P13-02350PLA Planning Committee Report 2.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

P13-02350PLA Planning Committee Report 2.Pdf LONDON BOROUGH OF ENFIELD PLANNING COMMITTEE Date : 22nd October 2013 Report of Contact Officer: Ward: Edmonton Assistant Director - Planning, Andy Higham Tel: 020 8379 3848 Green Highways & Transportation Sharon Davidson Tel: 020 8379 3841 Mr C. Ahmet Tel: 020 8379 3926 Application Number : P13-02350PLA Category: Other Development LOCATION: LAND OFF LOWER HALL LANE, Edmonton, London. PROPOSAL: Demolition of existing buildings and erection of a new Pumping Station with ancillary buildings, means of access and enclosure. Applicant Name & Address: Agent Name & Address: Kay Silver, David Henry, Essex & Suffolk Water Savills (UK) Ltd Sandon Valley House, UNEX HOUSE Cannon Barns Road, 132-134 HILLS ROAD Essex, Cambridge Chelmsford, Cambridgeshire East Hanningfield, CB2 8PA CM3 8BD RECOMMENDATION: That planning permission be GRANTED subject to conditions. Application No:- P13-02350PLA L T E Pipeline Foot Bridge Pipeline Tanks Sluice 10.7m C C y d B B L & t s n o C ly s A L G t, s n o C ro o B k c ra T n i a r D n io s r e iv D e e L r o a Tanks e L t c r u FB d e e u v q Sluice i A R FB Sluice Pumping Station D ra in Sluice FB Water Sluice FB in Dra th Pa FB Sluice 10.9m 1 3 1 o t 0 2 1 FB ry n FB o s a m g in p lo S 11.6m 11.4m Sl Posts w lo rf e v O Chingford Mill Pumping Station e n a ll L a r H e w o L 10.7m C y c le n o i s r T e r a v c i k D e e L r o a e L r e v i R C ycle Track Development Control 0 1 2 300m Scale - 1:2500 Time of plot: 09:16 Date of plot: 09/10/2013 © Crown copyright. London Borough of Enfield LA086363,2003 1.0 Site and Surroundings 1.1 The application site is located at the edge of the Lee Valley Park, south of the William Girling and King George V Reservoirs. The site currently comprises an existing pumping station (Pumping Station A), associated operational land and road access, measuring a total area of 2.35 hectares. A temporary contractor’s compound to the northwest of the application site is also indicated, outlined in blue on the location plan. The main access will remain from the A406 (North Circular). The site is located within the Metropolitan Green Belt. 1.2 The site is bound to the north by the existing William Girling Reservoir, the River Lea Diversion to its immediate eastern boundary and residential development located in Chingford (Waltham Forest) further east; an aggregates recycling plant/facility to the west and the River Lee Navigation Canal and towpath beyond that. Pumping Station B, sited to the south does not form part of this application. 1.3 The immediate character of the area is that of wide open landscape with the incidence of structures limited to the distant east and west. 2. Proposal 2.1 The application follows the decision of Essex and Suffolk Water to decommission Pumping Station A (currently leased from Thames Water) to provide a modern and efficient facility. Planning permission is therefore sought to erect a new pumping station and ancillary building to the northeast of this existing pumping station complex. The applicant advises that demolition of the existing facility would not commence until the new facility becomes fully operational. Pumping Station B would remain within the operational use and ownership of Thames Water and is therefore not comprised within the remit of this planning application. 2.2 The proposed pump house facility would measure approximately 16.7m (w) x 25.3m (l), with an overall height ranging from 5.6m to 8.6m, and would contain the main water (turbines). The electrical support building sited to the southwest of the new pump facility would measure approximately 18.4m (l) x 6.3m (w) and 5.3m in height. The applicant’s have indicated that the facility would be unmanned, with visits restricted to overseeing maintenance or for emergency purposes. 2.3 With regard to the construction and appearance of the building, the proposed drawings indicate the use of block work with timber cladding to all of the main elevations and Cambrian interlocking slates for the roof area. Doors and louvers, finished in grey powder coated steel, are arranged across all the elevations. In terms of the electrical building, this will also be finished in similar materials to the new pumping station. Galvanised steel platforms and stairs will be incorporated to the perimeter of both buildings. 2.4 Internal service road and turning areas are to be constructed from reinforced concrete with an aggregate finish, including bund to contain any spillage from delivery vehicles. The applicant indicates that the remainder of the site would be landscaped with a natural/informal approach consistent with the context of the location, although suggests that this detail is secured by planning condition. Fencing of three metres in height will also secure the perimeter of the site finished in a mild green colour, subject to agreement by planning condition once more. Other minor structures in the form of a free standing diesel generator and fuel tank are also proposed, sited to the north of the new pump house. No further details have been provided with regard to the relative size of each installation although the applicant agrees to reserving this by planning condition should the Council grant planning permission. 3. Relevant Planning Decisions 3.1 No relevant planning decisions. 4. Consultations 4.1 Statutory and non-statutory consultees Thames Water 4.1.1 Thames Water does not object to the proposals. Environment Agency 4.1.2 The Environment Agency does not object to the proposals. Lee Valley Regional Park Authority 4.1.3 Lee Valley Regional Park Authority does not object to the proposals although recommends the inclusion of planning conditions to secure demolition of the existing facility within 6 months of the first use of the new facility; details of all external materials and planting scheme and submission of all results of the ecological survey. Funding for enhancements to Footpath 274 including provision of sign posting is also requested to be secured via a S.106 agreement. Canal Trust 4.1.4 The Canal River Trust does not object to the proposals. Natural England 4.1.5 Natural England does not object to the proposals on ecological grounds subject to the inclusion of a planning condition that would restrict demolition work between March and July. It is recommended also that the applicant’s consider the opportunity for biodiversity enhancements within the design of the scheme. English Heritage 4.1.6 English Heritage has not objected to the proposals subject to the inclusion of a planning condition to secure a Written Scheme of Investigation prior to commencement of any demolition and or development. National Grid 4.1.7 National Grid has not objected to the proposals. Traffic and Transportation 4.1.8 Traffic and Transportation has not objected to the proposals subject to planning conditions to secure details of construction servicing/management plan. Biodiversity 4.1.9 The Council’s Ecologist does not object to the proposals subject to inclusion of planning conditions that will secure a survey of the existing pumping house for the presence of bats including any mitigation measures deemed necessary; any clearance of existing shrubs/vegetation to take place outside of bird nesting season; eradication of Japanese Knotweed and biodiversity enhancements. 4.2 Public response 4.2.1 Three separate site notices were displayed in locations surrounding the site. No responses have been received to date. 5 Relevant Policy 5.1 The National Planning Policy Framework (NPPF) published in March 2012 allowed local planning authorities a 12 month transition period to prepare for the full implementation of the NPPF. Within this 12 month period local planning authorities could give full weight to the saved UDP policies and the Core Strategy, which was adopted prior to the NPPF. The 12 month period has now elapsed and as from 28th March 2013 the Council's saved UDP and Core Strategy policies will be given due weight in accordance to their degree of consistency with the NPPF. 5.2 The Development Management Document (DMD) policies have been prepared under the NPPF regime to be NPPF compliant. The Submission version DMD document was approved by Council on 27th March 2013 for submission to the Secretary of State for examination. Examination and subsequent adoption is expected later this year. The DMD provides detailed criteria and standard based policies by which planning applications will be determined. 5.3 The policies listed below are considered to be consistent with the NPPF and therefore it is considered that due weight should be given to them in assessing the development the subject of this application. 5.4 London Plan Policy 2.18 Green infrastructure: the network of open and green spaces Policy 5.1 Climate change mitigation Policy 5.2 Minimising carbon dioxide emissions Policy 5.3 Sustainable design and construction Policy 5.14 Water quality and wastewater infrastructure Policy 5.15 Water use and supplies Policy 7.16 Green Belt Policy 8.1 Implementation Policy 8.2 Planning obligations Policy 8.3 Community infrastructure levy 5.5 Core Strategy CP20 Sustainable energy use and energy infrastructure CP28 Managing flood risk through development CP30 Maintaining and improving the quality of the built and open environment CP31 Built and landscape heritage CP33 Green belt and countryside CP35 Lee Valley Regional Park and waterways CP36 Biodiversity CP37 Central Leeside 5.6 Submission Version DMD DMD37 Achieving high quality and design led development DMD38 Design process DMD44 Preserving and enhancing heritage assets DMD47 New roads, access and servicing DMD59 Avoiding and reducing flood risk DMD60 Assessing flood risk DMD61 Managing surface water DMD71 Protection and enhancement of open space DMD78 Nature conservation DMD79 Ecological enhancements DMD80 Trees on development sites DMD81 Landscaping DMD82 Protecting the Green Belt 5.7 Unitary Development Plan (II)GD3 Planning standards (II) G8 Landscape Measures (II) G11 Environmental Measures affecting new development (II) G16 Environmental Measures affecting new development 5.8 Other relevant policy/guidance National Planning Policy Framework Central Leeside Area Action Plan Upper Lee Valley Opportunity Area Planning Framework 6.
Recommended publications
  • THE LONDON GAZETTE, 9Ra MAY 1975 6069
    THE LONDON GAZETTE, 9ra MAY 1975 6069 This application is to replace previous Permit No. posed scheme of artificial recharge of the ground-water 28/39/303120 For the same amount of abstraction. in the Lower Lee. Further details of the application are: in the Parish of A copy of the draft licence and of the plans deposited Chertsey, above. with if may be inspected free of charge at the office of the A copy of the application and of any map, plan or Solicitor to the Authority at Brettenham House (Third other document submitted with it may be inspected free Floor), Lancaster Place, London, WC2E 7EN, and at the of charge at Anningsley Park Farm Office at all reasonable office of the Divisional Manager, Lea Division, " The hours during the period beginning on 1st May 1975, and Grange", Crossbrook Street, Waltham Cross, Hertford- ending oh 5th June 1975. shire, EN8 8LX, at all reasonable hours during the period Any person who wishes to make representations about beginning 9th May 1975 and ending on 13th June 1975. the application should do so in writing to the Divisional Any person wishing to make representations about the Manager, Thames Conservancy Division, Thames Water draft licence should do so in writing to the Solicitor to Authority, Nugent House, Vastem Road, Reading, RG1 the Authority at Brettenham House, Lancaster Place, 9DB, before the end of the said period. London, WC2E 7EN, before the end of the said period. E. R. Hayes, on behalf of Mr. W. M. Vernon. After the expiry of the said period the Authority will be entitled to pass a resolution by virtue of which a 28th April 1975.
    [Show full text]
  • LONDON METROPOLITAN ARCHIVES Page 1 BRITISH WATERWAYS BOARD
    LONDON METROPOLITAN ARCHIVES Page 1 BRITISH WATERWAYS BOARD ACC/2423 Reference Description Dates LEE CONSERVANCY BOARD ENGINEER'S OFFICE Engineers' reports and letter books LEE CONSERVANCY BOARD: ENGINEER'S REPORTS ACC/2423/001 Reports on navigation - signed copies 1881 Jan-1883 Lea navigation Dec 1 volume ACC/2423/002 Reports on navigation - signed copies 1884 Jan-1886 Lea navigation Dec 1 volume ACC/2423/003 Reports on navigation - signed copies 1887 Jan-1889 Lea navigation Dec 1 volume ACC/2423/004 Reports on navigation - signed copies 1890 Jan-1893 Lea navigation Dec 1 volume ACC/2423/005 Reports on navigation - signed copies 1894 Jan-1896 Lea navigation Dec 1 volume ACC/2423/006 Reports on navigation - signed copies 1897 Jan-1899 Lea navigation Dec 1 volume ACC/2423/007 Reports on navigation - signed copies 1903 Jan-1903 Lea navigation Dec 1 volume ACC/2423/008 Reports on navigation - signed copies 1904 Jan-1904 Lea navigation Dec 1 volume ACC/2423/009 Reports on navigation - signed copies 1905 Jan-1905 Lea navigation Dec 1 volume ACC/2423/010 Reports on navigation - signed copies 1906 Jan-1906 Lea navigation Dec 1 volume LONDON METROPOLITAN ARCHIVES Page 2 BRITISH WATERWAYS BOARD ACC/2423 Reference Description Dates ACC/2423/011 Reports on navigation - signed copies 1908 Jan-1908 Lea navigation/ stort navigation Dec 1 volume ACC/2423/012 Reports on navigation - signed copies 1912 Jan-1912 Lea navigation/ stort navigation Dec 1 volume ACC/2423/013 Reports on navigation - signed copies 1913 Jan-1913 Lea navigation/ stort navigation
    [Show full text]
  • Surface Water Management Plan London Borough Of
    SURFACE WATER MANAGEMENT PLAN DRAIN LONDON LONDON BOROUGH OF ENFIELD FINAL DRAFT v2.0 Quality Management Quality Management DOCUMENT INFORMATION Title: Surface Water Management Plan for London Borough of Enfield Owner: Ian Russell Version: v3.0 Status: Final Project Number: CS/046913 File Name: DLT2_GP4_Enfield_SWMP Final_V3.0 REVISION HISTORY Date of Summary of Changes Completed By Version Issue Initial draft SI 12/06/2011 1.0 Final Draft SI 01/08/2011 2.0 Final IR 05/01/2012 3.0 AUTHOR Name Organisation and Role Stephanie Ip Senior Consultant, Capita Symonds Ruth Farrar Consultant, Capita Symonds APPROVALS Name Title Signature Date Ruth Goodall Director, Capita Symonds Principal Consultant, Capita Michael Arthur Symonds Ian Russell Senior Engineer, LB Enfield Kevin Reid Programme Manager DISTRIBUTION Name Organisation and Role Ian Russell Senior Engineer, LB Enfield Kevin Reid Programme Manager, GLA RELATED DOCUMENTS Date of Doc Ref Document Title Author Version Issue i Acknowledgements Acknowledgements A number of people and organisations outside Enfield Council have contributed to this Surface Water Management Plan. Their assistance is greatly appreciated, and in particularly inputs and information provided by: • The British Geological Survey • British Waterways • Drain London Group 4 boroughs: o London Borough of Haringey o London Borough of Hackney o London Borough of Waltham Forest o London Borough of Newham o London Borough of Tower Hamlets • The Environment Agency • The Greater London Authority • London Councils • The London Fire Brigade • Network Rail • Thames Water • Transport for London and London Underground ii Executive Summary Executive Summary This document forms the Surface Water Management Plan (SWMP) for the London Borough (LB) of Enfield.
    [Show full text]
  • AD06.02 Environmental Statement Volume 2 Appendices 11.1 to 11.3
    NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 AD06.02 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDIX 11.1 WATER RESOURCES AND FLOOD RISK ASSESSMENT METHODOLOGY AD06.02 North London Waste Authority North London Heat and Power Project Environmental Statement Volume 2 Appendix 11.1 Water Resources and Flood Risk Assessment Methodology AD06.02 The Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Regulation 5 (2)(a) Issue October 2015 Amec Foster Wheeler E&I UK Ltd This report takes into account the particular instructions and requirements of our client. It does not in any way constitute advice to any third party who is able to access it by any means. Amec Foster Wheeler excludes to the fullest extent lawfully permitted all liability whatsoever for any loss or damage howsoever arising from reliance on the contents of this report. We do not however exclude our liability (if any) for personal injury or death resulting from our negligence, for fraud or any other matter in relation to which we cannot legally exclude liability. North London Waste Authority North London Heat and Power Project Environmental Statement Volume 2 Appendix 11.1 Water Resources and Flood Risk Assessment Methodology Contents Page 1 Water Resources and Flood Risk Assessment Methodology 2 1.1 Introduction 2 1.2 Engagement 2 1.3 Legislation and guidance 10 1.4 Baseline conditions
    [Show full text]
  • London Borough of Waltham Forest Level 1 SFRA
    London Borough of Waltham Forest Level 1 SFRA Final Report Project number: 60577135 October 2018 London Borough of Waltham Forest Level 1 SFRA FINAL Project number: 60577135 Quality information Prepared by Checked by Approved by Hannah Booth Emily Craven Sarah Kelly Graduate Water Associate Director, Water Regional Director, Water Consultant Sarah Waite Hydrologist Consultant Revision History Revision Revision date Details Authorized Name Position 01 July 2018 Draft Report for 26 July 2018 Sarah Kelly Regional Director, client comment Water 02 August 2018 Final report 02 October 2018 Sarah Kelly Regional Director, Water AECOM i London Borough of Waltham Forest Level 1 SFRA FINAL Project number: 60577135 Prepared for: London Borough of Waltham Forest Council Prepared by: AECOM Infrastructure & Environment UK Ltd Midpoint, Alencon Link Basingstoke Hampshire RG21 7PP United Kingdom T: +44(0)1256 310200 aecom.com © 2018 AECOM Infrastructure & Environment UK Ltd. All Rights Reserved. This document has been prepared by AECOM Infrastructure & Environment UK Ltd (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. AECOM ii London Borough of Waltham
    [Show full text]
  • London Effluent Reuse SRO July 2021
    Strategic regional water resource solutions: Preliminary feasibility assessment Gate One Submission for: London Effluent Reuse SRO July 2021 i Contents 1 Executive Summary .......................................................................................................... 1 2 Solution Description ........................................................................................................ 3 3 Outline Project Plan ......................................................................................................... 5 4 Technical Information ..................................................................................................... 9 5 Environmental and Drinking Water Quality Considerations................................................ 13 6 Initial Outline of Procurement and Operation Strategy ..................................................... 17 7 Planning Considerations ................................................................................................ 20 8 Stakeholder Engagement ............................................................................................... 22 9 Key Risks and Mitigation Measures .................................................................................. 24 10 Option Cost/Benefits Comparison .................................................................................... 28 11 Impacts on Current Plan ................................................................................................. 32 12 Board Statement and Assurance ....................................................................................
    [Show full text]
  • The Impact on Receiving Waters of Pharmaceutical Residues and Antibiotic Resistant Faecal Bacteria Found in Urban Waste
    The impact on receiving waters of pharmaceutical residues and antibiotic resistant faecal bacteria found in urban waste water effluents Thesis submitted to Middlesex University in partial fulfilment of the award of Doctor of Philosophy (Ph.D.) degree By Rebecca Tuckwell Supervisors: Prof. Mike Revitt, Prof. Hemda Garelick, Dr. Huw Jones Middlesex University, London, UK October, 2014 i Abstract Pharmaceuticals intended for human use are frequently detected in the aquatic environment. This is predominantly from their excretion following ingestion and subsequent discharge in domestic sewage. Wastewater treatment provides an opportunity to control their release to surface waters however, their removal is often incomplete. This thesis addresses this pharmaceutical pathway and the potential impact on the aquatic environment. The progress of bezafibrate, carbamazepine, ciprofloxacin and clarithromycin were monitored through the treatment stages (screened sewage, settled sewage and final effluent) of a large urban wastewater treatment plant (WWTP) and in surface waters up- stream and down-stream of the effluent discharge point. All except clarithromycin were detected in the screened sewage (369 – 2696 ng/L). Reductions in the pharmaceutical concentrations throughout the WWTP (22.5 – 94.3 %) indicate the removal of these compounds is variable. Bezafibrate and carbamazepine were observed at higher concentrations (67.5 - 305.5 ng/L) in surface water down-stream of the effluent discharge point compared to up-stream (31.0 – 116.7 ng/L). The presence of antibiotics in the environment may contribute to the dissemination of antibiotic resistance. The second part of this thesis monitors the prevalence of resistant faecal bacteria through WWTPs and in surface waters.
    [Show full text]
  • River Lee Floods
    El A- Box ^ 1947 RIVER LEE FLOODS YEARS50 ON River Lee Catchment Area Showing Land Liable To Flood (based on extent of 1947 flooding) River Lee Catchment Area Chingford River Thames 8B& S3B Land Liable to Flood Main Rivers Stratford Hackney River Lee Navigation Hertford Union C aul Central London River Lee Flood Relief Channel Thames Barrier Urban area Major roads Minor roads 5 Km £ £A - f (.eo^L I w X CONTENTS page Introduction 1 The Nature of Flooding 1 ® L Responsibility for Managing Flood Protection in the Lee Valley The 1947 Flood Damage Caused by th e Flood r - Transport, Communications and Services 3 - Property 3 Flood Protection Measures - Prior to the 1947 Flood 3 Fig 1 Proposed river improvements in Stratford (1930) 4 Flood Protection Measures - Following the 1947 Flood 5 / 6 / 7 Table 1 Flow Control Structures on the River Lee Flood R elief Channel The Future of Flood Defence in the Lee Valley Appendix I Damage to Property from the 1947 Flood Appendix II References and Acknowledgments 10 Appendix III Working diagrams of: Labyrinth/Folded Weirs 11 Vertical Lift Gates 12 Radial Gates 13 Siphon Spillways 14 Map 1 The River Lee Catchment Area (including the Area Liable to Flood) Inside front cover Map 2 The River Lee Flood R elief Channel (including the location of flow control structures) Inside back cover Front cover River Lee flooding effecting Lee Bridge Rd. ENVIRONMENT AGENCY Note: Not all photographs in this document are of the 1947 flood, however, pictures are indicative of that event. Environment Agency 1947 River Lee Floods - SO Years On 1 INTRODUCTION 3 RESPONSIBILITY FOR FLOOD PROTECTION IN THE LEE VALLEY 1997 marks the 50th anniversary of one of the River Lee’s most damaging floods.
    [Show full text]
  • Strategic Policy Framework of the Lee Valley Regional Park Authority G
    he following organisations all formally endorse the policies contained in this T Part One of the Park Plan he Regional Park Authority also acknowledges the involvement and T support of the many other organisations who have taken part in preparing the Park Plan. CONTACT ADDRESS: All enquiries relating to this Part One: Strategic Policy Framework of the Lee Valley Regional Park Authority’s Park Plan should be addressed to: Gillian Morgan Senior Planning and Development Officer Lee Valley Regional Park Authority Myddelton House Bulls Cross Enfield Middx. EN2 9HG Tel: 01992 717711 Fax: 01992 788623 E-mail: [email protected] ISBN 09501433 9 1 British Library Cataloguing in Publication Data. A catalogue record for this book is available from the British Library. Foreword By the Chairman of the Authority his latest plan for the future development Part Two of the Plan, the Land Use Proposals, of the Lee Valley Regional Park differs in will put flesh on the bones of this Policy Framework T format from its predecessors in that its and the Authority’s strategic Business Plan will two main sections, the Policy Framework and the establish priorities, determine deadlines and ensure Land Use Proposals are published separately. resources are available so that plans do not remain There are a number of reasons for this, the most plans, but progress into realities. compelling being that we live in a changing world and must recognise that a change in the circumstances that affect the development of the Regional Park may call for a change in policy. Equally, in the context of an overall Policy Framework, the proposed use for particular sites might change again due to changing circumstances.
    [Show full text]
  • Application by North London Waste Authority for an Order Granting Development Consent for the North London Heat and Power Project
    Application by North London Waste Authority for an Order Granting Development Consent for the North London Heat and Power Project Written Representation Lee Valley Regional Park Authority Registration No. 10031942 23 March 2016 Attached Separately Appendix A Statutory Context of the Lee Valley Regional Park and Authority Appendix B Plan showing location of EcoPark and Regional Park Appendix C Letter 2 Oct 2015 response to Phase 2 Consultation Appendix D Extract from Park Development Framework Area 4 Proposals 1 Summary of Representation The Lee Valley Regional Park Authority (LVRPA) and the North London Waste Authority (NLWA) have been in regular contact throughout the application process for the North London Heat and Power project. Both parties are working towards a Statement of Common Ground to be submitted by 6 April. Certain matters fall outside the SoCG and these form the basis of the LVRPA’s written representation namely: 1. An amendment to the DCO Schedule 2 ‘Requirements’ under sections (3) to (5), (10) to (12) and (15) to ensure that there is specific reference to consultation with the Lee Valley Regional Park Authority as part of the LPA approval process for the requirements on detailed matters where it is stated that the LPA as approving the requirements with the addition of words as follows…’ in consultation with the Lee Valley Regional Park Authority.’ 2. Temporary Laydown Area – related to point 1 above. As much information as possible should be provided at the outset of the process for the final landscape treatment and reinstatement of the Temporary Laydown area. 3. Use of the site of the existing Energy to Waste Plant once demolished.
    [Show full text]
  • Waltham Forest
    LOCAL GOVERNMENT BOUNDARY COMMISSION FOR ENGLAND REVIEW OF GREATER LONDON, THE LONDON BOROUGHS AND THE CITY OF LONDON LONDON BOROUGH OF WALTHAM FOREST Boundaries with:- ENFIELD LB HACKNEY LB HARINGEY LB and EPPING FOREST DISTRICT in ESSEX LONDON BOROUGH OF ENFIELD Boundaries with:- EPPING FOREST DISTRICT in ESSEX in the area of the Lee Valley EPPING FOREST ENFIELD HARINGEY REDBRIDGE HACKNEY REPORT NO. 618 LOCAL GOVERNMENT BOUNDARY COMMISSION FOR ENGLAND REPORT NO 618 LOCAL GOVERNMENT BOUNDARY COMMISSION FOR ENGLAND CHAIRMAN Sir Geoffrey Ellerton CMC MBE MEMBERS Mr K F J Ennals CB Mr G R Prentice Mrs H R V Sarkany Mr C W Smith Professor K Young rveyctod pap«* THE RT HON MICHAEL HESELTINE MP SECRETARY OF STATE FOR THE ENVIRONMENT REVIEW OF GREATER LONDON, THE LONDON BOROUGHS AND THE CITY OF LONDON LONDON BOROUGH OF WALTHAM FOREST AND ITS BOUNDARIES WITH THE LONDON BOROUGHS OF ENFIELD, HACKNEY AND HARINGEY, AND WITH THE DISTRICT OF EPPING FOREST IN THE COUNTY OF ESSEX AND THE LONDON BOROUGH OF ENFIELD AND ITS BOUNDARY WITH THE DISTRICT OF EPPING FOREST IN THE COUNTY OF ESSEX, IN THE AREA OF THE LEE VALLEY COMMISSION'S FINAL REPORT AND PROPOSALS INTRODUCTION 1. On 1 April 1987 we announced the start of a review of Greater London, the London boroughs and the City of London as part of the programme of reviews we are required to undertake by virtue of section 48(1) of the Local Government Act 1972. We wrote to each of the local authorities concerned. 2. Copies of our letter were sent to the appropriate county, district and parish councils bordering Greater London; the local authority associations; Members of Parliament with constituency interests; and the headquarters of the main political parties.
    [Show full text]
  • Lee Valley Regional Park Authority Park Development Framework, Area
    Park Development Framework Area Proposals for Lee Valley Regional Park Foreword Lee Valley Regional Park is known and recognised as one of the nation’s great parks; a place that offers a unique combination of activities, sights and experiences. For over 40 years the Lee Valley Regional Park Authority has been working alongside many partner organisations to transform the Lee Valley into a place for leisure, recreation, sport and nature. Our new vision is to create a world class visitor destination in the Lee Valley bringing together a variety of landowners and partners. The Park is a mosaic of award-winning open spaces, heritage sites, country parks, farms, golf courses, lakes and riverside trails, campsites, marinas, angling and boating locations. All of these attract more than 4.5 million visitors a year. The Valley is being transformed by the London 2012 Games and Paralympic Games and the Authority will run four world class venues in legacy. These are Lee Valley White Water Centre near Waltham Cross, Hertfordshire – the only brand new London 2012 venue to open ahead of the Games and on Olympic Park in Stratford Lee Valley VeloPark, Lee Valley Hockey Centre and Lee Valley Tennis Centre. The Lee Valley Regional Park Act 1966, which established the Lee Valley Regional Park Authority, placed a duty on the Authority to develop, improve, preserve and manage the Park, either directly or through others. Our Park Development Framework is a suite of documents that will collectively provide the blueprint for our future efforts: setting out proposals for what we want to achieve, how we plan to balance competing demands, and how we intend to make best use of the limited resources available.
    [Show full text]