Stage 1 and 2 Archaeological Assessments Shantz Station Pit

Total Page:16

File Type:pdf, Size:1020Kb

Stage 1 and 2 Archaeological Assessments Shantz Station Pit Stage 1 and 2 Archaeological Assessments Shantz Station Pit 1175, 1195 Foerster Road and 1472 Village View Road Township of Woolwich Regional Municipality of Waterloo Part of Lots 81 and 82, German Company Tract Geographic Township of Waterloo Waterloo County, Ontario Prepared for Capital Paving Inc. P.O. Box 815 Guelph, ON N1H 6L8 Tel: (519) 822-4511 Licensed under P.J. Racher MTCS Licence #P007 PIF #P007-0892-2018 ARA File #2018-0098 and #2018-0174 10/05/2019 Original Report Stage 1 and 2 Archaeological Assessments Shantz Station Pit, Township of Woolwich, Regional Municipality of Waterloo i EXECUTIVE SUMMARY Under a contract awarded in March 2018, Archaeological Research Associates Ltd. carried out Stage 1 and 2 archaeological assessments of lands proposed for aggregate extraction and associated infrastructure under the Shantz Station Pit project at 1175, 1195 Foerster Road and 1472 Village View Road in the Township of Woolwich, Regional Municipality of Waterloo, Ontario. The assessments were completed as part of a permit application under the Aggregate Resources Act, R.S.O. 1990, c. A.8, as required by Policy No. 2.01.08 of the Aggregate Resources Policies and Procedures Manual (MNRF 2018). This report documents the background research and fieldwork involved in the assessments, and presents conclusions and recommendations pertaining to archaeological concerns within the assessed lands. The Stage 1 and 2 assessments were conducted in May 2018 under Project Information Form #P007-0892-2018. The investigation encompassed the majority of the licensed boundary, as well as additional adjacent lands that were previously considered for the project. Due to deteriorating field conditions and poor weather, three areas within the licensed boundary were not assessed during the 2018 season and represent outstanding archaeological concerns. Legal permission to enter and conduct all necessary fieldwork activities within the assessed lands was granted by the property owner. At the time of assessment, the study area consisted of agricultural fields, woodlots, an extant farmstead complete with residence, outbuildings and gravel driveway, grassed laneways and the Hopewell Creek riparian zone. The Stage 1 assessment determined that the study area comprised a mixture of areas of archaeological potential and areas of no archaeological potential. The Stage 2 assessment of the identified areas of archaeological potential resulted in the discovery of 11 locations of archaeological materials: Site 1 (AjHc-39), Site 2 (AjHc-40), Site 5 (AjHc-41), Site 7, Site 10, Site 13, Site 14, Site 15, Site 17 and Site 18. These sites can be summarized as follows: • Site 1 (AjHc-39) – a 160 x 101 m scatter of Euro-Canadian artifacts dating from the mid- 1800s to the early 1900s located immediately adjacent to the northern portion of the extant farming complex in the western half of the licensed boundary; • Site 2 (AjHc-40) – a 140 x 117 m scatter of Euro-Canadian artifacts dating from ca. 1830– late 1800s with a small Indigenous component of unspecified Pre-Contact date located east of the extant farming complex and gravel driveway on a naturally elevated area; • Site 5 (AjHc-41) – a 55 x 32 m scatter of Euro-Canadian artifacts dating from the mid- 1800s to the early 1900s located near the eastern edge of the licensed boundary and northwest of the neighboring property; • Site 7 – an isolated Indigenous artifact of unspecified Pre-Contact date located within the northwestern portion of the licensed boundary and south of a deciduous woodlot • Site 10 – an isolated Indigenous artifact of unspecified Pre-Contact date located within the northwestern portion of the licensed boundary and south of a deciduous woodlot; • Site 13 – a 17 x 1 m Indigenous scatter of unspecified Pre-Contact date located within the southwestern portion of the licensed boundary north of Foerster Road and west of the gravel driveway; • Site 14 – an isolated Indigenous artifact of unspecified Pre-Contact date located near the western edge of the licensed boundary and west of the unassessed farming complex; May 2019 Archaeological Research Associates Ltd. PIF #P007-0892-2018 ARA File #2018-0098 and #2018-0174 Stage 1 and 2 Archaeological Assessments Shantz Station Pit, Township of Woolwich, Regional Municipality of Waterloo ii • Site 15 – an isolated Indigenous artifact of unspecified Pre-Contact date located adjacent to the western edge of the licensed boundary and golf course; • Site 17 – a 33 x 16 m scatter of Euro-Canadian artifacts dating from the mid- to late 1800s with a small Indigenous component of unspecified Pre-Contact date located in the northern portion of the licensed boundary, west of Hopewell Creek and bordering the west edge of a neighboring property; • Site 18 – an isolated Indigenous artifact of unspecified Pre-Contact date located beyond the licensed boundary within the northeastern corner of the study area and east of Hopewell Creek; and • Site 19 – an isolated Euro-Canadian glass fragment of unspecific date located near the eastern edge of the licensed boundary and northwest of the neighboring property. Sites 1, 2 and 5 were found to be of further cultural heritage value or interest, whereas Sites 7, 10, 13, 14, 15 17, 18 and 19 were found to be of no further cultural heritage value or interest. Archaeological Research Associates Ltd. Recommends that Site 1 (AjHc-39), Site 2 (AjHc-40) and Site 5 (AjHc-41) be subject to Stage 3 site-specific assessments in accordance with the requirements set out in Section 3.2, Section 3.2.2 and Section 3.2.3 of the Standards and Guidelines for Consultant Archaeologists (MTC 2011:47, 50–53). Controlled Surface Pickups were conducted at each site location as part of the subject assessment and are not required in advance of test unit excavation. Detailed documentary research must also be carried out as per Section 3.1 of the Standards and Guidelines for Consultant Archaeologists (MTC 2011:46–47). Sites 7, 10, 13, 14, 15, 17, 18, 19 and the remainder of the assessed portion of the licensed boundary do not require further archaeological assessment. The outstanding areas within the licensed boundary still require Stage 1 and 2 assessments. These include a rectilinear parcel surrounding the extant farmstead, a square parcel adjacent to Foerster Road, and two irregularly-shaped parcels located along the northwestern and eastern limits of the licensed boundary, respectively. Given that there are no further concerns for impacts to archaeological sites within the majority of the project lands, Archaeological Research Associates Ltd. also makes a recommendation for partial clearance. A partial clearance is intended to accommodate the need for a development to be able to proceed while outstanding concerns for alterations to archaeological sites continue to be addressed. At the time of writing, Sites 1, 2 and 5 are the only sites of further archaeological concern located within the project lands. No ground alterations or development of any kind may occur within the designated protected areas until the required investigations are completed, recommendations that the sites have no further cultural heritage value or interest are made, and the associated reports are entered into the Ontario Public Register of Archaeological Reports. May 2019 Archaeological Research Associates Ltd. PIF #P007-0892-2018 ARA File #2018-0098 and #2018-0174 Stage 1 and 2 Archaeological Assessments Shantz Station Pit, Township of Woolwich, Regional Municipality of Waterloo iii TABLE OF CONTENTS EXECUTIVE SUMMARY I GLOSSARY OF ABBREVIATIONS VI PERSONNEL VII 1.0 PROJECT CONTEXT 1 Development Context 1 Historical Context 2 1.2.1 Settlement History 2 1.2.1.1 Pre-Contact 2 1.2.1.2 Post-Contact 3 1.2.2 Past and Present Land Use 4 Archaeological Context 5 1.3.1 Condition of the Property 6 1.3.2 Registered or Known Archaeological Sites 7 1.3.3 Previous Archaeological Work 7 2.0 STAGE 1 BACKGROUND STUDY 8 Background 8 Field Methods (Property Inspection) 8 Analysis and Conclusions 9 3.0 STAGE 2 PROPERTY ASSESSMENT 10 Field Methods 10 Site 1 (AjHc-39) 14 3.2.1 Record of Finds 14 3.2.2 Analysis and Conclusions 17 Site 2 (AjHc-40) 18 3.3.1 Record of Finds 18 3.3.2 Analysis and Conclusions 22 Site 5 (AjHc-41) 23 3.4.1 Record of Finds 23 3.4.2 Analysis and Conclusions 25 Site 7 26 3.5.1 Record of Finds 26 3.5.2 Analysis and Conclusions 26 Site 10 26 3.6.1 Record of Finds 26 3.6.2 Analysis and Conclusions 27 Site 13 27 May 2019 Archaeological Research Associates Ltd. PIF #P007-0892-2018 ARA File #2018-0098 and #2018-0174 Stage 1 and 2 Archaeological Assessments Shantz Station Pit, Township of Woolwich, Regional Municipality of Waterloo iv 3.7.1 Record of Finds 27 3.7.2 Analysis and Conclusions 27 Site 14 28 3.8.1 Record of Finds 28 3.8.2 Analysis and Conclusions 28 Site 15 28 3.9.1 Record of Finds 28 3.9.2 Analysis and Conclusions 29 Site 17 29 3.10.1 Record of Finds 29 3.10.2 Analysis and Conclusions 31 Site 18 32 3.11.1 Record of Finds 32 3.11.2 Analysis and Conclusions 32 Site 19 32 3.12.1 Record of Finds 32 3.12.2 Analysis and Conclusions 33 4.0 RECOMMENDATIONS 34 5.0 ADVICE ON COMPLIANCE WITH LEGISLATION 36 6.0 IMAGES 37 7.0 MAPS 49 8.0 BIBLIOGRAPHY AND SOURCES 60 LIST OF IMAGES Image 1: Disturbed Lands 37 Image 2: Disturbed Lands 37 Image 3: Sloped Lands 37 Image 4: Sloped Lands 37 Image 5: Permanently Wet 38 Image 6: Permanently Wet 38 Image 7: Permanently Wet 38 Image 8: Permanently Wet 38 Image 9: Pedestrian Survey 38 Image 10: Pedestrian Survey 38 Image 11: Pedestrian Survey 39 Image 12: Pedestrian Survey 39 Image 13: Pedestrian Survey 39 Image 14: Pedestrian Survey 39 May 2019 Archaeological Research Associates Ltd.
Recommended publications
  • Regional Express Rail Update
    Clause 5 in Report No. 10 of Committee of the Whole was adopted by the Council of The Regional Municipality of York at its meeting held on June 23, 2016 with the following additional recommendation: 3. Receipt of the memorandum from Daniel Kostopoulos, Commissioner of Transportation Services, dated June 22, 2016. 5 Regional Express Rail Update Committee of the Whole recommends adoption of the following recommendations contained in the report dated June 1, 2016 from the Commissioner of Transportation Services: 1. Metrolinx be requested to mitigate the impacts of Regional Express Rail service by addressing the gap between their Initial Business Case for Regional Express Rail and York Region’s needs for grade separations, additional GO stations and parking charges. 2. The Regional Clerk circulate this report to Metrolinx, Ontario Ministry of Transportation and Clerks of the local municipalities. Report dated June 1, 2016 from the Commissioner of Transportation Services now follows: 1. Recommendations It is recommended that: 1. Metrolinx be requested to mitigate the impacts of Regional Express Rail service by addressing the gap between their Initial Business Case for Regional Express Rail and York Region’s needs for grade separations, additional GO stations and parking charges. 2. The Regional Clerk circulate this report to Metrolinx, Ontario Ministry of Transportation and Clerks of the local municipalities. Committee of the Whole 1 June 9, 2016 Regional Express Rail Update 2. Purpose This report provides an update to Council on the Provincial Regional Express Rail (RER) Service Plan and associated staff activities as York Region’s response to the RER Service Plan to be implemented by the Province over the next 10 years.
    [Show full text]
  • (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016
    Bolton Residential Expansion Study (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016 The purpose of this memorandum is to review the professional literature pertaining to the potential develop- ment of a Transit-Oriented Development (TOD) in the Bolton Residential Expansion Study area, in response to the Region of Peel’s recent release of the Discussion Paper. The Discussion Paper includes the establishment of evaluation themes and criteria, which are based on provincial and regional polices, stakeholder and public comments. It should be noted that while the Discussion Paper and the Region’s development of criteria does not specifi- cally advocate for TOD, it is the intent of this memorandum to illustrate that TOD-centric planning will not only adequately address such criteria, but will also complement and enhance the Region’s planning principles, key points and/or themes found in stakeholder and public comments. In the following are research findings related to TOD generally, and specifically, theMetrolinx Mobility Hub Guidelines For The Greater Toronto and Hamilton Area (September 2011) objectives. Additionally, following a review and assessment of the “Response to Comments Submitted on the Bolton Residential Expansion Study ROPA” submission prepared by SGL Planning & Design Inc. (March 15, 2016), this memorandum evaluates some of the key arguments and assumptions made in this submission relative to the TOD research findings. Planning for Transit-Oriented Developments TOD policy and programs can result in catalytic development that creates walkable, livable neighborhoods around transit providing economic, livability and equitable benefits. The body of research on TODs in the United States has shown that TODs are more likely to succeed when project planning takes place in conjunction with transit system expansion.
    [Show full text]
  • Tel: 905-795-0639 Friday, Octoberjune 2, 201730, 2020 Volvol 26, 23, No
    www.WeeklyVoice.com FRONT PAGE Friday, August 21, 2020 | A-1 Canada’s Leading South Asian Newspaper - Tel: 905-795-0639 Friday, OctoberJune 2, 201730, 2020 www.WeeklyVoice.com VolVol 26, 23, No. No. 44 22 PM: 40025701 A-2 | Friday, October 30, 2020 www.WeeklyVoice.com www.WeeklyVoice.com FRONT PAGE Friday, August 21, 2020 | A-3 Canada’s Leading South Asian Newspaper - Tel: 905-795-0639 Friday, OctoberJune 2, 201730, 2020 www.WeeklyVoice.com VolVol 26, 23, No. No. 44 22 PM: 40025701 Action On Electronic Logging On Trucks, page 6 Plastic Capture Technology For The Great Lakes, page 8 Osler Getting Funds To Boost Bed Capacity, page 13 Ottawa Will Boost Recovery Incentives Measures Will Be Expensive, But We Need A Macro-Economic Approach Says Freeland At Forum OTTAWA: The Canadian Gov- will only be able to recover fully contact tracers. “And last spring, ernment is doing everything it once we have defeated the virus.” when they were needed, the takes to protect Canadians’ health Prime Minister Justin Trudeau women and men of the Canadian and jobs and to put COVID-19 hailed the speech and tweeted: Armed Forces went in to care for, behind us as quickly as we can, “No one should have to face this and protect, our elders.” Deputy Prime Minister and Fi- pandemic alone - not workers, Freeland was the keynote nance Minister Chrystia Freeland not families, not business owners. speaker on on the last day of said on Wednesday. That’s why we’ve stepped up to the three-day virtual conference, In a speech to the Toronto help.
    [Show full text]
  • Experience in Project Management and Engineering Design. Prior To
    Entuitive | Simplifying the Complex Louis Tilatti M.Eng., MBA, P.Eng. SENIOR ASSOCIATE | TORONTO Louis is a Senior Associate at Entuitive, with over 30 years of experience in project management and engineering design. Prior to joining Entuitive, Louis managed projects in the public and private sectors, and held various roles including manager of transit infrastructure, director of transit business development, project manager, project engineer, and structural engineer for the analysis, design and evaluation of a multitude of assignments including transit, infrastructure, commercial, automotive, industrial, power, manufacturing, warehousing, bridges, sports and recreational projects. Education Over the last 20 years, Louis has been primarily engaged with transit Master of Business Administration, and rail projects in the greater Toronto area including the planning, University of Toronto design and contract administration of GO Transit stations, TTC Master of Engineering, University of subway stations, transit station accessibility and redevelopment, Toronto station parking expansions, station platform modifications, layover Bachelor of Applied Science, University of Toronto facilities, yard expansions, bus and rail maintenance facilities, electrification, and rail grade separations. Memberships Professional Engineers Ontario Designated Consultant, Ontario “ I GENUINELY ENJOY FOSTERING STRONG COLLABORATIVE RELATIONSHIPS WITHIN PROJECT TEAMS WITH OPEN COMMUNICATION, TRUST, AND RESPECT WHICH PLAYS A CRITICAL ROLE IN SUCCESSFUL PROJECTS ”
    [Show full text]
  • Steeles - Redlea Insert: Context Image, Regeneration Area Rendering Study
    Public Meeting Steeles - Redlea Insert: Context Image, Regeneration Area Rendering Study November 16, 2015 Steeles-Redlea Regeneration Area Study Fast Facts: • One of seven Regeneration Areas resulting from adoption of OPA 231. • OPA 231 partially approved & Regeneration Areas designation & related SASP 395 are in force & effect. • Study commenced Spring 2014. • Concluded Summer 2015. 2 Study Area • Regeneration Area: 10 ha (25 acres) • Bounded by Steeles Avenue East, Stouffville GO Train Corridor, Redlea Avenue and its proposed extension south to Passmore Avenue & north limit of properties on the north side of 3 5 Passmore Avenue. 1 1. Milliken site: 6.5 acres 4 2. Anchor Shoring: 6 acres 2 3. 4665 Steeles E (GF1): 4 acres 4. 3447 Kennedy rear (GF2): 3.7 acres 5. Splendid China Mall: 2 acres • Stouffville GO line boundary between Wards 39 & 41. 3 Study Purpose • Establish a Development Framework for area. • Recommend land use designations for all lands in Regeneration Area as it is an interim land use designation only. • Establish Urban Design Guidelines to guide new development. • Community Services & Facilities Strategy should new residents be introduced in the area. 4 What are some of the features that make this Regeneration Area Unique? • Proximity to the City of Markham and development approvals & proposals north of Steeles Avenue East. • Milliken GO Station & Stouffville GO line & planned service & station improvements. • Planned Steeles Avenue grade separation. • Range of employment uses both within & adjacent to the Regeneration Area. 5 Key Study Considerations • Land Use Compatibility: between possible future sensitive uses (namely residential) & nearby industrial uses as well as GO rail corridor to protect from adverse effects (e.g.
    [Show full text]
  • Schedule 2 the Designation of Planned but Unbuilt Roads
    SCHEDULE 2 THE DESIGNATION OF PLANNED BUT UNBUILT ROADS Note: Additional planned but unbuilt roads are designated in Secondary Plans or contained within approved development agreements. STREET NAME FROM TO New Link Intersection of North Queen St and The West Mall (north of the CP rail Manstor Rd corridor) New Link The Queensway (opposite first set of Future westerly North Queen St traffic signals east of The West Mall) Extension New Link The Queensway, west of The West Mall The West Mall, south of The Queensway New Link Intersection of North Queen St and The West Mall Manstor Rd New Link Intersection of Norris Glen Rd and Dundas St W (opposite Highway 427 Paxman Rd southbound off-ramp at Dundas St W) Aukland Rd Bloor St West Burnhamthorpe Rd Legion Rd Legion Rd terminus south of CN rail F. G. Gardiner Expwy eastbound off- corridor (Lake Shore GO line) ramp at Park Lawn Rd F. G. Gardiner Expwy eastbound off- Park Lawn Rd Legion Rd ramp at Park Lawn Rd - addition of a westbound lane Queens Plate Drive (completion of Queens Plate Dr (western leg) at Vice Regent Blvd ring road around intersection of Hwy Rexdale Blvd 27 and Rexdale Blvd Marine Parade Dr Easterly extension of Marine Parade Lake Shore Blvd W Dr Finch Ave E Finch Ave E Morningside Ave/CPR Morningside Ave1 Finch Ave E Steeles Ave E Bridgend St Port Union Rd Lawrence Ave Executive Crt Executive Crt (easterly) Markham Rd & Hwy 401 WB Ramp Bushby Dr Grangeway Ave Bellamy Rd N Bellamy Rd N Progress Ave Milner Ave Nugget Ave McCowan Rd Sheppard Ave Midwest Rd Midwest Rd (northerly)
    [Show full text]
  • Shantz Aaron.Pdf (7.260Mb)
    Understanding Factors Associated With Commuter Rail Ridership A Demand Elasticity Study of the GO Transit Rail Network by Aaron Shantz A thesis presented to the University of Waterloo in fulfillment of the thesis requirement for the degree of Master of Environmental Studies in Planning Waterloo, Ontario, Canada, 2021 © Aaron Shantz 2021 Author’s Declaration I hereby declare that I am the sole author of this thesis. This is a true copy of the thesis, including any required final revisions, as accepted by my examiners. I understand that this thesis may be made electronically available to the public. ii Abstract Mode share in major North American cities is currently dominated by private automobile use. Planners have theorized that transitioning commuter rail systems to regional rail networks is a viable method to increase ridership and stabilize mode share. This process is currently underway in Ontario, Canada, as the amount and frequency of service is being increased throughout the GO Transit rail network via the GO Expansion Program. However, previous studies have shown that transit demand does not solely respond to service quantity expansions. Variables related to the built environment, regional economy, network characteristics, and socioeconomic status of the customer base can influence transit demand to varying degrees. Further, the literature states that the travel behavior of commuter rail users is unique, as access mode, distance, socioeconomic status, and the utility derived from varying trip types can differ compared to local transit users. These findings suggest that supplementary policies might be needed to reduce automobile reliance and stimulate demand for regional transit. Many transit researchers have conducted demand elasticity studies to identify what factors are significantly associated with transit ridership.
    [Show full text]
  • Stouffville Construction Updates
    STOUFFVILLE CONSTRUCTION UPDATES In the last few months, we’ve made a number of changes at our stations including updating amenities, enhancing accessibility, and making it easier to access GO services. GO Expansion will increase the frequency and number of GO trains across our network, reduce congestion and connect a growing region with fast, reliable transit options to get you where you need to go. Learn about more service and improvements planned for your corridor at metrolinx.com/stouffville-go-expansion. What's Changed Kennedy GO Improvements Made: • A new GO platform at Kennedy station is now open. Current Customer Impacts: • The new platform is shorter in length than the current platform and door restrictions will be in place for trains that have more than six coaches. • You can still access the new platform from the east side of the tracks by using the pedestrian tunnel to cross over to Kennedy TTC Station. • If you need an elevator, you will not be able to access the new platform through this route. Please access the platform through the west side of the tracks from Kennedy TTC Station or the adjacent TTC parking lot. • It might take a little longer than usual so give yourself extra time to get to your train during construction and follow signs for directions. Completion Date: August 2020 For more information on Kennedy GO improvements click here What's Changing Mount Joy GO Construction Map Work Completed/In Progress: • New yellow safety tiling on the train platforms • New digital signage on train platforms • New digital signage on bus platforms Current Customer Impacts: • Starting September 21, the north half of the platform will be closed to install tactile yellow safety tiles and digital signs.
    [Show full text]
  • Stouffville Stations Rer Project – Steeles Avenue East Underpass Project Update – Information As of March 2019
    TRANSFORMING TRANSIT IN YOUR AREA STOUFFVILLE STATIONS RER PROJECT – STEELES AVENUE EAST UNDERPASS PROJECT UPDATE – INFORMATION AS OF MARCH 2019 Metrolinx, an agency of the Province of Ontario, is working to transform the way the region moves by building a seamless, convenient and integrated transit network across the Greater Toronto and Hamilton Area (GTHA). Over the next 10 years, Metrolinx is transforming the existing GO rail system to deliver a whole new rapid transit experience to your community. With more frequent train service you’ll have more options to get you where you need to go. PROJECT BENEFITS Once the Project is complete in 2021, you’ll have: • A new grade separated pedestrian bridge and underpass at the Steeles Avenue East intersection between Kennedy Road and Midland Avenue. Vehicles will be able to pass under the railway, without having to stop or wait for trains. • The new pedestrian bridge across Steeles Avenue East will connect to both platforms at Milliken GO Station. • A new second track and platform at Milliken GO. • A renovated existing platform at Milliken GO. • Two new pedestrian tunnels with elevators. • Canopies and integrated shelters on the platforms to protect GO customers from the elements. • A canopy-covered walkway to Steeles Avenue. CONSTRUCTION UPDATE Work is well underway to make major improvements to the existing Stouffville line, which includes infrastructure upgrades to the Agincourt GO, Milliken GO, and Unionville GO Stations and to construct a new underpass at the railway crossing Steeles Avenue East. EllisDon Transit Infrastructure (the Contractor) is undertaking the construction of the Stouffville Regional Express Rail Project on behalf of Infrastructure Ontario and Metrolinx.
    [Show full text]
  • TTC 2020-2024 Service Plan Proposals Adapted from "Attachment 2: Service Requests"
    TTC 2020-2024 Service Plan Proposals Adapted from "Attachment 2: Service Requests" Date Source Assessment Page Route Description Analysis Add the northbound 329 (Dufferin Night bus) stop at Consultations Recommended 13 29 To be added in 2020. Springhurst to local 29C Dufferin route In 2020 the TTC will review reallocation of resources to provide Consultations Recommended 37 39 Improve service to Seneca College Newnham Campus better service in the Finch corridor. Service frequency will be improved in 2020 by redeploying standard- 2019.09.24 Board Recommended 10 41 Improve bus service on Keele St. sized buses onto 41 Keele and shfting the artics to another route. Remove westbound Shermount stop (first east of Allen Consultations Recommended 17 52 To be removed in 2020. Road) Extension of 954 Lawrence East Express to Science Centre Station Consultations Recommended 18 54 Add express service due to the length of the route (Don Mills & Eglinton) is part of the plan for Line 5 network changed. The report states that the service plan includes a concept for eastern Scarborough routes including the area in question. A map Improve service to connect Lawrence and Ellesmere Consultations Recommended 19 54 of proposed changes was included in a draft version of the plan around Morningside presented during a workshop, but it does not appear in the final version. Planned for 2021 subject to approval of the service plan and Consultations Recommended 22 68 Implement express service on Warden budget. The neighbourhood is outside of the standard for access and Service to Stanley Green neighbourhood at Keele and coverage standards, and has potential ridership that would meet 2019.04.11 Board Recommended 7 96 Wilson economic standards.
    [Show full text]
  • 2021 Annual Service Plan Public Consultation Summary
    TTC 2021 Annual Service Plan Public Consultation Summary Survey Timeframe: September 25, 2020 – October 9, 2020 Total Online Survey Participants: 334 Total Mail-in Survey Hard copies Received: 5 Total Feedback Received via Email and Voicemail: 15 Overview The TTC hosted a survey between September 25, 2020 and October 9, 2020 to seek the public’s feedback on the emerging priorities and proposed service initiatives for 2021. There were several ways people could share their feedback, including via an online survey, mailing a hard copy of the survey (which could be downloaded online or mailed upon request), sending an email, and leaving a voicemail. A total of 354 people participated and provided feedback, with 334 participating through the online survey, 5 through mail-in survey hard copy, 14 through email, and 1 through voicemail. The online survey was available on the TTC’s website and was promoted through the TTC’s social media networks, City Councillors, stakeholders, people who signed up to receive updates about the service plans, and by placing posters on key transit stop areas and stations. The survey was not designed or intended to ensure a statistically significant sample. This survey was part of a broader public and stakeholder consultation process for the 2021 Annual Service Plan (ASP). Annual Service Plans identify how the TTC will serve customers in the coming year, and the 2021 ASP will be unlike any other service plan the TTC has ever prepared. It will focus on transit strategies to respond to the COVID-19 pandemic and economic recovery as well as refining the initiatives approved in 2019 by the TTC Board in the 5-Year Service Plan and 10-Year Outlook.
    [Show full text]
  • Round 2 Online Survey Summary Survey Timeframe: July 3, 2019 – July 26, 2019 Total Respondents: 1,248
    TTC 5-Year Service Plan & 10-Year Outlook Round 2 Online Survey Summary Survey Timeframe: July 3, 2019 – July 26, 2019 Total Respondents: 1,248 Overview The TTC hosted an online survey from July 3, 2019 through to July 26, 2019 to gather public feedback to help inform the TTC’s 5-Year Service Plan & 10-Year Outlook. A total of 1,248 people participated in the survey. The survey was available on the TTC’s website and was promoted through the TTC’s social media networks, City Councillors, and networks of stakeholders. It was not designed or intended to ensure a statistically significant sample. The survey was one of several public and stakeholder consultation activities conducted during round 2 of the consultation program for the TTC’s 5-Year Service Plan & 10-Year Outlook, which aims to provide a transparent blueprint for continuous service improvements on the TTC’s surface transit network (i.e. bus and streetcar) by the end of 2019. Additional consultation activities in round 2 included a city-wide stakeholder workshop and six pop-up public consultations. The survey results will be used by the TTC to inform the development of a short-list of recommended improvements to TTC surface transit. The survey featured questions related to five categories, and this summary of responses is organized under the following categories: 1. Profile of respondents 2. Improvements to surface transit stop areas 3. Improvements on surface transit corridors 4. Opportunities for integration with other transit services and other transportation modes 5. Additional suggestions and comments This summary report was prepared by the third-party consultation and engagement team from Swerhun Inc.
    [Show full text]