Q2020/10 - TULLIBIGEAL RECREATION GROUND LIGHTING UPGRADE

LACHLAN SHIRE COUNCIL

REQUEST FOR QUOTATION RFQ 2020/10

TULLIBIGEAL RECREATION GROUND LIGHTING UPGRADE

Quotations close at 2:00 PM on Friday 14 August 2020.

All submissions to be marked:- “Q2020/10 TULLIBIGEAL RECREATION GROUND LIGHTING UPGRADE” Contact person for further information: David Wolfenden, Acting Manager Recreation Ph.: (02) 6895 1900 [email protected]

Q2020/10 - TULLIBIGEAL RECREATION GROUND LIGHTING UPGRADE

CONTENTS

1 BACKGROUND INFORMATION ...... 1 1.1 SUMMARY ...... 1 1.2 ABOUT COUNCIL ...... 1 1.3 COUNCIL POLICY ...... 1 2 PROJECT AND CONTRACT DETAILS ...... 3 2.1 TENDERER RESPONSIBILITY ...... 3 2.2 INSPECTION / BRIEFING ...... 3 2.3 TENDER ENQUIRIES AND CLARIFICATIONS ...... 3 2.4 SCOPE OF WORKS ...... 3 2.5 PRICE...... 5 2.6 LODGEMENT ...... 5 2.7 SELECTION CRITERION ...... 5 3 TENDER SCHEDULES ...... 6 Tender Form pricing ...... 6

Q2020/10 - TULLIBIGEAL RECREATION GROUND LIGHTING UPGRADE

1 BACKGROUND INFORMATION 1.1 SUMMARY The Lachlan Shire Council is committed to improving the facilities across the Shire, for the benefit of the local community and visiting public. To achieve this commitment, Council is requesting quotations from appropriately qualified contractors to undertake the sports ground lighting upgrade to improve utilisation of the Tullibigeal Recreation Ground, located at 24 Burgooney Road Tullibigeal. The identified project is to provide an upgraded sports ground lighting capacity for the existing football oval and netball courts which are located at the Tullibigeal Recreation Ground. The project scope extends to the removal of some existing infrastructure. Lachlan Shire Council (Council) is seeking the services of a suitably qualified Electrical Contractor for the design and execution of the work. Prior to the commencement of construction work, a Certificate of Compliance is to be provided by a practicing structural engineer certifying that the design of the pole foundations and the steel light poles are in accordance with the relevant Australian Standards and are suitable to the specific site conditions. A copy of the Geotechnical Report relating to the recently constructed near-by amenities building is included in the reference documents. A timely construction and commissioning of these works will score positively in the assessment of these quotations.

1.2 ABOUT LACHLAN SHIRE COUNCIL Lachlan Shire is located in the Central West of ; 200km west of Orange, 100km west of Parkes, 220km south west of Dubbo and 228km north east of the Griffith. Lachlan Shire has an area of 14,973 square kilometres and hosts the towns of , Lake Cargelligo and Tottenham and villages of Albert, Burcher, Tullibigeal, Fifield and Derriwong. Tullibigeal is a Village in the Lachlan Shire. It is about 70km south west of Condobolin and about 40km East of Lake Cargelligo. Refer to Council’s website for more information www.lachlan.nsw.gov.au

1.3 COUNCIL POLICY During the Tender and service delivery process, all parties are required to maintain the highest ethical business standards in accordance with the Council’s Code of Conduct and Procurement Policy. Copies of these Policies are available on Council’s website. http://www.lachlan.nsw.gov.au/council/council-policies.aspx Each member of the partnership; employees and sub-contractor must be familiar with Council’s Code of Conduct.

1

Q2020/10 - TULLIBIGEAL RECREATION GROUND LIGHTING UPGRADE

Image: Map depicting the location of Tullibigeal

2

2 PROJECT AND CONTRACT DETAILS 2.1 TENDERER RESPONSIBILITY The Tenderer shall be deemed to have examined each and every aspect of their obligations within these tender documents. It is the responsibility of the Tenderer to ensure that they have the qualifications, ability and understanding to undertake all requirements of the contract to the acceptable standard. As a minimum requirement, Contractors shall comply with all applicable qualifications and requirements of a licenced Electrical Contractor. The Tenderer shall supply to Council details of qualifications, Certificates of Competency and any other authority or permits that may be required for certain work processes, for all staff that will be involved on the contract.

2.2 INSPECTION / BRIEFING A Site inspection is strongly recommended to all prospective Contractors to ensure that they are fully aware of their obligations, site constraints and conditions. To arrange an inspection, contact: Mr David Wolfenden, Acting Manager Recreation, phone (02) 6895 1900, email [email protected]

2.3 TENDER ENQUIRIES AND CLARIFICATIONS Any questions regarding the works requested in the documents should be made to Council’s Acting Manager Recreation on (02) 6895 1900, or email [email protected]. No prior discussion on prices will be entered into. Canvassing of Councillors will disqualify Contractors. Any amendments, addendums, responses to substantive questions and queries will be made in writing, or email. These responses shall be made available to all prospective Contractors, without disclosing the source of the query.

2.4 SCOPE OF WORKS This is a Design and Construct contract for the supply and installation of electrical LED lighting to the sporting fields (football oval and netball courts) at Tullibigeal Recreation Ground. The scope of works for this project includes the design, set out, administration, supply of materials and installation of all necessary goods, light alignment, testing and commissioning the LED lights to the satisfaction of Council’s Manager Recreation for the Tullibigeal Recreation Ground. The scope of work includes the structural design and specification of the light post and footings by a Practicing Consulting Structural Engineer. The contractor is responsible to locate all underground services, and shall meet the repair cost of any services, irrigations systems or like infrastructure that is damaged as a result of the work. Please note that the information provided in the Irrigation as Constructed drawings must be confirmed on site prior to commencement of all excavation works. More specifically, the scope of work includes: 1. Four (4) x 24 metre nominal height steel poles including steel reinforced concrete foundations at locations as generally shown on the attached drawings; 2. Underground power to at least four (4) new steel poles; 3. LED lighting for the Football Oval; 3

4. LED lighting for the two (2) Netball Courts – (this may require an additional pole); 5. LED lighting to deliver an average of 100 Lux horizontal illuminance across the three (3) playing surfaces in accordance with the relevant Australian Standards (AS2560) and IP66 all weather rating. 6. Connect to the new switchboard located 7. Provide, install, test and commission all necessary electrical switch gear and controllers; 8. Remove three (3) redundant timber light poles (PP8323, PP8324 & PP8325) and place safely on the sullage adsorption area to the west of the tree line, west of the amenities building within the Recreation Ground precinct. 9. Electrically terminate and remove two redundant steel light poles and concrete foundations one located east of building one (1) and one located east of building three (3). 10. Either electrically terminate and remove or utilize, steel light post located to the west of the Netball Courts. 11. Remove and dispose of redundant lights, wires and associated equipment from site.

The following works are not included in this contract but are currently in progress and scheduled to be completed July 2020:-

 Level 1 ASP distribution network assets including all high voltage upgrade works;  Provision of a new 3-phase 63kVA substation mounted on NP423977 (old pole 1452);  Underground 3-phase cabling between NP423977 to vicinity existing pole 1453 111 which is to be re-labelled PP23564. .  Installation of Level 2 consumer metering and main switchboard vicinity existing pole 1453-111 (re-labelled PP23564)

The approved design for the Level 1 and Level 2 ASP work associated with the current electrical upgrade project is included in the electronic reference documents. It is noted that the Level 2 ASP meter installation contractor (not included in the scope of this contract) will supply and install a nominal size 600mm x 900mm Meter Box for the new 3PH meter and 24 pole load centre with circuit breakers. Underground conduits for the new sportsground lighting connection will extend approximately 2 metres from the new cabinet. Sufficient space should be available in the new meter box to house the necessary LED light control switch gear to be able to provide for independent lighting control of both the football oval and netball courts. Reference Documents: are listed below.

1. Tullibigeal Lighting Project – Sheet 1: Site Map, and Sheet 2: Pole and Light Layout; 2. Detailed Site Survey Plan 3. Tullibigeal Oval – Irrigation as Constructed 4. Level 1 & 2 ASP Electrical Works Tullibigeal Showground (3 sheets); 5. Geotechnical Report for nearby amenities building

Electronic copies are available on Council’s Web Site at https://www.lachlan.nsw.gov.au/council/tenders- contracts-eoi.aspx

4

2.5 PRICE The Contract is for the lump sum payment for the works described.

2.6 LODGEMENT Complete proposals will be considered only if: a) Titled “RFQ2020/10 - TULLIBIGEAL RECREATION GROUND LIGHTING UPGRADE”. b) Received electronically with total attachment’s size to be less than 8MB to [email protected]; or mailed to P.O .Box 216, Condobolin NSW 2877; or Hand delivered and deposited in the tender box at 58-64 Molong Street, Condobolin. c) Received by the closing time and date 2pm Friday 14 August 2020.

Proposals will need to contain the following information:

1. Price in the form of a completed Schedule form; 2. Timeline for proposed works; 3. Licenced electrical contractor information, proposed insurances (certificates of currency should be included), relevant WH&S information and any further information that would support the application; and 4. Name of certifying structural engineering firm proposed.

2.7 SELECTION CRITERION Applicants should address the following selection criteria:

Number Criterion Weighting 1 Value for money (including price, quality and minimum 40% lifecycle cost considerations) 2 Timeliness of delivery 40%

3 WH&S and Insurance information 20%

All proposals will be received and recorded upon opening. Evaluation and selection of the winning tender will be in accordance with the requirements of NSW Tendering Guidelines and Council’s Procurement and Local Preference Purchasing Policies. https://www.lachlan.nsw.gov.au/council/council-policies.aspx

Before working on-site, Contractors are required to undertake CENTROC Induction which comprises a half day safety induction at Council offices in Condobolin. Evidence showing currency in CENTROC induction (a valid card) will obviate this requirement on an individual employee basis.

5

3 TENDER SCHEDULES Tender Form pricing The price for the fee proposal shall be in the form of a lump sum Inclusive of GST with a price for each activity as outlined in Table 1 below. Name of person, firm or company submitting Tender: (USE BLOCK LETTERS) ………………………………………………………………………………………………………………….…………………………. Principle Business Address: ………….…………………………………………….………………………………………. …………………………………………………………………………………………………….………………………………………. Contact Person:……………………………………………………………………………………………………………………. ABN / ACN:……………………………………………………………………………..……………………………………………. Telephone: ………………………..…………………… Facsimile: …………………………………………………………… Email: ………………………………………………………………………………….. I/We, the undersigned hereby submit the enclosed tender for the complete, design, supply, construction, testing and commissioning of an outdoor LED lighting system at Tullibigeal Recreation Grounds as described in the supplied tender documents and plans. I/We accept that I/We have examined the site and the documents, plans and training calendar (as agreed) and are duly satisfied that they are complete in nature and intent and confirm our tender for the lump sum INCLUSIVE of GST:

Dated this………..…………………..day of …………………………………2020

Signed:…………………………………………Print Name:…………………………………

Table 1 Lump Sum Fee Schedule:

Activity $ Price (Including GST)

All Design, Specifications, Certifications, Administration, Site Project Management, Materials and Works to enable the upgraded lighting facility to the Tullibigeal Recreation Ground.

TOTAL

Estimated Time for project inception and Award Contract = 14/08/2020 Estimated lead time for ordering supplies = _____ weeks Estimated Time to begin ground works = __ / ___ / 2020 Estimate Time to complete Project = __ / ___ / 2020

6

TULLIBIGEAL ROAD

233

1

2

3 233

4

427.64

234

234 17 234 234 16 WATTLE STREET

7 15 234 5 14 8 6 13 231.24 9

10 12

11

235

BURGOONEY ROAD

235 1 2

3

4

A 187.79 NOMINAL SUPPLY NEEDED FOR THE PUMPPANEL. IS PUMP MINIMUMTHE 5.5KwFOR 3 PHASE.CIRCUIT WITH10AMP A240v PROPOSED TANK BE SIZETO SUPPLIED COUNCIL BY BORE WATER SUPPLY, STORAGECOUNCIL. TANKBY AND PUMP SHEDPROVIDED BE TO COUNCIL TO ENSURE THE POWER SITE. NECESSARYON FROM THEPROVIDED NEARESTBE WILL POLEAND OR METEREDSUPPLY SAMPLE FOOT PRINT SHOWN ONLY. AS A GUIDE STANDARD AND MINIMUMAND REQUIREMENTS COLOR TONE ASTANK. THE COUNCIL SHALL ALSO PROVIDE A SAME PUMP THE SHED ON WHICHBE TO IS TOSHED BE A LIGHTFRAMED INDUSTRIALSTEEL OPTION 2 160KLHGT160 CONSTRUCTION TO FACILITATE THE IRRIGATIONINFRASTRUCTURE. CONTRACTOR IS TO LIAISE WITH DURING COUNCIL SIZES FOR AND ALL NECESSARY LOCATIONS CONNECTIONS, POINTS, ACCESS THE CONTRACTOR THE CONTRACTOR SHALL LIAISESIZE. WITHAND COUNCIL AND CONFIRMCONFIGURATION THESHED FINALPUMP TANK MODEL BASED ON HERITAGE "STREAMLINE"COUNCIL. BY TANKS COLOURREQUIRED WOODLANDWISE OTHER GREY AS OR B IS TO PROVIDEPOWER

NOTE: MAINLINE RAIL AND LATERALINSIDE THE LINE ON SPRINKLERS TO BE LENGTH ON SHORT "T"BRANCHES TO BE ON THE INSIDE TRACK. OF THE RAILON ANDNOT ALIGNMENT RAILPOSTS. AS REQUIRED OF & LOCATEDFRONT SLIGHTLYIN 231.24 FROM THE NEAREST METERED SUPPLYNECESSARY. AS OR POWER POLE C 11 217L/M 50 21 50 FV 50 FV 217L/M 50 20

D B U 217L/M

50

R 4 G

17

O

O

N

E

Y

427.64

E

FENCING. FINAL SITE LOCATIONON TO BE DETERMINED NEW PIPE WORKRACE TO BEBETWEEN LOCATED POST ETC. RUN OVER OR UNDER FINISH EXISTINGTO SERVICES NOTE. SERVICES TO EITHER BE LOCATEDPIPES AND AND APPROVED BY COUNCIL. TRACK FENCING ANDARENA SIGNAGETHE AND

R

O

A

D

271L/M 58.47 50 09 F 271L/M 50 16 271L/M 50 10 HT-N 271L/M 50 G 11 271L/M 50 19 271L/M 50 12 271L/M 50 18 - L/M 50 271L/M 50 22 H 15 271L/M 50 100 13 100 271L/M 50 14 I 50 OR 100 50 xxL/M 50 HT-N 01 / FS J

IRRIGATION CONTROLLER. IRRIGATION CLOUD IQ-NCC AND ESPLXD RAINBIRD MANAGER FLOW WITH CONTROLLER. IRRIGATION PN10 POLY 75/110mm VALVES SOLENOID TO BRANCHES AND MAIN IRRIGATION NECESSARY. AS SUPPLY POWER IRRIGATION AND PUMP FOR SHED PUMP TO SUPPLY ELECTRICAL 650kPa @ 280LT/MIN CRIE15- 5 5.5KW.SOLOe NOMINAL -GRUNDFOS PUMP CONTROL AND PUMP THE TO CONNECTED & METER FLOW SIZE REFERENCE SENSOR LOCAL / FLOW RAINBIRD LABELING. NON-POTABLE WITH RISER ON "KEYTAP BRASS TYPE" SHOWN AS CABLE, DECODER TO ARRESTOR SURGE GPO. 240v LOCKABLE IN CABINET MODULE WITH VALVE BALL STEEL STAINLESS ISOLATION BRANCH SUB- VALVE SLUICE VALVE FLANGED ISOLATION MAINLINE FLOW ESTIMATEDSTATION NUMBER STATION SHOWN AS SIZE VALVE, PEB SOLENOID RAINBIRD VALVES SOLENOID TO CONTROLLER CABLE FROM CONTROLLER DECODER PE100 PN10 POLY 63mm SPRINKLERS. PIPE TO LATERAL 54.13Lt/min 450kPA, AT NOZZLE #14 SPRINKLER. POPUP 8005 RAINBIRD LEGEND: VALVE SIZE VALVE 243.72 K L SCALE: DATE: PROJECTNo.: F.B. 1:1500 ORIGIN OF DRAWING: PROJECT: LEGEND: TotalIrrigation Designers ISSUE AMENDMENT FULLSIZE 22/06/2020 SURVEYED: A3 FULLSIZE 131102 xxL/M 25 01 PRV RV FV SC AV F A D INSPECTED: DRAWINGNo: 2012-1-01D B C H BACKFLOW DEVICE PREVENTION IRRIGATION CONTROLLER PUMP PANEL CONTROL PUMP FILTER VALVE FLUSH PRESSUREVALVE REDUCING RELIEF VALVE LARGER & ISOLATION SLUICE VALVE80mm ISOLATIONLESS BALL OR VALVE 50mm IRRIGATION CABLE COMM IRRIGATION CABLE CONTROL IRRIGATION ELECTRICAL DRIP 'LINK' ZONE PIPE DRIP TURF DRIP GARDENS HEADER/COLLECTOR LATERAL RECYCLED MAIN POTABLEMAINLINE IRRIGATION MAINLINE MISTER/DRIPPER/OCTAMITTER MINI-SPRINKLER LEGEND: SCOUR VALVE SCOUR QUICKCOUPLING VALVE STATIONNUMBER SOLENOID VALVE CONDUITS STORMWATER SPRINKLERTYPE5 SPRINKLERTYPE4 SPRINKLERTYPE3 SPRINKLERTYPE2 SPRINKLERTYPE1 WATER METER VALVE/FILTER/PRV AIRVALVE APPROXIMATE ZONE FLOW VALVESIZE E FGJ I K L M N DESIGN: CHECKED: DATE INIT DRAWN: AUTOCAD: AL O AL DB AL NORTH P Q R S T MAINLINE IRRIGATION SHADOW OF SHADOW IN CONDUIT IN CABLE FIELD WIRING AND CONTROLLER CONNECTBETWEEN CONTROLLER" NEW"EXTERNALTO TERMINAL STRIP. TERMINALTO STRIP FORCOMMON. BLACK. EXCEPT MULTI-STRAND BE EITHERSOLID COLOUR, BUT NOT COLOUR, CABLE. OF MAY BE SUPERFLEXIBLE MAYBE CORE OR CONTROLLERTO WIRESFROM NEW ALL OF ALL SAME THE 1.6m) BEAT"EYE LEVEL" (NOMINAL 1.5 (NOMINAL TO 1.5 CONTROLLERTO A SPECS) CABINET( SEE LOCKEDOUTER TAPPING SADDLE TAPPING APPROVED OR TEE IMPORTED APPROVED IMPORTED CLIENT. OF APPROVAL TO SOD TURF WITH OVER, SOIL PENETRATION WIRE PROTECTING POLYTUBE THROUGH NUMBERPLAN ON MATCHVALVE TAGTO CABLE MASTER VALVE WHEREUSED MV GRAVEL OVER LEVELED OVER GRAVEL SUB-SOIL BASE SUB-SOIL 10mm COMPACTED NECESSARY IF DECODER TYPICALSOLENOID VALVEDETAIL TAG 1 2 3 4 5 6 7 8 9 101112131415161718192021222324 C C C GL TAG TAG CONTROLLER IRRIGATION TAG NEWFIELD CONDUIT B TYPICAL NOMINAL SUPPLY NEEDED FOR THE PUMP IS MINIMUMPANEL. 5.5KwPUMP 3THE PHASE.FOR WITHCIRCUIT A 240v10AMP PROPOSED TANK SIZEBE SUPPLIEDTO BY COUNCIL BORE WATER SUPPLY, STORAGE TANK ANDCOUNCIL. PUMPBY SHED TO BEPROVIDED COUNCIL TO ENSURE THE POWER NECESSARY FROM SITE. THE ON NEAREST POLE PROVIDED OR METEREDBE WILL SUPPLYAND SAMPLE FOOT PRINT SHOWN AS A GUIDEONLY. AND MINIMUMSTANDARD REQUIREMENTSAND COLOR TONE AS TANK. THE COUNCIL SHALL ALSO PROVIDE A PUMP SHED WHICHSAME ISTHE TOON BEBE A TO LIGHTSHED INDUSTRIALFRAMED STEEL OPTION 2 160KLHGT160 CONSTRUCTION TO FACILITATE THE IRRIGATIONINFRASTRUCTURE. CONTRACTOR IS TO LIAISE WITH COUNCIL FOR DURING ALL NECESSARYSIZES AND CONNECTIONS, LOCATIONS ACCESS POINTS, THE CONTRACTOR THE CONTRACTOR SHALL LIAISE WITH COUNCILSIZE. AND AND CONFIRM THE FINALCONFIGURATION PUMPSHED TANK MODEL BASED ON HERITAGE "STREAMLINE" TANKSCOUNCIL. COLOURBY WOODLAND REQUIRED GREYWISE OR AS OTHER MULTI-STRAND) MULTICORE (TYPICALLY EXISTING FIELD WIRES OF VALVE BOX VALVE OF EDGE OF UNDERSIDE TO TIED CABLE CONNECTIONS. WIRE APPROVED WATERPROOF APPROVED SHEATH OUTER ISOLATION BALL ISOLATION (see specs) (see VALVE AS AS REQUIRED VALVE SCHEMATIC CONTROLLERWIRING DETAIL C REQUIRED (see specs) (see REQUIRED WHERE REGULATOR WITH VALVE- SOLENOID IS TO PROVIDEPOWER UP MAXIMUMTO 5. EVERY 10 STATIONS MINIMUMCOMMON 2 FORMULTI CORE BLACK. OUTPUTS,FOR2 OR SYSTEMS CABLE COMMON BE TO NOT TO SCALE TO NOT GL GPO DOUBLE NECESSARY. AS COLOUR, IN LILAC LEVEL. GROUND AT LOCATED BOLT WITH EQUIPMENT ALL HOUSE - LID TO BE BOLTED AND GREEN OR GREEN AND BEBOLTED TO -LID AND BELEVEL TO BOX -VALVE TO SIZE SUITABLE OF BOX -VALVE AND LIP OVER TYPE LOCKABLE LID. LOCKABLE TYPE OVER LIP AND -NO SCALE -NO C OF PIPEWORK BYMINIMUM PIPEWORK OF 25mm BE CLEAR TO BOX VALVE LATERAL PIPE LATERAL 10mm GRAVEL OR OTHER OR GRAVEL 10mm BASE AND SUPPORT THE SUPPORT BASE AND VALVE BOX. VALVE TO MATERIAL APPROVED BEFORE BACKFILLING BEFORE WRAPPING GRAVEL 10mm THE IN LAID LAYER GEOFABRIC THE VALVE BOX VALVE THE OF OUTSIDE THE TO TAPPED AND AROUND FINAL LOCATIONON TO BE DETERMINED INSTALLED. RAINBIRD ESPLXD-MEFIQ WITH DECODER POWER WITHINAND TO BE SUPPLIED SITE WITH COUNCIL. CLOUD MODULE IN NEWSHED. PUMP ALLOW FOR NEWAND LOCKABLE CABINET NOTE: MAINLINE AND RAIL LATERAL INSIDE LINETHE ON SPRINKLERS TO BE ON SHORTLENGTH "T" BRANCHES TO BE ON THE INSIDE OF TRACK. RAILTHE ANDON NOT ALIGNMENT RAILPOSTS. AS REQUIRED & LOCATEDOF SLIGHTLYFRONT IN FROM THE NEAREST METERED SUPPLY OR NECESSARY. POWER AS POLE PUMP SHED AND PUMP STATION NOM160kl TANK D 4 E BIN 217L/M 50 100 08 271L/M 50 BIN 07 F 271L/M 50 BIN 09 BIN 271L/M 50 10 G 271L/M 50 11 217L/M 50 06 271L/M 50 12 H 271L/M 50 05 271L/M 50 13 271L/M 50 04 I 50 271L/M 50 14 OR 100 50 xxL/M 50 01 HT-N / FS 271L/M 50 03

IRRIGATION CONTROLLER. IRRIGATION CLOUD IQ-NCC AND ESPLXD RAINBIRD MANAGER FLOW WITH CONTROLLER. IRRIGATION PN10 POLY 75/110mm VALVES SOLENOID TO BRANCHES AND MAIN IRRIGATION NECESSARY. AS SUPPLY POWER IRRIGATION AND PUMP FOR SHED PUMP TO SUPPLY ELECTRICAL 650kPa @ 280LT/MIN CRIE15- 5 5.5KW.SOLOe NOMINAL -GRUNDFOS PUMP CONTROL AND PUMP THE TO CONNECTED & METER FLOW SIZE REFERENCE SENSOR LOCAL / FLOW RAINBIRD LABELING. NON-POTABLE WITH RISER ON "KEYTAP BRASS TYPE" SHOWN AS CABLE, DECODER TO ARRESTOR SURGE GPO. 240v LOCKABLE IN CABINET MODULE WITH VALVE BALL STEEL STAINLESS ISOLATION BRANCH SUB- VALVE SLUICE VALVE FLANGED ISOLATION MAINLINE FLOW ESTIMATEDSTATION NUMBER STATION SHOWN AS SIZE VALVE, PEB SOLENOID RAINBIRD VALVES SOLENOID TO CONTROLLER CABLE FROM CONTROLLER DECODER PE100 PN10 POLY 63mm SPRINKLERS. PIPE TO LATERAL 54.13Lt/min 450kPA, AT NOZZLE #14 SPRINKLER. POPUP 8005 RAINBIRD LEGEND: VALVE SIZE VALVE 524.42 100 271L/M 50 02 J BIN 217L/M 50 BIN 01 K L SCALE: DATE: PROJECTNo.: F.B. 1:1500 ORIGIN OF DRAWING: PROJECT: LEGEND: TotalIrrigation Designers ISSUE AMENDMENT DATE INIT FULLSIZE 22/06/2020 SURVEYED: A3 FULLSIZE xxL/M 25 01 PRV RV FV SC AV F A D INSPECTED: DRAWINGNo: 2012-1-01-01D B C H BACKFLOW DEVICE PREVENTION IRRIGATION CONTROLLER PUMP PANEL CONTROL PUMP FILTER VALVE FLUSH PRESSUREVALVE REDUCING RELIEF VALVE LARGER & ISOLATION SLUICE VALVE80mm ISOLATIONLESS BALL OR VALVE 50mm IRRIGATION CABLE COMM IRRIGATION CABLE CONTROL IRRIGATION ELECTRICAL DRIP 'LINK' ZONE PIPE DRIP TURF DRIP GARDENS HEADER/COLLECTOR LATERAL RECYCLED MAIN POTABLEMAINLINE IRRIGATION MAINLINE MISTER/DRIPPER/OCTAMITTER MINI-SPRINKLER LEGEND: SCOUR VALVE SCOUR QUICKCOUPLING VALVE STATIONNUMBER SOLENOID VALVE CONDUITS STORMWATER SPRINKLERTYPE5 SPRINKLERTYPE4 SPRINKLERTYPE3 SPRINKLERTYPE2 SPRINKLERTYPE1 WATER METER VALVE/FILTER/PRV AIRVALVE APPROXIMATE ZONE FLOW VALVESIZE E FGJ I K L M N DESIGN: CHECKED: DRAWN: AUTOCAD: AL O AL DB AL NORTH P Q R S T LEGEND NOTES

EXIST OH 22KV CONDUCTOR 35 DP752341 DESIGN REMOVE OH CONDUCTOR SITE PLAN REMOVE OH 3W LV NEW OH 22KV CONDUCTOR a) ALL OVERHEAD CONSTRUCTION TO BE IN ACCORDANCE WITH THE LATEST BARE. INSTALL UG EXISTING OH LV CONDUCTOR COPY OF ESSENTIAL ENERGY OVERHEAD CONSTRUCTION MANUAL PP8325 0 150m LEVEL 2 SERVICE. UG LV SERVICE CABLE CEOM7097 & CEOM7099. 30m RE-LABEL POLE 1453 111 NEW POLE SUBSTATION TO PP23564. PP23564 b) ALL UNDERGROUND CONSTRUCTION TO BE IN ACCORDANCE WITH THE SCALE PP8324 NEW 22KV POLE LATEST COPY OF ESSENTIAL ENERGY UNDERGROUND CONSTRUCTION WARNING MANUAL CEOM7098 & CEOM7199. EXIST 22KV POLE POTENTIALLY HAZARDOUS SEE INSET FOR CLARITY LV POLE EXISTING c) ALL SURVEY PEGS MUST BE IN POSITION PRIOR TO COMMENCEMENT OF POLE TOP LOAD CHANGES MAY NP423977 GROUND STAY EXISTING ANY CONSTRUCTION BY THE ASP. THE DEVELOPER IS RESPONSIBLE FOR OCCUR DURING SUB85350 RE-PEGGING SHOULD THIS BE NECESSARY. (EX SUB 70-640T4) GROUND STAY REMOVE CONSTRUCTION d) ALL UNDERGROUND CABLE TO BE FITTED WITH CABLE TAGS AS PER THE PP8323 GROUND STAY NEW LATEST COPY OF ESSENTIAL ENERGY OPERATION PROCEDURE: ASSET HV LINKS 145.9M IDENTIFICATION & OPERATIONAL LABELS MANUAL CEOP8042. REMOVE 22KV, 2 WIRE, 3/2.75 SC/GZ NP423976 1451 111 217.5M SPIRAL VIBRATION DAMPENERS NP423975 e) ALL WORKS TO CONFORM TO E.I.A. REQUIREMENTS & TO BE IN LEVEL 2 METERING POINT / MSB ACCORDANCE WITH LATEST COPY OF ALL RELEVANT STANDARDS & 1448 111 217.0M NEW 22KV, 3 WIRE, 3/4/2.50 ACSR @ 23% CBL APPLICABLE SUPPLIER RULES.

RE-LABEL POLE 1455 111 f) THIS DESIGN TO BE READ IN CONJUNCTION WITH THE CORRESPONDING TO PP23565. ƒ EIA CEOF1070-01 & CEOF1070-02 AS COMPLETED FOR PROJECT 120507. WARNING 1454 111 EXIST 22KV, 3 WIRE, 3/2.75 SC/GZ1447 111 36 DP752341 EXISTING OVERHEAD HIGH g) THIS DESIGN TO BE READ IN CONJUNCTION WITH CORRESPONDING DESIGNER SAFETY REPORT & SAFE DESIGN RISK REGISTER AS PP23565 VOLTAGE CONDUCTORS IN COMPLETED FOR PROJECT 120507 BY ACTIVENERGY 02 63628708 VICINITY. CARE TO BE TAKEN WHEN WORKING IN AREA EASEMENTS 1456 111 55 DP752341 31 DP752341 NO EASEMENTS ARE REQUIRED FOR THIS PROJECT. EXISTING ALIGNMENTS. WARNING UNDERGROUND SERVICES GENERAL FL1448 EXIST IN THE AREA. LEVEL 1 1. REMOVE EXISTING 2 WIRE OVERHEAD HV CONDUCTOR BETWEEN POLE 1446 111 ASP TO COMPLETE A DBYD 1448 AND 1452 (NP423977). PRIOR TO EXCAVATION. 3759 DP1191901 2. REMOVE POLE 1451. 3. INSTALL NEW POLES NP423975 AND NP423976 UNDER THE EXISTING OVERHEAD ALIGNMENT. 4. INSTALL NEW 3 PHASE, 3/4/2.50 ACSR CONDUCTOR BETWEEN POLES 1448 AND NP423977. 5. REMOVE EXISTING 25KVA SINGLE PHASE POLE SUBSTATION 70-640T4 AND POLE 1452. INSET FOR CLARITY 3.1. METER BOARD TO BE REMOVED FROM SUBSTATION POLE. NP423977 4. INSTALL A NEW 14.0M/6KN TIMBER POLE NP423977 IN THE POSITION OF REMOVED POLE 1452. INSTALL NEW 22KV, 63KVA, 3 LEVEL 2 ASP NOTES 5. INSTALL A 3 PHASE, 22KV, 63KVA POLE MOUNTED SUBSTATION SUB85350 PHASE POLE SUBSTATION. ONTO NEW POLE NP423977. REPLACE EXISTING POLE WITH A EXISTING METERING ARRANGEMENT APPEARS TO BE A SPLIT PHASE, 5.1. INSTALL A 3 PHASE SERVICE CONNECTION POINT CEOM7104.27. TALLER 14M, 6KN TIMBER POLE IN SUBTRACTION METERING. 6. REPLACE EXISTING STAY WIRES AT POLES NP223977 AND 1448 111. ITS CURRENT POSITION. THE MASTER METER ON SUB POLE NP23977 IS TO BE REMOVED FROM 7. RETAIN EXISTING LV DISTRIBUTION OVERHEAD BARE CONDUCTOR REMOVE METER BOARD FROM SERVICE. BETWEEN POLE NP423977. RE-TENSION CONDUCTOR AS REQUIRED. SUBSTATION POLE. NEW METERS ARE TO BE INSTALLED AT THE FOLLOWING POLES: 8. REMOVE EXISTING LV DISTRIBUTION OVERHEAD BARE CONDUCTOR REPLACE EXISTING STAY WIRE TO - PP23564 HEADING NORTH TOWARDS PP23564. 19/2.75 SC/GZ - PP23565 9. RE-LABEL POLE 1453 111 AS PP23564 AND 1455 AS PP23565. 10. CUSTOMER SERVICES & METERING TO BE PROVIDED BY A SUITABLY THE SERVICE SUPPLIED FROM POLE 1456 HAS AN EXISTING METER. ACCREDITED SERVICE PROVIDER. SEE LEVEL 2 NOTES. 11. CAUTION - CARE TO BE TAKEN WHEN WORKING NEAR LIVE HV LINES. A NEW 3 PHASE UNDERGROUND SERVICE IS TO BE CONNECTED WORK AS EXECUTED 12. TRAFFIC CONTROL IS REQUIRED. ARRANGED BY LACHLAN SHIRE A N B FROM THE POLE SUBSTATION NP423977. A, B AND NEUTRAL PHASES COUNCIL REMOVE EXISTING 3W LV PIN CROSSARM. WORK COMPLETED: 13. NO TREE TRIMMING OR REMOVAL IS REQUIRED. TO BE BONDED TO THE 3 WIRE LV BARE CONDUCTORS HEADING NAME (Block Letters) INSTALL NEW 3W LV TERMINATION CROSS SOUTH. C PHASE TO BE LUGGED AND INSTALLED DIRECTLY INTO THE ARM. SPARE C PHASE LV FUSE HOLDER. SIGNED: REMOVE LV 3 WIRE BARE TOWARDS PP23564. CONNECT LV 3 WIRES HEADING SOUTH, A &B DATE COMPLETED: PHASES AND NEUTRAL

EXISTING OVERHEAD CONDUCTORS SCOPE OF WORKS BETWEEN POLES NP23977 TO 1456 111 SCALE AS SHOWN CLASSED AS DISTRIBUTION MAINS. ASP LEVEL 1 ELECTRICAL WORKS CUSTOMER DESIGNED PAT ESSENTIAL ENERGY CUSTOMER FUNDED CUSTOMER FUNDED WORKS DRAWN ADS SUPPLIED MATERIALS NON-CONTESTABLE CHECKED TGP NIL SWITCHING, INSPECTION COSTS INCLUDES BUT NOT LIMITED TO: Powerline Design & Construction APPROVED TGP ESSENTIAL ENERGY FUNDED MATERIALS TO BE RETURNED - PROVIDE SUITABLE ACCESS ACCREDITATION No. 3491 PRINT DATE 14/07/2020 AS PER RETURNED MATERIAL - NEW U/G SERVICES NIL - SURVEY AND PEGGING Postal & Site Address: 8 Hawthorn Pl, ORANGE NSW 2800 ISSUE D SCHEDULE Ph (02) 6362 8708 Fax (02) 6363 1663 AE JOB No. 19176 REIMBURSED CONTESTABLE Email: [email protected] EE PROJECT No: ALL OTHER WORKS AND MATERIALS INCLUDING BUT NOT LIMITED SUBSTATION UPGRADE DBYD Job TO: TULLIBIGEAL SHOWGROUND 14/07/2020 20/05/2020 19/05/2020

30/04/2020 No. 18885443 NIL - REMOVAL OF EXISTING POLE SUBSTATION 120507 A3

AMENDMENTS - INSTALLATION OF NEW POLE SUBSTATION BURGOONERY RD, TULLIBIGEAL

SHEET 1 OF 3

D C

B ADDED DETAIL ON LV ADDED DETAIL

A CHANGED.

CORRECTED OH CONSTRUCTION SCHEDULE CONDUCTOR.

Original Issue Original LOCATION OF BORE PUMP MODIFY POLE LOCATIONS. MODIFY POLE - INSTALLATION OF NEW POLES AND OH CONDUCTOR LACHLAN SHIRE COUNCIL NEAREST ESSENTIAL ENERGY DEPOT: LAKE CARGELLIGO EARTHING DATA OVERHEAD CONSTRUCTION SCHEDULE Refer Drawing CEOM7109.11 ASSET No. CEOM / CEM No. ASSEMBLY STATUS CONSTRUCTION NOTES Substation No. SUB85350 EARTHING DIAGRAM 7101.03 10 EXISTING 14.0m/6kN TIMBER POLE Installation Type Underground SUB85350 7101.82 1 EXISTING RETAIN EXISTING 3 PHASE SMALL DELTA STRAIN RAIL CROSSING ARRANGEMENT. Earthing System Type Separate MIN 4m AS PER CEOM7109.11 REPLACE EXISTING LOWER TERMINATION CROSS ARM. 22KV 3PH, COMPOSITE FIBRE CROSS 7101.76 1 REPLACE ARM, FLAT TERMINATION. USE POLE BAND AS PER CEOM7010.82. DO NOT DRILL POLE. Date of Soil Test 17/04/20 1448 REMOVE 2 X FUSE LINKS FL1448. HV LV Ambient Temperature / Weather Condition ƒ&1RUPDO RAIL POLE FG71, 125 X 125 X 2000MM. 7111.71 NEW Average Soil Resistivity 44.4 DO NOT DRILL RETAIN EXISTING ATTACHMENT HEIGHT, 10.95m. Expected HV Separate Earthing Grid Resistance 33.1 Ohm 7106.20 NEW HARD BRIDGE ONTO MAIN LINE. PG CLAMP EE PART #292150. REPLACE EXISTING GROUND STAY WIRE.19/2.75 SC/GZ SINGLE WIRE EYEBOLT WITH GY3 Size / No. of HV Electrodes 1.2m x 1 7103.01 7 REPALCE INSULATOR. HV Electrode Separation N/A 7106.01 NEW ADD 1X SPIRAL VIBRATION DAMPER PER CONDUCTOR Expected LV Separate Earthing Grid Resistance 33.1 Ohm WARNING 7101.03 5 NEW 12.5m/4kN TIMBER POLE Size / No. of LV Electrodes 1.2m x 1 INSTALL AS PER THE DESIGN. IF 7103.10 P NEW POLE FOOTING, PLAIN. EMBED POLE 2.05M LV Electrode Separation N/A FINAL VALUE GREATER THAN NP423975 7101.54 3 NEW 22KV, 3 PHASE SMALL DELTA POLE TOP ARRANGEMENT. Min. Separation Between HV & LV Earthing 4m 20% DIFFERENCE, CONTACT 7111.62 NEW FG62, 100 X 100 X 2000, ATTACHMENT HEIGHT 10.22M Bonding Conductor Size PPð LEVEL 3 ASP IMMEDIATLEY. 7106.01 NEW ADD 1X SPIRAL VIBRATION DAMPER PER CONDUCTOR BOTH DIRECTIONS 7101.03 5 NEW 12.5m/4kN TIMBER POLE 7103.10 P NEW POLE FOOTING, PLAIN. EMBED POLE 2.05M PP8325 NP423976 7101.54 3 NEW 22KV, 3 PHASE SMALL DELTA POLE TOP ARRANGEMENT. 7111.62 NEW FG62, 100 X 100 X 2000, ATTACHMENT HEIGHT 10.22M 7106.01 NEW ADD 1X SPIRAL VIBRATION DAMPER PER CONDUCTOR BOTH DIRECTIONS REMOVE REMOVE EXISTING 12.5m/6kN TIMBER POLE. PP23564 PP8324 REMOVE REMOVE EXISTING 2 WIRE, 22KV TERMINATION AND EDO TIMBER CROSS ARM REMOVE REMOVE EXISTING 25KVA 22KV SINGLE PHASE TRANSFORMER L3288 REMOVE REMOVE EXISTING 3 WIRE, LV TIMBER CROSS ARM DUNDOO HILLS HV SCHEMATIC 7101.03 10 NEW INSTALL NEW 14.0m/6kN TIMBER POLE IN EXISTING POSITION. ZONE SUBSTATION: LCO LAKE CARGELLIGO 7103.10 S NEW POLE FOOTING, STABILISED. EMBED POLE 2.2M FEEDER: LCO22 LAKE CARGELLICO NOT TO SCALE 7101.70 1 NEW 22KV 3 PHASE, SMALL DELTA TERMINATION. POLE TOP ARRANGEMENT. 7111.71 NEW FG71, 125 X 125 X 2000. ATTACHMENT HEIGHT 11.22M PP8323 7106.01 NEW ADD 1X SPIRAL VIBRATION DAMPER PER CONDUCTOR. 7104.04 1 NEW POLE SUBSTATION, SUB85350. 63KVA, 3 PHASE, 22,000V. ROTATED 90 DEG. G10377 NP423977 (SUB85350) POLE SUBSTATION HV FUSE ARM, 3 PHASE, 22KV. USE 5A K TYPE FUSE ELEMENTS. TULLIBIGEAL 7104.20 5 NEW NP423977 (1452 111) FG63, ATTACHMENT HEIGHT 10.02M 640T1 7104.22 4 NEW POLE MOUNTED DISTRIBUTION TRANSFORMER. 63KVA 3 PHASE. PRIMARY TAP 22,550V L3806 TOWN AND SILOS LV FUSE SWITCH DISCONNECTOR, 160A, 3 PHASE. USE 80A FUSE ELEMENTS. TULLIBIGEAL TEE 7104.24 3 NEW 7104.27 4 NEW POLE SUBSTATION SERVICE CONNECTION POINT. 7104.28 1 NEW NEUTRAL TERMINAL CONNECTION. 7101.64 2 NEW LV 3 WIRE TERMINATION COMPOSITE CROSS ARM, POLE TOP ARRANGEMENT. 14129 REMOVE FL1448 7111.50 NEW FG50, 100 X 100 X 2200. ATTACHMENT HEIGHT 7.74m. TEE TO 640T4 FRAMPTON FLATS FEEDLOT POLE SUBSTATION SEPARATE EARTHING SYSTEM. CU RODS. 7109.11 NEW UPGRADE EXITING HV AND LV EARTH CONDUCTORS DOWN TO THE FIRST STAKE. 1454 REPLACE EXISTING GROUND STAY WIRE.19/2.75 SC/GZ SINGLE WIRE EYEBOLT WITH GY3 7103.01 3 REPLACE INSULATOR. 14P12 LOURAIN PP23565 1451 7101.03 2 REMOVE REMOVE EXISTING 11.0/4KN TIMBER POLE. PP23564 NO CHANGE TO CONSTRUCTION. REPLACE LABEL WITH PRIVATE POLE LABEL. REMOVE LV 3 EXISTING (1453) WIRE TERMINATION CROSS ARM. REMOVE EXISTING STAY WIRE 1454 EXISTING NO CHANGE TO CONSTRUCTION PP23565 NO CHANGE TO CONSTRUCTION. SUB85350 EXISTING (1455) REPLACE LABEL WITH PRIVATE POLE LABEL SPORTS GROUND WORK AS EXECUTED 1456 WORK COMPLETED: 1456 EXISTING NO CHANGE TO CONSTRUCTION NAME (Block Letters)

SIGNED: LV SCHEMATIC NOT TO SCALE DATE COMPLETED: SCALE AS SHOWN

OVERHEAD CONDUCTOR SCHEDULE DESIGNED PAT CONDUCTOR DETAILS ROUTE MAX DESIGN MIN DESIGN GC @ MAX DRAWN ADS FROM TO RULING SPAN VOLTAGE / WIRES / CONDUCTOR LENGTH TENSION OPERATING TEMP. CHECKED TGP NP423977 REMOVE Powerline Design & Construction 1448 580.4m APPROVED TGP (1452) 22KV / 2 WIRE / 3/2.75 SC/GZ SC/GZ ACCREDITATION No. 3490 PRINT DATE 14/07/2020 NP423977 INSTALL NEW 6.0m @ 100 DEG C 1448 580.4m 23.0 % CBL 193.77m Postal & Site Address: 8 Hawthorn Pl, ORANGE NSW 2800 ISSUE D (1452) 22KV / 3 WIRE / 3/4/2.50 ACSR 7.3m SHOWN FOR CLARITY Ph (02) 6362 8708 Fax (02) 6363 1663 REMOVE AE JOB No. 19176 NP423977 1453 111 84.8m Email: [email protected] 415V / 3 WIRE / 6/1/2.36 ACSR/GZ EE PROJECT No: RE-TENSION EXISTING SUBSTATION UPGRADE NP423977 1454 111 78.2m 6 % CBL 78.2m 6.0m @ 65 DEG C 415V / 3 WIRE / 6/1/2.36 ACSR/GZ TULLIBIGEAL SHOWGROUND 14/07/2020 20/05/2020 19/05/2020 30/04/2020 120507 A3 RE-TENSION EXISTING

AMENDMENTS 1454 111 1456 111 62.5m 6 % CBL 62.5m 6.0m @ 65 DEG C BURGOONERY RD, TULLIBIGEAL SHEET 2 OF 3

415V / 3 WIRE / 6/1/2.36 ACSR/GZ

D C

B ADDED DETAIL ON LV ADDED DETAIL

A CHANGED.

CORRECTED OH CONSTRUCTION SCHEDULE CONDUCTOR.

Original Issue Original LOCATION OF BORE PUMP MODIFY POLE LOCATIONS. MODIFY POLE LACHLAN SHIRE COUNCIL NEAREST ESSENTIAL ENERGY DEPOT: LAKE CARGELLIGO RETURNED MATERIALS SCHEDULE LAKE RETURN TO: CONTACT IAN MULLER PHONE 02 6966 9045 CARGELLIGO QUANTITY ITEM PROFILE 22KV 1 11.0/4kN TIMBER POLE NOT TO SCALE 1 12.5.6kN TIMBER POLE 5 TIMBER CROSS ARMS 4 22 KV EDO'S / FUSE LINKS 1 LV SUBSTATION FUSES 1 25KVA 22KV POLE TRANSFORMER 1160m 3/2.75 SC/GZ CONDUCTOR 255m LV BARE CONDUCTOR GOPHER 6/1/2.36 ACSR/GZ 10m 19/2.00 SC/GZ STAY WIRE AND INSULATOR

PROFILE LV NOT TO SCALE

Conductor Name Conductor Voltage (kV~) Type Ruling Span (m) ,ŽƌŝnjŽŶƚĂůdĞŶƐŝŽŶ;й>ΛΣͿ Conductor2aba 0.41 GOPHER 6/1/2.36 78.13 ϱ͘ϬϬΛϭϱ͘ϬΣ Start Pole End Pole Span Length (m) dĞŵƉĞƌĂƚƵƌĞ;ΣͿ -5 0 5 10 15 20 25 30 35 40 45 50 NP423977 1454 111 78.15 Sag (m) 1.39 1.46 1.52 1.59 1.65 1.71 1.77 1.83 1.89 1.94 1.99 2.05 Horizontal Tension (kN) 0.57 0.54 0.52 0.5 0.48 0.46 0.45 0.43 0.42 0.41 0.4 0.39 Time (s) 6.35 6.5 6.65 6.79 6.92 7.05 7.17 7.28 7.39 7.5 7.6 7.7 Conductor Name Conductor Voltage (kV~) Type Ruling Span (m) ,ŽƌŝnjŽŶƚĂůdĞŶƐŝŽŶ;й>ΛΣͿ Conductor2abab 0.41 GOPHER 6/1/2.36 62.48 ϱ͘ϬϬΛϭϱ͘ϬΣ Start Pole End Pole Span Length (m) dĞŵƉĞƌĂƚƵƌĞ;ΣͿ -5 0 5 10 15 20 25 30 35 40 45 50 1454 111 1456 111 62.48 Sag (m) 0.8 0.87 0.93 1 1.06 1.11 1.17 1.22 1.28 1.33 1.38 1.43 Horizontal Tension (kN) 0.63 0.58 0.54 0.51 0.48 0.46 0.43 0.41 0.4 0.38 0.37 0.36 Time (s) 4.82 5.02 5.2 5.37 5.53 5.68 5.83 5.96 6.08 6.2 6.32 6.43

SCALE AS SHOWN DESIGNED PAT DRAWN ADS CHECKED TGP Powerline Design & Construction APPROVED TGP ACCREDITATION No. 3490 PRINT DATE 14/07/2020 Postal & Site Address: 8 Hawthorn Pl, ORANGE NSW 2800 ISSUE D Ph (02) 6362 8708 Fax (02) 6363 1663 WORK AS EXECUTED Email: [email protected] AE JOB No. 19176 WORK COMPLETED: EE PROJECT No: NAME (Block Letters) SUBSTATION UPGRADE SIGNED: TULLIBIGEAL SHOWGROUND 14/07/2020 20/05/2020 19/05/2020 30/04/2020 120507 A3

AMENDMENTS DATE COMPLETED: BURGOONERY RD, TULLIBIGEAL

SHEET 3 OF 3

D C

B ADDED DETAIL ON LV ADDED DETAIL

A CHANGED.

CORRECTED OH CONSTRUCTION SCHEDULE CONDUCTOR.

Original Issue Original LOCATION OF BORE PUMP MODIFY POLE LOCATIONS. MODIFY POLE LACHLAN SHIRE COUNCIL NEAREST ESSENTIAL ENERGY DEPOT: LAKE CARGELLIGO