Gn 8006 Roads (Works, Use and Compensation)

Total Page:16

File Type:pdf, Size:1020Kb

Gn 8006 Roads (Works, Use and Compensation) G.N. 8006 ROADS (WORKS, USE AND COMPENSATION) ORDINANCE (Chapter 370) AS APPLIED BY SECTION 26 OF THE WATER POLLUTION CONTROL (SEWERAGE) REGULATION (Chapter 358) PWP ITEM NO. 4274DS YUEN LONG AND KAM TIN SEWERAGE STAGE III, PHASE 1A SHAP PAT HEUNG RISING MAIN AND GRAVITY SEWER (Notice under section 8(2) of the Roads (Works, Use and Compensation) Ordinance as applied by section 26 of the Water Pollution Control (Sewerage) Regulation) Notice is hereby given that the Director of Environmental Protection proposes to execute the sewerage works within the limit of works area as shown on the Plans No. DPM/274DS/1801C to DPM/274DS/1804C (the ‘Plans’) and described in the scheme annexed thereto, which Plans and scheme have been deposited in the Land Registry. The general nature of the proposed works is as follows:— (i) construction of about 1 720 metres of rising main and associated manholes within the limit of works area underneath the maintenance road of the proposed Yuen Long Bypass Floodway as shown on the Plans; (ii) construction of about 850 metres of gravity sewer and associated manholes within the limit of works area underneath the maintenance road of the proposed Yuen Long Bypass Floodway as shown on the Plans; and (iii) ancillary works including reinstatement of carriageway, footpaths and open space. The Plans and scheme may be inspected by members of the public, free of charge, at the following locations:— (i) Central and Western District Office, Public Enquiry Service Centre, Ground Floor, Harbour Building, 38 Pier Road, Central, Hong Kong; (ii) District Lands Office, Yuen Long, 9th Floor, Yuen Long Government Offices and Tai Kiu Market, No. 2 Kiu Lok Square, Yuen Long, New Territories; (iii) Yuen Long District Office, Yuen Long District Office Building, 269 Castle Peak Road, Yuen Long, New Territories; (iv) Environmental Protection Department Headquarters, 28th Floor, Southorn Centre, 130 Hennessy Road, Wan Chai, Hong Kong; (v) Local Control Office (Territory West) of Environmental Protection Department, 7th Floor, Chinachem Tsuen Wan Plaza, 455–457 Castle Peak Road, Tsuen Wan, New Territories; (vi) Yuen Long New Territories Land Registry, 7th Floor, Yuen Long Government Offices and Tai Kiu Market, No. 2 Kiu Lok Square, Yuen Long, New Territories; and (vii) Land Registry, 19th Floor, Queensway Government Offices, 66 Queensway, Hong Kong during the following hours when those offices are normally open to the public:— Opening hours (except public holidays):— Monday to Friday 9.00 a.m. to 4.30 p.m. Saturday 9.00 a.m. to 12.00 noon Except a small portion of the proposed rising main, most of the proposed trunk sewers and rising mains will be constructed within the site area of PWP Item No. 70CD Yuen Long Bypass Floodway project. A separate Notice in respect of the proposed floodway project is gazetted under Roads (Works, Use and Compensation) Ordinance (Chapter 370) concurrently with this Notice. Further enquiries regarding the proposed sewerage works can be addressed to the Project Management Division, Drainage Services Department, 42nd Floor, Revenue Tower, 5 Gloucester Road, Wan Chai, Hong Kong and at telephone number 2594 7262. Any person who wishes to object to the works or the use, or both, is required to address his objection in writing to the Director of Environmental Protection, Environmental Protection Department, 28th Floor, Southorn Centre, 130 Hennessy Road, Wan Chai, Hong Kong, so as to reach the office of the Director not later than 6 February 2001 describing his interest and the manner in which he alleges he will be affected by the works or the use. 5 December 2000 C. C. TSANG Senior Environmental Protection Officer.
Recommended publications
  • Traditional Hong Kong Celebrations
    Hong Kong Traditional Celebrations Experience four traditional festivals this spring in Hong Kong — just follow the joyous rhythms of rousing gongs and drums, which are the soundtrack for colourful parades in celebration of the city's ancient Chinese past. This is a great time to soak up the energy, tradition and passion that comprise the very soul of Hong Kong. 8 May Birthday of Tin Hau Worshippers flock in their thousands to temples across Hong Kong on the birthday of Tin Hau, praying to the Goddess of the Sea for safety, fine About the Fa Pau Raffle weather and full fishing nets for the coming year. The raffling of fa pau, or floral wreaths, depicting Tin Hau is an indispensible Yuen Long Shap Pat Heung Tin Hau Festival Procession part of the festivities to villagers of Yuen One of the highlights of the Tin Hau festivities is the three-hour Long. The Ding Choy Pau (see right) is Shap Pat Heung ('18 Villages') parade in Yuen Long, featuring the Hong Kong Police especially sought after as it’s believed fa pau Band, about 30 groups, lion dancers, dance groups and marching bands. the winning village will be blessed with fa pau good fortune and fertility. Date 8 May 2018 Some nine metres tall, the wreath is crafted with Time symbolic decorations: the ginger and lanterns represent 10am - Procession from Yuen Long town centre to Tin Hau Temple at Tai Shu Ha (see parade route map) lots of children; a gold ingot symbolises good fortune. 3pm - fa pau raffle at Tin Hau Temple, Tai Shu Ha Information provided by Mr.
    [Show full text]
  • List of Recognized Villages Under the New Territories Small House Policy
    LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN,
    [Show full text]
  • 漢語), Usually Called Chinese Language in Hong Kong, Belongs to the Sinitic Branch of the Sino-Tibetan Family
    Appendix I Linguistic Characteristics of Modern Chinese Language Hanyu (漢語), usually called Chinese language in Hong Kong, belongs to the Sinitic branch of the Sino-Tibetan Family. In comparison with other languages, the major characteristics of modern Chinese language are as follows – 1. Basically Using Monosyllabic Characters Chinese characters are the written symbol of the Chinese language. Generally, a Chinese character represents a syllable and carries a certain meaning. For example, “水” (water), “人” (human), “狗” (dog). However, not every character can be used independently. In modern Chinese, some of the characters must be used together with other characters and form compound words, such as “習” (study) in “學 習” (learn + study) and “擊” (strike) in “攻擊” (attack + strike). There are also some characters that only have their meanings when grouped in words of two or more characters, such as “葡萄” (grape), “蜻蜓” (dragonfly). 2. Tonal Chinese language is tonal. Putonghua has four tones, while Cantonese is generally thought to have nine tones. The same syllable, pronounced with different tones, will become different words and have different meanings. For example, “剛” [gong1] is different from “港” [gong2] while “文” [man4] is different from “問” [man6]. 3. Less Morphological Changes For example, nouns do not change according to gender or quantity. A book is “書”, a few books are also “書”. Verbs do not need to change to match the subject. For example, the verb “去” (go) in “我去” (I go) and “他去” (he go) is totally the same. However, Chinese verbs have tenses, such as “吃了飯” (“eat perfective rice” for “finish taking a meal”) “吃着飯” (“eat continuous rice” for “taking a meal”) and “吃過飯” (“eat experiential rice” for “have taken a meal”).
    [Show full text]
  • C N Figure 13.1 Yuen Long Shap Pat Heung Ping Shan Cultural Heritage
    t en e pm g ui a q td r E L o e s t Tin Shui Estate 5 nc ce S 0 Open Storage a vi dv r n A e e S p D n O Ope A age D Open Storage tor DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE. O S OA R R 0 Elegant Villa T 5 S Tin Shui Wai Park K A E ALL RIGHTS RESERVED. p A pp p P HO P I I p p N U p Legend N F P I c OVE ARUP & PARTNERS HONG KONG LIMITED. G p U T N Open Storage H p K A p A H H Hong Kong 1 p Wang Chau S 0 d I R School of Motoring n p O S Fuk Hing Tsuen a d i Tin Shui Wai A T t n p WANG CHAU a 0 D R 10 S u Bus Depot W o E Chung Hau r i E Ponds G T Wang Chau u N p Yu Man San Tsuen S h 2 s 0 Tung Tau Wai San Tsuen S t T t D T a I r N A S T n n 0 S i o O Open Storage I 2 d p R K T H T N p IN U S HU T K O I A C p ST P T 50 Potential Development Area 0 RE IN p ET N S Water Tank 5 R TI T O Z A D 0 Jetty D R Open Storage A 5 Jetty p O O Ting Fook Villas Sherwood A R D D D Court T Wang Chau A D N (PDA) A A I O Tin Oi Court O N Meon R p O p Yeung Hau R E Chung Sam Wai P R I p U S U Court Y Temple Wang Chau W H G p S N IN I U ING p T N Ha Mei H T Tung Tau Wai C L G Tung Tau Ka Fuk Yuen K San Tsuen p R p Tsuen N A OA P I A p D p p p S KA p Tin Tsz Estate I Tin Lai Court E h M Shan Pui Hong Mei a 20 Wang Chau l Tin Yiu Estate l Chung Hau Tsuen Tsuen A Sai Tau Wai u T H N Open Storage I p Works Boundary Outside PDA N p Wang Chau LAU Lo Uk Y Lam Uk Tsuen YIP I S NG TR Tsuen EET h a R Works in progress ll D u OA N Shan Pui D OA R Wang Chau G Yeung Uk Tsuen N Kingswood Villas p p I D San Wai P A p Open Storage Yuk Yat Garden O San Wai D R A p
    [Show full text]
  • Yuen Long District(Open in New Window)
    District : Yuen Long Provisional District Council Constituency Areas +/- % of Population Estimated Quota Code Proposed Name Boundary Description Major Estates/Areas Population (16,964) M01 Fung Nin 19,454 +14.68 N Castle Peak Road - Yuen Long 1. CHUN WAH VILLAS PHASE 3 2. CRYSTAL PARK NE Tai Tong Road 3. HO SHUN TAI BUILDING E Tai Tong Road 4. MANHATTAN PLAZA 5. PO SHING BUILDING SE Tai Tong Road, Tai Shu Ha Road East 6. TSE KING HOUSE (STAGE 1) S Nullah 7. TSING YU TERRACE 8. YEE FUNG GARDEN SW Nullah, Ma Tin Road W Yuen Long Tai Yuk Road NW Yuen Long Tai Yuk Road Castle Peak Road - Yuen Long M1 District : Yuen Long Provisional District Council Constituency Areas +/- % of Population Estimated Quota Code Proposed Name Boundary Description Major Estates/Areas Population (16,964) M02 Shui Pin 19,277 +13.63 N Ma Wang Road, Ping Wui Street 1. COVENT GARDEN 2. EMERALD GREEN Yuen Long On Ning Road 3. GREENERY PLACE NE Yuen Long On Ning Road, Nullah 4. PARK ROYALE 5. PARKSIDE VILLA E Castle Peak Road - Yuen Long 6. SCENIC GARDENS Yuen Long Tai Yuk Road 7. SHUI PIN WAI ESTATE SE Yuen Long Tai Yuk Road, Ma Tin Road 8. SPRINGDALE VILLAS 9. VILLA ART DECO S Ma Tin Road, Shap Pat Heung Road SW Shan Ha Road W Castle Peak Road - Ping Shan Shan Ha Road, Shui Pin Wai Road Town Park Road North NW Ma Wang Road, Shui Pin Wai Road M2 District : Yuen Long Provisional District Council Constituency Areas +/- % of Population Estimated Quota Code Proposed Name Boundary Description Major Estates/Areas Population (16,964) M03 Nam Ping 16,800 -0.97 N 1.
    [Show full text]
  • 十八鄉鄉事委員會shap Pat Heung Rural Committee Choi Uk
    SHAP PAT HEUNG RURAL COMMITTEE 十八鄉鄉事委員會 CHOI UK TSUEN 蔡屋村 Indigenous Inhabitant Representative TSOI LAWRENCE CHIK SANG 原居民代表 蔡植生 Resident Representative CHOI KA CHUNG 居民代表 蔡家驄 HA YAU TIN 下攸田 Indigenous Inhabitant Representative WONG LAP KWONG 原居民代表 黃立光 Resident Representative WONG KIM HUNG 居民代表 黃劍雄 HUNG CHO TIN 紅棗田 Indigenous Inhabitant Representative KAN KA WAI 原居民代表 簡嘉偉 Resident Representative KAN CHUK TIN 居民代表 簡竹田 KONG TAU 港頭 Indigenous Inhabitant Representative CHANG SEK YIU 原居民代表 蔣石耀 Resident Representative SO FOK SAU 居民代表 蘇福壽 LUNG TIN 龍田 Resident Representative WONG HON WING 居民代表 黃漢榮 SHAP PAT HEUNG RURAL COMMITTEE 十八鄉鄉事委員會 MA TIN 馬田 Indigenous Inhabitant Representative CHAN CHING LUN THOMAS 原居民代表 陳清麟 CHOW KAM CHEUNG 周錦祥 Resident Representative WONG KWOK WING 居民代表 黃國榮 MUK KIU TAU 木橋頭 Indigenous Inhabitant Representative WU WAI KIT 原居民代表 胡偉傑 Resident Representative WOO WAI CHUNG 居民代表 胡偉忠 NAM BIN WAI 南邊圍 Indigenous Inhabitant Representative CHAN LAI HEE 原居民代表 陳禮喜 CHAN SHU KIN 陳樹堅 CHENG YIN PING 鄭延平 YIP CHUN FAT 葉振發 Resident Representative SIN YEE SANG 居民代表 冼宜生 NAM HANG 南坑 Indigenous Inhabitant Representative CHEUNG CHI ON 原居民代表 張志安 Resident Representative CHEUNG YUET MING 居民代表 張月明 SHAP PAT HEUNG RURAL COMMITTEE 十八鄉鄉事委員會 NGAR YIU TAU 瓦窰頭 Indigenous Inhabitant Representative YIM TING YING 原居民代表 嚴廷英 Resident Representative WONG YUK TONG 居民代表 黃玉堂 PAK SHA 白沙 Indigenous Inhabitant Representative YIK HON YAU 原居民代表 易漢猷 Resident Representative YICK HI LEUNG 居民代表 易喜亮 SAI BIN WAI 西邊圍 Indigenous Inhabitant Representative LAM WAI KONG 原居民代表 林衛光
    [Show full text]
  • Installation Locations of Internet Protocol Cameras
    Annex Installation Locations of Internet Protocol Cameras District Installation Locations Central / 1. Outside Bowen Road Refuse Collection Point Western 2. Recyclable Collection Bin at Elgin Street (near Mid-Levels Escalator) 3. Rear Lane of Hau Wo Street, Sai Wan 4. At the junction of Elgin Street and Staunton Street 5. At the junction of Castle Steps and Robinson Place, No. 70 Robinson Road, Mid-Levels 6. Sands Street (near Lift) 7. Wo On Lane 8. Near Shek Tong Tsui Whitty Street Children's Playground 9. Pavement of Davis Street (section between Forbes Street and Belcher's Street) 10. Recyclable Collection Bin at Mosque Street (near Mid-Levels Escalator) 11. At the junction of Sataunton Street and Shelly Street Wanchai 12. Cannon Street 13. At the junction of Bowrington Road and Wan Chai Road 14. Pavement outside Methadone Clinic, No. 2 O'Brien Road 15. At the junction of Hennessy Road and Johnston Road (near Methodist House) 16. Tin Hau Station near Lau Sin Street Temporary Sitting-out Area 17. At the junction of Leighton Road and Wong Nai Chung Road(near Craigengower Cricket Club) 18. No. 4 Tin Hau Temple Road 19. At the junction of Cross Lane and Wood Road 20. At the junction of Canal Road West and Wan Chai Road 21. At the junction of Spring Garden Lane and Sam Pan Street (outside Spring Garden Lane Sitting-out Area) Eastern 22. At the junction of Shing On Street and Tai Shek Street, Sai Wan Ho 23. At the junction of North Point Road and Chun Yeung Street/Java Road 24.
    [Show full text]
  • Historic Building Appraisal 1 Tsang Tai Uk Sha Tin, N.T
    Historic Building Appraisal 1 Tsang Tai Uk Sha Tin, N.T. Tsang Tai Uk (曾大屋, literally the Big Mansion of the Tsang Family) is also Historical called Shan Ha Wai (山廈圍, literally, Walled Village at the Foothill). Its Interest construction was started in 1847 and completed in 1867. Measuring 45 metres by 137 metres, it was built by Tsang Koon-man (曾貫萬, 1808-1894), nicknamed Tsang Sam-li (曾三利), who was a Hakka (客家) originated from Wuhua (五華) of Guangdong (廣東) province which was famous for producing masons. He came to Hong Kong from Wuhua working as a quarryman at the age of 16 in Cha Kwo Ling (茶果嶺) and Shaukiwan (筲箕灣). He set up his quarry business in Shaukiwan having his shop called Sam Lee Quarry (三利石行). Due to the large demand for building stone when Hong Kong was developed as a city since it became a ceded territory of Britain in 1841, he made huge profit. He bought land in Sha Tin from the Tsangs and built the village. The completed village accommodated around 100 residential units for his family and descendents. It was a shelter of some 500 refugees during the Second World War and the name of Tsang Tai Uk has since been adopted. The sizable and huge fortified village is a typical Hakka three-hall-four-row Architectural (三堂四横) walled village. It is in a Qing (清) vernacular design having a Merit symmetrical layout with the main entrance, entrance hall, middle hall and main hall at the central axis. Two other entrances are to either side of the front wall.
    [Show full text]
  • (Sewerage Works at Portion B – Tai Tong Tsuen) Archaeological Watching Brief Report
    Contract No. DC/2012/05 Sewerage at Yuen Long Kau Hui and Shap Pat Heung (Sewerage Works at Portion B – Tai Tong Tsuen) Archaeological Watching Brief Final Report October 2015 Abstract Kwan On Construction Co. Ltd has been commissioned by the Drainage Services Department to conduct Sewerage Works at Portion B of Sewerage at Yuen Long Kau Hui and Shap Pat Heung (Project) under Contract No. DC/2012/05. The Project site involves an area of archaeological potential at Tai Tong Tsuen, Yuen Long, and the Hong Kong Institute of Archaeology (HKIA) has conducted an Archaeological Watching Brief (AWB) for the Project from April 2014 to July 2015. During the past two years, the archaeologist of the HKIA has observed the excavation of sewerage works at 40 AWB Points and not identified any sign of archaeological remains at any of the observed AWB Points within the boundary of Tai Tong Tsuen. The archaeologist has also scanned the entire surface of the village during the visits but has not found any archaeological artifact. Based on the results of the AWB works and surface search, it can be concluded that the archaeological potential within the AWB Licence Area at Tai Tong Tsuen is very low. 受渠務署委託,均安建築有限公司承接元朗舊墟及十八鄉污水收集系統工程(B 區),合 約編號 DC/2012/05。此工程範圍內的元朗大棠村區域可能有考古潛在價值,中港考古 研究室為此從 2014 年 4 月至 2015 年 7 月開展考古監察工作。在過去的兩年中,考古 人員在 40 個監察點查看了污水系統的發掘工作,但在整個工程範圍內的任何監察點未 見到任何考古遺存。在次期間,考古人員還在大棠村範圍內做地表調查,但也未發現 任何文物。根據此次考古監察和地表調查的結果,可以推斷,大棠村此次考古監察執照 範圍內的考古潛在價值極低。 I Table of Contents 1. Introduction 1 1.1 Background 1 1.2 Objective 1 2. Literature Review 2 2.1 Geography and Geology 2 2.2 History and Archaeology 2 3.
    [Show full text]
  • Shap Pat Heung T SHAP PAT HEUNG a Interchangeinterchange W
    L O T N E G E Y D I R P A T S S U O T S A R R I E S K T E G FOOK TAK ST A T O H N Legend L I p E U S Sun Yuen Long Centre E T U Pok Oi G T Y DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE. N N Hospital T S S U G ON SHUN ST K S N I ALL RIGHTS RESERVED. T YUEN LONG H N K G U R U SAU FU ST N c OVE ARUP & PARTNERS HONG KONG LIMITED. REET I SHUI CHE KW O Potential Development Area I T A K Works in progress D P U K (PDA) I LONG LOK ROAD N W CASTLE PEAK ROAD - YUEN LONG A CASTLE PEAK ROAD - YUEN LONG LIGHT RAIL I POK OI Works Boundary Outside PDA INTERCHANGE Shui Pin R D Wai A D H O D T R A Shui Pin A O N P I HONG W New Sewer from YLS STW to the R h ole K sale Tsuen N FAU TSOI STREET Shui Pin Tsuen K Fishe Yuen Long I s Market G O Playground G Yoho Midtown N N Police Station L N I Existing Inlet Chamber of the G H U D FUNG YAU ST NORTH G C F Yoho Midtown A N I F O S U N NWNT Effluent Tunnel at San Wai P KIN LOK ST R T N E h T a S G l U l K u T Y N U N Y T E for Discharging to the Urmston Y E E A A S16 E I R S T U R T MAU E A TAN ST Road Submarine Outfall T U E S T d KAU YUK ROAD T T S S d A R n I T E S D n G T a T Y O E E P a R T t YUEN LUNG STREE N I S E H t N R S FUNG KWAN ST I O Y C R S T G E N H L T D S N E S A N P S I Yuen Long D A O N U O S K M O A E H YUEN LONG ON HING ST U Stadium H 500m Assessment Area H U T O A U R C A Y N R K Yoho Town Y Yeung Uk Y Yuen Long Park I O O U G G A H Tsuen A N N S Y U in progress U G E SAI CHING STREET F P13 N H 2 H Watercourse 0 C O T L R HOP YICK ROAD G T O FUNG YAU ST SOUTH N N E u N E U l l F Y R a D T A h Y T n A A U A S O g I Greenfields D U Watercourse (Seasonal) R K A T d Yee Fung RO T A .
    [Show full text]
  • 1 : 20 000 Geological Map Sheet Index (Series Hgm20
    地質圖 圖 幅索引圖 (組別 及 ) 1 : 20 000 HG M 20 HG M 20S 索引圖 C10 1 : 20 000 G EOLO G IC AL M AP SHEET INDEX (SERIES H G M 20 & HG M 20S) Index C 10 大 鵬 灣 組別 HGM20S MIRS BAY 平洲 Series HGM20S 深 圳 市 SH EN ZH EN Ping C hau 沙 頭 角 吉澳海 吉澳 (Dapeng Wan) 年 T 圖 號 2 第一版 SHA TAU E 白沙洲 (1994 ) L Crooked KOK N CROOKED Island 海 I Round Island 打 鼓 嶺 HARBOUR 2 文 錦 渡 角 G Sheet Ed.1 (1994) 頭 IN MAN KAM TO TA KWU LING L 娥眉洲 沙 R A 插圖一 圖 號 6 第一版 年 羅 湖 T Crescent (2019 ) S 印洲塘 馬 草 壟 LO WU Island INSET 1 6 鹿 頸 往灣洲 Sheet Ed.1 (2019) MA TSO 上水 DOUBLE LUNG 塱 原 LUK KENG HAVEN Double 后 海 灣 SHEU NG SHU I Island L 落 馬 洲 LONG 海 I E 角 HO N VALLEY 石 湖 墟 竹 K N LOK MA 烏 蛟 騰 KO A ( 深 圳 灣 ) 黃 K H CHAU SHEK WU HU 門 C 組別 2 聯 和 墟 3 WU KAU C 4 新 田 G 赤 赤洲 Ed.1 HUI ON H HGM20 LUEN WO TANG W 大 T SAN TIN HUI R Port Islan d DEEP BAY NO (1988) Series HGM20 (Shenzhen Bay) 米 埔 粉嶺 Ed. 1 MA(I P1O 989) Ed. 1 (1991) Ed. 1 (19赤9洲口2) Ponds FAN LIN G MIDDLE CHANNEL 插圖二 版次(年份) 和 合 石 門 EL 牛 潭 尾 NN INSET 2 A 流 浮 山 WO HOP 赤 H 塔 門 NGAU SHEK C 石牛洲 TAM MEI Edition (Year) LAU FAU LO Grass Island SHAN Ponds 船 灣 O S he k N ga u T R Ch a u 天水圍 SHUEN U WAN O TIN SHU I B R WA I 海 大埔 鹽 田 仔 A 蛋 家 灣 H 錦 田 YIM TIN 灘 TAN KA TSAI 馬屎洲 G WAN 屏 山 KAM TIN 八 鄉 TA I PO 大 M a Shi Ch au N 廈 村 PAT HEUNG O PING 元朗 企 吐 露 港 L HA TSUEN SHAN F 嶺 A YUEN LO N G T 大 埔 滘 TOLO HARBOUR H T 下 O H 烏 溪 沙 M R 海 TAI PO E 十 八 鄉 石 崗 S E KAU WU KAI C O SHAP PAT HEUNG SHEK KONG SHA V 馬鞍山 十 四 鄉 E SHAP SZE 馬 料 水 M A O N HEUNG SHAN MA LIU 大 浪 大浪灣 龍 荃 錦 坳 SHUI 鼓 TSUEN KAM TAI LONG TAI LONG WAN 水 AU 火 炭 道 5 6 7 大 網 仔 8 屯門 FO TAN TAI MONG TU EN M UN TSAI Ed.
    [Show full text]
  • Franchised Bus Route Diversion Arrangement Upon Commissioning of Tuen Mun – Chek Lap Kok Link (Northern Connection)
    Franchised Bus Route Diversion Arrangement Upon Commissioning of Tuen Mun – Chek Lap Kok Link (Northern Connection) I. Service details of the franchised bus routes in Phase 2 With effect from midnight on 20 June 2021 (Sunday) Route NA36 Terminating Points Yuen Long (Kam Sheung Road Station) -Airport (Cathay Pacific City) Service Hours From Yuen Long (Kam Sheung From Airport (Cathay Pacific City): Road Station): Daily Daily 12.10 a.m., 12.40 a.m., 1.10 a.m., 3.45 a.m., 4.15 a.m., 4.35 a.m., and 1.40 a.m., 2.10 a.m., and 2.30 a.m. 4.55 a.m. (4 trips) (6 trips) Routeing From Yuen Long (Kam Sheung From Airport (Cathay Pacific City): Road) Station: Unnamed Road, Chun Ming Road, Tung Wui Road, Kam Ho Road, Scenic Road, Chun Wan Road Kam Tin Road, Castle Peak Road – Interchange, Scenic Road, East Coast Yuen Long, Castle Peak Road – Road, Airport Road, Cheong Hong Ping Shan, Long Tin Road, Tong Road, Cheong Lin Road, Airport Yan San Tsuen Interchange, Yuen (Ground Transportation Long Highway, Tuen Mun Road, Centre)(“GTC”) Bus Terminus, Tuen Fat Road, Tuen Mun Road, Cheong Lin Road, Airport South Wong Chu Road, Lung Fu Road, Interchange, Cheong Lin Road, Sky roundabout, Tuen Mun Chek Lap City Interchange, Chek Lap Kok Kok Tunnel Road, Chek Lap Kok Road, Shun Fai Road, Shun Wui Road, Shun Fai Road, Shun Wui Road, Hong Kong-Zhuhai-Macao Road, Chek Lap Kok Road, Tung Bridge (Hong Kong Port) Public Wing Road, Airport Road, Cheong Transport Interchange, Shun Wui Hong Road, Airport Road, Airport Road, Chek Lap Kok Road, Tuen South Interchange, Airport Road, Mun Chek Lap Kok Tunnel Road, East Coast Road, Scenic Road, Lung Fu Road, Wong Chu Road, Chun Wan Road Interchange, and Tuen Mun Road, Tuen Hi Road, Scenic Road.
    [Show full text]