MEETING NOTICE AND AGENDA

LOSSAN RAIL CORRIDOR AGENCY JOINT POWERS BOARD The Board may take action on any item appearing on this agenda.

Friday, August 23, 2013

1 to 3 p.m.

SANDAG, Board Room, 7th Floor 401 B Street San Diego, CA

Lunch Provided at 12:30 p.m.

Alternative Location: 500 E. Temple St., Room 259 Los Angeles, CA 90012

SANDAG Staff Contact: Linda Culp (619) 699-6957 [email protected]

AGENDA HIGHLIGHTS

• SELECTION OF THE LOSSAN MANAGING AGENCY

• PROPOSED APPROACH TO NEGOTIATIONS ON THE ADMINISTRATIVE SUPPORT AGREEMENT WITH THE LOSSAN MANAGING AGENCY

• UPDATE ON LOSSAN CORRIDOR CAPITAL PROJECTS www.lossan.org

MEETING LOCATION

The meeting will be held at the San Diego Association of Governments, 401 B Street, between 4th and 5th Avenues, Downtown San Diego in the Board of Directors Conference Room, 7th Floor. The main phone number is (619) 699-1900. Lunch will be available starting at 12:30 p.m.

Parking is accessible below the building from 4th Avenue. Please bring the parking ticket with you for validation. The building is accessible via the Blue and Orange Line Trolleys from the 5th Avenue Station and is a 12- to 15-minute walk from the Santa Fe Depot.

There will be an informal welcome event following the meeting at the Matisse Bistro at One America Plaza beginning at 3:15 p.m. (no-host bar/light appetizers). In addition, there is a group attending the Padres baseball game at 7:10 p.m. Please contact Linda Culp with questions on either of these events.

2 LOSSAN RAIL CORRIDOR AGENCY JOINT POWERS BOARD August 23, 2013

ITEM # RECOMMENDATION

1. CHAIR’S REPORT

Welcome and Introductions

2. PUBLIC COMMENT AND COMMUNICATIONS

Speakers are limited to three minutes each.

3. RECOGNITION OF FORMER BOARD OF DIRECTORS MEMBER JACKI BACHARACH

CONSENT (Items 4 through 6)

+4. JULY 17, 2013, MEETING MINUTES (Linda Culp, SANDAG) APPROVE

The meeting minutes are included for approval.

+5. CORRIDOR TRENDS (Danny Veeh, SANDAG) INFORMATION

Current statistics on corridor on-time performance, ridership, and revenue are attached.

+6. CORRIDOR MARKETING UPDATE (Danny Veeh, SANDAG) INFORMATION

The meeting summary from the member agency joint marketing staff meeting for July 11, 2013, is attached.

REPORTS (Items 7 through 12)

+7. SELECTION OF THE LOSSAN MANAGING AGENCY (Art Brown, APPROVE Selection Committee Chair; Linda Culp, SANDAG)

At the April 17, 2013, meeting, the Board of Directors approved a Request for Proposals for Member Agencies interested in serving as the LOSSAN Managing Agency. The Chair then appointed a screening committee to review the proposals. The Screening Committee members first individually reviewed each proposal and then collectively developed a recommendation that the Board of Directors enter into negotiations of an Administrative Support Agreement with the Orange County Transportation Authority with the intent to serve as the LOSSAN Managing Agency. At the invitation of the Chair, each of the proposing agencies has the opportunity to provide an overview of their proposal to the Board of Directors.

3

ITEM # RECOMMENDATION

+8. PROPOSED APPROACH TO NEGOTIATIONS ON THE APPROVE ADMINISTRATIVE SUPPORT AGREEMENT WITH THE LOSSAN MANAGING AGENCY (Linda Culp, SANDAG; Tim McNulty, County of San Luis Obispo)

Pending the action of the Board of Directors on Agenda Item #7, staff has developed a proposed approach to negotiations with the future Managing Agency. An initial outline of this agreement also is provided. The Board of Directors is asked to consider both the proposed approach and initial agreement outline and provide direction to staff in terms of initiating these negotiations.

This item was not ready at time of mail out and will be available under separate cover when completed.

+9. CALIFORNIA PASSENGER RAIL PROGRAM GUIDING PRINCIPLES INFORMATION (Fred Strong, Chair)

One of the joint initiatives of the intercity rail board Chairs and Vice Chairs is to develop a set of overall principles to guide future joint efforts for an integrated statewide rail network. Additional changes have been made to these principles based on the Board of Directors discussion on July 17, 2013, and subsequent meetings. These changes are presented to the Board as information, with the intent to request approval at the September 25, 2013, meeting.

+10. UPDATE ON LOSSAN CORRIDOR CAPITAL PROJECTS (Linda Culp INFORMATION and Bill Prey, SANDAG)

The Board has requested a recurring update on the status of capital improvement projects in the corridor. Staff will provide a status of projects in the corridor highlighting those currently in or nearing the construction phase.

11. BOARD MEMBER UPDATES INFORMATION

12. NEXT MEETINGS APPROVE

The next Board of Directors meeting is scheduled for Wednesday, September 25, 2013, from 12:30 to 2:30 p.m., at LA Metro. The Board is asked to consider moving the October 16, 2013, meeting from LA Metro to OCTA in Orange, CA, and revising the time to 11 a.m. to 1 p.m.

+ next to an item indicates an attachment

4

2013 BOARD OF DIRECTORS

County Members Alternates

San Luis Obispo: Fred Strong (Chair) Jan Howell Marx 1 vote Council Member, Mayor, City of Paso Robles City of San Luis Obispo President, Member, San Luis Obispo Council of Governments San Luis Obispo Council of Governments

Santa Barbara: Salud Carbajal Helene Schneider 1 vote Supervisor, Mayor, County of Santa Barbara City of Santa Barbara Member, Member, Santa Barbara County Association of Santa Barbara County Association of Governments Governments

Ventura: Keith Millhouse Brian Humphrey 1 vote Councilmember, Member, City of Moorpark Ventura County Transportation Commission Member, Ventura County Transportation Commission

Los Angeles: David Golonski Karen Heit 2 votes Representative, Representative, Los Angeles County Metropolitan Los Angeles County Metropolitan Transportation Authority Transportation Authority

Diane DuBois Beatrice Proo Mayor, Representative, City of Lakewood Los Angeles County Metropolitan Member, Transportation Authority Los Angeles County Metropolitan Transportation Authority

Orange: Bill Campbell 2 votes Representative, Orange County Transportation Authority

Patricia Bates Supervisor, County of Orange Member, Orange County Transportation Authority

5

County Members Alternates

Riverside: Greg Pettis Karen Spiegel 1 vote Council Member, Mayor Pro Tem, City of Cathedral City City of Corona Member, Chair, Riverside County Transportation Riverside County Transportation Commission Commission

San Diego: Chris Orlando Tony Kranz 2 votes Councilmember, Councilmember, City of San Marcos City of Encinitas Alternate, Member, North County Transit District North County Transit District

Jerry Rindone (Vice Chair) Harry Mathis Representative, Chair, San Diego Metropolitan Transit System San Diego Metropolitan Transit System

Ernest Ewin Vice Mayor, City of La Mesa Member, San Diego Metropolitan Transit System

Jim Janney Lesa Heebner First Vice Chair, Councilmember, San Diego Association of Governments City of Solana Beach Member, San Diego Association of Governments

Ex-Officio Members: Amtrak Jonathan Hutchison Amtrak

Caltrans Bill Bronte Division of Rail, California Department of Transportation

California High- Michelle Boehm Speed Rail Authority California High-Speed Rail Authority

Southern California Art Brown Association of Councilmember, Governments City of Buena Park Member, Southern California Association of Governments

6 Los Angeles – San Diego – San Luis Obispo (LOSSAN) Rail Corridor Agency JOINT POWERS BOARD

August 23, 2013 AGENDA ITEM NO.: 4

Action Requested: APPROVE

JULY 17, 2013, MEETING MINUTES File Number 3400600

The LOSSAN Rail Corridor Agency Joint Powers Board met on July 17, 2013, in Los Angeles. In attendance were:

Fred Strong, SLOCOG, Chair Lesa Heebner, SANDAG Jerry Rindone, SDMTS, Vice Chair Jonathan Hutchison, Amtrak Brian Humphrey, VCTC Art Brown, SCAG Bill Campbell, OCTA Chris Orlando, NCTD Via Teleconference: Diane DuBois, Metro Helene Schneider, SBCAG David Golonski, Metro Karen Heit, Metro CEOs/Staff: Beatrice Proo, Metro Tim McNulty, Counsel Karen Spiegel, RCTC Linda Culp, LOSSAN Staff Ernest Ewin, SDMTS Linda Bohlinger, HNTB

Public Comment and Communications

None.

June 19, 2013, Meeting Minutes Approved

Approved.

LOSSAN Amended Joint Powers Agreement and Bylaws

Linda Culp (SANDAG) provided an overview of this item and noted that all Member Agencies have approved the amended Joint Powers Agreement (JPA). She also reviewed the overall changes to the JPA. The Board of Directors unanimously approved the amended JPA and directed staff to file the necessary documents with the State of California.

Status Update from the Managing Agency Proposal Screening Committee

Board Member Art Brown (SCAG) gave an update on the Screening Committee’s role to review the proposals for the new LOSSAN Managing Agency and make a recommendation to the Board at its August meeting. To date, the Committee has held one kick-off meeting to discuss logistics. The next meeting will take place on July 22, 2013, where members of the Committee will provide their

7 individual evaluation scores and formulate a recommendation that will be reviewed by the CEO group and passed along to the LOSSAN Board. All applications will be available to the LOSSAN Board for review along with the Screening Committee’s recommendation.

Corridor Trends

Ms. Culp presented this item which discusses ridership, revenue, and on-time performance (OTP) for the , , and services. For the month of June, Surfliner ridership was down, revenue was up, and OTP was 80 percent. Customer satisfaction scored a record high in May, with slightly lower scores in June. For the month of June, ridership was down along the corridor with the exception of the COASTER, largely due to the county fair and ticketing partnerships between North County Transit District (NCTD) and the fairgrounds.

The former Surfliner Express trip has experienced an increase in ridership compared to June of last year, although ridership is not at the level which was seen when the Surfliner Express was initially launched.

Board Member Karen Spiegel (RCTC) gave an update on the Perris Valley Metrolink extension, noting that RCTC is now able to move forward with the project. Board Member Spiegel also asked Amtrak about the process for a service or fare change. Board Member Jonathan Hutchison (Amtrak) explained that Amtrak fares are similar to airport fares, fluctuating based on demand. Schedules are coordinated with rail owners along the corridor. In the case of the Surfliner Express conversion, there were no capital improvements required and it was a negotiation process. Board Member David Golonski (Metro) asked about both the recent declines in Capitol Corridor and Metrolink ridership. Board Member Hutchison noted that a new station configuration in Sacramento had a negative impact on ridership. Ms. Culp noted that additional information on both of these trends will be provided in next month’s Corridor Trends report.

Paul Dyson (RailPAC) made a comment regarding recent changes along the Capitol Corridor. The reconfiguration of the Sacramento station and commuter bus service from Placer County influence daily ridership routines. Moving a track affects ridership and he cautioned that major changes at stations could potentially have detrimental effects on service.

Follow-Up on the Pacific Surfliner Bicycle Reservation Policy and Additional Storage Project

Board Member Hutchison reviewed the Pacific Surfliner bicycle reservation policy. In order to better manage capacity issues, Amtrak initiated a reservation system June 1, 2013. During the first month, there were 2,443 bikes carried on the Surfliner by 1,543 individuals. The majority of people who brought bikes onto the Surfliner were not commuters. Ninety-five percent of individuals who brought their bike last month made one to two trips in that month. Weekends are the days with the highest bicycle usage. Eight of the nine trains on which bikes were reserved were longer distance, through trains traveling north of Los Angeles.

Scott Spaulding (SBCAG) asked if it would be possible to identify the days and trains that reach maximum bike capacity. He also asked about flexibility in the number of bikes allowed on each train. Board Member Hutchison stated that the reservation system allows space for seven bikes per train. On some of the cars with higher capacity, the conductor is given discretion to allow more.

8 Board Member Golonski suggested that the Amtrak bike policy be agendized at a future Technical Advisory Committee meeting with the analysis and discussion brought back to the Board of Directors for policy review. Chair Strong concurred with this suggestion.

Sponsorship of the September 24-25, 2013, RailPAC Rail Infrastructure Funding Conference

Ms. Culp introduced this item by noting that RailPAC is planning a conference centered on rail infrastructure needs and possible financing. Robert Manning (RailPAC) explained that the call for a Rail Summit is to address the many issues of rail travel in the state. This summit will be a collaborative effort and will include discussion between rail advocates, policymakers, politicians, rail passengers, and industry officials. The meeting is planned for Tuesday, September 24, 2013.

Chair Strong said LOSSAN is being asked to lend its name as a supporter; there will be no financial commitment. Board Member Jerry Rindone (SDMTS) stated that this is a good opportunity for LOSSAN Board Members to be proactive about positive legislative rail changes in the state. The Board voted unanimously to support this conference.

Board Member Updates

Board Member Rindone extended congratulations on final approval of the amended JPA to former LOSSAN Chair Joe Kellejian. Board Member Rindone also thanked Ms. Culp for her efforts at the staff level.

Board Member Golonski also thanked everyone who helped in the effort to pass the amended JPA.

Board Member Spiegel thanked LOSSAN for the JPA amendment to make RCTC a voting member.

Next Meeting

The next LOSSAN Board of Directors meeting is scheduled for Friday, August 23, 2013, in San Diego at 1 p.m.

Key Staff Contact: Linda Culp, (619) 699-6957, [email protected]

9 Los Angeles – San Diego – San Luis Obispo Rail Corridor Agency JOINT POWERS BOARD

August 23, 2013 AGENDA ITEM NO.: 5

Action Requested: INFORMATION

CORRIDOR TRENDS File Number 3400600

Introduction

This report includes statistics that measure ridership, revenue, on-time performance (OTP), and customer satisfaction index (CSI) for the passenger rail services on the LOSSAN Corridor, including the Pacific Surfliner, Coast Starlight, Metrolink, and COASTER. The Capitol Corridor, San Joaquin, and Amtrak overall figures are included for comparison.

Ridership

When compared to the previous year, the Pacific Surfliner experienced decreasing ridership in three of the past five months. However, July ridership increased by 2.1 percent and recorded the highest single month ridership in the past two years.

The Coast Starlight had maintained positive ridership growth since September 2011, but has declined for the past two months with a decrease of 1.3 percent in July. The Capital Corridor has had declining ridership since June 2012, but posted an increase of 2.3 percent in July. The Capitol Corridor Joint Powers Authority has taken steps to identify the causes and actions to address the 13 consecutive months of ridership loss, which are summarized in Attachment 1. The San Joaquin experienced a 12.0 percent increase in July and has only one month of declining ridership since 2010. Amtrak nationwide posted the best ridership month ever with 2.91 million trips in July, which is a 4.8 percent increase over July last year. Ten of Amtrak’s train routes set ridership records in July.

For the commuter rail services on the LOSSAN corridor, COASTER, and Metrolink have had fluctuating ridership since July 2012. COASTER ridership was up 13.2 percent in July. Metrolink total system ridership was up 1.5 percent in July. Ridership on the was up 0.9 percent, while the increased by 3.7 percent in July. Metrolink has researched the causes of ridership decline, which is summarized in Attachment 2.

10 Change In Passenger Rail Ridership

Pacific Capitol Coast Amtrak Surfliner Corridor San Joaquin Starlight Nationwide Metrolink COASTER 20%

15% Year 10%

Previous 5%

0% From

‐5% Change ‐10%

‐15%

Feb 2013 Mar 2013 Apr 2013 May 2013 Jun 2013 Jul 2013

Change In Ridership of Corridor Passenger Rail Service Previous 12 Months 25%

20% Year 15%

Previous 10%

From 5%

0% Change

‐5%

‐10% 12 12 12 12 12 13 13 13 13 13 13 13 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Jul Jan Jun Oct Apr Sep Feb ‐ Dec Aug ‐ Nov Mar May

Pacific Surfliner Coast Starlight Metrolink COASTER

11 Total LOSSAN Ridership 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 12 12 12 12 12 12 13 13 13 13 13 13 13

Pacific Surfliner Orange County Line Ventura County Line COASTER

Revenue

In addition to the historically high ridership, revenue was higher in July than in any month in Amtrak’s history. Seventeen Amtrak routes set revenue records. The Pacific Surfliner, revenue was up 7.2 percent in July and recorded the highest overall revenue in LOSSAN’s records dating back to 2008. The Capitol Corridor revenue was down 1.2 percent, the San Joaquin was up 7.0 percent, and the Coast Starlight increased by 5.4 percent.

The Pacific Surfliner ridership and revenue records were achieved despite an absolute work window in San Diego on July 12, 13, and 14.

Pacific Surfliner Ridership and Revenue 20.0% 15.0% 10.0% 5.0% 0.0% ‐5.0% ‐10.0% 13 13 12 13 12 12 13 13 13 12 13 12 12

Jul Jul Jan Jun Oct Apr Feb Sep Dec Aug Nov Mar May

Revenue Ridership

12 Change In Intercity Passenger Revenue

Amtrak Pacific Surfliner Capitol Corridor San Joaquin Coast Starlight Nationwide 15%

10% Year 5%

Previous 0%

‐5% From

‐10% Change ‐15%

‐20%

Feb 2013 Mar 2013 Apr 2013 May 2013 Jun 2013 Jul 2013

OTP

OTP on the LOSSAN Corridor was impacted by various mechanical problems, trespasser incidents, and heavy boardings for Comic Con and the Del Mar Races that affected all trains throughout the corridor. The overall Pacific Surfliner OTP dipped below 80 percent for the first time since August 2012 with 77.5 OTP in July. The LOSSAN North segment OTP performed better than LOSSAN South, with 94.1 percent and 77.2 percent, respectively.

The COASTER OTP dropped to 92.5 percent in July. Metrolink OTP in June was 92.5 percent for all lines, with the Ventura County Line at 93.9 percent and the Orange County Line at 92.9 percent.

The methodologies between calculating OTP for intercity and commuter services are different. Commuter trains are considered late if they are 6 or more minutes late to the terminal location. Pacific Surfliner trains operating between Goleta and San Diego are considered late if they arrive 10 or more minutes after their scheduled times, and 20 minutes or more for trains operating between San Luis Obispo and San Diego. There also are different assumptions as to whether annulled trains are included in OTP calculations.

13 On‐Time Performance of

100.0% Corridor Passenger Rail Services 95.0% 90.0% 85.0% 80.0% 75.0% 70.0% 65.0% 60.0% 55.0% 13 13 13 13 12 13 13 12 12 12 13 12

Jul Jan Jun Oct Apr Feb Sep Dec Aug Nov Mar May

Coast Starlight Metrolink COASTER Pacific Surfliner

On‐Time Performance of LOSSAN North and LOSSAN South

100.0% 95.0% 90.0% 85.0% 80.0% 75.0% 70.0% 65.0% 60.0% 55.0% 13 13 12 13 12 13 13 13 12 13 12 12

Jul Jan Jun Oct Apr Feb Sep Dec Aug Nov Mar May

Surfliner North Surfliner South Ventura County Line Orange County Line

14 CSI

The June Pacific Surfliner remained above average with an average score of 89. Attachment 3 is the Pacific Surfliner CSI summary sheets for June 2013. The Coast Starlight average CSI was 83, the Capitol Corridor had an average score of 91, the San Joaquin corridor average score was 90, and the Amtrak nationwide average CSI score was 86 in June.

Amtrak Overall Customer Satisfaction Index (CSI)

Surfliner Coast Starlight Capitol Corridor San Joaquin All Amtrak 100

95 Score 90 Average 85 CSI

80

75

Jan‐13 Feb‐13 Mar‐13 Apr‐13 May‐13 Jun‐13

Attachments: 1. Capitol Corridor Service Performance 2. Metrolink Service Performance 3. Pacific Surfliner CSI Summary Sheet – June 2013

Key Staff Contact: Danny Veeh, (619) 699-7317, [email protected]

15 Attachment 1

Capitol Corridor Service Performance

Ridership for June 2013 was down 4 percent compared to June 2012 with Year-to-date (YTD) ridership 3 percent lower than last year. YTD revenue is slightly below last year by 0.7 percent; however, YTD system operating ratio is 54 percent thanks to lower diesel fuel prices. On-time performance (OTP) continues to keep an element of performance on the bright side: for June the Capitol Corridor OTP was 95 percent; YTD OTP is 95 percent keeping the Capitol Corridor on top of the leader board in service reliability in the Amtrak system.

A detailed analysis of ridership information from the ridership database for the fiscal year from October 2012 to May 2013 indicates the following:

 Ridership is steady on the weekends  Ridership is growing in the San Jose/Silicon Valley travel market  Ridership is increasing in the reverse peak direction trains (to Sacramento in the morning and to the Bay Area/San Jose in the afternoon)  Ridership continues to have sustained losses in the Placer County trains and overall losses at the Sacramento Station that cannot offset increases noted above

In fact, those city pairs associated with Sacramento Station in the top 25 city-pairs represent a ridership loss of 4 percent, which coincides with the June dip in ridership.

Standard June 2013 vs. May 2012 YTD vs. Prior YTD vs. FY13 Plan Ridership 138,293 -4.4% 1,284,635 -3.4% -5.7% Revenue $2,402,893 -5.5% $22,012,786 -0.7% -6.3% Operating Ratio 44% 47% 54% 50% 52% OTP 95% 94% 95% 94% 90% Notes: June 2013 ridership for the Capitol Corridor decreased by 4.4% versus June 2012, resulting in a year-to-date loss of 3.4% ridership. Year-to-date, revenues are slightly below last year's revenues by 0.7%. OTP for June was 95% - the number 1 spot for June and keeping the Capitol Corridor as the most reliable service in the Amtrak system. The YTD operating ratio has improved to 54% due to reduced fuel costs.

Actions to Address Ridership Drop at Sacramento

Immediate-term: effective July 15, morning trains coming into Sacramento from Placer County and the Bay Area will arrive five minutes earlier to accommodate the longer distance from the new platforms to the Sacramento Regional Transit (Sac RT) light rail trains; this will ensure passengers can make that connection. Please note that staff has received emails from passengers praising this schedule adjustment.

Near-term (2-3 years): CCJPA staff has been meeting with Sac RT to help support Sac RT’s efforts to complete the design and environmental plans to move the current light train platform closer to the tunnel portal, which will shorten the transfer time between light rail and Capitol Corridor and Amtrak trains; the goal is to begin construction within the next two to three years.

16 Attachment 2

Metrolink Service Performance

Average weekday ridership on Metrolink trains in June 2013 recorded a 4.1 percent decrease from a year earlier. This decline is part of a trend that started last year when ridership growth began to decelerate in November 2012, and turned negative beginning in January 2013 (Figure 1). Since January, Metrolink has been experiencing a decline in average weekday ridership every month. Losses reached 4.1 percent in June, but could be limited to less than 1 percent in July 2013.

Ridership losses are systemic and are impacting all lines, with the exception only of the Inland Empire Orange County (IEOC) Line (Figure 2.). Weekend ridership continues to be strong. Although weekend ridership has been growing by 30 percent annually, it has not translated into new weekday commuters.

Figure 2. Average Weekday Ridership by Line Jun- Jun- Line 2012 2013 Change % Change Ventura County Line 3,897 3,847 -51 -1% 6,326 5,924 -402 -6% 12,407 11,521 -886 -7% 5,160 4,935 -226 -4% Orange County Line 8,148 8,039 -108 -1% IEOC Line 4,234 4,512 278 7% 91 Line 2,707 2,342 -364 -13%

17

These ridership losses can be traced to economic conditions, an increasing churn rate, and a decline in Metrolink’s core ridership segment: commuters traveling to Los Angeles Union Station. As these commuters defect, they are not being replaced by new commuters. Several findings support this hypothesis:

1. All lines serving Los Angeles County experience ridership losses. The only line exhibiting strong ridership growth is the IEOC Line, which does not serve Los Angeles. 2. During the fourth quarter, Monthly Pass sales declined 4.7 percent over the same quarter a year earlier. 3. The largest ridership losses were recorded for trips to and from LA Union Station, down 3.5 percent year over year. 4. Large ridership increases were recorded for trips to Orange County, but not by enough to compensate for other losses (Union Station accounts for 63% of all weekday trips). 5. Downtown Los Angeles lags the region in job growth, in part, because of the high concentration of the government sector, which has been shedding jobs. 6. Downtown Los Angeles also experiences increasing office vacancy rates. “Negative absorption rates will likely continue, meaning the vacancy rate is not likely to drop any time soon.” (Los Angeles Business Journal, July 22, 2013).

18 Attachment 3 Pacific Surfliner FY13 Customer Satisfaction Scores (with change vs year ago)

June 2013 3 Month Average Fiscal Year-to-Date FY13 Goal*: 88% % Very % Very % Very % Very % Very % Very FY12 Year-End Score*: 86% Satisfied Dissatisfied** Average Satisfied Dissatisfied** Average Satisfied Dissatisfied** Average (80, 90, 100) (0, 10, 20) Score (80, 90, 100) (0, 10, 20) Score (80, 90, 100) (0, 10, 20) Score CSI Chg. CSI Chg. CSI Chg. CSI Chg. CSI Chg. CSI Chg. CSI Chg. CSI Chg. CSI Chg.

Overall CSI 87% -3 3% +2 89 -2 88% 0 2% 0 90 0 90% +4 2% +1 91 +2

Value of Amtrak service for price paid 81% -1 4% +4 85 -3 82% +1 2% +1 86 0 83% +2 2% 0 87 +1

Trip information prior to boarding train 90% +3 3% 0 90 0 91% +4 3% 0 92 +3 92% +4 2% -1 92 +2

Comfort of seat 84% -6 2% +1 87 -3 84% 0 2% 0 87 0 84% 0 1% 0 88 +1 Smooth/comfortable ride 88% -1 2% +1 89 -1 87% +1 1% 0 89 0 88% +1 1% 0 90 +1 Air temperature 88% -4 3% +3 88 -4 86% -2 2% +2 88 -1 87% 0 2% +1 89 +1

Overall cleanliness of train 83% -5 2% +2 87 -3 82% -1 2% +2 86 -1 82% -1 2% +1 87 0 Cleanliness of train windows 68% +3 4% 0 79 -1 67% +2 4% -1 79 +1 69% +4 4% -1 80 +2 Restroom cleanliness 63% -10 5% +4 75 -6 66% +2 4% +1 77 -1 64% +1 4% -1 78 +2 Restroom odor 60% -9 12% +8 71 -7 61% -3 8% +4 74 -2 62% -1 7% 0 75 0

Information given on services/safety 74% -4 3% +3 82 -5 76% +2 2% +1 84 0 78% +5 2% -1 85 +2 Information given on problems/delays 82% 0 4% -2 85 0 84% +4 2% -2 88 +3 82% +2 3% -1 87 +2 Clarity of announcements 69% -9 4% +2 82 -3 73% -1 3% -1 84 +2 75% +1 2% -2 84 +2

On-time performance 82% -3 4% -2 85 0 86% +2 2% -3 89 +4 87% +6 3% -2 89 +4

Personal security on the train 88% -6 2% +2 89 -4 88% -3 1% +1 91 0 90% 0 1% +1 91 0

Friendliness/helpfulness of train conductors 83% -2 3% -1 88 0 86% +3 3% +1 89 +1 88% +3 2% 0 90 +1

Availability of food in café car 58% -21 3% -1 75 -9 63% -1 2% +1 77 -3 67% +1 4% +1 78 0 Friendliness/helpfulness of café car personnel 84% -5 8% +8 86 -4 82% -4 6% +6 86 -4 83% -1 4% +2 87 -1 Quality/freshness of food in café car 69% -15 8% +8 78 -11 70% -1 4% +3 81 -1 71% +2 5% +2 81 +1 Variety of food items in café car 57% 0 11% +7 70 -8 48% -4 6% +4 73 +1 52% -2 7% 0 72 +1 Overall experience in café car 78% -3 11% +11 81 -8 75% 0 6% +6 82 -1 74% +1 4% +2 82 0

Overall Wi-Fi service 59% +2 12% +1 72 0 56% 0 11% -3 72 +1 Ease of accessing Wi-Fi service (sign-on process) Due to the lower response rates for the 70% -1 6% -3 78 0 70% +3 7% -3 79 +2 Wi-Fi questions, scores for these Ability to perform online activities attributes are not reported at the 61% +7 15% -2 72 +4 59% +1 14% -2 72 +3 Ability to stay connected to Wi-Fi service monthly level. 54% +3 16% 0 69 +3 54% +2 16% -1 69 +3 Time it takes to load/access websites, emails, etc. 55% +3 15% 0 70 +5 52% -3 16% -1 69 +2

Number of responses in current period 124 312 913

Number of responses year ago 108 292 923 * Overall CSI score, % very satisfied ** For % Very Dissatisfied, a negative change in the year-over-year score shows an improvement; a positive change shows the score has worsened.

Amtrak Market Research and Analysis Confidential and Proprietary 19 8/6/13 Los Angeles – San Diego – San Luis Obispo (LOSSAN) Rail Corridor Agency JOINT POWERS BOARD

August 23, 2013 AGENDA ITEM NO.: 6

Action Requested: INFORMATION

CORRIDOR MARKETING UPDATE File Number 3400600

Introduction

Joint meetings of the LOSSAN member agency marketing and communications staff were identified as one of the improvements in the LOSSAN Corridor Quick Improvements Study (2008). Joint marketing/communications/planning staff meetings have been held bimonthly since July 2011. The last meeting was held July 11, 2013, with staff from Amtrak, LA Metro, Metrolink, Orange County Transportation Authority (OCTA), San Diego Association of Governments (SANDAG), and Santa Barbara County Association of Governments to discuss current marketing efforts and future joint marketing opportunities. The following is the meeting summary.

Joint Timetable Update

Danny Veeh (SANDAG) mentioned that the Pacific Surfliner schedule changes slightly for the Del Mar race season and that the LOSSAN joint timetable will be updated to reflect these changes. The Amtrak published timetable uses footnotes to indicate the alternate Del Mar schedules. The Metrolink and COASTER schedules will be changed in October.

Pacific Surfliner Update

The San Diego Comic-Con conference and the Del Mar Races opening weekend fall on the same weekend. Due to the high demand, Amtrak will be requiring reservations for travel on July 19, 20, and 21. This weekend will be operated the same as the Thanksgiving weekend, so that all passengers are guaranteed seating. No Rail2Rail passengers are allowed on Amtrak during this weekend. Amtrak also will be adding an exclusive Cross Country Café Dining and Lounge Car to accommodate more passengers on select trains that serve the races.

There were 2,440 bike reservations made in June during the first month of the new bike reservation program. There is no cost for bike reservations with purchase of an Amtrak ticket. National Train Day took place on May 11, 2013, with 10,000 visitors and 25 exhibitors at the event at Union Station. The Oxnard Strawberry Festival Kids Ride Free promotion generated $6,000 in additional revenue. Upcoming events include the International Travel Show, San Diego Chargers, Oxnard Salsa Festival, Paso Robles Lavender Festival, and San Luis Obispo Concerts in the Plaza. Amtrak is working on a San Diego Kids Ride Free program in October.

20 Metrolink Update

Metrolink, in conjunction with OCTA, partnered with the Orange County Fair to promote riding the train to the fair with a wrapped train and the Orange County Fair Express Shuttle. The Angels Express service has been successful and will continue throughout the baseball season. The special baseball series train carried 600 riders from Orange County to Union Station for an Angels/Dodgers game with special guest riders including Tommy Lasorda. Metrolink is considering a special train for a Padres/Dodgers series.

Metrolink ticket stock has been upgraded to include TAP card technology that allows Metrolink riders to transfer to Metro Rail services for free. Metrolink carried 800 bikes for the June CicLAvia event in Los Angeles. Metrolink and Thousand Oaks Transit will run shuttle service between Thousand Oaks and Moorpark to serve connecting Amtrak and Metrolink trains. There is no cost for the shuttle with a valid Metrolink pass. Metrolink also is working with Amtrak to add a barcode to the Metrolink monthly passes that allow an Amtrak conductor to scan the Metrolink ticket for verification and to count Rail2Rail passengers.

LA Metro Update

Metro announced that in August they will be adding more Antelope Valley Line Metrolink service on Sundays for a total of six roundtrips on both Saturday and Sunday.

Corridor Public Communications and Upcoming Construction Window

An absolute work window (AWW) is set for July 12-14 south of the for double track construction in the Sorrento Valley area of San Diego County. There will be no rail service south of Solana Beach. North County Transit District will operate special bus service from Solana Beach to Old Town and Santa Fe Depot. OCTA is considering an AWW in September in San Clemente for a station rehabilitation project.

Key Staff Contact: Danny Veeh, (619) 699-7317, [email protected]

21 Los Angeles – San Diego – San Luis Obispo (LOSSAN) Rail Corridor Agency JOINT POWERS BOARD

August 23, 2013 AGENDA ITEM NO.: 7

Action Requested: APPROVE

SELECTION OF THE LOSSAN MANAGING AGENCY File Number 3400600

Introduction

The Board of Directors approved a Request for Proposals (RFP) for selecting a Managing Agency at its April 17, 2013, meeting. Staff released the RFP on April 30, 2013 (www.lossan.org/rfp). Three proposals were received by the June 14, 2013, deadline from the San Diego Metropolitan Transit System (SDMTS), Orange County Transportation Authority (OCTA), and LA Metro. Each agency also made an informational presentation at the June 19, 2013, Board of Directors meeting.

A seven-person Screening Committee was appointed by the Chair and included Board Members Brown and Orlando, and representation from the Member Agency Chief Executive Officers (CEOs), Technical Advisory Committee (TAC), and independent members from the Capitol Corridor Joint Powers Authority (CCJPA) and the San Joaquin Regional Rail Commission (SJRRC). Board Member Brown served as the Committee Chair. These members individually rated each proposal using the evaluation criteria approved by the Board of Directors as part of the RFP (Attachment 1). On July 22, 2013, the Committee met to compile individual scores into a committee recommendation. OCTA received the highest overall score and was the Committee’s recommended agency.

The Member Agency CEOs discussed the Screening Committee’s recommendation at their August 5, 2013, meeting and did not have concerns.

Each of the three proposing agencies has been asked by the Chair to provide an overview of their proposal at the Board meeting prior to the Board considering the Screening Committee’s recommendation. (Each proposal is available on the meeting agenda page at www.lossan.org.)

Recommendation

The Screening Committee recommends that the Board of Directors enter into negotiations of an Administrative Support Agreement with OCTA with the intent to serve as the LOSSAN Managing Agency.

22

Discussion

Individual committee members used the criteria in Attachment 1 to rate each of the three proposals. Each individual’s scores for each evaluation criteria were then averaged into a collective score for that criteria and summed, shown in Table 1.

Table 1 Proposal Evaluation Criteria Average Scores*

Overall Agency Evaluation Criteria Average Score Max Possible Score Rank Capabilities 33.0 35 Administrative Experience 18.7 20 Staffing Plan 11.1 15 LA Metro Program Cost 4.0 10 2 Corridor Experience 18.3 20 Sum of Average Score 85.1 100 Capabilities 34.4 35 Administrative Experience 17.6 20 Staffing Plan 13.4 15 OCTA Program Cost 7.7 10 1 Corridor Experience 18.0 20 Sum of Average Score 91.1 100 Capabilities 32.4 35 Administrative Experience 16.3 20 Staffing Plan 11.6 15 SD MTS Program Cost 9.3 10 3 Corridor Experience 15.4 20 Sum of Average Score 85.0 100

* Average of individual Screening Committee member scores

Committee members were unanimous in their belief that LOSSAN was privileged to receive three very qualified proposals, that any one of these agencies could perform the role of Managing Agency, and that LOSSAN is fortunate to have this caliber of Member Agencies. The Committee’s decision was difficult, with several comments referring to the high quality of each proposal. However, a few aspects of OCTA’s proposal were highlighted by the Committee:

 Cost-effective proposal  Strong staff team, including cost-effective integration of shared staff  Proven consensus building style, since OCTA lead the effort to build consensus related to the formation of the LOSSAN Joint Powers Agreement (JPA)  Strong, experienced Managing Director proposed

23

 Proposal was collaborative in terms of cultivating relationships and involving corridor agencies in key initiatives  Staff proposal was strongest  Staff team has deeper bench regarding intercity railroad experience and corridor knowledge  Strategic advisors have long history with Amtrak and know how to run intercity service  Good use of CEO as an advisor in interagency transfer agreement (ITA) negotiation efforts  Good commitment to corridor both in terms of capital improvements and service enhancements

Attachment: 1. Criteria Used In Evaluating Proposals

Enclosures: Managing Agency Proposals from SDMTS, OCTA, and LA Metro

Key Staff Contact: Linda Culp, (619) 699-6957, [email protected] Tim McNulty, (805) 781-5400, [email protected] Linda Bohlinger, (714) 460-1612, [email protected]

24 Attachment 1 CRITERIA USED IN EVALUATING PROPOSALS

All proposals must be completed and convey all of the information requested in order to be considered responsive. The proposals then will be evaluated on the basis of the criteria listed below. The total number of points used to score this proposal is 100.

Evaluation Measure(s) Points Criteria Capabilities 1. The agency should be large enough that it can fulfill its primary 35 responsibilities, yet undertake this additional responsibility; sufficient administrative and technical capabilities 2. The agency should have available space to house the initial intercity rail management team (IRMT) staff and expand as necessary at little or no additional cost 3. The agency should have legal and government affairs expertise to help guide the IRMT in their negotiations with the state to affect an interagency transfer agreement (ITA) 4. The agency should have existing administrative support functions that can absorb the IRMT staff with minimal cost impact 5. The agency should be able to administer the financial and administrative functions to support the IRMT including human resources, develop and execute budgets, treasury, accounts receivable & payable, payroll, contracts/procurement, board secretarial and administrative duties, etc., in a cost effective manner (recognizing that the gross annual Pacific Surfliner intercity operating budget will be in the $130 million per year range, with net‐ of‐revenue state support being in the $55‐65 million range) Administrative 1. The agency should have an understanding of, and experience in, 20 Experience administering capital projects (rail preferable), as such projects could reach a scope of hundreds of millions of dollars 2. The agency should have significant knowledge of and experience in federal capital grant processes, preferably in federal railroad administration (FRA) grants, and their reporting requirements 3. The agency should have significant familiarity with the California Department of Transportation‐Division Of Rail (DOR), as the working relationship between the JPA, the IRMT staff in the managing agency and Caltrans DOR will remain integrated 4. The agency should have significant familiarity, experience and established relationships with CPUC and FRA 5. The agency should have significant familiarity with Amtrak (which crews the trains, staffs the stations, maintains the rolling stock and supervises operations) 6. The agency should have significant familiarity with and ability to negotiate with railroad owners/operators 7. The agency should have experience identifying, analyzing and managing risks related to operations and administration

25

Evaluation Measure(s) Points Criteria 8. The agency should be free of any appearance of a conflict of interest in the proper use and allocation of state‐supported intercity rail funds. Staffing Plan 1. The agency should propose a staffing plan, including the level of required 15 and recommended experience and expertise of the IRMT staff for both the start‐up and initial period under the ITA. Proposals should include a timeline. 2. Evaluation is to be based on the reasonableness of the staffing plan and proposed timeline. Program Cost 1. The agency should identify the proposed cost of the program including 10 staffing plan (e.g., salaries, benefits, and other related costs) using the Program Cost Template provided. 2. Evaluation is to be based on the reasonableness of the estimated budget. Corridor 1. The IRMT staff should physically be located in a place along the corridor or 20 Experience an alternative location. This location should be specified. 2. The agency should have a clear understanding of the intercity corridor marketplace (as distinct from the ‘commuter rail’ market and ‘the long distance rail’ market), its intercity submarkets, opportunities for connectivity with other transit and rail services, and engage the professional IRMT staff to aggressively plan, manage and promote the corridor‐wide intercity services. 3. The agency should have a clear understanding of the reporting relationships between the LOSSAN Board of Directors, Managing Agency, and its own organization.

Total Points 100

26 Los Angeles – San Diego – San Luis Obispo Rail Corridor Agency JOINT POWERS BOARD

August 23, 2013 AGENDA ITEM NO.: 8

Action Requested: APPROVE

PROPOSED APPROACH TO NEGOTIATIONS ON THE ADMINISTRATIVE SUPPORT AGREEMENT WITH THE LOSSAN MANAGING AGENCY

This item was not ready at time of mail out and will be available under separate cover when completed.

27 Los Angeles – San Diego – San Luis Obispo (LOSSAN) Rail Corridor Agency JOINT POWERS BOARD

August 23, 2013 AGENDA ITEM NO.: 9

Action Requested: INFORMATION

CALIFORNIA PASSENGER RAIL PROGRAM GUIDING PRINCIPLES File Number 3400600

Introduction

The Chairs from the LOSSAN, Capitol, San Joaquin, and Coast Rail Corridors meet periodically either at joint leadership meetings or for advocacy trips to Sacramento and/or Washington D.C. In addition, staff from the corridor agencies along with Caltrans and Amtrak holds a biweekly call to coordinate joint activities. The Board leadership is currently developing a set of overall guiding principles for the state’s passenger rail network, in conjunction with a number of agencies.

The Board provided the following comments based on a review of the initial draft at the June 19, 2013, meeting:

 Preservation of Amtrak’s long-distance, nationwide system is crucial to the ongoing success of the statewide passenger rail network.  Connectivity to rail stations, including the various connecting forms of transportation available to passengers.

The Chairs and Vice Chairs from the intercity rail corridor boards met on July 19, 2013, to further refine these principles. Attachment 1 shows the current working draft version of these principles. Attachment 2 shows the attendees who contributed to these changes. Changes made at the board leadership meeting or subsequent staff-level meetings include:

 Inclusion of all modes of rail transportation and connecting services.  Additional specific provisions to support at both the state and federal levels (listed under the first bullet).  Support for state-owned, standardized intercity rail rolling stock.  Support for additional state sources of funds by lowering required voter approval thresholds and allocating a share of future cap-and-trade funds to rail.  Support for funding program streamlining.

The Board is welcome to make additional comments at this time. Pending further refinement, the Board will be asked to consider approval at the September 25, 2013, meeting.

Attachments: 1. California Passenger Rail Program Guiding Principles 2. CIPR Corridor Joint Powers Authorities Chairs/Vice Chairs Annual Meeting July 19, 2013

Key Staff Contact: Fred Strong, (805) 801-4778, [email protected]

28 Attachment 1

CALIFORNIA PASSENGER RAIL PROGRAM GUIDING PRINCIPLES

 Protect and enhance California’s investment in the existing successful passenger rail system, including sustainable and recurring new sources of funds at both the state and federal levels. Specifically support:

a. A new recurring state source of capital and operations funds to cover the existing passenger rail corridors and emerging corridors throughout the state. b. A new program for state of good repair improvements to existing rail corridors that facilitate the movement of passengers and freight. c. Allocations of State Propositions 1A, 1B, and other current and future funds in support of high-speed services and connecting transit services, including commuter and state-supported passenger rail. d. “High-Speed and Intercity Passenger Rail” (HSIPR) programs title in federal surface transportation reauthorization, funded by other than the current Highway Trust Fund revenues. e. The American Public Transit Association’s (APTA’s) recommendation for $50 billion in federal funding over an initial six year period for the development of a nationwide HSIPR network.  Support priority investments in integrated passenger rail networks that connect both existing services and future high-speed service which can in turn influence mode shift to be more sustainable and efficient and have positive impacts on the environment.

 Procure a fleet of state-owned, standardized, bi-level rolling stock to support existing and future intercity passenger service.

 Continue partnerships at the federal, state, regional, and local levels in support of future passenger rail investments which support safety, reliability, goods movement, job creation, sustainability, economic development, and quality of life.

 Support lowering voter approval thresholds at the regional level in order to create new sources for rail investments.

 Support state efforts to dedicate a portion of cap and trade funds for public transportation systems and specifically for the development and improvement of an integrated passenger rail network.

 Support streamlining of existing programs and policies to expedite efficient development of passenger rail improvements (e.g., RRIF, TIFIA).

29 Attachment 2

330

California Intercity Passenger Rail Program Corridor Joint Powers Authorities Chairs and Vice Chairs Annual Meeting July 18-19, 2013

Attendees:

Board Member Corridor Board(s) Position(s) John Pedrozo SJJPA Chair Henry Perea SJJPA Vice Chair Jim Spering CCJPA Chair Gail Murray CCJPA Vice Chair Dave Potter CRCC Chair Helene Schneider CRCC, LOSSAN Member Fred Strong LOSSAN Chair Jerry Rindone LOSSAN Vice Chair Staff Agency Position(s) Stacey Mortensen SJJPA Staff Dan Leavitt SJJPA Staff Angelo Lamas SJJPA Staff David Kutrosky CCJPA Staff Pete Rodgers CRCC, LOSSAN Staff, SLOCOG Staff Scott Spaulding CRCC, LOSSAN SBCAG Staff Todd Muck TAMC Staff Christina Watson TAMC Staff Linda Culp LOSSAN Staff

30 Los Angeles – San Diego – San Luis Obispo (LOSSAN) Rail Corridor Agency JOINT POWERS BOARD

August 23, 2013 AGENDA ITEM NO.: 10

Action Requested: INFORMATION

UPDATE ON LOSSAN CORRIDOR CAPITAL PROJECTS File Number 3400600

Introduction

Approximately two-thirds of the 351-mile LOSSAN corridor is currently a single track. As a result, the LOSSAN Corridorwide Strategic Implementation Plan identified an extensive capital improvement program in excess of $4 billion in additional capacity, station improvements, signal and communications improvements, and other capital projects.

The corridor’s owners and developers have a number of projects currently in varying degrees of development, from planning to final design to construction (Attachment 1). Projects are currently under construction in San Diego, Orange, and Los Angeles Counties, with additional projects in preliminary engineering or final design along other segments of the corridor. Attachment 1 provides the status of corridor capital projects. Projects currently in construction are highlighted below.

San Diego County

Sorrento to Miramar Phase 1: This project constructs 1.1 miles of double track just south of the Sorrento Valley COASTER station in the City of San Diego, which will benefit COASTER and Pacific Surfliner passenger service and Burlington Northern Sante Fe (BNSF) freight service. The $42 million project is scheduled to be open to the public in 2013 and is funded by a combination of state and local transportation dollars.

Santa Margarita River Bridge: This project constructs 0.8 miles of double track and replaces an aging single track bridge with a double track structure on Camp Pendleton. The $44 million project is approximately 80 percent complete, with an open for service date of 2014.

Tecolote Washington Crossovers: This project constructs crossovers at Tecolote and Washington Streets, which are north and south of the respectively, in the City of San Diego. The project is scheduled for completion in late 2013 and will increase the operational flexibility of the corridor.

Orange County

Sand Canyon Grade Separation: The Sand Canyon Avenue grade separation project is located in the City of Irvine. The $56 million project will lower Sand Canyon Avenue under the railroad tracks to provide a new, grade-separated crossing. A railroad bridge for two existing railroad tracks and a

31

future third track, as well as a bicycle path, are being constructed. Construction is underway and expected to be complete by mid-2014.

Laguna Niguel/Mission Viejo Parking Expansion: This $4.4 million project will add a new surface- level parking lot and landscaping at the Laguna Niguel/Mission Viejo Metrolink station. This project will increase the parking count at the station by 176 spaces for a total parking count of 460 spaces. Construction of the expanded parking lot began April 2013 and is expected to be complete in October 2013.

Anaheim Regional Transportation Intermodal Center (ARTIC): ARTIC is a multimodal transportation center in the City of Anaheim that will facilitate convenient travel and connections via train, intercity bus, taxi, car, and local transit, and also accommodate planned high-speed rail service. The $190 million ARTIC project will relocate the existing Metrolink/Amtrak station from its current location at Angel Stadium to the ARTIC facility across from the Honda Center. The 16-acre site also will feature supporting retail, restaurants, and civic space and passenger services within the building. The City of Anaheim is leading the ARTIC project development. Construction began in September 2012 and is anticipated to be completed in late 2014.

Los Angeles County

Los Angeles to Fullerton Triple Track: A key bottleneck in the corridor is the section of double track between Fullerton and Los Angeles, heavily used by passenger trains and BNSF freight trains. Caltrans has completed approximately 35 percent of Segment 7 of 8 segments of triple track, which also includes two grade separation projects. These projects total $267 million and are funded by state and federal transportation sources.

Attachment: 1. Status of LOSSAN Corridorwide Capital Projects

Key Staff Contact: Linda Culp, (619) 699-6957, [email protected]

32 Attachment 1 STATUS OF LOSSAN CORRIDORWIDE CAPITAL PROJECTS

Level of Open to Total Cost Current Phase Project Funding Public Description Estimate ($M) [2] [1] (Estimate)

SAN DIEGO COUNTY

CP Songs to CP "Trestles" Double Track $38 N P tbd approximate 1 mile of double track on Camp Pendleton

San Onofre to Pulgas Double Track (Phase 1) $38 F FD 2016 4.2 miles of double track on Camp Pendleton

San Onofre to Pulgas Double Track (Phase 2) $28 P FD tbd 1.6 miles of double track on Camp Pendleton

0.8 miles of double track and replacement of single track bridge Santa Margarita River Bridge Replacement $44 F C 2014 with double track structure .6 miles of double track and lagoon bridge replacement in City Eastbrook to Shell Double Track $59 P PE/ENV 2011‐2020 of Oceanside

Oceanside Transit Center Parking $23 N P 2021‐2030 parking structure

Oceanside Through Track $20 F FD 2016 add third station track to relieve train congestion

Carlsbad Village COASTER Station Parking $19 N P 2021‐2030 parking structure

1.0 mile of double track and lagoon bridge replacement in City Carlsbad Village Double Track $46 P PE/ENV 2011‐2020 of Carlsbad

Carlsbad Poinsettia COASTER Station Parking $21 N P 2021‐2030 parking structure

construct pedestrian undercrossing, inter‐track fence in order Poinsettia Station Improvements $13 F FD 2014 to eliminate thru‐train "hold out" rule in City of Carlsbad

first of four planned pedestrian undercrossings in City of Encinitas Pedestrian Grade Separation (Santa Fe Drive) $6 F Complete Feb‐13 Encinitas construct remaining 3 pedestrian undercrossings in City of Encinitas Grade‐Separated Pedestrian Crossings $18 P PE/ENV 2011‐2020 Encinitas 2.7 miles of double track and lagoon bridge replacement in City CP Ponto to CP Moonlight DT $49 P PE/ENV 2021‐2030 of Carlsbad

CP Moonlight to CP Swami DT $20 N P 2021‐2030 .8 miles of double track in City of Encinitas

Leucadia Boulevard Grade Separation $150 N P 2041‐2050 grade Separation in City of Encinitas

1.5 miles of double track and lagoon bridge replacement in City San Elijo (Cardiff to Craven) Double Track $77 F FD 2016 of Encinitas

33 STATUS OF LOSSAN CORRIDORWIDE CAPITAL PROJECTS

Level of Open to Total Cost Current Phase Project Funding Public Description Estimate ($M) [2] [1] (Estimate)

Solana Beach Station Parking $25 N P 2011‐2020 parking structure

1.1 miles of double track and lagoon bridge replacement in City San Dieguito Double Track, Bridge Replacement, and $110 P PE/ENV 2021‐2030 of Del Mar; construction of permanent special events platform Fairgrounds Special Events Platform at Fairgrounds replace 4 aging timber trestle lagoon bridges for state of good Los Penasquitos Bridge Replacements $22 P FD 2015 repair in City of San Diego tunnel and approximately 4 miles of double track in City of Del Mar Tunnel $1,200 N P 2041‐2050 Del Mar 1.7 miles of double track and lagoon bridge replacements in Los Penasquitos Lagoon Double Track $80 N P 2041‐2050 City of San Diego 1.1 miles of double track and lagoon bridge replacement in City Sorrento Valley Double Track $34 F FD 2015 of San Diego 1.4 miles of double track, signals, and new bridge in City of Sorrento to Miramar Double Track (Phase 1) $43 F C 2014 San Diego 1.8 miles of double track, curve realignments in City of Sorrento to Miramar Double Track (Phase 2) $98 P FD 2021‐2030 San Diego 2.6 miles of double track, curve realignment in City of Elvira to Morena Double Track $91 P PE/ENV 2017 San Diego 0.9 miles of double track and river bridge replacement in City of CP Tecolote to CP Friar $73 P PE/ENV 2021‐2030 San Diego

Tecolote and Washington Crossovers $11 F C 2013 crossovers in City of San Diego to provide operational flexibility

track improvements and new station adjacent to Airport Intermodal Transportation Center $165 P P tbd San Diego International Airport

Santa Fe Station Parking $8 N P 2021‐2030 additional station parking

implementation of a safety system allowing the precise Positive Train Control (San Onofre to San Diego) $88 F C 2015 monitoring of train movement and location, collission prevention mechanism ORANGE COUNTY

Laguna Niguel to San Juan Capistrano Passing Siding $30 F PE/ENV 2016 1.7 mile siding extension in City of Laguna Niguel

Anaheim Canyon Station Double Track $20 F P 2017 additional track at Metrolink Station

grade separation for freight, commuter, intercity and high‐ State College Grade Separation $92 P PE tbd speed services

34 STATUS OF LOSSAN CORRIDORWIDE CAPITAL PROJECTS

Level of Open to Total Cost Current Phase Project Funding Public Description Estimate ($M) [2] [1] (Estimate)

grade separation for freight, commuter, intercity and high‐ Ball Road Grade Separation $71 P PE/ENV tbd speed services grade separation for freight, commuter, intercity and high‐ Orangethorpe Grade Separation $99 N P tbd speed services

Sand Canyon Grade Separation $56 F C 2014 grade separation for freight, commuter and intercity rail

17th Street Grade Separation ‐ Santa Ana $89 P PE/ENV tbd grade separation for freight, commuter and intercity rail

Grand Avenue Grade Separation ‐ Santa Ana $72 N P tbd grade separation for freight, commuter and intercity rail

Santa Ana Boulevard Grade Separation ‐ Santa Ana $74 N P tbd grade separation for freight, commuter and intercity rail

Main Street Grade Separation ‐ Orange $69 N P tbd grade separation for freight, commuter and intercity rail Laguna Niguel/Mission Viejo (LNMV) Station Parking Lot $4 F C 2013 (176 spaces) addition of surface parking lot with 176 spaces

LNMV ADA Ramp Improvements $8 F FD 2015 design and construction of ADA compliant ramps at station addition of new elevators on boths ends of existing pedestrian Fullerton Transportation Center Elevator Upgrades $1 F FD 2014 overpass Anaheim Regional Transportation Center ‐ construction is Anaheim Regional Transportation Intermodal Center $190 F C 2014 20 percent complete

Orange Station Parking Structure $23 F FD 2015 new parking structure with 500 spaces

Serra Siding Extension $15 N P tbd siding extension in south Orange County

implementation of a safety system allowing the precise Positive Train Control (Moorpark to San Onofre) $205 F C 2015 monitoring of train movement and location, collission prevention mechanism LOS ANGELES COUNTY approximately 15 miles of third main track in 8 segments on the BNSF Railway between LA and Fullerton. There are 6 Commerce to Fullerton, Triple Track $160 P C 2014 related grade separations planned between Commerce and Fullerton, two of which are scheduled to be built concurrently with this project

35 STATUS OF LOSSAN CORRIDORWIDE CAPITAL PROJECTS

Level of Open to Total Cost Current Phase Project Funding Public Description Estimate ($M) [2] [1] (Estimate)

grades separates Valley View Avenue and BNSF mainline MP Valley View Avenue Grade Separation $64 F C 2014 158.41, located in the City of Santa Fe Springs

grade separates Passons Blvd and BNSF mainline MP 151.4 in Passons Blvd Grade Separation $43 F C 2014 the City of Pico Rivera track and signal improvements to facilitate thru train Union Station Run‐Through Tracks $350 P PE/ENV 2017 movements at Los Angeles Union Station

CP Raymer to CP Bernson Second Main Track $88 P PE/ENV 2017 7 miles of second main track in City of Northridge

Van Nuys North Platform $35 P FD 2017 second platform at Van Nuys Station to eliminate chokepoint

realignment and hi‐speed switches at junction used by Burbank Junction Track Realignment $9 Metrolink, Surfliner, and Amtrak long‐distance trains communications network installation microwave, fiber, Sealed Corridor $3 F C 2013 ethernet

Doran Street Grade Crossing Improvement $35 P PE/ENV tdb grade separation to improve safety at intersection

VENTURA COUNTY

CP Las Posas to MP 423 Second Main Track $57 N P tbd 4 miles of second track in City of Moorpark

additional continuous second track in conjunction with Oxnard to Camarillo Second Main Track $15 N P tbd Leesdale Siding

Leesdale Siding Extension $15 N P tbd siding extension

Seacliff Siding $28 P PE/ENV 2018 extend siding to 10,000 feet

Santa Susana Siding Extension $40 N P tbd siding extension, second platform at Simi Valley Station

station platform and track improvements to facilitate Ventura East Ventura Station Improvements $5 N P tbd to Santa Barbara commuter service

Oxnard Station North Platform $20 N P tbd second platform at Oxnard Station

Montalvo Wye Second Track $55 N P tbd additional track capacity

design grade crossing improvements that meet Metrolink's Ventura County Sealed Corridor $8k FFD Sealed Corridor engineering standard and/or installing new fencing at key locations

36 STATUS OF LOSSAN CORRIDORWIDE CAPITAL PROJECTS

Level of Open to Total Cost Current Phase Project Funding Public Description Estimate ($M) [2] [1] (Estimate)

SANTA BARBARA COUNTY reconstruct siding destroyed by storm damage in the 1990s; Ortega Siding $20 P PE/ENV tbd will increase passenger and freight capacity on a 17‐mile stretch of single track

Goleta Siding Extension $10 N P tbd siding extension, signal improvements, tie replacement

installation of Centralized Traffic Control in key areas of the CTC Installation (Islands only) $30 N P tbd corridor

Capitan Siding Extension $15 N P tbd siding extension, signal improvements, tie replacement

Devon Siding Extension $15 N P tbd siding extension, signal improvements, tie replacement

siding extension and double track approximately 30 miles south Waldorf Siding Double Track $25 N P tbd of San Luis Obispo, signal improvements SAN LUIS OBISPO COUNTY connect islands of CTC for continuous system from San Luis CTC Installation $30 N P tbd Obispo to San Diego

Grover Beach Second Platform and Track $75 N P tbd platform and track improvements at Grover Beach Station

TOTAL PROJECTS $5,040 [1]: F=Full Funding; P=Partial Funding; N=No Funding [2]: P=Planning; PE/Env=Preliminary Engineering/Environmental Documentation; FD=Final Design; C=Construction Projects in construction or closeout phases are highlighted.

37