Media Release
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Strategic Framework
FRASER COAST REGIONAL COUNCIL SOUTH BURNETT REGIONAL COUNCIL PLANNING SCHEME STRATEGIC PLAN MAP NORTH BURNETT REGIONAL COUNCIL Legend Principal Centre Local Centre Airport Extractive Mining GYMPIE REGIONAL COUNCIL Major Infrastructure B oon doo ma Dam Roa d Tourism M u n Infrastructure Corridor d u b b e r a Wonda d - i a - Pro D ston o u Ro a R Proston r o d s n r g e t Cycling/Walking Route R s o a a c d n a Hivesville L Silv erleaf Road Interregional Links W ondai - P roston Ro ad d State Controlled Road a o R e e y B ay hw Hig unya ay B Nature Conservation/Open Space hw ig H Murgon a y n u ad B a Ro doom oon Proston - B Rural Residential Murgon R Kilcoy - oad B u r n e t Urban t H i CHERBOURG ABORIGINAL SHIRE COUNCIL g h w a y d a o R g Rural n o r u D - y a Wondai a r w e h b ig b H u t d t Major Watercourses y n a e u w n h r M ig u H B a y n u B Important Agricultural Areas Tingoora Mining Tenements Durong d Declared Catchment a o R i a d n o Wooroolin W - a l l i Local Government Area Boundary h c n i h C y a Note: This map is of a strategic nature and does not detail individual w h g i H property zoning. -
Download Drive
The Banana Shire is littered with Historical features and experiences for you to enjoy. From Museums and Homestead's to Historical Villages and the Cracow Pub, you don't want to miss a thing! Camping spots are available in all the overnight stay locations. For more information on these refer to the Sandstone Wonders Tourist Guide (pages 17-22) or our website www.sandstonewonders.com/camping. Day One - Wowan, Goovigen & Biloela (82km/1.5hrs) Start at the Wowan Museum (GPS -23.909922, 150.195682). Open Mon-Thurs, 9am-1pm. Spend an hour or two looking through the old relics. There is a lot to see. Travel south along the Leichhardt Wway approximately 24km and turn left onto Goovigen-Rannes Road (GPS -24.106287, 150.118327). Follow Goovigen-Rannes Road 19km and you will arrive at the Percy Schluter Memorial School of Arts Hall and Engel Homestead, on the outskirts of Goovigen (GPS -24.143988, 150.286513). Open by appointment only, phone ahead and speak to Gwen on (07) 4996 5146, or pop into the house next to the Church. Continue 150m and turn right onto Stanley Street and left onto Goovigen Jambin Road (just after the pub) (GPS -24.146874, 150.285811). Continue 10km and via left at the intersection with Mercers Road (GPS -24.198820, 150.365403). Approximately 1km further you will meet the Burnett Highway. Turn right and continue to Biloela. As soon as you arrive in Biloela, turn left onto Exhibition Avenue (GPS -24.405953, 150.502103) and 200m along you will arrive at the Qld Heritage Park on your left (GPS -24.404270, 150.501000). -
Facts and Statistics 6
SOQ.001.001.1308 Version - 2.0 16/04/08 TARA:- o All normal resupply routes are open for Tara. o Dept of Communities is performing outreach from Tara. MILES:- o Nil issues FLiNTON:- o Isolated by Moonie River - 2.155 metres at 0600hrs 19/01/2011, now falling slowly. Re-supplyof food and fuel to Flinton earlier in week by SES flood boats - no resupply concerns at this time. MOONIE:- o Dept of Communities undertook outreach in Moonie. 5. Projected Operations For Next 24/48 Hours (Major problems next 24148 hours. Anticipated resource requirements, including food re-supply) 1. Chinchilla o Continue clean-up and recovery activities in Chinchilla . • , 0 Clean up of public areas and private properties continuing. 2. Dalby o Level 5 water restrictions remain in place due. o Clean up of public areas and private properties occurring. 3. Condamine o Repatriation of Condamine town continues. o ADF to continue with assisting repatriation of townShip. o Condamine now accessible by road. 4. Flinton o Due to isolation of Flinton (6 Weeks). Resupply to community is being monitored. Moonie River heights are being monitored and continue to fall. 5. Moonie Department of Communities made contact with this community on 18.1.11 . • 0 FACTS AND STATISTICS 6. Response SES Tasks: Received: I Completed: SES Numbers Local: Deployed: Staff Deployed EMQ: QFRS: QAS: Resources Available: SOQ.001.001.1309 Version - 2.016/04/08 I Problems Encountered: SOCIAL 7. Population Deceased: Two (1. Suspected electrocution at Wieambilla via Tara - Property owner checking on generator; 2. Suspected heart attack of Tara Council truck driver carting water to Condamine) Injured: Nil Missing: Nil 8. -
Wide Bay Regional Economic Recovery Plan
WIDE BAY Draft 6 - 20 September WIDE BAY REGIONAL ECONOMIC RECOVERY covid19.qld.gov.au A VISION FOR THE FUTURE Our vision for Queensland’s recovery The Wide Bay region has abundant from this pandemic is threefold – we are fertile agricultural land and a significant working to protect the health of every forestry and tourism industry. Two Queenslander, we are creating jobs, and university campuses and a port support we are working together to create the the diverse industries of the region. conditions for future success. Our investment will draw new industries Our regions are the key to building such as renewable energy to the Queensland’s economic recovery. It has region and build traditional industries taken a collaborative effort from every such as manufacturing, supporting region to shape our plan for the future. innovation and setting up a long We will continue to partner – with and prosperous recovery. governments, industries, businesses and communities – to navigate this new world for future growth. We acknowledge the Aboriginal and Torres Strait Islander people as the traditional owners and custodians of the land and water on which we rely and operate. We pay our deepest respects to Elders past, present and emerging. MESSAGE FROM MESSAGE FROM THE PREMIER THE TREASURER The Honourable Annastacia Palaszczuk MP The Honourable Cameron Dick MP This year has tested Queenslanders like no other. Wide Bay’s fertile environment contributes signifi cantly to the The COVID-19 pandemic has touched everyone and communities state’s produce and economy. It is a region of diverse industries, in Wide Bay have not been immune to its effects. -
Renewable-Energy-Brochure.Pdf
ADVANCEROCKHAMPTON.COM.AU RENEWABLE ENERGY IN THE ROCKHAMPTON REGION 220 Quay Street | PO Box 1860 Rockhampton QLD 4700 [email protected] 07 4936 8282 Economic Development, Tourism, Events & Marketing THE ROCKHAMPTON REGION HAS EMERGED AS A RENEWABLE ENERGY HOT SPOT As demand for energy increases globally so does the need for renewable energy sources that foster sustainability without efficiency being compromised. The location of the Powerlink distribution system and the Queensland Government’s target of having 50 per cent of the State’s electricity generation coming from renewable sources by 2030 has sharpened the focus of renewable energy within the Rockhampton Region. The transition towards a focus on a renewable energy system represents a unique economic growth opportunity for the Rockhampton Region that brings with it a host of positive impacts. 3 PROJECTS Renewable energy projects within the Rockhampton Region will fuel economic growth, generate new employment opportunities, boost human welfare and work towards a climate safe future. ROCKHAMPTON REGION MOAH CREEK RENEWABLE ENERGY BOULDER CREEK WIND FARM MT HOPEFUL WIND FARM AND PROJECT Proponent: Epuron BATTERY STORAGE Proponent: Central Queensland Power Location: Between Westwood and Mt Proponent: Neoen Location: 30km west of Rockhampton Morgan Location: 30km south of Rockhampton Expected to produce 500 megawatt Expected to generate 360 megawatts Proposed construction of 116 wind (wind), 300 MW (solar) and 300 MW of electricity. turbines including battery storage. (battery). BOULDERCOMBE SOLAR FARM BOULDERCOMBE BATTERY STORAGE Proponent: Eco Energy World Proponent: Genex Power Limited Location: 20km south west of Location: 20km south west of Rockhampton Rockhampton The 280 megawatt project is expected The project is expected to be sized to include up to 900,000 solar at 50 megawatts and will be the first modules. -
Queensland Transport and Roads Investment Program 2014-15 to 2017-18 | Page 85 Department of Transport and Main Roads
Department of Transport and Main Roads Fitzroy fitzroy district fitzroy districtDepartment of Transport and Main Roads Marlborough LIVINGSTONE Byfield SHIRE COUNCIL Capella YEPPOON WOORABINDA ROCKHAMPTON Marlborough ABORIGINAL REGIONAL Emu Park LIVINGSTONE SHIRE SHIRE COUNCIL Byfield ROCKHAMPTON COUNCIL EMERALD COUNCIL Gracemere CBalpaecllkawater YEPPOON GogWanOgOoRABINDA ROCKHAMPTON Bogantungan Mount Emu Park Duaringa ABORIGINAL MorgaRnEGIONAL SHIRE GLADSTONE Dululu CMOtU LNarCcIoLm COUNCIL Gracemere ROCKHAMPTON CENTRAL HIGHLANDS EMERALD Tannum Sands Blackwater REGIONAL COUNCIL Calliope Springsure Woorabinda Gogango Bogantungan GLADSTONEMount Morgan WOORABINDA Baralaba Duaringa REGIONAL GLADSTONE Dululu Miriam Vale ABORIGINAL COUNCIL Mt Larcom CENTRAL HIGHLANDS SHIRE Biloela Tannum Sands Rolleston Banana REGIONAL COUNCIL COUNCIL Moura Calliope Springsure Bauhinia Woorabinda GLADSTONE WOORABINDA Baralaba REGIONAL Miriam Vale ABORIGINAL COUNCIL SHIRE Biloela Rolleston Theodore Banana COUNCIL Bauhinia Moura Legend National road network BANANA SHIRE COUNCIL Theodore State strategic road network Taroom Legend State regional and other district road National road netwoNrkational rail network BANANA State strategic road Onethtwero rakilway SHIRE COUNCIL State regional and oLthoecra dl igsotrvicetr nromaednt boundary Taroom ³ Legend National rail networkNational road network 0 50 Km Other railway State strategic road network Local government boSutantdea reygional and other district road ³ National rail network 0 50 Km Other railway Fitzroy District -
Fitzroy 117,588 Km2 Area Covered by Location1
Fitzroy 117,588 km2 Area covered by location1 4.45% Population of Queensland1 3,163 km Other state-controlled road network 366 km National Land Transport Network2 374 km National rail network See references section (notes for map pages) for further details on footnotes. Fitzroy Office 31 Knights Street | North Rockhampton | Qld 4701 PO Box 5096 | Red Hill Rockhampton | Qld 4701 (07) 4931 1500 | [email protected] • duplication of Philip Street in Gladstone to four lanes, • complete pavement strengthening of Program Highlight between the Dawson Highway and Glenlyon Road, Rockhampton – Yeppoon Road, jointly funded by the funded by the Australian Government Australian Government and Queensland Government as part of the COVID-19 economic recovery response In 2020–21 we completed: • widening and strengthening of Dawson Highway between Moura Golf Club and Zamia Creek, jointly • complete the upgrade of three floodways on • restoration of disaster-damaged floodways on funded by the Australian Government and Queensland Gladstone – Monto Road, jointly funded by the Gladstone – Monto Road, jointly funded by the Government as part of the COVID-19 economic recovery Australian Government and Queensland Government Australian Government and Queensland Government response as part of the COVID-19 economic recovery response • improvements and upgrades for Stage 2 of the • planning for an upgrade of the road access to • commence construction for the upgrade of Rockhampton road train access, jointly funded by the Gladstone Port. Rockhampton -
Fitzroy 2020–21 to 2023–24 117,588 Km2 Area Covered by Location1
Queensland Transport and Roads Investment Program Fitzroy 2020–21 to 2023–24 117,588 km2 Area covered by location1 4.45% Population of Queensland1 3,163 km Other state-controlled road network 366 km National Land Transport Network2 374 km National rail network See References section (Notes for Map pages) for further details on footnotes Legend National road network 2 State strategic road network State regional and other district road Office National rail network 31 Knight Street | North Rockhampton | Qld 4701 Other railway PO Box 5096 | Red Hill Rockhampton | Qld 4701 Local government boundary (07) 4931 1500 | [email protected] Program highlights • continue duplication, from two to four lanes, of the • complete duplication of Philip Street in Gladstone to In 2019–20 we completed: Bruce Highway Rockhampton Northern Access between four lanes, between the Dawson Highway and Glenlyon Rockhampton - Yeppoon Road and Parkhurst, jointly Road, funded by the Australian Government • construction of a southbound overtaking lane on the funded by the Australian Government and Queensland Bruce Highway, north of Granite Creek, funded by the Government • commence widening to four lanes and upgrading Australian Government intersections along Gavial - Gracemere Road (Lawrie • continue a safety upgrade of the Bruce Highway at Street), as part of the Queensland Government’s • construction of a new bridge at Valentine Creek on Terranova Drive intersection in Parkhurst, jointly COVID-19 economic recovery response the Capricorn Highway, between -
Minutes of Ordinary Meeting Held Wednesday 9 August 2017 Held in the Simeon Lord Room Library / Museum Building Redbank Street
Minutes of Ordinary Meeting Held Wednesday 9 August 2017 Held in the Simeon Lord Room Library / Museum Building Redbank Street, Esk Present Cr G D Lehmann (Mayor) Cr D Hall (Deputy Mayor) Cr H Brieschke (Councillor) Cr S Choat (Councillor) Cr C Gaedtke (Councillor) Cr M Ogg (Councillor) Cr B Whalley (Councillor) Mr R Bain (Chief Executive Officer) Mr C Payne (Director Corporate and Community Services) Mr T Jacobs (Director Operations) Mr B Sully (Director Planning and Development) Mr G Smith (Director Finance) Mrs K Jones (Director HR and Customer Service) Mrs S Pitkin (Minute Secretary) Ms M Maeseele (Communications and Marketing Manager) Minutes of Ordinary Meeting 9 August 2017 C O N T E N T S Adoption of Local Government LGAQ Annual Conference – Gladstone – Infrastructure Plan (LGIP) ....................... 4 16 – 18 October 2017 ...................... 164 APPENDIX A ...................................... 169 Matters of Public Interest ........................ 3 Brisbane Valley Rail Trail incomplete Mayor Lehmann – Matters of public section ............................................. 133 interest ................................................. 4 Business arising out of minutes of Mayor’s and Councillors’ Reports ........ 165 previous meeting ................................. 3 Meetings authorised by Council .......... 164 Closed session.................................... 164 Natural Resource Management Monthly Closure of Meeting .............................. 168 Report June/July 2017 ......................... 5 Community Assistance -
RACQ Recommended Projects for Acceleration and Funding
RACQ Recommended Projects for Acceleration and Funding Project Comments Program Accelerate Centenary Bridge duplication SRN Centenary Motorway Darra to Toowong upgrade SRN Upgrade Centenary Mwy at Carole Park / Logan Motorway interchange to four lanes SRN Gateway Motorway North - Bruce Highway to Deagon Deviation project NHN Gateway Motorway Old Cleveland Road Interchange - Deliver minor upgrade project and accelerate planning/funding for major interchange upgrade NHN Daisy Hill to Logan Motorway project NHN Pacific Motorway Interchange upgrades (Exit 38, 41, 45 and 49) NHN Ipswich Motorway upgrade Complete Stage 1 and Stage 2, Oxley to Darra project NHN Coomera Connector Stage 1 - Coomera to Nerang SRN Fast track all projects under BHUP safety, capacity and flooding streams NHN Bruce Highway Upgrade Program Bruce Highway six lane upgrade between Pine River and Caloundra Road NHN Bruce Highway Maroochydore Road to Mons Road upgrade NHN Shaw Road/North Shore Blvd, Townsville intersection/s upgrade NHN Gympie Arterial Road Accelerate Beams Road to Gateway Motorway project SRN Nicklin Way roundabout SRN Caloundra Road Kawana Way roundabout SRN North West Transport Corridor (Stafford Road to Carseldine), North Brisbane Bruce Highway Western Transport corridor projects Alternative, North South Urban Arterial (NSUA) SRN Fast track business case and project funding for Mooloolah River Interchange upgrade at Mountain Creek SRN Sunshine Motorway Investigate interchange upgrade at Coolum Beach SRN Duplicate (four lanes) between Pacific Paradise -
Infrastructure
SOQ.001.001.1438 Numbers Staying in As above. Centres: Origin: Theodore. 9. Community Recovery Centres . Locations: Community Recovery Agencies are aware and involved in recovery operations. Opening hours: Operations commenced. Numbers Utilising Operations commenced. Centre: Issues I Nil reported at this time. •10. Health There will be health concerns regarding water supply and sewerage issues prior Public Health: to repatriation of Theodore township but these will hopefully be resolved today. Issues regarding cleaning and vector control anticipated. Mental Health: No issues reported at this time. Infrastructure 11. Transport \... _roads, airstrips etc closed, include estimated time of opening) UNCHANGED Runway at Theodore aerodrome has extensive pavement damage however Aviation: 740metres remains useable for appropriate fixed winged aircraft. Open to rotary wing aircraft. LZ for rotary aircraft remains useable in Theodore Town Centre. Rail: In operation no issues reported. BANANA SHIRE COUNCIL Received from BSC Works department at 1300 hours. State Roads Closed: • Leichhardt Hwy - • Taroom to Theodore Road: • Closed at Cattle Creek • Closed at Palm Tree Creek • Banana to Theodore • Closed at S Bends • Dawson Highway • Moura to Bauhinia Closed at Dawson River • .. \\C,t·fls-01lAII UOIts Guest FoldelSlAII UOitS' Dump FOlderlFlood Cns,s ReViewlDDMG ResponseslCERIGladstonelGladstone SltrepslSITREP ..... • .................. r- "·... n "' ... - Version _ 3.019/09108 PaQe 4 of 7 SOQ.001.001.1439 • "0"0"0 to Mn'''~ • Closed at Banana Creek • Biloela to Banana • Closed. • Baralaba - Woorabinda Rd • Closed at Dawson River Bridge Baralaba . • Roma Taroom Rd • Closed at Sandy Creek • Taroom to Bauhinia • Fitzroy Development Road Closed • Eidsvold - Theodore Rd • Closed at Boam Creek • Burnett Highway • Biloela to Dululu • Closed at Alma Creek • Closed at Dee River Bridge - Dululu Banana Shire (Local Controlled) Roads , • Injune Rd - Closed. -
Wide Bay Burnett 48,503 Km2 Area Covered by District1
Queensland Transport and Roads Investment Program 2019–20 to 2022–23 Wide Bay Burnett 48,503 km2 Area covered by district1 5.92% Population of Queensland1 2,700 km Other state-controlled road network 271 km National Land Transport Network 242 km National rail network 1Queensland Government Statistician’s Office (Queensland Treasury) Queensland Regional Profiles. www.qgso.qld.gov.au (retrieved 16 May 2019) Legend Bundaberg Office 23 Quay Street | Bundaberg | Qld 4670 National road network Locked Bag 486 | Bundaberg | Qld 4670 State strategic road network (07) 4154 0200 | [email protected] State regional and other district road National rail network Gympie Office Other railway 50 River Road | Gympie | Qld 4570 PO Box 183 | Gympie | Qld 4570 Local government boundary (07) 5482 0333 | [email protected] Divider image: Looking north at the construction of a southbound overtaking lane on the Bruce Highway at Woco Creek, just north of Apple Tree Creek. District program highlights • complete intersection upgrades and widening on the • continue planning and design for flood immunity Bruce Highway between the Maryborough Showgrounds upgrades on the Bruce Highway at Tiaro and in the In 2018–19 we completed: and Howard Heights Road, jointly funded by the vicinity of Saltwater Creek, north of Maryborough, Australian Government and Queensland Government jointly funded by the Australian Government and • works to realign and signalise the Pialba-Burrum Heads Queensland Government Road intersections with Scrub Hill Road and Wide