1.0 INTRODUCTION

SKYCABLE CORPORATION is issuing a Request for Quotation (RFQ) for the proposed services (Semi Turn Key) of projects to all applicable areas. SKYCABLE to evaluate complete scope, costing and timeline from all the shortlisted bidders. If you are interested in providing these services, please submit a proposal for this works based on the information presented on this RFQ.

2.0 INSTRUCTION TO BIDDER

2.1 RFQ Terms & Conditions

2.1.1 Sky assumes no contract obligation in the issuance of the Request for Quotation (RFQ). The bidder shall shoulder any cost incurred in the preparation of the Quotation.

2.1.2 It shall be understood that these documents are confidential and property of . In accepting this RFP, the bidder agrees to safeguard the information contained herein.

2.1.3 SKY reserves the right to reject any or all proposal. Sky Cable will notify the bidder regarding acceptance of their proposal.

2.2 Important Dates and information:

2.2.1 Pre-Bid conference, clarification meeting will be scheduled.

2.2.2 Technical clarifications concerning the project may be emailed to SKY Cable procurement division.

2.2.3 Submission of bids will be finalized shall be through hard copy (green/red envelope)

3.0 SUBMITTALS Participating bidders shall submit the following documents as part of the proposal;

3.1 Commercial (for submission to Procurement Team)- 2 copies in Green Envelope 3.1.1 Price Proposal 3.1.2 Price BOQ 3.1.3 Financial capability 3.1.4 Proforma contract compliance checklist/statement 3.2 Technical (for submission to Technical Team)- 2 copies in Red Envelope 3.2.1 General Understanding of the Scope of Work 3.2.2 Engineering 3.2.3 ROW/Permitting/RTA 3.2.4 Construction 3.2.5 Quality Assurance( QA), Turn-over and Acceptance Program 3.2.6 Acceptance metrics 3.3 Incomplete submittal shall be ground for technical disqualification

1 | P a g e

3.4 The Sealed Envelopes Shall: 3.4.1 Bear the name of the Project to be bided. 3.4.2 Shall be addressed to the party designated to receive the Bid. 3.4.3 Indicate the name and address of the Bidder to enable the Bid to be returned un-opened in case it is declared “late”. 3.4.4 Be marked Do not open before (Date and Time of opening Bids.

Submitted proposal will be considered as Provisional Sum. All quantity/scope of work are re- measurable and subject to reconciliation once the plan are approved.

Sealed envelopes shall be marked as follows in capital letters:

Bid For : SEMI TURN KEY PROJECT To : ROSANNO DE GUZMAN SKYCABLE CORPORATION 6F ELJ Communication Center Mother Ignacia St., Diliman,

Name and Address of the Bidder: ______

DO NOT OPEN BEFORE (Date and Time for Opening Bids)

4.0 PROJECT SCOPE OF WORK

4.1 The CONTRACTOR shall be assigned to perform Semi Turn Key Sky projects.

4.2 The COMPANY shall provide the CONTRACTOR a work order, as the case maybe, on a per project basis. All work shall be performed and completed with the established standards, guidelines and timetable.

4.3 The CONTRACTOR shall be responsible for the necessary permits / authorization required to complete the implementation of the project .

5. A CABLING

5. A.1 COAXIAL CABLING (0.565, Figure 8) TOTAL REQUIREMENT : ______Coaxial Cabling & Installation of Grounding P______per strand km.

5. A.1.1 Laying-out of new cables and pole hardware as per design map. 5. A.1.2 Pullout of damaged/replaced cables. 5. A.1.3 Correction of sag cable / for pole/ alley arm attachment / for transfer of cable to new position on alley arm, as applicable.

2 | P a g e

5. A.1.4 Installation of grounding wire (messenger wires/copper wire) from strand wire to ground rod, which includes the utilization of various grounding hardware and accessories and burying of 8 ft. ground rod, applicable for new build. 5. A.1.4 Installation of Cable Sticker. 5. A.1.5 Identification of utilized cable position per pole in the as-built map.

5. B. FIBER OPTIC CABLING TOTAL REQUIREMENT: ______The contract price of the following scope of work to be performed by the CONTRACTOR shall be P______per strand km:

5. B.1 Figure 8 Parameters 5. B.1.1a Fiber Counts – 24C, 48C, 96C, 204C 5. B.1.1b Hauling (Km) – 4 km max 5. B.1.2 Laying-out of new fiber optic cables and corresponding pole hardware as needed on the relocation requirement. 5. B.1.3 Installation of grounding wire (messenger wires/copper wire) from strand wire to ground rod which includes the utilization of various grounding hardware and accessories and burying of 8 ft. ground rod, applicable for new build. 5. B.1.4 Installation of Cable Sticker 5. B.1.5 Identification of utilized cable position per pole in the as-built map.

5. B.2. Figure 8 Parameters 5. B.2.1a Fiber Counts – 8C, 12C, 24C 5. B.2.1b Hauling (Km) – 2 km max 5. B.2.2 Laying-out of new fiber optic cables and corresponding pole hardware as needed on the relocation requirement 5. B.2.3 Installation of grounding wire (messenger wires/copper wire) from strand wire to ground rod which includes the utilization of various grounding hardware and accessories and burying of 8 ft. ground rod, applicable for new build. 5. B.2.4 Installation of Cable Sticker 5. B.2.5 Identification of utilized cable position per pole in the as-built map.

5. B.3 Non -Messenger The contract price of the following scope of work to be performed by the CONTRACTOR shall be P______per strand km:

5. B.3.1 Laying-out of strand wires, non-messenger fiber optic cables and lashing of such cables including pole hardware installation as needed on the relocation requirement. 5. B.3.2 Installation of grounding wire (messenger wires/copper wire) from strand wire to ground rod which includes the utilization of various grounding hardware and accessories and burying of 8 ft. ground rod, applicable for new build. 5. B.3.3 Installation of Cable Sticker 5. B.3.4 Identification of utilized cable position per pole in the as-built map.

5. B.4 Over lashing

5. B.4.1 Fiber Optic Cable

The contract price of the following scope of work to be performed by the CONTRACTOR shall be P______per strand km:

5. B.4.1.1. Laying-out of fiber optic cables and overlashing of such cables on existing strand wire including pole hardware installation as needed on the relocation requirement 5. B.4.1.2. Pullout of old/damaged fiber optic cables and strands.

3 | P a g e

5. C CABLE PLANT RECOVERY / TEARDOWN TOTAL REQUIREMENT: ______The contract price of the following scope of work to be performed by the CONTRACTOR shall be P______per strand km:

5. C.1.1 Trunk and Distribution Cables (Figure 8) and with Messenger Wires (steel strand) 5. C.1.2 Removal of amplifiers and power supplies. 5. C.1.3 Removal of coaxial cables including all passive (taps, splitters, couplers, etc.) devices, and pole hardware from the poles where these materials are attached. 5. C.1.4 Extraction of passive devices from the cables. 5. C.1.5 Removal of lashing wires wrapped around coaxial cables 5. C.1.6 Removal of messenger wires (steel strand) 5. C.1.7 Inventory of materials recovered. 5. C.1.8 Delivery of all the materials recovered to SKY CABLE warehouses.

5. C.2 Documentation 5. C.2.1 Picture taking: 5. C.2.1.1 before teardown 5. C.2.1.2 after teardown 5. C.2.1.3 visible cable attachment/detachment 5. C.2.1.4 pole tag

5. C.2.2 Teardown excel summary file: 5. C.2.2.1 item number 5. C.2.2.2 pole number 5. C.2.2.3 street name 5. C.2.2.4 number of pieces of cable detached per pole per cable position

5. C.2.3 Destiny Teardown Map: 5. C.2.3.1 item number besides the pole number (subject for teardown) 5. C.2.3.1 cable detached per pole per cable position besides the pole number

5. C.3 Fiber Optic Cable – any count (Figure 8) The contract price of the following scope of work to be performed by the CONTRACTOR shall be P______per cable strand km:

5. C.3.1 Removal of fiber optic cable including pole hardware from the poles where these materials are attached. 5. C.3.2 Inventory of materials recovered. 5. C.3.3 Delivery of all the materials recovered to SKY CABLE warehouses.

5. C.4 Fiber Optic Cable with Messenger wires (steel strand) – any count The contract price of the following scope of work to be performed by the CONTRACTOR shall be P______per cable strand km:

5. C.4.1 Removal of lashing wires wrapped around coaxial cables 5. C.4.2 Removal of messenger wires (steel strand) 5. C.4.3 Removal of fiber optic cables including pole hardware from the poles where these materials are attached.

5. C.4.4 Inventory of materials recovered. 5. C.4.5 Delivery of all the materials recovered to SKY CABLE warehouses.

4 | P a g e

5. D DROP SWING TOTAL REQUIREMENT = ______P______per Pole

5. D.1 Installation of High Pass Filter.

5. D.2 Replacement of Drop Connector and Drop Cable (as needed).

5. D.3 Installation of Port Terminator.

5. D.4 Installation of Splitter and Jumper drop cable (as needed).

5. D.5 Transferring of Drop Cable as per design provided by SKY.

5. D.6 indicating in the Design Map the pole number and number of subscribers per pole.

5. D.7 Drop Swing to the nearest tap-off.

5. D.8 Submission of Accomplishment Report.

5. E TAP INSERTION/REPLACEMENT TOTAL REQUIREMENT: ______P______

5. E.1 The CONTRACTOR shall be responsible for the necessary permits/ authorization required to complete the implementation of the project 5. E.2 Installation and replacement of taps/ passives as per design provided by SKY Cable

5. E.3 Installation and pullout of amplifiers/ power supplies are required 5. E.4 Laying- out of new cables and pole hardware as needed on the relocation requirement 5. E.5 Pullout damaged/ replaced cables 5. E.6 Installation of Heat- shrinkable-tubes and sealing the said shrinkable tubes for all connectors 5. E.7 Correction of sag cable / for pole / alley arm attachment / for transfer of cable to new position on alley arm, as applicable. 5.E.8 Installation of grounding wire (messenger wires/ cooper wire) from strand wire to ground rod which includes the utilization of various grounding hardware and accessories and burying of 8ft. Ground rod for all EOL, power supplies, splitters and couplers and amplifiers. 5. E.9 Forward /Reverse balancing and end of line testing 5. E.10 Installation Cable sticker 5. E.11 returning of drop cable to New/Replaced Tap off 5. E.12 Installation of Port Terminator 5. E.13 Indicating in the design map the as built OSP Design including signal levels together with spectrum reverse performance before and after activity

5. F MANHOLE WORKS / UNDERGROUND SYSTEM TOTAL REQUIREMENT: AS NEEDED The contract price of the following scope of work to be performed by the CONTRACTOR shall be P______per cable strand km (excluding looping allowance):

5. F.1 Opening and restoration of manhole, service box and hand hole 5. F.2 Installation of polyethylene rope into existing conduit. * Dewatering per manhole shall be P ______. * Duct sealant per conduit shall be P ______.

5 | P a g e

* Push rodding and Mandrelling through existing conduit shall be P______per meter

5. G WALK-OUT - ADDRESS FALL-OUT TOTAL REQUIREMENT: ______P______

5. G.1 WORK ORDER MUST BE COMPLETED AND UPDATED W/IN 24HRS. SLA FROM TIME OF RECEIPT 5. G.1.1 CORRECT STREET NAME/HOUSE# (NEW / OLD) 5. G.1.2 INDICATE IF COMPOUND/APT TYPE 5. G.1.3 INDICATE IF LETTER OR NUMBER AS IDENTIFIER BEING USED 5. G.1.4 INDICATED DOOR# AND FLOOR OF BOTH SUBS AND DUPLICATE ACTIVE 5. G.1.5 AT LEAST 5 NEAR HOUSE # 5. G.1.6 AT LEAST 2 POLE TAG / NUMBER 5. G.1.7 BOTH SIDES / CORNER STREET NAMES 5. G.1.8 INDICATE ALL POSSIBLE LANDMARKS 5. G.1.9 INDICATE THE LATITUDE & LONGITUDE 5. G.1.9.1 WRITE REMARKS 5. G.1.9.2 ACCOMPLISHED BY WITH SIGNATURE 5. G.1.9.3 DATE ACCOMPLISHED 5. G.1.9.4 FINDINGS – NEGATIVE / POSITIVE 5. G.1.9.5 CORRECT PHYSICAL ADDRESS 5. G.1.9.6 INDICATE NAME OF PERSON AT SAID ADDRESS – RELATIONSHIP 5.G.2 ONLINE UPDATE PER W.O. 5. G.3 LOCATE ADDRESS OF SUBS. AS PER RELAYED BY AGENT ON W.O. 5. G.4 UNLOCATED ADDRESS OF SUBS. (Team ensure callback to mapping and get the additional information before pull-out to area). 5. G.5 IDENTIFY/COMPARE ADDRESS BASED ON WORK ORDER AGAINST PHYSICAL 5. G.6 TAKE PICTURE OF HOUSE INDICATING PHYSICAL HOUSE # 5. G.7 TAKE/RECORD LONGITUDE & LATITUDE LOCATION DATA PER WORK ORDER 5. G.8 ACCURATE FINDINGS VERSUS SKETCH/DRAWING 5. G.9 SKETCH HOUSE AT WORK ORDER

5. H SURVEY FOR RTA (REQUEST TO ATTACH) P______per km TOTAL REQUIREMENT: ______

5. H.1 Plotting/Drawing of all Telco poles location at map. 5. H.2 Pole Identification (Meralco, PLDT, etc.) and pole tag (Pole #). 5. H.3 Pole to pole distance (Strand) and pole type/description (Concrete / wood). 5. H.4 Indicate number of alley arm and all cable position at alley arm (C3, C4, C5, T1 & T3 etc.). 5. H.5 Location of possible connecting point for cable signal. 5. H.6 Location of alternative cable route if design route is not possible. 5. H.7 Provide pictures of all identified Merico &Telco poles. 5. H.8 Provide excel file data of survey (w/excel format)

6 | P a g e

5. I POWER SUPPLY INSTALLATION/ACTIVATION TOTAL REQUIREMENT: ______

5. I.1 Site Survey 5. I.1.1 Physical Inspection of Power Supply 1st power supply P______

Succeeding power supply in the same location P______

5. I.2 Installation of power supply including housing and electrical works (standard installation). P______per power supply

5. I.3 Sealant / waterproofing of pipe fittings. 5. I.4 Installation of grounding wire (AWG 8 color white/gray) and or grounding rod (5/8” X 8 feet). 5. I.5 Installation of service drop pipe with stranded wire (AWG 10), ½” EMT Pipe or metal flexible (liquid tight) from circuit breaker housing to Power Supply housing. 5. I.6 Measurement of AC via ammeter. 5. I.7 Testing of different parameters base on Checklist provided by Preventive Maintenance Group. 5. I.8 Measurement of AC via ammeter 5. I.9 Measurement of AC parameter (digital) 5. I.10 Battery status. 5. I.11 Installation of grounding wire and or grounding rod. 5. I.12 Painting of service drop pipe. 5. I.13 Installation of padlock. 5. I.14 Sealant/waterproofing pipe fittings.

5. J MDU REHABILITATION TOTAL REQUIREMENT = ______

A Installation of Amplifier/Node Receiver

Termination and replacement of devices in existing box, activation, including video test and trouble shoot

Termination and replacement of devices in existing box, including activation and alignment, video test and trouble shoot

B Installation of Power Supply

Indoor type

Including electrical wiring and meter installation. (Standard Installation only, application of contract price to the installation of conduit outside of room where active/power supply is installed.

C Installation of Passive Devices

Outdoor : Splitter

7 | P a g e

Coupler

Hi Pass Filter

Line Equalizer

Negative Trap

Power Inserter

Tap Off

Indoor:

Splitter/Coupler/Splice connector

Drop Hi Pass Filter/Negative Trap

Locking terminator only

D

Scope of Work

Layouting using clamps, cable Tie, Hanger, expansion bolt, tox screw & clips, including termination, continuity test, tagging

Layouting in conduits (IMC,EMT,PVC &Molding) including termination, continuity test, tagging

Layouting in existing conduit, molding and tray including terminating, continuity test, tagging (Note: applicable also for UG interconnection, including dewatering, duct sealing, cable fixing and opening manhole)

Layouting in existing conduit and tray with multiple cables, including, termination, continuity test, tagging

Layouting in existing conduit and tray with cable pullout, including termination, continuity test, tagging

Layouting in electrical Sleeves using clamps, hanger & clips, including termination, continuity test, tagging

Termination, activation, continuity test, video test, including trouble shooting of existing Rg-11, RG-6, RG-59 coaxial cable.

Termination of existing drop cable extension with indoor passive device and F-81

Fine tuning (Applicable if Contractor laid our own drop and need to be terminated and activated.

8 | P a g e

Boring, chipping including restoration per hole

E Installation of Metal Boxes

2"x2"x4", 4"x4"x4", 6"x6"x4"

22"x14"x8", 18"x12"x8"

32"x20"x10", 36"x24"x12"

48"x36"x12"

Installation of bracket for active and passive device in the existing box

F Installation of Pipes

IMC 4", 3"

IMC 2", 1/2", 1/4"

IMC 1', 3/4", 1/2"

EMT/PVC 4", 3"

EMT/PVC 2", 1/2", 1/4"

EMT/PVC 1', 3/4", 1/2"

Flexible metal, PVC

Plastic Molding 3/4", 1", 1/2", 2"

9 | P a g e