Firm Portfolio August 2020 CONTENT

01 INTRODUCTION

04 DISCIPLINES

11 SELECTED PROJECTS TABLE

13 SELECTED PROJECTS INTRODUCTION INTRODUCTION INTRODUCTION

A WORD FROM THE TEAM OUR VALUES Our values are our guiding principles to how we operate and behave. They are vital to the creation of a work- MAKS Engineering Consultancies represent the dynamic energy of fusion and movement. Fusion in the ing environment where u can achieve excellence and enjoy a fulfilling career. binding of both scientific and artistic disciplines, concept and detailed design, the old and the new, the dreams and reality. Movement in the bold mentality the firm has developed to itself. The team blends these core attributes in our daily work and is represented from the management to the designers. We are collectively more than architects, engineers, and project studies, together we are creators. OUTSTANDING PEOPLE All our people make MAKS unique. We create relationships with colleagues and clients based on trust and respect. We value diversity and difference and recognize people for who they are. Success in highly compet- MAKS ENGINEERING CONSULTANCIES itive markers mean MAKS people take an interest in the developments of themselves and their col- leagues and provide challenging work and growth opportunities to improve each other’s performance. MAKS Engineering Consultancies are the result of a partner- ship between Architects, Engineers, and Businessmen, where each partner, a leader in his field, has brought his creativity, CUSTOMER DRIVEN experience & knowledge, to create an idyllic engineering con- sultancy firm, rising beyond all expectations. Having clients, both internal and external, at the center of everything we do allows us to build strong relation- ships through listening to what they want, anticipating their requirements checking on expectations and act- For many years MAKS Engineering Consultancies has pre- ing with speed and precision. Undertaking our customers and their markets puts them and us. sented a creative approach to Architecture & Engineering. Our work reflects the determination of our employees to bring the most satisfaction to our clients & our diversified culture reflects the commitments that our employees have practiced over the years. WINNING PERFORMANCE Throughout years of practice & experience, MAKS Engineering Winning performance to deliver. We are results oriented, accepting account- ability for targets and able to Consultancies concept have been driven by both, passion & make and stay with difficult decisions that are required by the business to address unsatisfactory perfor- distinction. It is not only buildings & community centers that we mance. To be the best we set stretching and realistic targets for each other, keeping people informed and create, but also a way of life. demonstrating a positive and pro-active attitude to every task. We believe that each structure engages with the tradition of its place & positively affects the wellbeing of its surrounding. It is why we are sensitive to the culture & to the climate of each proj- ect location & concerned with its physical context. We are involved in different kinds of projects: Public & private, feasibility studied, Consultancy, Project Management & Super- vision. MAKS Engineering Consultancies is planning to have office in other Middle East countries; Saudi Arabia, Oman, Iraq, Syria during 2020/2021.

MISSION MAKS Engineering Consultancies is committed to the continuous improvement of its professional services and endeavors to be able to provide its client with height standard of know-how, Planning, Designing, Project Management of the projects towards the development and service of the project

VISION To continuously improve its rating the top architectural and engineering consulting firms, pioneer state of the art technological solutions and provide the best professional service value to its clients wherever they are achieving greater efficiency and quality.

maks-partners.com 2 3 maks-partners.com DISCIPLINES Disciplines Disciplines

ARCHITECTURE STRUCTURE MECHANICAL & UTILITIES

Having our Headquarter in the Heart of , Economies around , from businesses and The Architecture department of MAKS is at the core of the firm, from here the visionary design, studies of MAKS Engineering Consultancies have been service industries, to clients and designers, they all innovation and iconic landmarks can be brought to life through efficient management, detailed analysis of amongst the complexity of design and the chal- are facing an increase of high-power technology continuous tracking performance. lenges of greater use of buildings has engulfed with advanced networks, understandably a neces- Creating inspirational structures which can be realized requires a lot more than design documents, working the structural department engineers to be under sary part of modern project. The mechanical engi- efficiently and progressively with the multiple firms needed to create most projects is how things get com- scrutiny in order to deliver state-of-the-art solu- neering department work proactively to continue to pleted. MAKS has worked with many leading businesses to deliver the best result to our clientele. tions and to enforce rigorous standards of quality offer services for these demands and approach the and safety. A focus of re- sources for this depart- design of the MEP network in a viable way for many Our team is built up of middle eastern and western qualified staff who have solid expertise with international ment is shown as it needs to be able to seamless- years of escalating demand years ahead. projects and accordingly the international codes and standards. These key elements which collaborate to- ly work with design team, the client and according gether allow our disciplines and engineering capability to shine through to the requirements of our clientele. to regional and international codes. MAKS Engineering Consultancies offer specialized The Architecture department of MAKS is at the core of the firm, from here the visionary design, studies of A key department which allows the ideas of ar- mechanical consulting services such as: innovation and iconic landmarks can be brought to life through efficient management, detailed analysis of chitects to be safe, functional, efficient and build continuous tracking performance. them to last longer all whilst carrying heavier • Process piping layout and design per loads, allowing easier overall maintenance and ASME-B31 specification series adhering to international safety standards. • Skid-mounted packaged equipment and REGIONAL & URBAN PLANNING The combination of institutional tradition with piping state-of-the-art techniques and technology, using • Preparation and modifications of piping world class standard software to ensures the cli- specifications ent that the most appropriate structural solution The exponential growth of modern-day cities and rapid expansion of buildings and infrastructure has brought in terms of cost and safety will be selected, tak- • Heat trace systems for process and cold with it the heightened need for both regional and urban planning to manage the natural environment and ing into account all the particular conditions of the protection using hot water, steam, & hot built up areas. MAKS Engineering Consultancies tackles this need with a multidisciplinary team to allow the project. oil tracing fit between the current design and future needs of that com- munity. This will create efficiencies for future demands of road traffic, human transport and service for residents. • Dust Collection Systems MAKS Engineering Consultancies the environmental and socio-economic impacts on both the project and MAKS Engineering Consultancies Structural De- • Chilled water-cooling systems its surroundings through solid design and planning strategies to create solutions that continue to work to- partment included services: • Hot water system wards sustainable development at the national, regional and local level. MAKS Engineering Consultancies • Design of New Structures aims to utilize the land and maximize potential. • Ventilation systems for parking use, • Checking of Existing Designs including scrubber equipment, air curtains, MAKS Engineering Consultancies regional & Urban planning services include: evaporativE coolers, and dust control. • Scope of Structures • Regional & City Master-planning Urban planning and Regeneration Social facilities planning • Reinforced Concrete Structures • Urban design of mixed used development Landscaping and ecosystem management • Pre-Stressed Concrete • Urban institutional strengthening management capacity building • Structures

maks-partners.com 6 7 maks-partners.com Disciplines Disciplines

ELECTRICAL QHSE - QUALITY QA/QC SYSTEMS & PROCEDURES QUALITY PROCEDURES

Economies around the world, from businesses The Quality, Safety and Environmental manage- MAKS Engineering Consultancies is certified to At MAKS, we have developed our Quality Manual on and service industries, to clients and designers, ment is discussed here due to its importance and internationally recognized QE management sys- the basis of the process approach to management. they are all facing an increase of high-power tech- as it is a key element of good project management. tems: BS EN ISO 9001. This combines a systematic identification of the nology de- mands with advanced networks, un- MAKS has a dedicated staff to oversee the ad- processes required for product delivery with an un- derstandably a necessary part of modern project. ministration of the business management system derstanding of their sequence and interactions and The electrical engineering department work pro- All MAKS projects are undertaken within an estab- and this includes the implementation of a Quality their effective management. actively to continue to offer services for these de- lished corporate framework for the management Management System (QMS). mands and approach the design of the electricity of quality, health and safety and the environment. MAKS Quality Manual sets out the principles that The principles of our policies in these critical areas MAKS has dedicative staff to ensure that the pro- we adopt in the execution of our service to clients. network in a viable way for many years of escalat- are highlighted below and are embedded in our ap- cedures outlined in the QMS are executed ac- ing demand years ahead. It describes how the quality objectives embod- proach to the management of all our commissions. cordingly. ied within the Quality Policy Statement are to be MAKS uses systematic and cost-effective proce- achieved and controlled. MAKS Engineering Consultancies offers special- dures that determine, assess and achieve quality ized electrical consulting and value in satisfying the requirements of our cus- tomers, in pursuit of our objective to meet or exceed QUALITY POLICY STATEMENT customer expectations effectively, efficiently and PROJECT QUALITY PLAN Lighting due with regard to sustainability principles. We as- MAKS operate as center of excellence through a proactive strategy that takes into account both Indoor/ Flood Lighting/ Landscape/ Tunnel pire to meet industry best practice in all sectors in Each project requires a quality assessment system the characteristics of the market and the require- which participate. that is effective in assuring that the quality of de- ments of the client. liverables and the completed work should provide Building: In order to drive this, all MAKS staff understand trace- ability of information. that client care is a shared responsibility, and a MV/LV, Power Distribution, Protection and Safety- All projects are managed in accordance with MAKS We intend to earn and maintain a reputation for the day-to-day activity. Low Current Systems; Security, Alarm, Audio- Quality Management System. This requires a proj- provision of excellent services through the provision visual All members of staff are encouraged to view each ect Quality plan which will include all project spe- of adequate resources, training and the ap- appoint- project as an opportunity to exceed client expec- cific procedures. ment of quality professionals. We shall maintain a tations through the provision of the highest quality program of continued improvement in all fields of We prepared initial Design Briefs which are reviewed Conveying Systems: services.” operation to the benefit of our customers, stake- by the client prior to its incorporation into the Project Elevators, Escalators, Moving Ramps, Building holders, the Business and the Company. Quality plan. Automation System power The Brief is updated from time to time throughout QUALITY OBJECTIVES the design development process by means of in- Infrastructure: house de- sign workshops and through design progress meetings with the client. Transmission, Distribution, Substation The quality objectives of MAKS is to provide our customers with a full range of professional con- sultancy services which combine competence and objectivity with integrity. The achievement and continuous improvement of quality are mainly oriented towards the objective of exceeding the client’s expectations in deliver- ing the highest quality products (professional ser- vices) on time and within budget. The aim is to perform the work activities of the company right first time and to apply a concept of continuous quality improvement.

maks-partners.com 8 9 maks-partners.com SELECTED PROJECT’S TABLE List of Project done by M.A.K.S. Engineering Consultancies up to January 2019 List of Project done by M.A.K.S. Engineering Consultancies up to January 2019 List of Selected Project List of Selected Project Project Value Project Value Project Name Description Client Scope Status Year Project Name Description Client Scope Status Year (AED) (AED) Silicon Heights 1, Vision Av- Abjar Tower Jumeriah Residential Tower Khuyool Invest- Design Residential Building Complete Design Construction Complete Design Dubai Silicon Oasis, enue Homes, 85,000,000 2010 Village, South Dubai, (2B+G+4P+TP+54 ments, Dubai, 450,000,000 Development 2009 1 (1B+G+B) and Supervision Completed 19 and Supervision Dubai, U.A.E. Dubai, U.A.E. U.A.E. Typ+2Tech U.A.E. Completed Mr. Nabil Mixed use Developmental Private Villa at Emir- Construction Villa (B+G+1) Joz, Dubai, 12,000,000 Complete Design 2010 (Themed, Entertainment, 2 ates Hills, Dubai, U.A.E Completed U.A.E. Commercial, Residential and Hotel) 215 m diameter Design Construction Snow Dome Dubai 32 Group, partially started, 20 super structured dome, 2 1,500,000,000 Concept Design Development 2009 IRCCO, Land, Dubai, U.A.E. Dubai, U.A.E. Hills, Mirdif Complete Design then stopped Hotels inside the dome, 2 Completed 6 Nos. Buildings Baghdad, 3,600,000,000 2015 3 Dubai, U.A.E. and Supervision and could be Hotels outside the dome, 9 Iraq resumed in Residential Buildings, 3MP 2019 Halls Meraas Khuyool Invest- Phase-1 300 villas at 3 Nos. Residential Building Complete Design Working Draw- Holdings/ Complete Design Construction 21 Muhra 1 and ments, Dubai, 65,000,000 2009 Al Ain Road, Umm Al 300 Villas 16,000,000 2017 (2B+G+4) and Supervision ings Completed 4 Dubai Police, and Supervision Completed U.A.E. Daman, Dubai, U.A.E Dubai, U.A.E Faras Building Jumei- Khuyool Invest- Residential Building Complete Design Working Draw- Labour Accommoda- SP Interna- 22 rah, Village, South, ments, Dubai, 28,000,000 2009 Complete Design Construction (2B+G+4) and Supervision ings Completed tion, Dubai Investment 2 Nos. Buildings (G+4) tional, Dubai, 60,000,000 2019 Dubai, U.A.E. U.A.E. 5 and Supervision Completed Park 2, Dubai, U.A.E. U.A.E. Mr. Kamal Al Diamond Arch 3 JVS, Residential Building Complete Design Working Draw- Under Con- 23 Hakmi, Dubai, 35,000,000 2009 SP Interna- Dubai, U.A.E (2B+G+4) and Supervision ings Completed Staff Accommodation Complete Design struction- to be U.A.E. Building (G+3) tional, Dubai, 30,000,000 - 6 Mizin, Dubai, U.A.E and Supervision completed in Stallion Tower, Ju- Khuyool Invest- U.A.E. Residential Tower Complete Design Working Draw- May 2020 meirah Village, South ments, Dubai, 250,000,000 2009 24 (1B+G+4P+35Typ+2Tech) and Supervision ings Completed Under Con- Dubai, U.A.E. U.A.E. South Heights, Al 2 Nos. Residential and Retail Complete Design struction to be Gulf Line Bada'a Street, Dubai, Confidential Confidential - 7 Buildings (G+3P+18) and Supervision Completed in North Gate DTJA, Office Building International Complete Design Working Draw- U.A.E. 175,000,000 2009 August 2020 25 Dubai, U.A.E. (6B+G1+G2+4P+19Typ) Limited, Dubai, and Supervision ings Completed Under Con- U.A.E. Heights, 3 Nos. Building (G+2P+12) Complete Design struction - to High Garden, Confidential Confidential - Residential Building Complete Design Design Com- 8 Second Dubai, U.A.E. Residential and Retail and Supervision be completed in Al Quoz 4th, Dubai, Confidential Confidential 2018 26 (1B+G+10) and Supervision pleted Dec 2020 U.A.E. Rosehill Gardens, 6 Nos. Residential Building Complete Design Under Con- Mixed use Commercial, Master Planning Confidential Confidential - Baghdad Media City, 9 Dubai, U.A.E (G+6) and Supervision struction Hospital, Residential and BMC L.L.C. 920,000,000 and Concept Completed 2013 27 Baghdad, Iraq Nshama Media Sector Activity Design Plot 04 & 40 Town Residential Apartment Build- Develop- Complete Design Under Con- Residential City, (Mixed use, Square Development, 50,000,000 - 10 ing (G+5) ment L.L.C., and Supervision struction Residential and Commercial) Dubai, U.A.E Dubai, U.A.E. Sports Complex, Medical, Construction Global Jannat Al Hussain Educational, 5,166 Housing IRCCO, Complete Design Manhattan Building, Residential Building 28 3,600,000,000 partially started, - Procurement, 12,000,000 Concept Design Completed 2009 Residential City, Iraq Units, 12 Types differ- Baghdad, Iraq and Supervision 11 Mizin, Dubai, U.A.E. (2B+G+7) then stopped Dubai, U.A.E. ent housing types, Villas, Towers, Mall and Service Silicon Heights 2, Vision Av- Residential Building Complete Design Design Com- Buildings 12 Dubai, Sislicon Oasis, enue Home, 110,000,000 2009 (2B+G+9) and Supervision pleted Royal Bay Dubai, Mixed use (4B+G+2P+37) Tender Docu- Dubai, U.A.E. Dubai, U.A.E. VIP Waterfront, Complete Design Waterfront, Madinat Al Residential, Offices and 890,000,000.00 ment Com- 2009 North 25, Concept Design 29 Dubai, U.A.E. and Supervision 'a, Al Warqa'a Arab, Dubai, U.A.E. Commercial Building pleted 13 Residential Building (G+6) Dubai, 17,000,000 and Design Completed 2017 1st, Dubai, U.A.E. Mixed use (4B+G+2P+37) U.A.E. Development Royal Lagoon Dubai Tender Docu- (Hotels, Offices, Commercial VIP Waterfront, Complete Design Al Quoz 2nd, Staff 30 Waterfront, Madinat Al 610,000,000.00 ment Com- 2009 North 25, Concept Design Apartment, Commercial Dubai, U.A.E. and Supervision Accommodation, Arab, Dubai, U.A.E. pleted Residential Building (G+4) Dubai, 10,000,000 and Design Completed 2017 Buildings) 14 Al Quoz 4th, Dubai, U.A.E. Development U.A.E. North 25, Al Khail Gate Phase 3, Pre-concept 9 Nos. Building (G+9) Dubai, Not Applicable Completed 2018 15 Dubai, U.A.E. Design U.A.E. Residential Building, Khuyool In- Complete Dubai World Trade 3 Nos. Residential Building vestments, 225,000,000 Design and Completed 2009 16 Central, , (2B+G+4) Dubai, Supervision Dubai, U.A.E. U.A.E. Residential Building, Global Dubai World Trade Procurement Complete Design 2 Nos. Building (2B+G+4) 150,000,000 Completed 2009 17 Central, Jebel Ali, Company, and Supervision Dubai, U.A.E. Dubai, U.A.E. Residential Building, Gazzale Dubai World Trade 8 Nos. Residential Building Properties Complete Design Concept Com- 400,000,000 2009 18 Central, Jebel Ali, (G+6) Limited, and Supervision pleted Dubai, U.A.E. Dubai, U.A.E.

maks-partners.com 12 13 maks-partners.com Selected Projects Selected Projects Selected Projects UMM AL DIMANN HOUSING PROJECT - DUBAI, UAE

Client: Meraas Holdings

Construction Coast: $360 Millions

Features: 1000 residential villias

Area: 1,600,000 Sq.M

Status: Completed 2018

maks-partners.com 16 17 maks-partners.com Selected Projects Selected Projects MIRDIF RESIDENTIAL COMMUNITY - DUBAI, UAE

Client: Confidential

Project Value: Confidential

Features: Buildings of G+5

Typical Floors & 13 Town Houses

Build Up Area: 47,040 Sq. m

Status: Completed 2016

maks-partners.com 18 19 maks-partners.com Selected Projects Selected Projects GOLDEN GATE JEBEL ALI - DUBAI, UAE

Client: Confidential

Features: 30 G+6 Residential Buildings,.

Built-up Area : 360,000 Sq.m .

Status : Under Construction.

Scope: Lead Consultants.

20 maks-partners.com 21 maks-partners.com Selected Projects Selected Projects SOUTH HEIGHTS ’A - DUBAI, UAE

Client: Confidential

Features: 2 Residential Towers of G +3 P+19 Typical Floor

Build-up Area: 82,000 Sq. m.

Status: Under Construction.

maks-partners.com 22 23 maks-partners.com Selected Projects Selected Projects AL QUSAIS 2ND, AL TAWAR - DUBAI, UAE PLOT 04 AL YALAYIS 2 - DUBAI, UAE

Client: Confidential

Features: 3 Residential Towers Client: NSHAMA Development G+2P+12 Typical Floors Features: G+5 Typical Floors Build up Area: 79,000 Sq. m Build up Area: 18,800 Sq. m Status: Under Construction Status: Under Construction

maks-partners.com 24 25 maks-partners.com Selected Projects Selected Projects (PHASE 3) 3D PRINTED HOME - DUBAI, UAE

Client: Emaar P.J.S.C

Features: 3D Printed Home

Area: 1620 Sq.ft

Status: Under Construction.

Scope: Lead Consultants.

26 maks-partners.com 27 maks-partners.com Selected Projects Selected Projects RESIDENTIAL TOWERS ON PLOT A011 - DUBAI CREEK - DUBAI, UAE BARSHA HEIGHTS - DUBAI, UAE

Client: Confidential Client: EMAAR Properties PJSC Features: 2 Residential Towers Features: 2 Towers of G+2P+12 Typical Floors G+4P+25/35 Typical Floors GFA: 70,000 Sq. m. GFA: 65,750 Sq. m. Status: Completed 2018 Status: Approved Concept. Scope: Concept Consultants, Client Scope: Concept Design. Representative Consultant

maks-partners.com 28 29 maks-partners.com Selected Projects Selected Projects AL JALILA CULTURAL CENTER BUILDING AL WASL STREET - DUBAI, UAE DUBAI SNOW DOME - DUBAI, UAE

Client: 32 Group

Project Value: $ 2 Billion

Features: The Largest Indoor Skating Area and Client: Al Jalila Cultural Center the only Transparent Indoor Environment, 5 Hotels, 2 Residential Buildings, Shoppin Features: G+1 Office Building+ Restaurant. Center and Entertainment Facilities

Scope: Concept & Design Development Area: 800,000 Sq. m

Status: Completed Status: Design Development.

maks-partners.com 30 31 maks-partners.com A J G E B N H M A' O' B' C' N' D' M' 8 8 F.F.L. +0.20 F.F.L. +0.20 F.F.L. +3.00 F.F.L. +0.20 F.F.L. +2.00 7 7 F.F.L. +400 Selected Projects F.F.L.

+1.00

.

L

. .

00 .

L

F

.

.

.

.

L

2 .

F

F

L

.00

0 .

.

+

F

.

F

F

.0

.

+4

F

+1.00

F

3 + F.F.L. +3.00 ADVENTURE AREA F.F.L. +0.40 F.F.L. F.F.L. +0.15 F.F.L. +0.50 +0.20 F.F.L. JANNAT AL HUSSAIN - KARBALA, IRAQ +0.15 L' E'

.L. .L. 00 0 .F 00 . .F F 3. L F 2. + F.F.L. + F. 00 +1.0 .

F 4. .

+

L

.

F

.00

.

F

+2 .

F.F.L. .

+3.00

L

.

F

L

.00

.

0

F

.

+1

.

2

L

. L.

0

F

F 0

. 00 .

3. F

. F.F. 4.

+ + 0

L.

F F. L.

F.

+ 00 +3.00 .

F.F.

+2 .

L. .

.00 L

F.F 1 0

+ .

F.F.L. 4

+0.20

F

.

. 0

. F

10 + .F.L

F 0.

+ F.F.L. +0.00 Ld' Ed' F.F.L. +2.00 F.F.L. +3.00

0

.F.L. .0

F

+2 F.F.L. +1.00

F.F.L. .

L +0.00 F.F.L. 00 .

F.F. +0.15 +2

.

.L

F .00

F.

F.F.L. +1 +0.00 Lc' Ec' F.F.L. +0.00 E'b Lb' K' F' F.F.L. +0.00 La' Ea' F.F.L. +0.00 F.F.L. +0.00 E4 F.F.L. L1' +0.15 E3 L2' TOILET FEMALE LOBBY TOILET MALE F.F.L. +0.50 J' G' 6k F.F.L. +0.50 6j 6i F.F.L. -2.00 F.F.L. -0.50 6h F.F.L. JUICE BAR / CUT-OFF LOBBY H' I' +0.00 0.00 F.F.L 6g F.F.L. +0.00 SKI PATH INSIDE THE MOUNTAIN PL8 6f PL7 PL5 6e GREEN AREA F.F.L. -1.50 FOOD COURT E'b E'3 6d 6d PL6 E'2 E'a E'1 Bb Bf Ba Bc Be 6c 6c ARCADE GAMES 6 6 Bd F.F.L. +10.00 6b 6b F.F.L. +16.00 6a 6a F.F.L. 0.00 F.F.L. +12.00 F.F.L. +0.90 H' I' F.F.L. 0.00 MECHANICAL AREA F.F.L. _1.00 F.F.L. +2.40 F.F.L. F.F.L. +5.00 +0.00 F.F.L. +9.00 F.F.L. 0.00 F.F.L. +0.00 F.F.L. +4.00 F.F.L. +0.00 F.F.L. 0.00 LEVEL:+0.00 BEGINNER'S SKI- ARIVAL POINT

TRAVELATOR RAMP TO REACH 29.00 LEVEL F.F.L. +2.00 J' G' F.F.L. +0.00 F.F.L. -4.00 F.F.L. +0.90 F.F.L. -4.00 Expert Ski Ramp LEVEL: - 4.0 MOUNTAIN RUN ARRIVAL F.F.L. +1.20 Ld' Ed' LEVEL:-4.00 EXIT FROM THE MOUNTAIN LEVEL:-4.00 EXPERT'S SKI- ARIVAL POINT F.F.L. +0.00 K' F' Lc' Ec' Lb' E'b F.F.L. +0.00 L3' E2 La' Ea' L4' SNOW MAN IGLOO E1' LINE OF OPENING ABOVE L' E' F.F.L. +0.00 IGLOO 5 5 IGLOO 4 4 RAMP AT LEVEL 19.5M LIFT UP TO THE TRAVELATOR D' M' (SNOW PLAING AREA) FROM GROUND FLOOR DOWN TO FIRST BASMENT C' Client: IRCCO N' O' Project Value: $ 980 Million B' A' Features: Residential City of 5200 units

Build Up Area: 1.1 Million Sq.m

Status: Construction started 2015 and stopped and will be restarted in 2020 3 3 GROUND FLOOR GROUND FLOOR LIFT LIFT LIFT LIFT UP TO GROUND FLOOR FROM (SNOW PLAING AREA) FROM GROUND FLOOR DOWN FROM FIRST FLOOR TO maks-partners.com UP TO FIRST FLOOR FROM 32 DOWN TO FIRST BASMENT FIRST BASEMENT(SNOW PLAING AREA) 2 2 PL1 PL2 PL3 PL4 PL4 GROUND FLOOR UP TO FIRST FLOOR FROM 1 1 A J C G K B L N D H E F I M HOTEL TOWER HOTEL TOWER maks-partners.com