Southern Queensland Region 2020–21 Project Pipeline Industry Briefing
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Warrego Highway, Helidon Spa TOOWOOMBA SECOND RANGE CROSSING
Gowrie Junction Murphys Creek Mt Cranley Kynoch Ballard Charlton Harlaxton Postmans Ridge Wellcamp Withcott Helidon Spa Warrego Highway, Helidon Spa TOOWOOMBA SECOND RANGE CROSSING Athol As part of work on the Toowoomba Second Range Crossing (TSRC), an Stay in touch interchange will be constructed at the eastern entry to the TSRC on the Residents can visit the TSRC Visitor Warrego Highway at Helidon Spa. Information Centre located at the Traffic impacts project’s site office on Bedford Street, Cranley. Opening hours This involves: In early 2017, east and westbound lane are Monday to Friday, 9:00am to • constructing a bridge from the closures will commence on the Warrego 5:00pm. The centre is also open Warrego Highway at Helidon Highway for bridge construction outside these times by appointment. Spa, with two eastbound lanes (approximately 4.3km west of the Visitor Information Booths are open and two westbound lanes, Lockyer Creek Bridge at Helidon). at the Lockyer Valley Cultural Centre enabling motorists to enter and and Toowoomba City Library. These exit the TSRC Intermittent hold and release traffic displays are open as per each centre’s opening hours and will be regularly • closing the Warrego Highway control measures and temporary lane median break between Postmans updated with the latest project closures will allow for construction information. For employment and Ridge Road and Twidales Road materials to be delivered safely. at Helidon Spa (due to the safety procurement enquiries, please visit the website for further information. impacts of merging and weaving In late 2018, the Warrego Highway traffic at the Warrego Highway median break between Postmans Ridge 1800 198 878 East interchange and right-turning Road and Twidales Road at Helidon Spa [email protected] traffic at the intersection). -
Section 3.7 – Local Area Frameworks
Draft Ipswich Planning Scheme 2019 Statement of Proposals 3.7 Local Area Frameworks 3.7.1 Preliminary (1) The Ipswich Local Government Area has been divided into thirty local area strategic planning units based on geographically identifiable communities of interest (areas with identifiable boundaries and within which there are broad land use and planning commonalities) to which individual Local Area Frameworks apply. (2) The thirty Local Area Frameworks provide a more detailed spatial expression of the policies included in the Whole of City Strategic Framework (refer to sections 3.1 to 3.6) for each of the local area strategic planning units by: (a) including a description of the geographic extent of the strategic planning unit to which the Local Area Framework applies; (b) identifying the Valuable Features in the area that are of significance and are to be protected; (c) identifying the most significant Development Constraints that impact on development in the area and that need to be considered and addressed in allocating precincts and for development assessment; (d) setting out the Growth Management outcomes that are to be delivered in the area; (e) identifying the key Infrastructure that needs to be delivered to support growth and development in the area; (f) showing the preferred use of land in the area by including each property in a land use precinct designation; and (g) where there are different development options (including for example building heights, lot sizes, dwelling densities or different land uses) for an area or individual -
New South Wales Class 1 Load Carrying Vehicle Operator’S Guide
New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Important: This Operator’s Guide is for three Notices separated by Part A, Part B and Part C. Please read sections carefully as separate conditions may apply. For enquiries about roads and restrictions listed in this document please contact Transport for NSW Road Access unit: [email protected] 27 October 2020 New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Contents Purpose ................................................................................................................................................................... 4 Definitions ............................................................................................................................................................... 4 NSW Travel Zones .................................................................................................................................................... 5 Part A – NSW Class 1 Load Carrying Vehicles Notice ................................................................................................ 9 About the Notice ..................................................................................................................................................... 9 1: Travel Conditions ................................................................................................................................................. 9 1.1 Pilot and Escort Requirements .......................................................................................................................... -
Queensland Parliamentary Service Annual Report 2003 - 04
Queensland Parliamentary Service Annual Report 2003 - 04 www.parliament.qld.gov.au Communication Objective .............................................................................................................................................................. 1 About Us .......................................................................................................................................................................................... 3 Mission ........................................................................................................................................................................................... 3 Values ............................................................................................................................................................................................. 3 Message from the Speaker ............................................................................................................................................................ 4 Clerk’s Report ................................................................................................................................................................................ 5 Management Profi les .................................................................................................................................................................... 6 Corporate Governance .................................................................................................................................................................. -
Map Marking Information for Kingaroy, Queensland [All
Map marking information for Kingaroy,Queensland [All] Courtesy of David Jansen Latitude range: -30 19.8 to -23 13.5 Longitude range: 146 15.7 to 153 33.7 File created Tuesday,15June 2021 at 00:58 GMT UNOFFICIAL, USE ATYOUR OWN RISK Do not use for navigation, for flight verification only. Always consult the relevant publications for current and correct information. This service is provided free of charge with no warrantees, expressed or implied. User assumes all risk of use. WayPoint Latitude Longitude ID Distance Bearing Description 95 Cornells Rd Strip 30 19.8 S 152 27.5 E CORNERIP 421 172 Access from Bald Hills Rd 158 Hernani Strip 30 19.4 S 152 25.1 E HERNARIP 420 172 East side, Armidale Rd, South of Hernani NSW 51 Brigalows Station Strip 30 13.0 S 150 22.1 E BRIGARIP 429 199 Access from Trevallyn Rd NSW 151 Guyra Strip 30 11.9 S 151 40.4 E GUYRARIP 402 182 Paddock North of town 79 Clerkness 30 9.9 S151 6.0 ECLERKESS 405 190 Georges Creek Rd, Bundarra NSW 2359 329 Upper Horton ALA 30 6.3 S150 24.2 E UPPERALA 416 199 Upper Horton NSW 2347, Access via Horton Rd 31 Ben Lomond Strip 30 0.7 S151 40.8 E BENLORIP 382 182 414 Inn Rd, Ben Lomond NSW 2365 280 Silent Grove Strip 29 58.1 S 151 38.1 E SILENRIP 377 183 698 Maybole Rd, Ben Lomond NSW 2365 Bed and Breakfast 165 Inverell Airport 29 53.2 S 151 8.7 E YIVL 374 190 Inverell Airport, Aerodrome Access Road, Gilgai NSW 2360 35 Bingara ALA 29 48.9 S 150 32.0 E BINGAALA 381 199 Bingara Airstrip Rd West from B95 55 Brodies Plains AF 29 46.4 S 151 9.9 E YINO 361 190 Inverell North Airport, Inverell NSW 2360. -
Queensland Transport and Roads Investment Program (QTRIP) 2016
Metropolitan Metropolitan | Map and Contact Details Brisbane office 313 Adelaide Street | Brisbane | Qld 4000 PO Box 70 | Spring Hill | Qld 4004 (07) 3066 5499 | [email protected] Divider Image: Moggill Road Cycle Bridge looking north east towards Brisbane central business district (bridge spans Moggill Road, Indooroopilly). Copyright © 2015 Department of Transport and Main Roads, the Queensland Government. Department of Transport and Main Roads Metropolitan Overview • A two-lane bus-only extension road from Warrigal Road • Commence intersection improvements on Mount Crosby through to Logan Road in Eight Mile Plains. Road, at the Delacy Street and Pine Street intersection. The Metropolitan District covers an area of about 2,968km2, or around 0.2% of Queensland1. It straddles the Brisbane In 2016-17 we will: • Continue to seek Australian Government funding River and extends from Mount Glorious in the north to Logan for the Pacific Motorway-Gateway Motorway merge City in the south, and from Point Lookout in the east to west • Continue construction of the Gateway Upgrade North upgrade (southbound lanes), with $42 million provided of Helidon and the major centre of Ipswich. project that will widen the Gateway Motorway to towards this $210 million project by the Queensland six lanes, between Nudgee and Bracken Ridge, jointly Government as part of the State Infrastructure Fund. The district has an estimated residential population of funded by the Australian Government and Queensland about 1,461,733 or around 31.4% of Queensland’s total Government. population1. Future plans • Commence the Ipswich Motorway (Rocklea to Darra) The district looks after about 414km of other state-controlled Stage 1 project, to construct additional lanes between We are continuing to plan for the future transport roads, about 112km of the National Land Transport Network, Oxley Road and Suscatand Street, jointly funded by the requirements of residents in the Metropolitan District. -
THE COST of CRASHES an Analysis of Lives Lost and Injuries on NSW Roads
THE COST OF CRASHES An analysis of lives lost and injuries on NSW roads May 2017 About the NRMA Better road and transport infrastructure has been a core focus of the NRMA since 1920 when our founders lobbied for improvements to the condition of Parramatta Road in Sydney. Independent advocacy was the foundation activity of the organisation and remains critical to who we are as we approach our first centenary. From humble beginnings, the NRMA has grown to represent over 2.4 million Australians principally from NSW and the ACT. The NRMA also provides motoring, mobility and tourism services to our Members and the community. Today, the NRMA works with policy makers and industry leaders to advocate for increased investment in road infrastructure and transport solutions to make mobility safer, provide access for all and to deliver sustainable communities. By working together with all levels of government to deliver integrated transport options we can give motorists a real choice about how they get around. The NRMA believes that integrated transport networks, including efficient roads, high-quality public transport and improved facilities for cyclists and pedestrians, are essential to solve the challenge of growing congestion and provide for the future growth of our communities. Comments & Queries NRMA PO Box 1026 Strathfield NSW 2135 Email: [email protected] Web: mynrma.com.au Contents Introduction 2 The Cause for Concern 3 Calculating the Cost 4 The Cost of Road Crashes 5 Trends in Casualty Numbers 5 Total Cost of Road Trauma 5 Lives -
RACQ Regional Road Inspection Tour 2009
Regional Road Inspection Tour December 2009 <<Insert image here>> Document description South Western Queensland and North / North Western and Central Queensland RACQ Regional Road Inspection Tour 2009 Introduction In August/September 2009 the RACQ Traffic & Safety Department undertook a road inspection tour of major Queensland highways in the North, Central and Southern Queensland. The tour included meetings with representatives at Department of Transport and Main Roads (DTMR) offices in the regions to gain a better understanding of issues and current condition of the National and State road network in these areas. It also provided the opportunity to better comprehend the difficulties of building and maintaining roads in harsh weather and inferior soil conditions. General measurements were taken of traffic lanes, shoulders and clear zones. Visual assessments of the roads such as pavement condition, delineation, ride comfort and presence of roadside hazards were recorded together with observational surveys of traffic mix. These were logged and are discussed in greater detail within the main report. The data collected, with the knowledge and understanding of relevant local issues gained, together with the fact that RACQ experts were „on-site‟, generated a great deal of media interest and community feedback throughout both tours. The two week-long trips are shown below: South-western Queensland (1750km) North, North Western and Central (August 31 – September 4) Queensland (2250km) (September 14-18) • Warrego Highway • Flinders Highway • Moonie Highway • Barkly Highway • Balonne Highway • Landsborough Highway • Mitchell Highway • Capricorn Highway 2 RACQ Regional Road Inspection Tour 2009 pavement including trees and exposed South Western culverts. Queensland Regional Road Tour Moonie Highway (Dalby – Moonie) The pavement surface has failed (in sections) in the initial 20km south of Dalby due to environmental cracking (caused by expansion/contraction of foundations). -
Darling Downs 79,530 Km2 Area Covered by Location1
Darling Downs 79,530 km2 Area covered by location1 5.72% Population of Queensland1 3,846 km Other state-controlled road network 687 km National Land Transport Network2 See references section (notes for map pages) for further details on footnotes. Toowoomba Office 1-5 Phillip Street | Toowoomba | Qld 4350 Locked Bag 1 | Warwick | Qld 4370 (07) 4639 0777 | [email protected] Warwick Office 306 Wood Street | Warwick | Qld 4370 Locked Bag 1 | Warwick | Qld 4370 (07) 4661 6333| [email protected] • continue pavement rehabilitation on the Gore Highway • continue planning for bikeways in Central Toowoomba Darling Downs between Toowoomba and Millmerran, jointly funded and the Warwick principal cycle network by the Australian Government and Queensland Government • commence planning to improve Toowoomba In 2020–21 we completed: Connection Road and Hursley Road intersection • continue bridge replacement on the Rocky Creek • upgrading of the Emu Creek bridge on the New England Bridge on Murphy’s Creek Road, as part of the • continue planning to identify a Toowoomba North Highway, jointly funded by the Australian Government Queensland Government’s COVID-19 economic South Transport Corridor. and Queensland Government recovery response Link for TMR Project Page: • construction of Stage 1 of the New England Highway • continue pavement strengthening and widening on https://www.tmr.qld.gov.au/Projects Cycleway between Highfields and Toowoomba CBD the New England Highway between Yarraman and Toowoomba, as part of the Queensland Government’s -
Road Closure – Regional NSW & South East QLD – Wednesday 2
24 March 2021 Dear Customer, Re: National Customer Advice – Road Closure – Regional NSW & South East QLD – Wednesday 24 March 2021 (Update 2) You are receiving this advice due to severe wet weather conditions and flash flooding continuing on the East Coast causing the ongoing closure of all roads heading in and out of Brisbane from a southerly direction. The New England Highway is closed in Wallangarra in Queensland due to flooding – motorists cannot travel beyond Jennings in New South Wales as a result Between Moree and the Queensland border – The Carnarvon Highway is closed The Newell Highway is closed between Moree and the Queensland border, and between Moree and Narrabri At Biniguy, east of Moree – the Gwydir Highway is closed, east of Gretai Road Between Coopernook and Cundletown - one lane of the Pacific Highway is open in each direction with a reduced speed limit Between Walcha and Gloucester - Thunderbolts Way is closed At Failford - Failford Road is closed between the Pacific Highway and The Lakes Way The Oxley Highway is closed between Sancrox and Long Flat, as well as between Walcha and Mount Seaview Between Macksville and Nambucca Heads - Giinagay Way is closed between the Pacific Highway and Edgewater Drive Due to the unforeseen disruption of the road network that is beyond ScottsRL control we will endeavour to deliver but cannot guarantee your delivery will arrive on time as originally booked and will not accept any liability. ScottsRL Customer Service teams are working to ensure any customers affected by these delays, will be contacted with regards to order delivery status. -
RACQ Unroadworthy Roads Technical Appendix
RACQ Unroadworthy Roads Technical Appendix Author Public Policy Date March 2016 Title: RACQ Unroadworthy Roads Technical Appendix Issued Date: March 2016 Page: 1 of 104 List of roads with number of responses to identified problems cont’d IDENTIFIED PROBLEMS Tight Vegetation Poor or Slippery / curves / Narrow Narrow Poor Hazardous Poor or or objects Lack of inadequate Rough Loose blind road / bridge / road Poor Poor roadside no guard block overtaking Flood Poor road Steep Road Name # Responses Surface surface crests lanes culvert markings signing shoulders objects rails visibility opportunities prone drainage lighting grade Bruce Highway 67 38 9 10 27 17 14 8 27 8 11 8 30 22 15 11 1 Pacific Motorway 32 8 1 1 6 1 3 - 4 - - 1 4 - 2 - - Mount Lindesay Highway 21 5 - - 5 - 1 2 4 1 1 - 14 4 2 3 1 Captain Cook Highway 19 5 2 2 2 1 2 - 2 2 1 1 1 4 5 - - Rickertt Road 19 18 3 - 8 3 6 1 13 3 2 - 6 16 9 10 - D'Aguilar Highway 16 12 5 4 6 1 4 1 6 2 1 3 12 2 5 1 1 Kennedy Highway 15 2 5 7 6 1 - - 6 1 5 2 13 1 - 1 1 Warrego Highway 14 11 3 3 5 2 3 2 6 2 - 2 3 3 3 2 - New England Highway 11 9 2 2 4 2 1 1 4 2 2 1 5 2 1 - - Telegraph Road 11 4 - - - - - - 2 - - - - 1 1 - - Kingsford Smith Drive 10 8 2 - 4 - 3 - 2 - - - - - 1 - - Maleny-Kenilworth Road 10 10 2 4 10 4 2 1 8 4 - 1 5 - 2 - - Gore Highway 9 8 1 - 5 - - - 5 1 2 - 2 2 - - - Samford Road 9 7 2 3 6 - 1 1 1 2 - - 2 - 2 - - Tinaburra Drive 9 7 3 5 9 2 4 2 6 2 - 1 3 - - 4 - Burnett Highway 8 8 - 3 4 4 2 2 7 2 1 2 5 3 4 1 - Beachmere Road 7 6 1 2 7 6 1 2 7 - 1 2 2 6 3 3 - Beechmont Road 7 1 2 7 7 -
School Bus Upgrade Scheme
School Bus Upgrade Scheme (SchoolBUS) Capital–Based Kilometric School Bus Services Information Statement No.16A/2018 Guidelines and Conditions October 2018 Content Introduction ................................................................................................................................. 3 Conditions of operations ...................................................................................................... 3 Funding ......................................................................................................................................... 3 Buses .......................................................................................................................................... 4 Air-conditioning ........................................................................................................................... 4 Fire detection and mitigation systems. ............................................................................................ 4 Seatbelts ..................................................................................................................................... 5 3 for 2 seatbelted seats ................................................................................................................. 5 Power train retarders ......................................................................................................................... 5 Funding does not include ..............................................................................................................