draft February 2017 Contents 1 Introduction 1 2 Vision and Objectives 2 3 Context 13 4 Development Concept 29 5 Theme 1 – A Residentially Diverse Charlton Riverside 41 6 Theme 2 – An Economically Active Charlton Riverside 49 7 Theme 3 – A Connected and Accessible Charlton Riverside 61 8 Theme 4 – An Integrated and Lifetime Ready Charlton Riverside 73 Draft9 Theme 5 – A Well-designed Charlton Riverside 87 10 Theme 6 – A Sustainable and Resilient Charlton Riverside 113 11 Theme 7 – A Viable and Deliverable Charlton Riverside 121 12 Illustrative Masterplan 135 Appendices Charlton Riverside SPD | February 2017 iii List of Figures Figure Page Figure Page Figure Page 1.1 SPD Area 3 5.4 Development densities 47 8.7 Green Bridge Option 1 83 1.2 Basis of this SPD and how it should be used 5 6.1 Existing land use (at ground floor) 50 8.8 Green Bridge Option 2 84 3.1 The City in the East 14 6.2 Economic activity at Charlton Riverside 52 8.9 Green Crossing 85 3.2 Charlton Riverside 15 6.3 Angerstein and Murphy’s Wharves 53 9.1 Character areas 88 3.3 Economic activity at Charlton Riverside 17 6.4 Riverside Wharf 54 9.2 Neighbourhood and local centres 91 3.4 Existing building heights 18 6.5 Proposed ground floor uses 55 9.3 Neighbourhood Centre/High Street 92 3.5 Flood risk 20 6.6 Proposed upper floor uses 56 9.4 Retail and commercial uses 93 3.6 Public Transport Accessibility Level (PTAL) 21 6.7 Employment locations 57 9.5 Historic assets map 95 3.7 Existing open space 22 7.1 Proposed network of streets 62 9.6 Block structure -
Relationship Between Transport and Development in the Thames Gateway
Relationship between transport and development in the Thames Gateway Contents Front cover......................................................................................................................2 Strategic overview and summary..................................................................................3 1. Introduction ................................................................................................................8 2. The scope of the Thames Gateway in 2003 ............................................................11 3. Transport analysis....................................................................................................30 4. Potential scale of development ................................................................................34 5. Transport and development interaction ................................................................48 6. Strategic focus in the Thames Gateway .................................................................62 7. Phasing of transport and development...................................................................66 8. Conclusions ...............................................................................................................69 9. Appendix A: Travel characteristics and capacities...............................................72 10. Appendix B: Planning aspiration forecasts for SE sub areas ............................86 11. Appendix C: Examples from the Netherlands.....................................................89 12. Appendix -
Download Brochure
FARADAYWORKS.COM WE NEED YOUR HELP IN DEFINING THE FUTURE OF A PIECE OF CHARLTON RIVERSIDE’S RICH HERITAGE. FARADAY FARADAY WORKS WORKS WE NEED YOUR HELP TO DEFINE AND SHAPE THE FUTURE OF The Wire FARADAY WORKS Workshops The Junction Box The Faraday Works site comprises four historic buildings in the north-eastern 37 Bowater part of the Westminster Industrial Estate Unity House Road in Charlton Riverside. We are making some changes to the planning application submitted at the end of 2019. Over previous public consultation sessions we’ve listened to and learned from your feedback, and we’re once again asking for your input in order to create an exemplar London neighbourhood. This booklet outlines our revised vision for Faraday Works – a heritage-led mixed use scheme that will bring new jobs, shops, homes and public space to Charlton Riverside. COME AND GET IN TOUCH WITH TALK TO US: YOUR FEEDBACK: We will be holding a series of online You can return the survey in and in-person events where you can the Freepost envelope provided meet the team and ask questions. or complete it on our website. Further details, including how Visit: faradayworks.com to register can be found on the Call: 020 3633 6625 back page of this brochure. Email: [email protected] 2 3 Current site plan FARADAY FARADAY WORKS WORKS OUR KEY AMBITIONS Our key principles and aspirations for the previous scheme remain in place, but have been improved and adapted both in line with your feedback and in response to the Grade II listing of 37 Bowater Road in 2020. -
Snewbusinessheartphas Eone / Typea
LONDON'S NEW BUSINESS HEART 03/17 PHASE ONE / TYPE A CONTENTS 04 05 London is looking east 06 07 Breathing new life into a world-famous dock 08 09 A truly global village 10 11 The arc of opportunity – 04 05 06 07 £26 billion investment 22 23 A location with financial benefits 24 25 Connected to everywhere 26 27 You have arrived 30 31 Sociability is at our heart 32 37 Day and night 38 39 Royal Albert Dock N 26 27 by numbersW E S 42 63 Phase One buildings 64 65 Specification 66 67 Delivery team 30 31 42 63 AT THE HEART OF LONDON’S FUTURE PHASE ONE TYPE A 2 3 LONDON IS LOOKING EAST Finding a prestigious space for your business to thrive in London is rare. Finding one that offers both lifestyle and international business connections is even more rare. That’s why the new ABP Royal Albert Dock is set to send shock waves throughout the business world. As the global centre of international finance, London’s new financial districts have grown eastwards along the docklands. First St Katharine’s Dock was transformed, then Limehouse, and then the world-famous Canary Wharf. Now there is ABP Royal Albert Dock. Learning from these previous developments, ABP Royal Albert Dock is designed to offer more. More opportunity, life and vibrancy. With 4.7 million sq ft of brand new business, residential, retail and entertainment, it will be a new business heart of the capital, Europe and beyond. But it will also be a unique place to live, shop and relax, with dynamism like no other. -
Silvertown Tunnel from a Category a Tunnel to a Category E Tunnel
Appendix 2: assessment of Transport for London’s reasons for changing the proposed Silvertown Tunnel from a category A tunnel to a category E tunnel Cost It has been advised by Transport for London that a category A tunnel would cost approximately £2.5 million more than a category E tunnel. This is considered to be a very small sum of money in the context of the cost of the scheme as a whole (nearly £1 000 million) and saving this sum appears to be a false economy given the benefits that would accrue from safely conveying dangerous goods across the River Thames without unnecessarily long routes via Central London. Concurrent Operation of the Blackwall and Silvertown Tunnels Transport for London’s position is that the shared Greenwich Peninsula approach road would increase the risk of vehicles conveying dangerous goods using the Blackwall Tunnel, which is an existing category E tunnel that is not capable of safely conveying dangerous goods. This does not seem to be a valid reason for designing the Silvertown Tunnel so as to also be incapable of safely conveying dangerous goods. The need to sign vehicles carrying dangerous goods away from the Blackwall Tunnel onto a diversion route is an existing situation. Currently the diversion is to Tower Bridge. A diversion to a category A Silvertown Tunnel would be a vastly shorter and less complicated diversion that would be much more likely to be complied with. The only operational situation when a category A Silvertown Tunnel would not represent a much less onerous diversion away from the Blackwall Tunnel would be when the Silvertown Tunnel was closed (for maintenance or because of an incident) but the Blackwall Tunnel remained open. -
We're CCRA – and We Never Give
We’re CCRA – and we never give up! e frst featured our concerns about the trafc g replacing the single yellow line outside the post ofce lights at the bottom of Charlton Church Lane 18 with a double yellow line; Wmonths ago and are grateful to a CCRA mem- g removing a redundant stop line. ber for conducting trafc surveys demonstrating the trafc We are grateful to Andy Barker and Alex Djan (RBG’s control measures’ failings. Following this we met RBG Trafc Trafc Group Manager) for their hard work on our behalf Group representatives to discuss the situation. Council ofc- and look forward to hearing more from Alex as the scheme ers agreed the trafc light phasing is poor, leading to unnec- progresses. essary trafc jams and bus delays, particularly in peak hours, but they strongly indicated that little could be done without Silvertown Tunnel decision delayed again funding. The decision on whether to build the Silvertown Tunnel We continued to press for action and in October 2017, has been delayed again, this time until May 2018, to allow ofcers outlined some ideas they hope to take forward issues about air quality to be considered further. with TfL to improve the interchange. They indicated that We think this gives London mayor Sadiq Khan and his funding is available that would include: ways to improve deputy mayor for transport, Val Shawcross, the ideal trafc fow, provide safer crossings for pedestrians and stop chance to show leadership and cancel a scheme which inconsiderate parking. While discussions are on-going and threatens to increase pollution and congestion across large fnal approval still needs to be agreed, RBG are currently areas of south-east and east London. -
What Is the Silvertown Tunnel?
What is the Silvertown Tunnel? The Silvertown Tunnel will be a new twin-bore tunnel providing a road link beneath the Thames from the Blackwall Tunnel Southern Approach on the Greenwich Peninsula to the Tidal Basin roundabout in the Royal Docks area. The Silvertown Tunnel alignment Our current estimate is that the tunnel will cost around £750m. Construction could start in late 2017 and the soonest that the tunnel could be open is 2021/2022. The section beneath the Thames will be built as a ‘bored’ tunnel, using a tunnel boring machine similar to those used to construct Crossrail. The sections either side of the river will be built using the ‘cut & cover’ technique, in which the ground is excavated, following which the tunnel is built and then covered over. The tunnels will be accessible to all motorised vehicles. There will be two traffic lanes in each direction, in a separate bore. One lane in each direction could be reserved for buses and HGVs. We will build new junctions to link the tunnels into the existing road network, and new portal buildings to house the infrastructure necessary to operate the tunnel, including ventilation equipment. Changes to the A102 Blackwall Tunnel Approach Road We would need to make a number of changes to the existing road network on the south side, on the immediate approach to the new tunnel. These changes are: • Widening the A102 Blackwall Tunnel Approach road in order to create new access routes to the Silvertown Tunnel portals. • Demolishing the existing footbridge over the A102 near the junction with Boord Street, to allow for the A102 Blackwall Tunnel Approach to be widened.