THE LONDON GAZETTE, 9Ra MAY 1975 6069

Total Page:16

File Type:pdf, Size:1020Kb

THE LONDON GAZETTE, 9Ra MAY 1975 6069 THE LONDON GAZETTE, 9ra MAY 1975 6069 This application is to replace previous Permit No. posed scheme of artificial recharge of the ground-water 28/39/303120 For the same amount of abstraction. in the Lower Lee. Further details of the application are: in the Parish of A copy of the draft licence and of the plans deposited Chertsey, above. with if may be inspected free of charge at the office of the A copy of the application and of any map, plan or Solicitor to the Authority at Brettenham House (Third other document submitted with it may be inspected free Floor), Lancaster Place, London, WC2E 7EN, and at the of charge at Anningsley Park Farm Office at all reasonable office of the Divisional Manager, Lea Division, " The hours during the period beginning on 1st May 1975, and Grange", Crossbrook Street, Waltham Cross, Hertford- ending oh 5th June 1975. shire, EN8 8LX, at all reasonable hours during the period Any person who wishes to make representations about beginning 9th May 1975 and ending on 13th June 1975. the application should do so in writing to the Divisional Any person wishing to make representations about the Manager, Thames Conservancy Division, Thames Water draft licence should do so in writing to the Solicitor to Authority, Nugent House, Vastem Road, Reading, RG1 the Authority at Brettenham House, Lancaster Place, 9DB, before the end of the said period. London, WC2E 7EN, before the end of the said period. E. R. Hayes, on behalf of Mr. W. M. Vernon. After the expiry of the said period the Authority will be entitled to pass a resolution by virtue of which a 28th April 1975. (768) licence authorising the proposals shall be deemed to be granted unless the Secretary of State for the Environment either in consequence of any representations made with NOTICE OF APPLICATION TO VARY A LICENCE respect to the proposals or otherwise, requires an applica- TO ABSTRACT WATER tion for a licence to be made to him. Notice is hereby given that an application is being made R. A. R. Gray, Solicitor to the Thames Water to the Anglian Water Authority, Essex River Division by Authority. A. T. Dunn, of Overbury Hall, Layham, to vary the 2nd May 1975. (547) licence (serial number 8/36/17/3) to abstract water from underground strata at Wyncoll's Farm, Layham, Hadleigh, Suffolk, National Grid Reference TM 015394. The variation applied for is to increase the authorised NOTICE OF APPLICATION TO VARY A LICENCE abstraction from 450,000 gallons per year to 1,200,000 TO ABSTRACT WATER gallons per year for a period of five years. Notice is hereby given that an- application is being made to A copy of the application and of any map, plan or the Thames Water Authority by Hall Aggregates (Thames document submitted with it may be inspected at the offices Valley) Ltd. of R.M.C. House, Lavender Park Road, West of Strutt & Parker, 11 Museum Street, Ipswich, in normal Byfleet, Surrey, to vary the licence (serial number ofnce hours during a period beginning on the 6th May 28139/18/69) to abstract water from Upper Greensand 1975, ending on the 6th June 1975. underground strata at National Grid Reference SU 646905 Any person making representations about the application in Ewelme Parish. should do so in writing to the Clerk of the Anglian Water The variation applied for is: at any time when the flow Authority, Essex River Division, at Rivers House, Spring- of the Ewelme Brook as measured at the Authority Weir field Road, Chelmsford, Essex, before the end of the at National Grid Reference SU 643916 is at a rate less than above period. 31,000 gallons per hour as indicated by the head gauge board reading of 2'5 inches, water shall not be extracted in B. N. Hinton, for Strutt & Parker, on behalf of pursuance of this licence at a rate exceeding 2,000 gallons A. T. Dunn. per hour. 6th May 1975. (723) A copy of the application and of any map, plan or other document submitted with it may be inspected free of charge at Ewelrne Quarry, Ewelme, at all reasonable hours during the period beginning oh 18th May 1975 and ending on NOTICE OF APPLICATION FOR LICENCE TO 16th June 1975. ABSTRACT WATER Any person who wishes to make representations about the Notice is hereby given that the Thames Water Authority application should do so in writing to the Divisional have prepared a draft licence authorising them to abstract Manager, Thames Conservancy Division, Thames Water 27,500,000 cubic metres of water per year from underground Authority, Nugent House, Vastern Road, Reading, RG1 strata in the Lower Lee between Waltham Abbey and the 8DB, before the end of the said period. Lea Bridge Works of the Metropolitan Water Division of R. A. Fox, on behalf of Hall Aggregates (T.V.) Ltd. the Authority at the following points of abstraction: 2nd May 1975. (821) (Existing Well Stations) (a) At Waltham Abbey Well, Lea Road, Waltham Abbey in the County of Essex TL 375003 NOTICE OF APPLICATION FOR LICENCE TO (6) At Ponders End Well, Ponders End in ABSTRACT WATER the London Borough of Enfield ... TQ 364956 Notice is hereby given that the Thames Water Authority (c) At Lower Hall Lane. Chingford in the have prepared a draft licence authorising them to abstract London Borough of Waltham Forest ... TQ 362924 17,500,000 cubic metres of water per year from under- (d) At Park Wells, Tottenham in the ground strata in the Lower Lea between Waltham Abbey and London Borough of Haringey TQ 350908 the Lea Bridge Works of the Metropolitan Water Division («) At Coppermill Lane, Walthamstow in of the Authority at the following points of abstraction: the London Borough of Waltham Forest TQ 350884 (/) At Lea Bridge Road, Leyton in the London Borough of Waltham Forest ... TQ 360865 (New Boreholes) (1) At King George's Pumping Station, Enfield Lock. The Thames Water Authority have prepared a draft TQ 373978. Order under section 1 of the Water Resources Act 1971 (2) At Sewardstone Road, Waltham Abbey. TQ 376963. authorising them to inject water into the underground (3) At Chingford South Pumping Station, Lea Valley strata in the Lower Lee as part of a proposed scheme Road, Chingford. TQ 373948. for augmenting the water resources of the Lee Catchment. (4) At Flanders Weir, Chingford. TQ 367932. The abstraction to which this draft licence refers forms (5) At Greaves Pumping Station, Walthamstow Avenue, part of the same scheme. The Authority are making a Chingford. TQ 362918. complementary application for a new licence authorising {6) At Lockwood Reservoir, Blackhorse Lane, Waltham- them to abstract water from seven additional boreholes stow. TQ 355904. which are included in the proposed scheme. The Thames Water Authority's draft Order also (7) At Warwick Reservoir West, Walthamstow. TQ authorises them to discharge water abstracted under the 348878. authority of this draft licence into the River Lee Diversion The Thames Water Authority have prepared a draft for abstraction by the Authority under their existing licences. Order under section 1 of the Water Resources Act 1971, The draft Order, the draft licence to which this notice authorising them to inject water into the underground refers and the application by the Authority for a licence strata in the Lower Lea as part of a proposed scheme for for seven additional boreholes together form the authorities augmenting the water resources of the Lea Catchment. The which are being sought for the carrying out of the pro- abstraction to which this draft licence refers forms part B.
Recommended publications
  • Middlesex University Research Repository an Open Access Repository Of
    Middlesex University Research Repository An open access repository of Middlesex University research http://eprints.mdx.ac.uk Read, Simon ORCID: https://orcid.org/0000-0002-2380-5130 (2017) Cinderella River: The evolving narrative of the River Lee. http://hydrocitizenship.com, London, pp. 1-163. [Book] Published version (with publisher’s formatting) This version is available at: https://eprints.mdx.ac.uk/23299/ Copyright: Middlesex University Research Repository makes the University’s research available electronically. Copyright and moral rights to this work are retained by the author and/or other copyright owners unless otherwise stated. The work is supplied on the understanding that any use for commercial gain is strictly forbidden. A copy may be downloaded for personal, non-commercial, research or study without prior permission and without charge. Works, including theses and research projects, may not be reproduced in any format or medium, or extensive quotations taken from them, or their content changed in any way, without first obtaining permission in writing from the copyright holder(s). They may not be sold or exploited commercially in any format or medium without the prior written permission of the copyright holder(s). Full bibliographic details must be given when referring to, or quoting from full items including the author’s name, the title of the work, publication details where relevant (place, publisher, date), pag- ination, and for theses or dissertations the awarding institution, the degree type awarded, and the date of the award. If you believe that any material held in the repository infringes copyright law, please contact the Repository Team at Middlesex University via the following email address: [email protected] The item will be removed from the repository while any claim is being investigated.
    [Show full text]
  • LONDON METROPOLITAN ARCHIVES Page 1 BRITISH WATERWAYS BOARD
    LONDON METROPOLITAN ARCHIVES Page 1 BRITISH WATERWAYS BOARD ACC/2423 Reference Description Dates LEE CONSERVANCY BOARD ENGINEER'S OFFICE Engineers' reports and letter books LEE CONSERVANCY BOARD: ENGINEER'S REPORTS ACC/2423/001 Reports on navigation - signed copies 1881 Jan-1883 Lea navigation Dec 1 volume ACC/2423/002 Reports on navigation - signed copies 1884 Jan-1886 Lea navigation Dec 1 volume ACC/2423/003 Reports on navigation - signed copies 1887 Jan-1889 Lea navigation Dec 1 volume ACC/2423/004 Reports on navigation - signed copies 1890 Jan-1893 Lea navigation Dec 1 volume ACC/2423/005 Reports on navigation - signed copies 1894 Jan-1896 Lea navigation Dec 1 volume ACC/2423/006 Reports on navigation - signed copies 1897 Jan-1899 Lea navigation Dec 1 volume ACC/2423/007 Reports on navigation - signed copies 1903 Jan-1903 Lea navigation Dec 1 volume ACC/2423/008 Reports on navigation - signed copies 1904 Jan-1904 Lea navigation Dec 1 volume ACC/2423/009 Reports on navigation - signed copies 1905 Jan-1905 Lea navigation Dec 1 volume ACC/2423/010 Reports on navigation - signed copies 1906 Jan-1906 Lea navigation Dec 1 volume LONDON METROPOLITAN ARCHIVES Page 2 BRITISH WATERWAYS BOARD ACC/2423 Reference Description Dates ACC/2423/011 Reports on navigation - signed copies 1908 Jan-1908 Lea navigation/ stort navigation Dec 1 volume ACC/2423/012 Reports on navigation - signed copies 1912 Jan-1912 Lea navigation/ stort navigation Dec 1 volume ACC/2423/013 Reports on navigation - signed copies 1913 Jan-1913 Lea navigation/ stort navigation
    [Show full text]
  • Waltham Forest Archaeological Priority Area Appraisal October 2020
    London Borough of Waltham Forest Archaeological Priority Areas Appraisal October 2020 DOCUMENT CONTROL Author(s): Maria Medlycott, Teresa O’Connor, Katie Lee-Smith Derivation: Origination Date: 15/10/2020 Reviser(s): Tim Murphy Date of last revision: 23/11/2020 Date Printed: 23/11/2020 Version: 2 Status: Final 2 Contents 1 Acknowledgments and Copyright ................................................................................... 6 2 Introduction .................................................................................................................... 7 3 Explanation of Archaeological Priority Areas .................................................................. 8 4 Archaeological Priority Area Tiers ................................................................................ 10 5 History of Waltham Forest Borough ............................................................................. 13 6 Archaeological Priority Areas in Waltham Forest.......................................................... 31 6.1 Tier 1 APAs Size (Ha.) .......................................................................................... 31 6.2 Tier 2 APAs Size (Ha.) .......................................................................................... 31 6.3 Tier 3 APAs Size (Ha.) .......................................................................................... 32 6.4 Waltham Forest APA 1.1. Queen Elizabeth Hunting Lodge GV II* .................... 37 6.5 Waltham Forest APA 1.2: Water House ...............................................................
    [Show full text]
  • Surface Water Management Plan London Borough Of
    SURFACE WATER MANAGEMENT PLAN DRAIN LONDON LONDON BOROUGH OF ENFIELD FINAL DRAFT v2.0 Quality Management Quality Management DOCUMENT INFORMATION Title: Surface Water Management Plan for London Borough of Enfield Owner: Ian Russell Version: v3.0 Status: Final Project Number: CS/046913 File Name: DLT2_GP4_Enfield_SWMP Final_V3.0 REVISION HISTORY Date of Summary of Changes Completed By Version Issue Initial draft SI 12/06/2011 1.0 Final Draft SI 01/08/2011 2.0 Final IR 05/01/2012 3.0 AUTHOR Name Organisation and Role Stephanie Ip Senior Consultant, Capita Symonds Ruth Farrar Consultant, Capita Symonds APPROVALS Name Title Signature Date Ruth Goodall Director, Capita Symonds Principal Consultant, Capita Michael Arthur Symonds Ian Russell Senior Engineer, LB Enfield Kevin Reid Programme Manager DISTRIBUTION Name Organisation and Role Ian Russell Senior Engineer, LB Enfield Kevin Reid Programme Manager, GLA RELATED DOCUMENTS Date of Doc Ref Document Title Author Version Issue i Acknowledgements Acknowledgements A number of people and organisations outside Enfield Council have contributed to this Surface Water Management Plan. Their assistance is greatly appreciated, and in particularly inputs and information provided by: • The British Geological Survey • British Waterways • Drain London Group 4 boroughs: o London Borough of Haringey o London Borough of Hackney o London Borough of Waltham Forest o London Borough of Newham o London Borough of Tower Hamlets • The Environment Agency • The Greater London Authority • London Councils • The London Fire Brigade • Network Rail • Thames Water • Transport for London and London Underground ii Executive Summary Executive Summary This document forms the Surface Water Management Plan (SWMP) for the London Borough (LB) of Enfield.
    [Show full text]
  • Corporate Responsibility and Sustainability
    In this section of the report, we highlight how customer engagement underpins everything we do. We’ve engaged with nearly a million customers to understand what their needs are and what they want from us as we look to develop our strategy and long-term plans. We submitted our draft business plan to our regulator Ofwat on 3 September 2018 and published it on our website here. We also highlight how working in partnership with our stakeholders and regulators is fundamental to the way we do business. We know that the decisions we make today affect our ability to deliver our services sustainably in the future. That’s why we’re committed to working collaboratively with partners who can align to our vision and values to deliver excellently on our customer and stakeholder promises. We describe our corporate responsibility programme which focusses on education, engagement and enhancement - designed to engage our people, customers and stakeholders on key business and environmental issues. We also show how we offer support to charitable groups within the communities we serve, through projects linked to our core business of providing essential water and wastewater services. Sustainable and resilient financing is crucial to our long-term provision of essential services to customers. We outline how we’re simplifying our structure and closing our Cayman Islands subsidiaries, and how we’re increasing resilience and diversity in our funding portfolio by raising our first Green Bond. We’ve also brought together three years’ worth of key financial data, data sources, policy references and performance data in one place for all stakeholders by producing an environmental, social and governance (ESG) statement.
    [Show full text]
  • Lee Valley Regional Park Landscape Character Assessment
    LCT C: Urban Valley Floor with Marshlands SPA, which provides a nationally important habitat for overwintering birds. Cultural Influences 4.64 The low-lying land of rich alluvial deposits supported a system of grazing, referred to as the Lammas system5 from the Anglo-Saxon period to the end of the C19th. Grazing rights on the marshes were extinguished by the early C20th and a substantial proportion of the marshlands, with the exception of Walthamstow Marshes, were then modified by industrial activities and landfill, including the dumping of bomb rubble after WW2. In the 1950 and 60s the construction of flood relief channels ended the periodic inundation of the marshlands. 4.65 Communication routes through the valley floor proliferated over the C20th, including pylons, roads and railway lines mounted on embankments, but residential and industrial development remains largely confined to the margins. 4.66 Public access and recreation now characterises much of the marshlands, with some areas managed as nature reserves. However substantial infrastructure, such as the railway lines and flood relief channels and adjacent industrial development, means access through and into the marshes from surrounding urban areas is often severed. The tow-path following the River Lee Navigation provides a continuous link along the valley for visitors to enjoy the landscape. 5 A system of grazing whereby cattle was grazed only after the cutting and collection of hay Lee Valley Regional Park Landscape Strategy 85 April 2019 LCA C1: Rammey Marsh Lee Valley Regional Park Landscape Strategy 86 April 2019 LCA C1: Rammey Marsh Occasional long views out to wooded valley sides between Residential properties overlooking the southern area across the riverside vegetation.
    [Show full text]
  • Case Study – April 2018
    Collaborative working to reduce disruption. Case study – April 2018. Collaborative working to reduce disruption. We’re passionate about reducing the impact our work can have on customers across our region. So we’re working with gas, power and telecommunications providers, as well as Transport for London, the London Borough of Croydon and the Greater London Authority, to see how collaborating on planned streetworks can reduce the impact on the lives of all our customers, local communities and the environment, while still improving our services. Background. Over the past year we’ve been working with Atkins and their digital partner Fluxx, challenging ourselves to make improvements in the way we deliver streetworks to reduce their impact on our customers, and become more efficient by collaborating better. We know that our essential streetworks can often Visualising complex data. disrupt our customers’ daily lives, especially when a During our workshops with teams across Thames road reopens only to quickly close again for a different Water, we identified numerous benefits of sharing project, or for another company to start work. project information at the planning stage - including less frequent streetwork disruptions, less From talking to our customers, we know that they environmental impact, saving money, and better want us to minimise the inconvenience of roadworks. relations with our partners and customers. Our customers see the need for roadworks to maintain and upgrade infrastructure, but they want However, sharing complicated early stage pre- planning, advance warning, co-ordination with other planning information can be very difficult. This is utilities and highway authorities, and clear information because the information often isn’t finalised yet, it’s about the roadworks and how long they’ll last.
    [Show full text]
  • AD06.02 Environmental Statement Volume 2 Appendices 11.1 to 11.3
    NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 AD06.02 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDIX 11.1 WATER RESOURCES AND FLOOD RISK ASSESSMENT METHODOLOGY AD06.02 North London Waste Authority North London Heat and Power Project Environmental Statement Volume 2 Appendix 11.1 Water Resources and Flood Risk Assessment Methodology AD06.02 The Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Regulation 5 (2)(a) Issue October 2015 Amec Foster Wheeler E&I UK Ltd This report takes into account the particular instructions and requirements of our client. It does not in any way constitute advice to any third party who is able to access it by any means. Amec Foster Wheeler excludes to the fullest extent lawfully permitted all liability whatsoever for any loss or damage howsoever arising from reliance on the contents of this report. We do not however exclude our liability (if any) for personal injury or death resulting from our negligence, for fraud or any other matter in relation to which we cannot legally exclude liability. North London Waste Authority North London Heat and Power Project Environmental Statement Volume 2 Appendix 11.1 Water Resources and Flood Risk Assessment Methodology Contents Page 1 Water Resources and Flood Risk Assessment Methodology 2 1.1 Introduction 2 1.2 Engagement 2 1.3 Legislation and guidance 10 1.4 Baseline conditions
    [Show full text]
  • London Borough of Waltham Forest Level 1 SFRA
    London Borough of Waltham Forest Level 1 SFRA Final Report Project number: 60577135 October 2018 London Borough of Waltham Forest Level 1 SFRA FINAL Project number: 60577135 Quality information Prepared by Checked by Approved by Hannah Booth Emily Craven Sarah Kelly Graduate Water Associate Director, Water Regional Director, Water Consultant Sarah Waite Hydrologist Consultant Revision History Revision Revision date Details Authorized Name Position 01 July 2018 Draft Report for 26 July 2018 Sarah Kelly Regional Director, client comment Water 02 August 2018 Final report 02 October 2018 Sarah Kelly Regional Director, Water AECOM i London Borough of Waltham Forest Level 1 SFRA FINAL Project number: 60577135 Prepared for: London Borough of Waltham Forest Council Prepared by: AECOM Infrastructure & Environment UK Ltd Midpoint, Alencon Link Basingstoke Hampshire RG21 7PP United Kingdom T: +44(0)1256 310200 aecom.com © 2018 AECOM Infrastructure & Environment UK Ltd. All Rights Reserved. This document has been prepared by AECOM Infrastructure & Environment UK Ltd (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. AECOM ii London Borough of Waltham
    [Show full text]
  • London Effluent Reuse SRO July 2021
    Strategic regional water resource solutions: Preliminary feasibility assessment Gate One Submission for: London Effluent Reuse SRO July 2021 i Contents 1 Executive Summary .......................................................................................................... 1 2 Solution Description ........................................................................................................ 3 3 Outline Project Plan ......................................................................................................... 5 4 Technical Information ..................................................................................................... 9 5 Environmental and Drinking Water Quality Considerations................................................ 13 6 Initial Outline of Procurement and Operation Strategy ..................................................... 17 7 Planning Considerations ................................................................................................ 20 8 Stakeholder Engagement ............................................................................................... 22 9 Key Risks and Mitigation Measures .................................................................................. 24 10 Option Cost/Benefits Comparison .................................................................................... 28 11 Impacts on Current Plan ................................................................................................. 32 12 Board Statement and Assurance ....................................................................................
    [Show full text]
  • Meridian Water Masterplan Approved July 2013 2 Meridianwaterecocommunity Meridian Water Masterplan Contents
    Meridian Water Masterplan Approved July 2013 2 MeridianWaterEcoCommunity Meridian Water Masterplan Contents Foreword 4 6.0 Frameworks 99 Purpose of Document 5 6.1 The Frameworks 101 6.2 Movement 103 1.0 The Vision 6 6.3 Homes 109 1.1 The Masterplan 8 6.4 Business and Employment 114 1.2 The big drivers for change 12 6.5 Shopping and Leisure 117 1.3 Guiding principles 14 6.6 Community 120 6.7 Water 122 2.0 The Context 17 6.8 Public space 126 2.1 The context 18 6.9 Energy 130 2.2 The historical context 20 2.3 A well connected location 22 7.0 Delivering Meridian Water 134 2.4 A link within the Lee Valley 24 7.1 Making it happen 135 2.5 The waterways of the Lee Valley 26 7.2 Development Guidance 146 2.6 The existing communities 28 7.3 Land use 152 2.7 Business, employment and retail 30 2.8 The planning context 32 Contact Details 153 2.9 The physical history and a fractured site 34 Acknowledgements 154 3.0 The Masterplan 39 3.1 The concept 40 3.2 Masterplan 44 4.0 The Causeway 45 4.1 The Causeway 46 5.0 The Neighbourhoods 55 5.1 The neighbourhoods 56 5.2 Meridian Angel 58 5.3 The Gateway 64 5.4 Meridian Central 70 5.5 The Islands 76 5.6 Canal-side West 82 5.7 Meridian East 88 5.8 The Parklands 94 MeridianWaterEcoCommunity 3 Meridian Water Masterplan Foreword Cllr Doug Taylor Rob Leak Cllr Del Goddard Leader of Enfield Chief Executive Lead Member for Council London Borough of Business & Regeneration Enfield Meridian Water is located in the London Borough of Enfield Meridian Water also provides a unique location for business.
    [Show full text]
  • The Impact on Receiving Waters of Pharmaceutical Residues and Antibiotic Resistant Faecal Bacteria Found in Urban Waste
    The impact on receiving waters of pharmaceutical residues and antibiotic resistant faecal bacteria found in urban waste water effluents Thesis submitted to Middlesex University in partial fulfilment of the award of Doctor of Philosophy (Ph.D.) degree By Rebecca Tuckwell Supervisors: Prof. Mike Revitt, Prof. Hemda Garelick, Dr. Huw Jones Middlesex University, London, UK October, 2014 i Abstract Pharmaceuticals intended for human use are frequently detected in the aquatic environment. This is predominantly from their excretion following ingestion and subsequent discharge in domestic sewage. Wastewater treatment provides an opportunity to control their release to surface waters however, their removal is often incomplete. This thesis addresses this pharmaceutical pathway and the potential impact on the aquatic environment. The progress of bezafibrate, carbamazepine, ciprofloxacin and clarithromycin were monitored through the treatment stages (screened sewage, settled sewage and final effluent) of a large urban wastewater treatment plant (WWTP) and in surface waters up- stream and down-stream of the effluent discharge point. All except clarithromycin were detected in the screened sewage (369 – 2696 ng/L). Reductions in the pharmaceutical concentrations throughout the WWTP (22.5 – 94.3 %) indicate the removal of these compounds is variable. Bezafibrate and carbamazepine were observed at higher concentrations (67.5 - 305.5 ng/L) in surface water down-stream of the effluent discharge point compared to up-stream (31.0 – 116.7 ng/L). The presence of antibiotics in the environment may contribute to the dissemination of antibiotic resistance. The second part of this thesis monitors the prevalence of resistant faecal bacteria through WWTPs and in surface waters.
    [Show full text]