Goldsboro Urban Area Metropolitan Planning Organization Highway Program
Total Page:16
File Type:pdf, Size:1020Kb
GOLDSBORO URBAN AREA METROPOLITAN PLANNING ORGANIZATION HIGHWAY PROGRAM TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ROUTE/CITY ID LENGTH COST COST COUNTY NUMBER LOCATION / DESCRIPTION (Miles) (THOU) (THOU) FUNDS FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FUTURE YEARS INTERSTATE PROJECTS I-795 I-6047 WILSON COUNTY LINE TO SR 2075 (ASH 14.2 6903 10 NHPIM CG 324 CG 324 CG 324 CG 324 CG 324 CG 324 CG 324 CG 324 CG 324 CG 324 CG 1620 WAYNE STREET). UPGRADE GUARDRAIL, S(M) C 2033 SHOULDER AND MEDIAN REPAIRS. SW GARVEE BOND FUNDING $3,775,252; PAYBACK FY 2020-2034 US 117 I-6048 US 70 TO DUPLIN COUNTY LINE. 16.7 10110 10 NHPIM C 5050 C 5050 (FUTURE I-795) PAVEMENT AND BRIDGE REHABILITATION. WAYNE SW RURAL PROJECTS US 13 R-5853 SR 1572 (SAULSTON ROAD) TO SR 1700 3.6 11210 10 T R 2050 R 2050 GREENE H150498 (RODELL BARROW ROAD). MODERNIZE T U 1000 ROADWAY. WAYNE T C 3050 C 3050 DIV US 70 R-5829 US 70 BYPASS TO EAST OF SR 2314 6.7 252815 2000 T R 10797 A R 10798 A R 10798 A JOHNSTON H111256 (PONDFIELD ROAD). UPGRADE TO T U 9209 A FREEWAY STANDARDS. WAYNE T C 30725 A C 30725 A C 30725 A C 30725 A T R 3621 B R 3620 B R 3620 B T U 3552 B T C 17975 B C 53925 B SW A US 70 BYPASS TO WEST OF SR 1229 (LUBE SMITH ROAD). UPGRADE TO FREEWAY STANDARDS. SW B WEST OF SR 1229 (LUBE SMITH ROAD) TO EAST OF SR 2314 (PONDFIELD ROAD). UPGRADE TO FREEWAY STANDARDS. VARIOUS R-5784 DIVISION 4 PROGRAM TO UPGRADE 5747 5247 TA C 400 EDGECOMBE INTERSECTIONS TO COMPLY WITH THE S C 100 AMERICANS WITH DISABILITIES ACT HALIFAX (ADA) USING TRANSPORTATION JOHNSTON ALTERNATIVES (TA) FUNDS. NASH WAYNE WILSON DIV IN PROGRESS; "S" FUNDS REFLECT STATE HIGHWAY FUNDS URBAN PROJECTS US 13 U-5724 REALIGNMENT OF SR 1709 (CENTRAL 0.6 17070 2670 T C 7200 C 7200 (BERKELEY HEIGHTS ROAD) AT BERKELEY BOULEVARD) BOULEVARD IN GOLDSBORO. WAYNE H090922 REG RIGHT-OF-WAY IN PROGRESS. DIV - Division Category EX - Exempt Category SD - State Dollars (Non STI) Page 1 of 9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE SW - Statewide Category TRN - Transition Project Friday, November 13, 2020 GOLDSBORO URBAN AREA METROPOLITAN PLANNING ORGANIZATION HIGHWAY PROGRAM TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ROUTE/CITY ID LENGTH COST COST COUNTY NUMBER LOCATION / DESCRIPTION (Miles) (THOU) (THOU) FUNDS FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FUTURE YEARS URBAN PROJECTS US 70 U-5958 SR 1719 (BESTON ROAD). IMPROVE 1.0 1700 1700 WAYNE H150564 INTERSECTION. REG UNDER CONSTRUCTION US 70 U-6110 SR 1711 (NORTH OAK FOREST ROAD). 0.5 6609 10 NHP R 400 WAYNE H171791 IMPROVE INTERSECTION. NHP U 3199 NHP C 3000 REG US 117 U-5796 SR 1120 (O'BERRY ROAD) IN 1980 1980 WAYNE H128030 GOLDSBORO. CONSTRUCT INTERCHANGE. DIV UNDER CONSTRUCTION US 117 BUS/US 117 U-2714 FROM NORTH OF US 70 TO SR 1571 1.1 37197 9483 T PE 282 PE 282 PE 282 PE 282 PE 282 PE 282 PE 282 PE 282 PE 282 PE 282 PE 1410 (N. WILLIAMS STREET) (TOMMY'S ROAD) IN GOLDSBORO. T PE 4 PE 4 PE 4 PE 4 PE 4 PE 4 PE 4 PE 4 PE 4 PE 24 WIDEN ROADWAY AND MAKE SAFETY WAYNE H090357 T RB 234 RB 234 RB 234 RB 234 RB 234 RB 234 RB 234 RB 234 RB 234 RB 234 RB 1170 IMPROVEMENTS. T CB 997 CB 997 CB 997 CB 997 CB 997 CB 997 CB 997 CB 997 CB 997 CB 5982 T C 4959 REG RIGHT-OF-WAY IN PROGRESS. BUILD NC BOND FUNDING: $3,291,791 FOR PE, $2,733,041.73 FOR ROW PAYBACK 2020 - 2034 (FY 2019 / YR 1 SALE); $41,018.46 FOR PE, $11,615,419.07 FOR CON PAYBACK 2021 - 2035 (FY 2021 / YR 2&3 SALE). SR 1556 U-6204 COUNTRY DAY ROAD TO NEW HOPE 1.1 15459 10 T R 3400 (WAYNE MEMORIAL ROAD. ACCESS MANAGEMENT. T U 2649 DRIVE) T C 9400 WAYNE H171665 DIV SR 1556 U-4753 SR 1003 (NEW HOPE ROAD) TO 0.9 14200 920 T R 4180 (WAYNE MEMORIAL PROPOSED US 70 BYPASS IN T C 3033 C 3033 C 3034 GOLDSBORO. WIDEN TO MULTI-LANES. DRIVE) WAYNE H090493 DIV RIGHT-OF-WAY IN PROGRESS SR 1556 U-5994 LOCKHAVEN DRIVE TO COUNTRY DAY 0.3 1476 800 T C 676 (WAYNE MEMORIAL ROAD. CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS. DRIVE) WAYNE H150484 DIV DIV - Division Category EX - Exempt Category SD - State Dollars (Non STI) Page 2 of 9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE SW - Statewide Category TRN - Transition Project Friday, November 13, 2020 GOLDSBORO URBAN AREA METROPOLITAN PLANNING ORGANIZATION HIGHWAY PROGRAM TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ROUTE/CITY ID LENGTH COST COST COUNTY NUMBER LOCATION / DESCRIPTION (Miles) (THOU) (THOU) FUNDS FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FUTURE YEARS URBAN PROJECTS US 13 U-3609 SR 1560 (ROYAL AVENUE) TO NORTH OF 3.0 49471 5806 T PE 160 B PE 160 B PE 160 B PE 160 B PE 160 B PE 160 B PE 160 B PE 160 B PE 160 B PE 160 B PE 800 B (BERKELEY SR 1572 (SAULSTON ROAD) IN T RB 1 B RB 1 B RB 1 B RB 1 B RB 1 B RB 1 B RB 1 B RB 1 B RB 1 B RB 1 B RB 5 B BOULEVARD) GOLDSBORO. WIDEN TO MULTI-LANES. T R 6250 B R 6250 B WAYNE H090428 T U 3750 B T C 7834 B C 7833 B C 7833 B T C 1500 BA TRN A SR 1560 (ROYAL AVENUE) TO SR 1003 (NEW HOPE ROAD). - UNDER CONSTRUCTION REG B H090428-B SR 1003 (NEW HOPE ROAD) TO SR1572 (SAULSTON ROAD). - BUILD NC BOND FUNDING: $1,862,685 FOR PE, $1,253.83 FOR ROW PAYBACK 2020 - 2034 (FY 2019 / YR 1 SALE) REG BA REALIGNMENT OF HOOD SWAMP ROAD. NC 581 U-6207 ARRINGTON BRIDGE ROAD TO NC 111. 2.1 11921 10 T R 700 (BILL LANE MODERNIZE ROADWAY. T U 311 BOULEVARD) T C 10900 WAYNE H171829 DIV US 70 BUSINESS U-4407 SR 1579 (BERKELEY BOULEVARD) EAST 1.8 22555 750 T R 1386 R 1386 (EAST ASH STREET) TO US 70 IN GOLDSBORO. WIDEN TO T U 333 MULTI-LANES. WAYNE H090461 T C 18700 REG DIV - Division Category EX - Exempt Category SD - State Dollars (Non STI) Page 3 of 9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE SW - Statewide Category TRN - Transition Project Friday, November 13, 2020 GOLDSBORO URBAN AREA METROPOLITAN PLANNING ORGANIZATION HIGHWAY PROGRAM TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ROUTE/CITY ID LENGTH COST COST COUNTY NUMBER LOCATION / DESCRIPTION (Miles) (THOU) (THOU) FUNDS FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FUTURE YEARS URBAN PROJECTS US 117 U-3125 I-40 TO I-795. UPGRADE ROADWAY TO 29.9 370005 1000 NHP R 7900 A (FUTURE I-795) INTERSTATE STANDARDS, PART ON NHP U 1200 A NEW LOCATION. DUPLIN H090383 NHP C 61000 A NHP R 12000 B SAMPSON NHP U 1700 B WAYNE NHP C 55600 B NHP R 800 C NHP U 500 C NHP C 14625 C NHP R 3400 D NHP U 600 D NHP C 35980 D NHP R 3600 E R 3600 E NHP U 450 E U 450 E NHP C 54300 E NHP R 5266 F R 10534 F NHP U 450 F U 450 F NHP C 94600 F A H111213-A I-40 TO SR 1006 (WEST TRADE ROAD). - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY. B H111213-B SR 1006 (WEST TRADE STREET) TO NORTH OF SR 1135 (COUNTRY CLUB ROAD). - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY. REG C H090383-A NORTH OF SR 1135 (COUNTRY CLUB ROAD) TO SOUTH OF SR 1129 (SOUTH LANDFILL ROAD). REG D H090383-B SOUTH OF SR 1129 (SOUTH LANDFILL ROAD) TO SOUTH OF SR 1927 (GENOA ROAD). REG E H090383-C SOUTH OF SR 1927 (GENOA ROAD) TO SOUTH OF NC 581 (ARRINGTON BRIDGE ROAD). REG F H090383-D SOUTH OF NC 581 (ARRINGTON BRIDGE ROAD) TO I-795. SR 1713 U-6206 US 70 TO SR 1712 (THOROUGHFARE 1.0 7473 10 T R 1000 (MILLER'S ROAD). MODERNIZE ROADWAY. T U 863 CHAPEL ROAD) T C 5600 WAYNE H171820 DIV SR 1556 U-6205 US 70 BYPASS TO SR 1572 (SAULSTON 2.8 33221 10 T R 6000 R 6000 (WAYNE MEMORIAL ROAD).