
<p>Murphys Creek <br>Gowrie Junction </p><p>Mt Kynoch <br>Ballard <br>Cranley </p><p>Charlton </p><p>Harlaxton <br>Postmans Ridge </p><p>Wellcamp </p><p>Withcott <br>Helidon Spa </p><p><strong>Warrego Highway, Helidon Spa </strong></p><p><strong>TOOWOOMBA </strong>SECOND RANGE CROSSING </p><p>Athol </p><p>As part of work on the Toowoomba Second Range Crossing (TSRC), an interchange will be constructed at the eastern entry to the TSRC on the Warrego Highway at Helidon Spa. </p><p>Stay in touch </p><p>Residents can visit the TSRC Visitor Information Centre located at the project’s site office on Bedford Street, Cranley. Opening hours are Monday to Friday, 9:00am to 5:00pm. The centre is also open outside these times by appointment. Visitor Information Booths are open at the Lockyer Valley Cultural Centre and Toowoomba City Library. These displays are open as per each centre’s opening hours and will be regularly updated with the latest project information. For employment and procurement enquiries, please visit the website for further information. </p><p>Traffic impacts </p><p>In early 2017, east and westbound lane closures will commence on the Warrego Highway for bridge construction </p><p>(approximately 4.3km west of the Lockyer Creek Bridge at Helidon). </p><p>This involves: </p><ul style="display: flex;"><li style="flex:1">•</li><li style="flex:1">constructing a bridge from the </li></ul><p>Warrego Highway at Helidon Spa, with two eastbound lanes and two westbound lanes, enabling motorists to enter and exit the TSRC </p><p>Intermittent hold and release traffic </p><p>control measures and temporary lane closures will allow for construction </p><p>materials to be delivered safely. </p><p></p><ul style="display: flex;"><li style="flex:1">•</li><li style="flex:1">closing the Warrego Highway </li></ul><p>median break between Postmans Ridge Road and Twidales Road at Helidon Spa (due to the safety impacts of merging and weaving </p><p>traffic at the Warrego Highway </p><p>East interchange and right-turning </p><p>traffic at the intersection). </p><p>In late 2018, the Warrego Highway median break between Postmans Ridge Road and Twidales Road at Helidon Spa </p><p>will permanently close. This will restrict </p><p>right turns in and out of Postmans </p><p>Ridge Road and Twidales Road. </p><p><strong>1800 198 878 </strong></p><p><a href="mailto:[email protected]" target="_blank">[email protected] </a></p><p>Facebook NexusTSRC </p><p><a href="/goto?url=http://www.nexustsrc.com.au" target="_blank">www.nexustsrc.com.au </a></p><p>During construction, road users will </p><p>experience changed traffic conditions, </p><p>including reduced speed limits, lane </p><p>closures, short delays and detours. Traffic control and signage will be used, </p><p>as required, to direct motorists safely </p><p>through the work area. </p><p>Working hours </p><p>Works will be undertaken during standard construction hours, which are </p><p>6:30am to 6:30pm, Monday to Saturday. </p><p>Out-of-hours works may occasionally </p><p>occur between 8:00pm and 5:00am. Residents will be notified prior to out-ofhours works commencing. </p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-