Warrego Highway, Helidon Spa TOOWOOMBA SECOND RANGE CROSSING
Total Page:16
File Type:pdf, Size:1020Kb
Gowrie Junction Murphys Creek Mt Cranley Kynoch Ballard Charlton Harlaxton Postmans Ridge Wellcamp Withcott Helidon Spa Warrego Highway, Helidon Spa TOOWOOMBA SECOND RANGE CROSSING Athol As part of work on the Toowoomba Second Range Crossing (TSRC), an Stay in touch interchange will be constructed at the eastern entry to the TSRC on the Residents can visit the TSRC Visitor Warrego Highway at Helidon Spa. Information Centre located at the Traffic impacts project’s site office on Bedford Street, Cranley. Opening hours This involves: In early 2017, east and westbound lane are Monday to Friday, 9:00am to • constructing a bridge from the closures will commence on the Warrego 5:00pm. The centre is also open Warrego Highway at Helidon Highway for bridge construction outside these times by appointment. Spa, with two eastbound lanes (approximately 4.3km west of the Visitor Information Booths are open and two westbound lanes, Lockyer Creek Bridge at Helidon). at the Lockyer Valley Cultural Centre enabling motorists to enter and and Toowoomba City Library. These exit the TSRC Intermittent hold and release traffic displays are open as per each centre’s opening hours and will be regularly • closing the Warrego Highway control measures and temporary lane median break between Postmans updated with the latest project closures will allow for construction information. For employment and Ridge Road and Twidales Road materials to be delivered safely. at Helidon Spa (due to the safety procurement enquiries, please visit the website for further information. impacts of merging and weaving In late 2018, the Warrego Highway traffic at the Warrego Highway median break between Postmans Ridge 1800 198 878 East interchange and right-turning Road and Twidales Road at Helidon Spa [email protected] traffic at the intersection). will permanently close. This will restrict right turns in and out of Postmans Facebook NexusTSRC Ridge Road and Twidales Road. www.nexustsrc.com.au During construction, road users will Working hours experience changed traffic conditions, Works will be undertaken during including reduced speed limits, lane standard construction hours, which are closures, short delays and detours. 6:30am to 6:30pm, Monday to Saturday. Traffic control and signage will be used, Out-of-hours works may occasionally as required, to direct motorists safely occur between 8:00pm and 5:00am. through the work area. Residents will be notified prior to out-of- hours works commencing. N POSTMANS RIDGE ROAD (WEST) CUL DE SAC TO TOOWOOMBA WARREGO HIGHWAY, EAST P O S T M A REEK N ON C S GATT R ID G E R O A D (E A S T TOOWOOMBA SECOND ) RANGE CROSSING TWO ANES IN EACH DIRECTION TO WITHCOTT WA RRE GO HIGH WAY BRIDGE OVER WARREGO ARTISTS IPRESSION SECT TO CHANGE HIGHWAY EASTBOUND EASTERN END OF TSRC WARREGO HIGHWAY WESTBOUND TO HELIDON SPA TO BRISBANE.