The World Bank Report No: ISR9328
Implementation Status & Results Belarus Water Supply and Sanitation Project (P101190)
Operation Name: Water Supply and Sanitation Project (P101190) Project Stage: Implementation Seq.No: 9 Status: ARCHIVED Archive Date: 28-Jan-2013 Country: Belarus Approval FY: 2009
Public Disclosure Authorized Product Line:IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Board Approval Date 30-Sep-2008 Original Closing Date 30-Jun-2013 Planned Mid Term Review Date Last Archived ISR Date 24-Dec-2012 Public Disclosure Copy Effectiveness Date 17-Feb-2009 Revised Closing Date 30-Jun-2013 Actual Mid Term Review Date 16-May-2011
Project Development Objectives Project Development Objective (from Project Appraisal Document) To increase access to water supply services and to improve the quality of water supply and wastewater services in selected urban areas in six participating oblasts of the Borrower. Has the Project Development Objective been changed since Board Approval of the Project?
● Yes No Public Disclosure Authorized Component(s)
Component Name Component Cost Rehabilitation of water supply and sanitation systems 53.60 Support to the preparation and sustainability of investments 6.05 Project implementation and management 0.20
Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory
Public Disclosure Authorized Overall Risk Rating Moderate Moderate
Implementation Status Overview Insufficient design and procurement progress during FY12 have led to very limited construction activities since April 2012. However, all the issues that had contributed to that slow- down have now been addressed. Significant progress was recently achieved towards the procurement of most remaining contracts, paving the way towards major implementation
Public Disclosure Copy progress in 2013.
Works are now completed in six sub-projects and have been initiated in seven others out of twenty sub-projects. Procurement activities have been initiated in five sub-projects. In the
Page 1 of 10 Public Disclosure Authorized The World Bank Report No: ISR9328
two remaining sites, preparation of designs and bidding documents is ongoing.
The Board approved on December 20, 2012, a first order restructuring paper including (a) a revision of the Project Development Objectives (PDO), indicators and targets aligned with Project activities, (b) an extension of the closing date to December 31, 2014, and, (c) triggering of the involuntary resettlement and physical cultural resources safeguard policies.
Locations Country First Administrative Division Location Planned Actual Belarus Not Entered Vitsyebskaya Voblasts
Belarus Not Entered Vyerkhnyadzvinsk
Belarus Not Entered Smalyavichy Public Disclosure Copy Belarus Not Entered Shklow
Belarus Not Entered Sharkowshchyna
Belarus Not Entered Rahachow
Belarus Not Entered Pinsk
Belarus Not Entered Mahilyowskaya Voblasts
Belarus Not Entered Minskaya Voblasts
Belarus Not Entered Minsk
Belarus Not Entered Mazyr
Belarus Not Entered Masty
Belarus Not Entered Marina Horka
Belarus Not Entered Mahilyow
Belarus Not Entered Hrodna
Belarus Not Entered Hlybokaye
Belarus Not Entered Hrodzyenskaya Voblasts
Belarus Not Entered Homyelskaya Voblasts
Belarus Not Entered Gantsevichi
Belarus Not Entered Dubrowna Public Disclosure Copy Belarus Not Entered Brestskaya Voblasts
Page 2 of 10 The World Bank Report No: ISR9328
Country First Administrative Division Location Planned Actual Belarus Not Entered Brest
Belarus Not Entered Baravukha
Belarus Not Entered Bogushevsk
Belarus Not Entered Berezino
Belarus Not Entered Baranavichy
Belarus Not Entered Babruysk
Public Disclosure Copy Belarus Not Entered Gorodok
Results
Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Number of people in urban areas provided with Number Value 0.00 4820.00 7910.00 access to Improved Water Sources under the Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 project Comments Number of people in urban areas provided with Number Value 0.00 4820.00 4820.00 access to Improved Water Sources under the Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 project in Mosty Breakdown Comments Number of people in urban areas provided with Number Value 0.00 0.00 750.00 access to Improved Water Sources under the Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 project in Shklov Breakdown Comments Number of people in urban areas provided with Number Value 0.00 2300.00 2700.00 access to Improved Water Sources under the Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 project in Sharkovschina Breakdown Comments Population provided with access to drinking Number Value 0.00 8800.00 307300.00 water compliant with national quality standards Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Comments Population provided with access to drinking Number Value 0.00 0.00 50000.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 in Baranovitchi Breakdown Comments Public Disclosure Copy
Page 3 of 10 The World Bank Report No: ISR9328
Population provided with access to drinking Number Value 0.00 2340.00 2340.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 in Bogushevsk Breakdown Comments Population provided with access to drinking Number Value 0.00 2800.00 2800.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 in Sharkovschina Breakdown Comments Population provided with access to drinking Number Value 0.00 0.00 21300.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 in Mariina Gorka Breakdown Comments Value
Public Disclosure Copy Population provided with access to drinking Number 0.00 0.00 17200.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 in Smolevitchi Breakdown Comments Population provided with access to drinking Number Value 0.00 0.00 210000.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 in Bobruisk Breakdown Comments Population provided with access to drinking Number Value 0.00 3300.00 3300.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 in Borovukha Breakdown Comments % of treated wastewater samples complying Percentage Value with national standards for BOD level (BOD-5) Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Comments (no aggregated value) (no aggregated value) (no aggregated value) % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for BOD level (BOD-5) Sub Type in Baranovitchi Supplemental % of treated wastewater samples complying Percentage Value 80.00 80.00 95.00 with national standards for BOD level (BOD-5) Sub Type in Gantsevitchi Supplemental % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for BOD level (BOD-5) Sub Type in Pinsk Supplemental % of treated wastewater samples complying Percentage Value 71.00 95.00 95.00 with national standards for BOD level (BOD-5) Sub Type in Gorodok Supplemental Public Disclosure Copy
Page 4 of 10 The World Bank Report No: ISR9328
% of treated wastewater samples complying Percentage Value 95.00 with national standards for BOD level (BOD-5) Sub Type in Dubrovno Supplemental
Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target % of produced water effectively treated with Percentage Value iron content below 0.3 mg/l (regulatory water Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 samplings) Comments % of produced water effectively treated with Percentage Value 94.00 94.00 95.00 Public Disclosure Copy iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Baranovitchi Supplemental % of produced water effectively treated with Percentage Value 0.00 70.00 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Bogushevsk Supplemental % of produced water effectively treated with Percentage Value 0.00 34.00 46.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Sharkovschina Supplemental % of produced water effectively treated with Percentage Value 75.50 85.50 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Rogachev Supplemental % of produced water effectively treated with Percentage Value 0.00 0.00 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Mariina Gorka Supplemental % of produced water effectively treated with Percentage Value 0.00 0.00 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Smolevitchi Supplemental % of produced water effectively treated with Percentage Value 30.00 70.00 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Bobruisk Supplemental % of produced water effectively treated with Percentage Value 0.00 95.00 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Borovukha Supplemental Public Disclosure Copy
Page 5 of 10 The World Bank Report No: ISR9328
Number of km of transmission and distribution Kilometers Value 0.00 28.30 48.80 pipelines laid/replaced Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Comments Number of km of transmission and distribution Kilometers Value 0.00 15.50 15.50 pipelines laid/replaced in Mosty Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Breakdown Comments Number of km of transmission and distribution Kilometers Value 0.00 3.00 13.70 pipelines laid/replaced in Sharkovschina Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Breakdown Comments Value
Public Disclosure Copy Number of km of transmission and distribution Kilometers 0.00 0.00 8.30 pipelines laid/replaced in Rogachev Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Breakdown Comments Number of km of transmission and distribution Kilometers Value 0.00 1.50 1.50 pipelines laid/replaced in Shklov Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Breakdown Comments Number of km of transmission and distribution Kilometers Value 0.00 9.80 9.80 pipelines laid/replaced in Mozyr Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Breakdown Comments Piped household water connections that are Number Value 0.00 4250.00 34350.00 benefiting from rehabilitation works undertaken Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 by the project Comments Piped household water connections affected by Number Value 0.00 50.00 50.00 rehabilitation works undertaken under the Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Project in Bogushevsk Breakdown Comments Piped household water connections affected by Number Value 0.00 0.00 14300.00 rehabilitation works undertaken under the Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Project in Rogachev Breakdown Comments Piped household water connections affected by Number Value 0.00 4200.00 5000.00 rehabilitation works undertaken under the Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Project in Mozyr Breakdown Comments Piped household water connections affected by Number Value 0.00 0.00 15000.00 rehabilitation works undertaken under the Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Project in Baranovichi Breakdown Comments Public Disclosure Copy
Page 6 of 10 The World Bank Report No: ISR9328
Share of customers in relevant Project areas Percentage Value reporting improved satisfaction with water Date supply service Comments Share of customers in relevant Project areas Percentage Value 95.00 reporting improved satisfaction with water Sub Type supply service in Borovukha Supplemental Share of customers in relevant Project areas Percentage Value 30.00 95.00 reporting improved satisfaction with water Sub Type supply service in Bobruisk Supplemental Value
Public Disclosure Copy Share of customers in relevant Project areas Percentage 95.00 reporting improved satisfaction with water Sub Type supply service in Shklov Supplemental Share of customers in relevant Project areas Percentage Value 65.00 95.00 reporting improved satisfaction with water Sub Type supply service in Smolevitchi Supplemental Share of customers in relevant Project areas Percentage Value 95.00 reporting improved satisfaction with water Sub Type supply service in Mariina Gorka Supplemental Share of customers in relevant Project areas Percentage Value 70.00 95.00 reporting improved satisfaction with water Sub Type supply service in Rogachev Supplemental Share of customers in relevant Project areas Percentage Value 83.00 reporting improved satisfaction with water Sub Type supply service in Sharkovschina Supplemental Share of customers in relevant Project areas Percentage Value 95.00 reporting improved satisfaction with water Sub Type supply service in Bogushevsk Supplemental Share of customers in relevant Project areas Percentage Value 90.00 95.00 reporting improved satisfaction with water Sub Type supply service in Baranovichi Supplemental % of treated wastewater samples complying Percentage Value with national standards for nitrogen content Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Comments Public Disclosure Copy
Page 7 of 10 The World Bank Report No: ISR9328
% of treated wastewater samples complying Percentage Value 68.00 95.00 95.00 with national standards for nitrogen content in Sub Type Gorodok Supplemental % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for nitrogen content in Sub Type Pinsk Supplemental % of treated wastewater samples complying Percentage Value 70.00 70.00 95.00 with national standards for nitrogen content in Sub Type Gantsevitchi Supplemental Value
Public Disclosure Copy % of treated wastewater samples complying Percentage 90.00 90.00 95.00 with national standards for nitrogen content in Sub Type Baranovitchi Supplemental % of treated wastewater samples complying Percentage Value 0.00 0.00 95.00 with national standards for nitrogen content in Sub Type Brest Supplemental % of treated wastewater samples complying Percentage Value 0.00 0.00 95.00 with national standards for nitrogen content in Sub Type Dubrovno Supplemental % of treated wastewater samples complying Percentage Value with national standards for phosphor content Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Comments % of treated wastewater samples complying Percentage Value 0.00 0.00 95.00 with national standards for phosphor content in Sub Type Brest Supplemental % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for phosphor content in Sub Type Baranovitchi Supplemental % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for phosphor content in Sub Type Gantsevitchi Supplemental % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for phosphor content in Sub Type Pinsk Supplemental Public Disclosure Copy
Page 8 of 10 The World Bank Report No: ISR9328
% of treated wastewater samples complying Percentage Value 71.00 95.00 95.00 with national standards for phosphor content in Sub Type Gorodok Supplemental % of treated wastewater samples complying Percentage Value 0.00 0.00 95.00 with national standards for phosphor content in Sub Type Dubrovno Supplemental Number of km of wastewater collectors laid/ Kilometers Value 0.00 0.00 8.10 replaced Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Comments Value
Public Disclosure Copy Number of km of wastewater collectors laid/ Kilometers 0.00 0.00 6.30 replaced in Grodno Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Breakdown Comments Number of km of wastewater collectors laid/ Kilometers Value 0.00 0.00 1.84 replaced in Mogilev Sub Type Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Breakdown Comments Number of sub-projects for which feasibility Number Value 0.00 9.00 11.00 studies and detailed designs have been Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 completed and have been competitively awarded Comments
Number of water utilities that the project is Number Value 21.00 21.00 supporting Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Comments Successful implementation and utilization of Yes/No Value No Yes Yes IBNET tools Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Comments PCT can independently appraise, monitor, Yes/No Value No Yes Yes supervise and report on sub-projects Date 10-Jan-2008 26-Dec-2012 31-Dec-2014 Comments
Data on Financial Performance (as of 13-Nov-2012)
Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P101190 IBRD-75890 Effective 30-Sep-2008 21-Oct-2008 17-Feb-2009 30-Jun-2013 30-Jun-2013 Public Disclosure Copy
Disbursements (in Millions)
Page 9 of 10 The World Bank Report No: ISR9328
Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P101190 IBRD-75890 Effective USD 60.00 60.00 0.00 20.13 39.87 34.00
Disbursement Graph Public Disclosure Copy
Key Decisions Regarding Implementation Finalizing the last ongoing designs is critical to initiate the contracting of additional sub-projects, as further delays must be avoided.
Restructuring History Level one Approved on 20-Dec-2012
Related Projects P127986-TO BE RECYCLED Public Disclosure Copy
Page 10 of 10