Warrego Highway Upgrade Strategy

Total Page:16

File Type:pdf, Size:1020Kb

Warrego Highway Upgrade Strategy Warrego Highway – Toowoomba Range Crossing Introduction This document provides a long-term investment strategy Continued strong growth along the South East Government), and are either under construction or to improve the safety, reliability, capacity, transport Queensland western corridor and the development well-advanced in terms of planning. These priorities efficiency and flood immunity on the Warrego Highway. of the Surat Basin energy province are placing are published in the current Queensland Transport The highway is Queensland’s principal east-west freight significant pressures on the highway. and Roads Investment Program. route, extending 714km west from Brisbane to Charleville. The Warrego Highway Upgrade Strategy identifies short, Investments beyond the four-year horizon will be As the primary road link in south-western Queensland, medium and long-term priorities spanning the length dependent on available federal and state funding. providing access and economic opportunity to of the Warrego Highway from Brisbane to Charleville. This Strategy will form the basis for future funding communities and industry in the region, the Warrego Collectively, these priorities demonstrate how the negotiations with the Australian Government. Highway provides an essential freight route for the Warrego Highway can support the growth and prosperity As part of the National Land Transport Network, of movement of commodities such as coal, grain, meat of southern Queensland over coming decades. which the Warrego Highway is a critical link, funding and cotton to domestic and international markets. These priorities will be supported by ongoing corridor support from the Australian Government is required The highway is a four-lane, dual carriageway highway improvements and continued maintenance as part of to enable related highway projects to be completed. between Ipswich and Toowoomba, and generally a broader vision for safe, reliable and efficient travel. The Queensland Government will continue to work a two-lane highway west of Toowoomba. A high Of these priority investments, those within the one to closely with the Australian Government to agree on proportion of heavy vehicle traffic services the four-year time horizon are funded (or are the subject a prioritised pipeline of investments to make this region’s agricultural, energy and commercial sectors. of current funding submissions to the Australian plan a reality. 02 Planning for stronger regions Transport Coordination Plan Key Warrego Highway Facts The Warrego Highway Upgrade Strategy forms part of The Transport Coordination Plan delivers the vision for Queensland’s principal east-west freight the Queensland Government’s overall strategic planning the transport system to connect Queensland, promote route, extending 714km west from Brisbane for the state. This planning ensures infrastructure and economic development and improve the quality of life to Charleville services can be provided to accommodate population for Queenslanders. It informs more detailed transport system strategies, plans and investment decisions. Forms part of the Australian Government’s growth, support economic prosperity and enhance the liveability of Queensland’s regions. National Land Transport Network Integrated Freight Strategy for Queensland Is the second-highest trafficked rural Queensland Regionalisation Strategy and Developed by the Department of Transport and Main national highway outside South East Queensland Infrastructure Plan Roads in conjunction with industry, the Integrated Queensland, after the Bruce Highway Regionalisation is a key tool in shaping the future of Freight Strategy for Queensland (IFSQ) is a high-level Passes through the major regional centres Queensland and accommodating expected growth. strategy that establishes principles and guidelines of Ipswich, Toowoomba, Oakey, Dalby, to inform government policy, planning, regulation Chinchilla, Miles, Roma, Mitchell, Morven The Queensland Regionalisation Strategy focuses and investment to develop more efficient freight and Charleville, and serves as a key tourist on building stronger regions and ensuring growth solutions for the future. As a key link in the Australian route to outback Queensland and economic opportunities are shared throughout Government’s proposed National Land Freight Queensland. It provides a vision for Queensland’s Network, the Warrego Highway has an important role A vital transport link for communities and regions and is the overarching strategic framework for in the efficient movement of freight. Current capacity rural settlements in the Lockyer Valley, regional policy and planning. constraints of the rail network limit the opportunity Darling Downs, Maranoa and south-west for bulk transport by rail of commodities such as coal Queensland regions The Queensland Infrastructure Plan has been developed alongside the Queensland Regionalisation Strategy and grain, making the upgrade of the Warrego Highway Is the transport gateway for the burgeoning to ensure that Queensland has the infrastructure even more urgent. energy sector in the Surat Basin to respond to prosperity and quality of life needs Will support a predicted population increase as the state’s population and economy continue Regional Planning of 95,000 by 2031 in the Surat Basin region to grow. To be updated annually, the Queensland The Queensland Regionalisation Strategy provides (including Toowoomba, Western Downs and Infrastructure Plan outlines principles to guide long- the framework for other planning activities to Maranoa regional councils) term infrastructure investment in collaboration with all ensure consistency and to support the outcomes of levels of government and the private sector, supported regionalisation. through a pipeline of investment in growth-related infrastructure when and where it is needed most. Other plans, such as statutory regional plans, council planning schemes, regional planning policies and A key action of the Queensland Regionalisation Strategy integrated regional transport plans all contribute to is improving the efficiency and reliability on east- good planning across Queensland’s regions. A range west and inland freight routes, including the Warrego of plans and government strategies are in place across Highway, with priorities for improving safety, reliability, the state to respond to Queensland’s population and capacity, transport efficiency and flood immunity. economic growth. Warrego Highway Upgrade Strategy 2012 03 Oakey gas fired power station Connecting SEQ 2031 Queensland Transport and Roads Investment development in the region over the next 20 years and beyond. While this provides opportunities for economic Connecting SEQ 2031 is the Queensland Government’s Program development, it also puts extreme pressure on local long-term transport plan to develop a sustainable The Queensland Transport and Roads Investment communities, services and infrastructure, including transport system in the south-east corner of the state. Program, developed by the Department of Transport the Warrego Highway. This Statement aims to Over the next two decades, the vision for South East and Main Roads, is a four-year rolling program of road maximise economic benefits and minimise any Queensland includes the development of a more fully and transport infrastructure works. It is published unintended consequences of rapid growth for the integrated transport network to support a prosperous annually on the basis that works identified in years one region. It recognises that an upgraded Warrego region. Upgrading of the Warrego Highway and the and two are fully committed, with those in years three Highway is vital to facilitate development of the Toowoomba Second Range Crossing are strategic and four indicative for planning purposes. This allows Surat Basin energy province. priorities identified in the plan for completing the local government, industry and the community to plan motorway network. ahead with greater certainty. The draft Surat Basin Regional Transport Strategy prepared in 2011, considered the various and Key projects in the Queensland Transport and Roads 2007 Brisbane – Darwin and Melbourne – wide-ranging impacts on the transport network in Investment Program are reflected in the Queensland Brisbane Corridor Strategies the Surat Basin and identified strategic actions Infrastructure Plan. to support sustainable growth in the region. It The 2007 Brisbane - Darwin Corridor Strategy and recognises that development in the Surat Basin the 2007 Melbourne - Brisbane Corridor Strategy – Surat Basin Future Directions Statement and Draft is currently, and will continue to place, significant jointly developed by the Australian and Queensland Surat Basin Regional Transport Strategy pressure on the already strained Warrego Highway, Governments – provide short and long-term visions for The Surat Basin Future Directions Statement released and that significant investment needs to be made the Warrego Highway corridor. Along with identifying by the Queensland Government in 2010 establishes a to ensure the transport network will be able to emerging transport demand pressures and performance framework for the state, community and industry to cater for current and future traffic demand and issues, these strategies provide statements of key work together to achieve a prosperous and sustainable support continued economic development. challenges, shared objectives and strategic priorities future for the Surat Basin region. for the corridor and have guided development of the The draft Transport Strategy identifies upgrading the Warrego Highway Upgrade Strategy. Development of the vast coal and coal seam gas Warrego Highway, including the Toowoomba Second resources in the Surat Basin, located between Range Crossing, as short to medium-term priorities. Toowoomba and Roma, will drive significant economic 04 .
Recommended publications
  • Warrego Highway, Helidon Spa TOOWOOMBA SECOND RANGE CROSSING
    Gowrie Junction Murphys Creek Mt Cranley Kynoch Ballard Charlton Harlaxton Postmans Ridge Wellcamp Withcott Helidon Spa Warrego Highway, Helidon Spa TOOWOOMBA SECOND RANGE CROSSING Athol As part of work on the Toowoomba Second Range Crossing (TSRC), an Stay in touch interchange will be constructed at the eastern entry to the TSRC on the Residents can visit the TSRC Visitor Warrego Highway at Helidon Spa. Information Centre located at the Traffic impacts project’s site office on Bedford Street, Cranley. Opening hours This involves: In early 2017, east and westbound lane are Monday to Friday, 9:00am to • constructing a bridge from the closures will commence on the Warrego 5:00pm. The centre is also open Warrego Highway at Helidon Highway for bridge construction outside these times by appointment. Spa, with two eastbound lanes (approximately 4.3km west of the Visitor Information Booths are open and two westbound lanes, Lockyer Creek Bridge at Helidon). at the Lockyer Valley Cultural Centre enabling motorists to enter and and Toowoomba City Library. These exit the TSRC Intermittent hold and release traffic displays are open as per each centre’s opening hours and will be regularly • closing the Warrego Highway control measures and temporary lane median break between Postmans updated with the latest project closures will allow for construction information. For employment and Ridge Road and Twidales Road materials to be delivered safely. at Helidon Spa (due to the safety procurement enquiries, please visit the website for further information. impacts of merging and weaving In late 2018, the Warrego Highway traffic at the Warrego Highway median break between Postmans Ridge 1800 198 878 East interchange and right-turning Road and Twidales Road at Helidon Spa [email protected] traffic at the intersection).
    [Show full text]
  • Darling Downs 79,530 Km2 Area Covered by Location1
    Darling Downs 79,530 km2 Area covered by location1 5.72% Population of Queensland1 3,846 km Other state-controlled road network 687 km National Land Transport Network2 See references section (notes for map pages) for further details on footnotes. Toowoomba Office 1-5 Phillip Street | Toowoomba | Qld 4350 Locked Bag 1 | Warwick | Qld 4370 (07) 4639 0777 | [email protected] Warwick Office 306 Wood Street | Warwick | Qld 4370 Locked Bag 1 | Warwick | Qld 4370 (07) 4661 6333| [email protected] • continue pavement rehabilitation on the Gore Highway • continue planning for bikeways in Central Toowoomba Darling Downs between Toowoomba and Millmerran, jointly funded and the Warwick principal cycle network by the Australian Government and Queensland Government • commence planning to improve Toowoomba In 2020–21 we completed: Connection Road and Hursley Road intersection • continue bridge replacement on the Rocky Creek • upgrading of the Emu Creek bridge on the New England Bridge on Murphy’s Creek Road, as part of the • continue planning to identify a Toowoomba North Highway, jointly funded by the Australian Government Queensland Government’s COVID-19 economic South Transport Corridor. and Queensland Government recovery response Link for TMR Project Page: • construction of Stage 1 of the New England Highway • continue pavement strengthening and widening on https://www.tmr.qld.gov.au/Projects Cycleway between Highfields and Toowoomba CBD the New England Highway between Yarraman and Toowoomba, as part of the Queensland Government’s
    [Show full text]
  • F6 Integrated Transport and Movement
    F6 Integrated Transport and Movement Vision Statement and Action Plan Framework - November 2005 IPSWICH2020ANDBEYOND IPSWICH2020ANDBEYOND Integrated Transport and Movement Ipswich City is the Motorway is now up to Ø Cunningham Highway to 6.2 Summary of Ø Identify and align the transport Strategy ITM 1.4 100 000 vehicles a day during the Warrego Highway connection priorities and objectives for well-serviced by busiest days of the week, The (pending Goodna Bypass and Goals and Ipswich of all stakeholders. A Safe Transport Network: Ensure mixture of cars and freight River Road Investigation). that residents feel safe travelling an integrated transport vehicles is problematic. Strategies - throughout Ipswich. Ø Extension of Centenary Strategy ITM 1.2 public transport To address the transport issues in Highway - Springfield to Ripley Integrated Ipswich a number of major Ø Develop and implement Bus and roads system to Yamanto. infrastructure projects have been Transport Connected Centres: Ensure that Stop and Station Design that effectively proposed in the State SEQ centres are connected and enable Guidelines. Infrastructure Plan and Program Ø Centenary Highway four and efficient movement between eliminates (2005) including: lanes - Ipswich Motorway to communities. Ø Provide real time service Springfield. Movement updates at major bus stops. congestion, Ø Ø Ipswich rail line third track Provide a loop bus service that conserves Corinda-Darra and Darra- Ø Western Ipswich Bypass ITM Goal 1 - connects major centres in Ø Identify and implement safety Ipswich. community Redbank. (Haigslea to Amberley). Connected measures around transport interchanges and rail stations. Ø character and Ø Springfield passenger rail line. Ø Cunningham Highway four Communities Investigate and implement lanes - Ripley Road to public transport services to Ø Improve security services on enhances Ebenezer.
    [Show full text]
  • Brisbane – Mt Isa Mt Isa ‐ Brisbane
    E As at 02nd February 2015 BARCALDINE NEWS & TRAVEL For Bookings or Enquires please contact Colleen or Kayla 07 4651 1104 / [email protected] BRISBANE – MT ISA MT ISA ‐ BRISBANE TOWN Departure Time Pick up and Set down point TOWN Departure Pick up and Set down point Brisbane 4.00pm Brisbane Transit Centre, Roma st Time Mt Isa 6.50am Outback at Isa Centre, 19 Marian St Ipswich 4.50pm Bus Bay, Bell Street Cloncurry 8.10am Cloncurry Agencies, 45 Ramsay St Cloncurry Meal 9.00am BP Ausfiel, Ramsey Street Haigslea 5.07pm Sundowner Hotel Stop Mckinlay 10.00 BP Roadhouse, Landsborough H/way Minden/Crossroad 5.15pm Front of Service Station Kynuna 11.00 Kynuna Roadhouse, Landsborough h/way Plainland 5.26pm Bus Stop, Plainlands Hotel Winton Meal Stop 1.20 Waltzing Matilda Centre, Elderslie St Gatton College 5.30pm Bus Shelter Winton 1.25 Newsagents, 75 Elderslie St Lorraine Stn 2.15 Lorraine Station Gatton 5.35pm Bus Stop on Highway Longreach 3.25 Cnr Ealge & Duck Street (Commercial Hotel) Withcott 5.55pm Civic Centre Ilfracombe 3.45 Post Office Toowoomba 6.45pm Toowoomba Bus Interchange, Neil St Barcaldine 5.00 Choice Roadhouse Oakey 7.05pm Railway Station Blackall 6.40 BP Blackall, 10 Shamrock St Jondaryan 7.15pm Cobb & Co Roadhouse Tambo 7.50 Post Office Dalby 7.55pm Shell Roadhouse Augathella 9.10 BP Roadhouse, Warrego H/way Warra 8.20pm Old Service Station Charleville 10.40 Railway Station, Mitchell H/way Brigalow 8.30pm General Store Morven 11.44 Opposite Newsagent, Albert St Chinchilla 8.50pm Bus Shelter Mungallala 12.05 General Store,
    [Show full text]
  • Chapter 13 – Traffic and Transport
    13. Traffic and Transport Contents 13 Traffic and Transport 13-1 13.1 Introduction 13-1 13.2 Regulatory framework 13-1 13.2.1 Guidelines for Assessment of Road Impacts of Development (GARID) 13-1 13.3 Existing traffic and transport environment 13-2 13.3.1 Description of existing infrastructure 13-2 13.3.2 State controlled roads 13-4 13.3.3 Local roads 13-5 13.3.4 School bus routes 13-6 13.3.5 Road crash data 13-8 13.3.6 Scheduled road improvements 13-8 13.3.7 Police and emergency services 13-8 13.3.8 Public transport services 13-8 13.3.9 Rail and Port facilities 13-9 13.3.10 Airport services 13-9 13.3.11 Infrastructure requirements 13-9 13.4 Background traffic 13-10 13.4.1 Existing (2012) traffic volumes 13-10 13.5 Existing road level of service 13-11 13.5.1 Performance criteria 13-11 13.5.2 Existing level of service - 2012 13-11 13.5.3 Existing intersection counts 13-12 13.5.4 Historic traffic growth 13-13 13.5.5 Background traffic growth 13-13 13.5.6 Committed developments 13-13 13.6 Project overview 13-14 13.6.1 Project time frames 13-14 13.6.2 Proposed site access and haul roads 13-14 13.6.3 Proposed road diversions and closures 13-17 13.6.4 Rail transportation 13-22 13.7 Project construction phase 13-27 13.7.1 Construction working hours 13-27 13.7.2 Construction workforce traffic 13-27 13.7.3 Construction equipment and materials 13-28 13.7.4 Heavy vehicles and oversized vehicles 13-30 13.7.5 Hazardous and dangerous materials 13-30 13.7.6 Construction phase traffic 13-30 13.8 Project operation phase 13-34 13.8.1 Operation working hours
    [Show full text]
  • View Timetables
    Eective from: 15th June 2020 Eective from: 15th June 2020 Eective from: 15th June 2020 Eective from: 15th June 2020 Brisbane Coach Terminal, Parklands Cres adj to platform 10 Roma St Mount Isa Outback at Isa Centre, 19 Marian Street Ipswich Bus Stop A, Bell Street, Ipswich Cloncurry Flinders Medical Centre, 27 Ramsey Street Haigslea Sundowner Hotel on Service Road Cloncurry (Meal Stop) Puma Service Station, Ramsey Street Minden Crossroads Crossroads on Warrego Highway, near Barbs Kitchen Cloncurry (Meal Stop) Puma Service Station, Ramsey Street Plainlands Plainland Hotel Bus Stop on off ramp to Laidley McKinlay United Roadhouse, Landsborough Highway Gatton College Bus Shelter on Highway, after over pass Kynuna Kynuna Roadhouse, Landsborough Highway Gatton Railway Station, Crescent Street Winton (Meal Stop) Newsagent, 74 Elderslie Street Withcott Bus Shelter on Highway, Opposite Withcott Hotel Winton (Meal Stop) Newsagent, 74 Elderslie Street Toowoomba Bus Interchange (Bay 1), Neil Street Longreach Commercial Hotel, Cnr Eagle St and Duck St Toowoomba Depot Bus Queensland, 308 Taylor Street, Toowoomba Ilfracombe Opposite Ilfracombe Post Office, Landsborough Highway Oakey Railway Station Bus Shelter, Bridge Street Barcaldine Council Bus Stop, Opposite 133 Oak Street Jondaryan Cobb and Co Roadhouse, Duke Street Blackall (Meal Stop) BP Blackall, 10 Shamrock Street Dalby Shell Roadhouse, Cnr Drayton Street and Cunninham Street Blackall (Meal Stop) BP Blackall, 10 Shamrock Street Warra Cnr Warrego Highway and Raff St Tambo Post Office, Cnr Arthur
    [Show full text]
  • TOOWOOMBA SECOND RANGE CROSSING Scheduled Activities for the Eastern Interchange
    Helidon Spa How will acess be maintained? Single lane closures are effective in both directions on the Warrego Highway at Helidon Spa to complete • Nexus has installed a temporary u-turn facility TOOWOOMBA SECOND RANGE CROSSING scheduled activities for the eastern interchange. 600m west of the intersection for vehicles (up to B-doubles) to maintain access to Postmans Ridge These works involve: Road while right turns across the centre median of the Warrego Highway are restricted. Construction Update September 2018 • switching traffic from the right hand (fast lane) to • Eastbound traffic exiting Twidales Road will turn left the left-hand lane (slow lane) onto the Warrego Highway and turn around at the This month, Nexus is connecting the east and central sections of the Toowoomba Second Range • single lane closures to allow for works in the centre u-turn to proceed eastbound. median between carriageways. Crossing (TSRC), finishing works on the Nass Road truck stop at Charlton as well as the Operations and • Coming from the west, access to Twidales Road will Management building, and continuing its landscaping along the alignment. be maintained through the use of the u-turn facility For safety reasons, these works require a temporary at the Kellys Road intersection with the Warrego closure of the centre median on the Warrego Highway Highway, 1.4km east of the intersection closure. between Postmans Ridge Road and Twidales Road for up to three months. - Light vehicles will u-turn at the Kellys Road intersection with the Warrego Highway, head west The temporary closure of the median will require and turn left into Twidales Road.
    [Show full text]
  • PROGRESS REPORT - 23 JULY, 2020 Funding of Priorities Identified and Advocated Through the Inland Queensland Roads Action Project (IQ-RAP)
    PROGRESS REPORT - 23 JULY, 2020 Funding of Priorities Identified and Advocated through the Inland Queensland Roads Action Project (IQ-RAP) Page 1 INTRODUCTION TO THE INLAND QUEENSLAND ROADS ACTION PROJECT (IQ-RAP) The IQ-RAP was developed through consultation and engagement with local governments and industry peak bodies. Regional Roads Forums were convened in December 2013 in Longreach and in August 2014 in Mount Isa with participants coming from across inland Queensland. Regional Development Australia Townsville and North West Queensland (RDA) was requested and agreed to be the Secretariat and raised funds from partners in 2015. Funding support was forthcoming from 33 local governments that covered 82% of Queensland’s area, RACQ and 5 Regional Development Australia Committees. A Project Steering Committee was formed and consultants the Harrison Infrastructure Group (HIG) were engaged. In February, 2016 the Inland Queensland Roads Action Plan was launched. This was followed by extensive advocacy to the Australian and Queensland Governments and peak industry bodies through to mid-2018. In mid-2017 IQ-RAP partners agreed to extend the project and update the Plan into a new Inland Queensland Road Network Strategy, taking into account the funding commitments that had been made to priorities identified in 2016, carrying over the priorities that still required funding and updating the Multi- Criteria Analysis with new information. 28 local governments, 5 Regional Development Australia Committees and RACQ provided on-going funding support. Further extensive advocacy was undertaken. This document summarises the funding that has been secured for priorities identified and advocated through the Inland Queensland Roads Action Project (IQ-RAP) and the two major reports that were prepared by Harrison Infrastructure Group (HIG) and Regional Development Australia Townsville and North West Queensland (RDA).
    [Show full text]
  • Marburg Then & Now
    Marburg Then & Now 13 11 12 11 10 8 4 4 7 5 6 9 33 2 1 1 Marburg Showgrounds: The annual May show is one of the State's best. Even more popular are the Saturday Night dances that draw young and old from near and far. The trotting track is also one of the best trotting facilities in South East Queensland. 2 Former German Baptist Church: Once the German Baptist Church, this building is now a popular craft and coffee-house. 3 Proudlock's Drapery: Constructed c1910 as a drapery this building is now a modern hairdressing salon, recalling Marburg's hey-day as hub of a bustling community. Drive up the hill and u-turn at the palm trees opposite. 4 Dr Sirois Memorial Stone, Hospital Hill: The memorial stone bears an inscription to the legendary local hero Dr Euchariste Sirois who established a private hospital at Marburg in 1912. He is also renowned as the 'father of the Warrego Highway'. 5 Rosewood Scrub Historical Society's Museum, Marburg Community Centre: At the Edmond and Queen Streets corner, with the flagpole, war memorials and children's playground is the Marburg Community Centre, which was formerly the Queensland National Bank. The quaint wooden building next door was once the Walloon Shire Council's civic administrative centre and is now the Rosewood Scrub Historical Society's Museum. The Society specialises in historic photographs of the local area. Located behind is an original local dairy building. 6 Marburg Hotel: Built in 1879, the Marburg Hotel was the centrepiece of the film 'The Settlement'.
    [Show full text]
  • Minister for Main Roads, Road Safety and Ports
    Queensland Government Minister for Main Roads, Road Safety and Ports Our ref: PET23251 1 William Street Brisbane 4000 GPO Box 2644 Brisbane Queensland 4001 Australia Telephone +61 7 3719 7300 2 0 SEP 2017 Email mainroads@)ministerial.qld.gov.au Website W\Vw.tmr.qld.gov.au Mr Neil Laurie The Clerk of the Parliament Parliament House George Street BRISBANE QLD 4000 · tJ~\ Dear Mr Lt urie I refer to petition 2779-17 lodged with the Legislative Assembly by Dr Christian Rowan MP, Member for Moggill, on 23 August 2017 requesting a feasibility study for a bridge to Bellbowrie in collaboration with Brisbane City Council (BCC) to ease traffic congestion and allow access to rail services. The Department of Transport and Main Roads (TMR) continues to monitor growth and development in Moggill, Bellbowrie and surrounding suburbs including Anstead, Karana Downs and Mount Crosby. TMR acknowledges that increased residential and commercial development, particularly in Moggill and Bellbowrie, will place growing pressure on roads and transport corridors in the area. The Palaszczuk Government is committed to providing an integrated and efficient public transport network for Queensland. I'm advised that currently, TMR's Translink division scheduled urban bus routes 444 and 443, and BCC personalised public transport (PPT) service are helping meet demand for commuter services and assisting in reducing the use of personal vehicles travelling along the Moggill Road corridor. These bus routes and BCC's PPT provide residents and visitors to Brisbane's outer south­ western suburbs with connections to additional services operating across Brisbane and South East Queensland. TMR will, however, continue to monitor the use of public transport services in these suburbs and consider future service improvements to ensure the public transport needs of the area continue to be met.
    [Show full text]
  • Warrego Highway (Roma to Mitchell) 0 2 41 Revision: 06/2013 3Version
    4 4 0 3 4397 259/18F/1 (NBP) and 259/18F/652 $6.5m FKG Pavement repairs and overlay 259/18E/658 and 259/18E/11 (NBP) works, Mitchell West deviation $14m Mid 2013 to early 2014 FKG Pavement repairs and overlay works Mid 2013 to early 2014 259/18E/656 MITCHELL 24D 79 $14m 77 FKG 259/18E/653 259/18E/654 3.75 $10m 18F 0.3 Pavement repairs and overlay works 259/18E/651 $6m RoadTek Mid 2013 to early 2014 $7m (existing contract) RoadTek 355 Pavement repairs and overlay works RoadTek Pavement repairs and overlay works May 2013 to late 2013 Pavement repairs and overlay works Mid 2013 to early 2014 259/18E/15 69.45 59 $16m AMBY Aug 2012 to mid 2013 259/18E/12 (NBP) Albem 18E $3m Replacement of existing bridge FKG 63.5 5.85 Late 2012 to late 2013 18 ROMA Pavement repairs and overlay works 18D MUCKADILLA 10.8 2.3 Completed early 2013 40.5 31.5 HODGSON 9.85 48 259/18E/657 and 259/18E/7 (NBP) MARANOA $8m 13A LANDSBOROUGH HIGHWAY (Morven - Augathella) FKG 13B LANDSBOROUGH HIGHWAY (Augathella - Tambo) 259/18E/650, 259/18E/481 and 259/18E/3 (NBP) Pavement repairs and overlay works 259/18E/655 18D WARREGO HIGHWAY (Miles - Roma) $10m Mid 2013 to early 2014 $18m 18E WARREGO HIGHWAY (Roma - Mitchell) 259/18E/6 (NBP) Probuild RoadTek 18F WARREGO HIGHWAY (Mitchell - Morven) $12m Repairing Cattle Creek crossing, pavement repairs and Pavement repairs and overlay works 18G WARREGO HIGHWAY (Morven - Charleville) FKG overlay works and breakdown pad construction Mid 2013 to early 2014 23A MITCHELL HIGHWAY (Barringun - Cunnamulla) Pavement repairs and overlay works
    [Show full text]
  • RACQ Recommended Projects for Acceleration and Funding
    RACQ Recommended Projects for Acceleration and Funding Project Comments Program Accelerate Centenary Bridge duplication SRN Centenary Motorway Darra to Toowong upgrade SRN Upgrade Centenary Mwy at Carole Park / Logan Motorway interchange to four lanes SRN Gateway Motorway North - Bruce Highway to Deagon Deviation project NHN Gateway Motorway Old Cleveland Road Interchange - Deliver minor upgrade project and accelerate planning/funding for major interchange upgrade NHN Daisy Hill to Logan Motorway project NHN Pacific Motorway Interchange upgrades (Exit 38, 41, 45 and 49) NHN Ipswich Motorway upgrade Complete Stage 1 and Stage 2, Oxley to Darra project NHN Coomera Connector Stage 1 - Coomera to Nerang SRN Fast track all projects under BHUP safety, capacity and flooding streams NHN Bruce Highway Upgrade Program Bruce Highway six lane upgrade between Pine River and Caloundra Road NHN Bruce Highway Maroochydore Road to Mons Road upgrade NHN Shaw Road/North Shore Blvd, Townsville intersection/s upgrade NHN Gympie Arterial Road Accelerate Beams Road to Gateway Motorway project SRN Nicklin Way roundabout SRN Caloundra Road Kawana Way roundabout SRN North West Transport Corridor (Stafford Road to Carseldine), North Brisbane Bruce Highway Western Transport corridor projects Alternative, North South Urban Arterial (NSUA) SRN Fast track business case and project funding for Mooloolah River Interchange upgrade at Mountain Creek SRN Sunshine Motorway Investigate interchange upgrade at Coolum Beach SRN Duplicate (four lanes) between Pacific Paradise
    [Show full text]