Pioneer 3 Operations Manual

Total Page:16

File Type:pdf, Size:1020Kb

Pioneer 3 Operations Manual Pioneer 3 Operations Manual © 2007 MobileRobots Inc. All rights reserved. This document, as well as the software described in it, is provided under license and may only be used or copied in accordance with the terms of the respective license. Information in this document is subject to change without notice and should not be construed as a commitment by MobileRobots Inc. The software on disk, CD-ROM and firmware which accompany the robot and are available for network download by MobileRobots customers are solely owned and copyrighted or licensed for use and distribution by MobileRobots Inc. Developers and users are authorized by revocable license to develop and operate custom software for personal research and educational use only. Duplication, distribution, reverse-engineering or commercial application of MobileRobots software and hardware without license or the express written consent of MobileRobots Inc. is explicitly forbidden. PeopleBot™, AmigoBot™, PowerBot™, PatrolBot™, ARCSinside™, SetNetGo™, MobilePlanner™, MobileSim™ and MobileEyes™ are trademarks of MobileRobots Inc. Other names and logos for companies and products mentioned or featured in this document are often registered trademarks or trademarks of their respective companies. Mention of any third-party hardware or software constitutes neither an endorsement nor a recommendation by MobileRobots Inc. Pioneer 3 Operations Manual ● Version 5 ● July 2007 ii MobileRobots Inc. Important Safety Instructions 9 Read the installation and operations instructions before using the equipment. 9 Avoid using power extension cords. 9 To prevent fire or shock hazard, do not expose the equipment to rain or moisture. 9 Refrain from opening the unit or any of its accessories. 9 Keep wheels away from long hair or fur. 9 Never access the interior of the robot with charger attached or batteries inserted. Inappropriate Operation Inappropriate operation voids your warranty! Inappropriate operation includes, but is not limited to: 9 Dropping the robot, running it off a ledge, or otherwise operating it in an irresponsible manner 9 Overloading the robot above its payload capacity 9 Getting the robot wet 9 Continuing to run the robot after hair, yarn, string, or any other items have become wound around the robot’s axles or wheels 9 Opening the robot with charger attached and/or batteries inserted 9 All other forms of inappropriate operation or care Use MOBILEROBOTS authorized parts ONLY; warranty void otherwise. iii Table of Contents Chapter 1 Introduction ...............................................................................................................1 ROBOT PACKAGES ..........................................................................................................................................1 Basic Components (all shipments) ........................................................................................................................ 1 Optional Components and Attachments (partial list)............................................................................................ 1 User-Supplied Components / System Requirements ........................................................................................... 2 ADDITIONAL RESOURCES .................................................................................................................................2 Support Website...................................................................................................................................................... 2 Newsgroups............................................................................................................................................................. 2 Support.................................................................................................................................................................... 2 Chapter 2 What Is Pioneer? .......................................................................................................4 PIONEER REFERENCE PLATFORM......................................................................................................................4 PIONEER FAMILY OF ROBOT MICROCONTROLLERS AND OPERATIONS SOFTWARE .....................................................4 PORTS AND POWER.........................................................................................................................................5 CLIENT SOFTWARE..........................................................................................................................................5 ARIA ......................................................................................................................................................................... 5 SonARNL Localization and Navigation .................................................................................................................. 6 MODES OF OPERATION....................................................................................................................................6 Server Mode............................................................................................................................................................ 6 Maintenance and Standalone Modes ................................................................................................................... 7 Joydrive Mode ......................................................................................................................................................... 7 THE PIONEER LEGACY .....................................................................................................................................7 Pioneer AT ............................................................................................................................................................... 7 Pioneer 2 and PeopleBot™..................................................................................................................................... 8 Pioneer 3 and Recent Pioneer 2-DX8, -AT8 and Plus........................................................................................... 8 Pioneer 3 SH Robots............................................................................................................................................... 8 Chapter 3 Specifications & Controls.........................................................................................9 PHYSICAL CHARACTERISTICS AND COMPONENTS .................................................................................................9 DECK..........................................................................................................................................................10 MOTOR STOP BUTTON...................................................................................................................................10 USER CONTROL PANEL..................................................................................................................................10 Power and Status Indicators ................................................................................................................................10 Buzzer....................................................................................................................................................................11 Serial Port..............................................................................................................................................................11 Power Switches.....................................................................................................................................................11 Reset and Motors .................................................................................................................................................12 BODY, NOSE, AND ACCESSORY PANELS...........................................................................................................12 Nose.......................................................................................................................................................................12 Access Panels .......................................................................................................................................................12 SONAR ........................................................................................................................................................12 Multiplexed Operation ..........................................................................................................................................13 Sensitivity Adjustment ..........................................................................................................................................13 MOTORS, WHEELS, AND POSITION ENCODERS .................................................................................................13 BATTERIES AND POWER.................................................................................................................................13 Battery Indicators and Low Voltage Conditions ..................................................................................................14 Recharging ............................................................................................................................................................14 SAFETY ARCOS WATCHDOGS ........................................................................................................................14
Recommended publications
  • University of Iowa Instruments in Space
    University of Iowa Instruments in Space A-D13-089-5 Wind Van Allen Probes Cluster Mercury Earth Venus Mars Express HaloSat MMS Geotail Mars Voyager 2 Neptune Uranus Juno Pluto Jupiter Saturn Voyager 1 Spaceflight instruments designed and built at the University of Iowa in the Department of Physics & Astronomy (1958-2019) Explorer 1 1958 Feb. 1 OGO 4 1967 July 28 Juno * 2011 Aug. 5 Launch Date Launch Date Launch Date Spacecraft Spacecraft Spacecraft Explorer 3 (U1T9)58 Mar. 26 Injun 5 1(U9T68) Aug. 8 (UT) ExpEloxrpelro r1e r 4 1915985 8F eJbu.l y1 26 OEGxOpl o4rer 41 (IMP-5) 19697 Juunlye 2 281 Juno * 2011 Aug. 5 Explorer 2 (launch failure) 1958 Mar. 5 OGO 5 1968 Mar. 4 Van Allen Probe A * 2012 Aug. 30 ExpPloiorenre 3er 1 1915985 8M Oarc. t2. 611 InEjuxnp lo5rer 45 (SSS) 197618 NAouvg.. 186 Van Allen Probe B * 2012 Aug. 30 ExpPloiorenre 4er 2 1915985 8Ju Nlyo 2v.6 8 EUxpKlo 4r e(rA 4ri1el -(4IM) P-5) 197619 DJuenc.e 1 211 Magnetospheric Multiscale Mission / 1 * 2015 Mar. 12 ExpPloiorenre 5e r 3 (launch failure) 1915985 8A uDge.c 2. 46 EPxpiolonreeerr 4130 (IMP- 6) 19721 Maarr.. 313 HMEaRgCnIe CtousbpeShaetr i(cF oMxu-1ltDis scaatelell itMe)i ssion / 2 * 2021081 J5a nM. a1r2. 12 PionPeioenr e1er 4 1915985 9O cMt.a 1r.1 3 EExpxlpolorerer r4 457 ( S(IMSSP)-7) 19721 SNeopvt.. 1263 HMaalogSnaett oCsupbhee Sriact eMlluitlet i*scale Mission / 3 * 2021081 M5a My a2r1. 12 Pioneer 2 1958 Nov. 8 UK 4 (Ariel-4) 1971 Dec. 11 Magnetospheric Multiscale Mission / 4 * 2015 Mar.
    [Show full text]
  • Information Summaries
    TIROS 8 12/21/63 Delta-22 TIROS-H (A-53) 17B S National Aeronautics and TIROS 9 1/22/65 Delta-28 TIROS-I (A-54) 17A S Space Administration TIROS Operational 2TIROS 10 7/1/65 Delta-32 OT-1 17B S John F. Kennedy Space Center 2ESSA 1 2/3/66 Delta-36 OT-3 (TOS) 17A S Information Summaries 2 2 ESSA 2 2/28/66 Delta-37 OT-2 (TOS) 17B S 2ESSA 3 10/2/66 2Delta-41 TOS-A 1SLC-2E S PMS 031 (KSC) OSO (Orbiting Solar Observatories) Lunar and Planetary 2ESSA 4 1/26/67 2Delta-45 TOS-B 1SLC-2E S June 1999 OSO 1 3/7/62 Delta-8 OSO-A (S-16) 17A S 2ESSA 5 4/20/67 2Delta-48 TOS-C 1SLC-2E S OSO 2 2/3/65 Delta-29 OSO-B2 (S-17) 17B S Mission Launch Launch Payload Launch 2ESSA 6 11/10/67 2Delta-54 TOS-D 1SLC-2E S OSO 8/25/65 Delta-33 OSO-C 17B U Name Date Vehicle Code Pad Results 2ESSA 7 8/16/68 2Delta-58 TOS-E 1SLC-2E S OSO 3 3/8/67 Delta-46 OSO-E1 17A S 2ESSA 8 12/15/68 2Delta-62 TOS-F 1SLC-2E S OSO 4 10/18/67 Delta-53 OSO-D 17B S PIONEER (Lunar) 2ESSA 9 2/26/69 2Delta-67 TOS-G 17B S OSO 5 1/22/69 Delta-64 OSO-F 17B S Pioneer 1 10/11/58 Thor-Able-1 –– 17A U Major NASA 2 1 OSO 6/PAC 8/9/69 Delta-72 OSO-G/PAC 17A S Pioneer 2 11/8/58 Thor-Able-2 –– 17A U IMPROVED TIROS OPERATIONAL 2 1 OSO 7/TETR 3 9/29/71 Delta-85 OSO-H/TETR-D 17A S Pioneer 3 12/6/58 Juno II AM-11 –– 5 U 3ITOS 1/OSCAR 5 1/23/70 2Delta-76 1TIROS-M/OSCAR 1SLC-2W S 2 OSO 8 6/21/75 Delta-112 OSO-1 17B S Pioneer 4 3/3/59 Juno II AM-14 –– 5 S 3NOAA 1 12/11/70 2Delta-81 ITOS-A 1SLC-2W S Launches Pioneer 11/26/59 Atlas-Able-1 –– 14 U 3ITOS 10/21/71 2Delta-86 ITOS-B 1SLC-2E U OGO (Orbiting Geophysical
    [Show full text]
  • Deep Space Chronicle Deep Space Chronicle: a Chronology of Deep Space and Planetary Probes, 1958–2000 | Asifa
    dsc_cover (Converted)-1 8/6/02 10:33 AM Page 1 Deep Space Chronicle Deep Space Chronicle: A Chronology ofDeep Space and Planetary Probes, 1958–2000 |Asif A.Siddiqi National Aeronautics and Space Administration NASA SP-2002-4524 A Chronology of Deep Space and Planetary Probes 1958–2000 Asif A. Siddiqi NASA SP-2002-4524 Monographs in Aerospace History Number 24 dsc_cover (Converted)-1 8/6/02 10:33 AM Page 2 Cover photo: A montage of planetary images taken by Mariner 10, the Mars Global Surveyor Orbiter, Voyager 1, and Voyager 2, all managed by the Jet Propulsion Laboratory in Pasadena, California. Included (from top to bottom) are images of Mercury, Venus, Earth (and Moon), Mars, Jupiter, Saturn, Uranus, and Neptune. The inner planets (Mercury, Venus, Earth and its Moon, and Mars) and the outer planets (Jupiter, Saturn, Uranus, and Neptune) are roughly to scale to each other. NASA SP-2002-4524 Deep Space Chronicle A Chronology of Deep Space and Planetary Probes 1958–2000 ASIF A. SIDDIQI Monographs in Aerospace History Number 24 June 2002 National Aeronautics and Space Administration Office of External Relations NASA History Office Washington, DC 20546-0001 Library of Congress Cataloging-in-Publication Data Siddiqi, Asif A., 1966­ Deep space chronicle: a chronology of deep space and planetary probes, 1958-2000 / by Asif A. Siddiqi. p.cm. – (Monographs in aerospace history; no. 24) (NASA SP; 2002-4524) Includes bibliographical references and index. 1. Space flight—History—20th century. I. Title. II. Series. III. NASA SP; 4524 TL 790.S53 2002 629.4’1’0904—dc21 2001044012 Table of Contents Foreword by Roger D.
    [Show full text]
  • NASA and Planetary Exploration
    **EU5 Chap 2(263-300) 2/20/03 1:16 PM Page 263 Chapter Two NASA and Planetary Exploration by Amy Paige Snyder Prelude to NASA’s Planetary Exploration Program Four and a half billion years ago, a rotating cloud of gaseous and dusty material on the fringes of the Milky Way galaxy flattened into a disk, forming a star from the inner- most matter. Collisions among dust particles orbiting the newly-formed star, which humans call the Sun, formed kilometer-sized bodies called planetesimals which in turn aggregated to form the present-day planets.1 On the third planet from the Sun, several billions of years of evolution gave rise to a species of living beings equipped with the intel- lectual capacity to speculate about the nature of the heavens above them. Long before the era of interplanetary travel using robotic spacecraft, Greeks observing the night skies with their eyes alone noticed that five objects above failed to move with the other pinpoints of light, and thus named them planets, for “wan- derers.”2 For the next six thousand years, humans living in regions of the Mediterranean and Europe strove to make sense of the physical characteristics of the enigmatic planets.3 Building on the work of the Babylonians, Chaldeans, and Hellenistic Greeks who had developed mathematical methods to predict planetary motion, Claudius Ptolemy of Alexandria put forth a theory in the second century A.D. that the planets moved in small circles, or epicycles, around a larger circle centered on Earth.4 Only partially explaining the planets’ motions, this theory dominated until Nicolaus Copernicus of present-day Poland became dissatisfied with the inadequacies of epicycle theory in the mid-sixteenth century; a more logical explanation of the observed motions, he found, was to consider the Sun the pivot of planetary orbits.5 1.
    [Show full text]
  • Mission Overview the Pioneer Mission Set the Stage for U.S. Space
    Mission Overview The Pioneer mission set the stage for U.S. space exploration. Pioneer 1 was the first manmade object to escape the Earth's gravitational field. Later Pioneer 4 was the first spacecraft to fly to the moon, Pioneer 10 was the first to Jupiter, Pioneer 11 was the first to Saturn and Pioneer 12 was the first U.S. spacecraft to orbit another planet, Venus. The following table summarizes the Pioneer spacecraft and scientific objectives of the Pioneer mission. Name Launch Mission Status (as of 1998) ----------------------------------------------------------------- Pioneer 1 1958-10-11 Moon Reached altitude of 72765 miles Pioneer 2 1958-11-08 Moon Reached altitude of 963 miles Pioneer 3 1958-12-02 Moon Reached altitude of 63580 miles Pioneer 4 1959-03-03 Moon Passed by moon into solar orbit Pioneer 5 1960-03-11 Solar Orbit Entered solar orbit Pioneer 6 1965-12-16 Solar Orbit Still operating Pioneer 7 1966-08-17 Solar Orbit Still operating Pioneer 8 1967-12-13 Solar Orbit Still operating Pioneer 9 1967-11-08 Solar Orbit Signal lost in 1983 Pioneer E 1969-08-07 Solar Orbit Launch failure Pioneer10 1972-03-02 Jupiter Communication terminated 1998 Pioneer11 1972-03-02 Jupiter/Saturn Communication terminated 1997 Pioneer12 1978-05-20 Venus Entered Venus atmos. 1992-10-08 The focus of this document is on Pioneer Venus (12), the last spacecraft in a mission of firsts in space exploration. Probe Separation: Pioneer Venus separated into two spacecraft on Aug 8, 1978: an Orbiter (PVO) and a Multiprobe. The latter was separated into five separate vehicles near Venus.
    [Show full text]
  • Mondmissionen Von 1958 Bis 2019
    WELT DER WISSENSCHAFT: RAUMFAHRT ZUM MOND Mondmissionen von 1958 bis 2019 Im Zeitraum zwischen dem 23. September 1958 und dem 9. August 1976 starteten fast 100 unbemannte und bemannte Raumfahrzeuge zum Mond. Die erste große Phase der Monderkundung endete mit der erfolgreichen Mission der sowjetischen Raumsonde Luna 24, die am 22. August 1976 mit 170 Gramm Mondmaterial aus dem Mare Crisium in Sibirien landete. Danach vergingen mehr als 14 Jahre, bis mit der japanischen Raumsonde Hiten das nächste Raumfahrzeug zum Erdtrabanten entsandt wurde. Von Eugen Reichl und Harro Zimmer 1950er Jahre Pioneer 0: Start am 17. August 1958; sollte am Mond Luna 1: 2. Januar 1959; sollte hart auf dem Mond aufschlagen, vorbeifliegen, Rakete explodierte beim Start. verfehlte den Mond und trat in eine Sonnenumlaufbahn ein. Erste erfolgreiche Raumsonde der Sowjetunion. Luna 1958A: 22. September 1958; sollte hart auf dem Mond aufschlagen, Rakete explodierte beim Start. Pioneer 4: 3. März 1959; Sonde passierte Mond in 60 000 Kilo- meter Abstand und trat in eine Sonnenumlaufbahn ein, erste Pioneer 1: 11. Oktober 1958; sollte am Mond vorbeifliegen, funktionierende Raumsonde der USA. Fehlschlag da Trägerrakete zu schwach, erreichte nur einen Abstand von 114 000 Kilometern zur Erde. Luna 1959A: 16. Juni 1959; sollte hart auf dem Mond aufschlagen, Versagen der Rakete beim Start. Luna 1958B: 11. Oktober 1958; sollte hart auf dem Mond aufschlagen, Rakete explodierte beim Start. Luna 2: 12. September 1959; schlug als erstes Objekt aus Menschenhand hart auf der Mondoberfläche ein, übermittel- Pioneer 2: 8. November 1958; sollte am Mond vorbeifliegen, te dabei keine Messdaten. Versagen der Rakete beim Start.
    [Show full text]
  • China Dream, Space Dream: China's Progress in Space Technologies and Implications for the United States
    China Dream, Space Dream 中国梦,航天梦China’s Progress in Space Technologies and Implications for the United States A report prepared for the U.S.-China Economic and Security Review Commission Kevin Pollpeter Eric Anderson Jordan Wilson Fan Yang Acknowledgements: The authors would like to thank Dr. Patrick Besha and Dr. Scott Pace for reviewing a previous draft of this report. They would also like to thank Lynne Bush and Bret Silvis for their master editing skills. Of course, any errors or omissions are the fault of authors. Disclaimer: This research report was prepared at the request of the Commission to support its deliberations. Posting of the report to the Commission's website is intended to promote greater public understanding of the issues addressed by the Commission in its ongoing assessment of U.S.-China economic relations and their implications for U.S. security, as mandated by Public Law 106-398 and Public Law 108-7. However, it does not necessarily imply an endorsement by the Commission or any individual Commissioner of the views or conclusions expressed in this commissioned research report. CONTENTS Acronyms ......................................................................................................................................... i Executive Summary ....................................................................................................................... iii Introduction ................................................................................................................................... 1
    [Show full text]
  • Rybelsus, INN-Semaglutide
    30 January 2020 EMA/95374/2020 Committee for Medicinal Products for Human Use (CHMP) Assessment report Rybelsus International non-proprietary name: semaglutide Procedure No. EMEA/H/C/004953/0000 Note Assessment report as adopted by the CHMP with all information of a commercially confidential nature deleted. Official address Domenico Scarlattilaan 6 ● 1083 HS Amsterdam ● The Netherlands Address for visits and deliveries Refer to www.ema.europa.eu/how-to-find-us Send us a question Go to www.ema.europa.eu/contact Telephone +31 (0)88 781 6000 An agency of the European Union Table of contents 1. Background information on the procedure .............................................. 6 1.1. Submission of the dossier ..................................................................................... 6 1.2. Steps taken for the assessment of the product ........................................................ 9 2. Scientific discussion .............................................................................. 10 2.1. Problem statement ............................................................................................. 10 2.1.1. Disease or condition ........................................................................................ 10 2.1.2. Epidemiology .................................................................................................. 10 2.1.3. Aetiology and pathogenesis .............................................................................. 10 2.1.4. Clinical presentation, diagnosis ........................................................................
    [Show full text]
  • Dataset of Post Stamps on Rocket and Satellite (1957-1959)
    第69卷 增刊 地 理 学 报 Vol.69, Supplement 2014年8月 ACTA GEOGRAPHICA SINICA August, 2014 Dataset of post stamps on rocket and satellite (1957-1959) LIU Chuang (Institute of Geographic Sciences and Natural Resources Research, CAS, Beijing 100101, China) Abstract: The launching of rocket and satellite was one of the major tasks of International Geophysical Year (IGY). The first of Russia satellite named Sputnik 1 was successful launched on 4 October 1957, which is recognized as a milestone for a new era - a space age. Besides the satellites of Sputnik 1, 2 and 3, Luna 1, 2 and 3 from Russia, the Explorer 1, 3, 4, 6, 7, Vanguard 1, 2, 3, Pioneer 1,2,3, 4, Discoverer 1, 2, 5, 6, 7, 8 and Score from USA were successful launched from 1957-1959 in IGY (The Rocket and Satellite task was extended for implementation for one more year in 1959 than that of tasks else from 1957-1958). For celebrating and commemorating the great achievements in human history, 23 countries in the world issued post stamps during IGY, the first three years of the space era. The collection of post stamps consisted of 349 pieces from 23 countries are archived in LIN Chao Geomuseum (www.geomuseum.cn), The dataset consisted of 349 .jpg files for all of archived stamps and one table file which is the list of the collections. The code, image, date issued, country issued, contributor and descriptions are listed at the table items. Keywords: rocket; satellites; post stamps; dataset; IGY; 1957-1959 DOI: 10.11821/dlxb2014S005 Citation: LIU Chuang.
    [Show full text]
  • Linking Asteroids and Meteorites Through Reflectance
    Astronomy 101 The Solar System Tuesday, Wednesday, Thursday Tom Burbine [email protected] Remaining Schedule • Today – Quiz; Meteorites, Mercury, and Venus • Wednesday - Presentations • Thursday - Mars • Tuesday – Last quiz; Optional final; Final presentation What are meteorites? Meteorite • A small extraterrestrial body that reaches the Earth's surface Why are meteorites important? Why are meteorites important? • They are primarily fragments of asteroids, which can hit us • They are records of the early solar system Moon Meteorites • Usually have ages of ~4.6 billion years • Asteroids and comets are thought to be the building blocks of the terrestrial planets Meteorites • Many early cultures recognized (or believed) certain stones as having fallen from the sky • Many early cultures had tools made from iron meteorites • But to the scientists of the Renaissance and later periods, stones falling from the heavens were considered superstition or heresy More evidence … • In 1492, a meteorite weighing almost 130 kilograms landed near the town of Ensisheim, Alsace, France, then in the hands of Germany Then .. • In 1794, Ernst Friedrich Chladni, considered the father of meteoritics, published a book in which he concluded that stone and iron masses did fall out of the sky • In 1803, thousands of meteorite fragments bombarded L'Aigle in Normandy, France, an event investigated by Jean -Baptiste Biot of the French Academy of Science. Thomas Jefferson • Meteorite landed in Weston, CT • It was brought to Yale where it was concluded it was
    [Show full text]
  • Cooperation Or Competition?
    Exploring the Universe: Cooperation or Competition? European Forum Alpbach 2013 Shuang-Nan Zhang Director, Center for Particle Astrophysics Institute of High Energy Physics Chief Scientist, Space Science Division National Astronomical Observatories Chinese Academy of Sciences 1 Day 1 2 Ways of learning Write down one thing you think you are good at doing Write down how you learnt of doing this Choose and write down one of these answers: (1) From lecturing in classroom (2) By yourself: reading, asking, discussion, practicing (3) Other 3 Importance of asking and discussion The greatest scholar and teacher in Chinese history, Confucius (孔夫子), told us: “Among every three people, there must be someone who know more than me (三人一 行,必有我师)” The Nobel Laureate C.N. Yang (杨振宁) once said “Most of my knowledge comes from asking and discussing with my fellow students”. In Chinese, an intellectual is called “a person learning by asking (有学问的人)” 4 Nobel Laureate C.N. Yang (杨振宁) and me C.N. Yang is the “person learning by asking (有学问的人)” 5 Albert Einstein (爱因斯坦) and me I am the “person learning by asking (有学问的人)” 6 Traditional and interactive teaching Traditional teaching: one directional delivery of information from the teacher to students (notebooks) Role of teacher: information delivery Success measured by rate of information delivered Interactive teaching: asking + discussion Role of teacher: stimulate and moderate the process Success measured by rate of information received Just like communications: it only matters how much is received at the receiver’s end! Barriers must be removed for efficient communications. 7 Interruptions are invited during these seminars You are invited to interrupt me during at any time Asking questions, making points and comments, and even challenging me.
    [Show full text]
  • Launch and Results of Pioneer
    H UMAN F LIGHT &ROBOTIC E XPLORATION “Pioneering Space” Part II By Gideon Marcus research determined that 108 had experi- days for Earth and Moon to be in similar enced the same problem. This discovery did respective positions again. The launch win- An Unnumbered Pioneer not come as a complete surprise. Dolph dows were so narrow that mission planners Just six months after Louis Dunn Thiel, propulsions expert at Space had long since decided to not provide trajec- gave the order to start production, through Technology Laboratories and Peenemünde tory compensation for launch holds. dint of hard effort and ingenuity, the first veteran, had noted early that year that Instead, each Thor was preprogrammed Thor-Able three-stage booster towered 88 Thor’s turbopump design was thoroughly with a particular roll program, which varied feet above Launch Complex 17 pad A on marginal and recommended that the prob- depending on the launch day. The Air Force Merritt Island, Florida. The serial number, lem be fixed in the next run of the Thor mis- took for granted that the rocket would be 127, was printed on the Thor IRBM first sile. The problem was that several of the ready to fire at the proper time.2 stage, and USAF was proudly emblazoned potentially faulty Thors had already been Able-1’s first countdown went by along the Vanguard second stage. Atop the built and were committed for a variety of almost without a hitch. The Thor-Able third stage rested the world’s first lunar missions: several test flights, two more booster was fully fueled by the afternoon of probe.
    [Show full text]